Permit GraphShortlistSan Francisco building permits since 2000

Block 2473, lot 019

2695 23rd Ave

City’s use
Single Family Residential
Built
1926
Stories
2
Units
1
Rooms
4 bedrooms, 3 bathrooms
Building
1,525 sq ft
Lot
2,818 sq ft
Zoning
RH1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 3, 2023Completed
final sign-off Jan 2025
2695 23rd Avrev 202211176756: show hatch walls as (n) walls for clarification only. no new walls proposed.
Details
Permit
202308033669
Status
complete
Filed
Aug 3, 2023
Permit issued
Aug 24, 2023
Final sign-off
Jan 9, 2025
Address
2695 23rd Av

rev 202211176756: show hatch walls as (n) walls for clarification only. no new walls proposed.

Open the permit page

Nov 17, 2022Completed
final sign-off Jan 2025
2695 23rd AvRockland Construction Group Increvision to 202202097686 and 202210285463. remove 1 bath @ ground fl. relocate kitchen, add 1 bath @ 2nd fl. add one bath @ 3rd fl. revised struct. framing
Details
Permit
202211176756
Status
complete
Filed
Nov 17, 2022
Permit issued
Feb 24, 2023
Final sign-off
Jan 9, 2025
Address
2695 23rd Av

revision to 202202097686 and 202210285463. remove 1 bath @ ground fl. relocate kitchen, add 1 bath @ 2nd fl. add one bath @ 3rd fl. revised struct. framing

Open the permit page

Oct 28, 2022Completed
final sign-off Jan 2025
2695 23rd Avrevision to bpa#2022002097686. replace foundation on north side, replace partial foundation on west/east side. replace slab. no excavation., revise this note to reflect 1' maximum excavation, dmj 10/28/2022;lower slab by 1 max
Details
Permit
202210285463
Status
complete
Filed
Oct 28, 2022
Permit issued
Oct 31, 2022
Final sign-off
Jan 9, 2025
Declared cost
$10,000
Address
2695 23rd Av

revision to bpa#2022002097686. replace foundation on north side, replace partial foundation on west/east side. replace slab. no excavation., revise this note to reflect 1' maximum excavation, dmj 10/28/2022;lower slab by 1 max

Open the permit page

$10,000
Oct 28, 2022Expired or cancelled
withdrawn Jan 2025
2695 23rd Avreplace foundation on northside, partial foundation on west/east sides, replace slab
Details
Permit
202210285445
Status
withdrawn
Filed
Oct 28, 2022
Address
2695 23rd Av

replace foundation on northside, partial foundation on west/east sides, replace slab

Open the permit page

Feb 9, 2022Completed
final sign-off Jan 2025
2695 23rd Avremodel ground floor to 2 bedroom, 1 family room, & 3 bath. alter interior stair. remodel kitchen & bath at 2nd fl. remodel top fl to have dormer window (shed type) per plan.
Details
Permit
202202097686
Status
complete
Filed
Feb 9, 2022
Permit issued
Apr 15, 2022
Final sign-off
Jan 9, 2025
Declared cost
$100,000
Address
2695 23rd Av

remodel ground floor to 2 bedroom, 1 family room, & 3 bath. alter interior stair. remodel kitchen & bath at 2nd fl. remodel top fl to have dormer window (shed type) per plan.

Open the permit page

$100,000
Sep 24, 2002Completed
final sign-off Oct 2002
2695 23rd Avexisting family room and bathroom and 12 x 12 sink to be legalized
Details
Permit
200209247374
Status
complete
Filed
Sep 24, 2002
Permit issued
Sep 24, 2002
Final sign-off
Oct 3, 2002
Declared cost
$5,000
Address
2695 23rd Av

existing family room and bathroom and 12 x 12 sink to be legalized

Open the permit page

$5,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Rockland Construction Group Inc
Engineers
Chuck Voong
Designers
Tommy Lee

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.