Bai Yuan Li
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Sep 2026
- Last 24 months
- 8 permits filed
79 permits since 2000: 74 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Sep 2026 | 3861 23rd St | replace back yard stair, some dryrock, handrail riser tread. less than 50%Details
replace back yard stair, some dryrock, handrail riser tread. less than 50% | $4,800 |
| Dec 12, 2025 | Completed final sign-off Mar 2026 | 1998 08th Av | remodel two bathrooms on second flr in kind (except change tubs to showers). no walls to be moved.each bathroom appropx 64 sq ft.Details
remodel two bathrooms on second flr in kind (except change tubs to showers). no walls to be moved.each bathroom appropx 64 sq ft. | $25,000 |
| Oct 20, 2025 | Completed final sign-off Dec 2025 | 2270 Filbert St | 1 bathroom remodel, no wall moving. change tub to shower.Details
1 bathroom remodel, no wall moving. change tub to shower. | $12,000 |
| Jul 1, 2025 | Completed final sign-off Oct 2025 | 1566 46th Av | replace all new windows in kind total 18 windows in front and back of house.Details
replace all new windows in kind total 18 windows in front and back of house. | $8,000 |
| Jun 18, 2025 | Completed final sign-off Oct 2025 | 1566 46th Av | remodel the kitchen and bathroom on first floor in kind. no removal of walls. no change to floor layout. no change on wall layout. no structural work.Details
remodel the kitchen and bathroom on first floor in kind. no removal of walls. no change to floor layout. no change on wall layout. no structural work. | $26,800 |
| May 30, 2025 | Completed final sign-off Aug 2025 | 694 08th Av | remodel the bathroom and laundry room on 3rd floor. no remove walls.Details
remodel the bathroom and laundry room on 3rd floor. no remove walls. | $21,000 |
| Apr 21, 2025 | Completed final sign-off Jun 2025 | 2539 35th Av | replace (7) joints in the front of the house balcony.less than 50%.Details
replace (7) joints in the front of the house balcony.less than 50%. | $5,800 |
| Feb 21, 2025 | Completed final sign-off Apr 2025 | 2446 30th Av | remodeling kitchen and bathroom on first floor. no structural work. and replace a new central heater. no removal of wallsDetails
remodeling kitchen and bathroom on first floor. no structural work. and replace a new central heater. no removal of walls | $40,000 |
| Oct 3, 2024 | Completed final sign-off Jul 2025 | 1207 30th Av | change front window (3) windows of the house. like for like.Details
change front window (3) windows of the house. like for like. | $3,000 |
| Mar 22, 2024 | Completed final sign-off Aug 2024 | 2075 30th Av | remodel kitchen on 2nd fl. upgrade electrical services on 200 amp; non structural.Details
remodel kitchen on 2nd fl. upgrade electrical services on 200 amp; non structural. | $36,000 |
| Feb 29, 2024 | Completed final sign-off Apr 2024 | 2127 35th Av | rev 202309126387: add (n) 10x10 rear deck. minor arch layout changes on 1/f & 2/f. shift kitchen orientation and revert 2/f shower back to tub.Details
rev 202309126387: add (n) 10x10 rear deck. minor arch layout changes on 1/f & 2/f. shift kitchen orientation and revert 2/f shower back to tub. | $10,000 |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 2127 35th Av | 1/f: new bedroom, new media room, construct 2 new bathrooms, replace mech, new bar, laundry. 2/f: relocate (e) kitchen, new bedroom and 2 new bathrooms.Details
1/f: new bedroom, new media room, construct 2 new bathrooms, replace mech, new bar, laundry. 2/f: relocate (e) kitchen, new bedroom and 2 new bathrooms. | $250,000 |
| Jun 21, 2023 | Completed final sign-off Apr 2024 | 3241 Taraval St | unit 1:to comply with nov# 202200151: kitchen and bathroom remodel (replace in kind). installation of washer/dryer in closet. no demo of walls. 100 sq. in. make-up air. vent to rear, 3' from pl and openings into the building. maintain rated separation.Details
unit 1:to comply with nov# 202200151: kitchen and bathroom remodel (replace in kind). installation of washer/dryer in closet. no demo of walls. 100 sq. in. make-up air. vent to rear, 3' from pl and openings into the building. maintain rated separation. | $5,000 |
| Jun 8, 2023 | Completed final sign-off Jan 2025 | 1727 25th Av | replace five windows in front of house pa#202302142001Details
replace five windows in front of house pa#202302142001 | $9,500 |
| Feb 14, 2023 | Completed final sign-off Jan 2025 | 1727 25th Av | repair water damaged wood and stucco in front of house above 8x10 sq ft. no structural work repair in-kindDetails
repair water damaged wood and stucco in front of house above 8x10 sq ft. no structural work repair in-kind | $5,000 |
| Dec 30, 2022 | Completed final sign-off Oct 2023 | 51 De Long St | g/f: relocate bathroom, new media room, bar, relocate mechanical room. 2/f: new bathroom & remodel (e) kitchen in-kind.Details
g/f: relocate bathroom, new media room, bar, relocate mechanical room. 2/f: new bathroom & remodel (e) kitchen in-kind. | $105,000 |
| Nov 3, 2022 | Completed final sign-off Jun 2023 | 2432 15th Av | one kitchen renovation. one second floor- no structural workDetails
one kitchen renovation. one second floor- no structural work | $18,000 |
| Oct 19, 2022 | Completed final sign-off May 2023 | 2531 32nd Av | in front of house, replace two windows. one slide door in back of house. replace 8 windows and adding around 650 sq ft of the primed cedarmill hardie cement board siding. no structural work.Details
in front of house, replace two windows. one slide door in back of house. replace 8 windows and adding around 650 sq ft of the primed cedarmill hardie cement board siding. no structural work. | $19,600 |
| Oct 19, 2022 | Completed final sign-off Mar 2023 | 1654 36th Av | in front stairway of house, repairng water damaged wood and stucco about 8x10 feet. no structural work.Details
in front stairway of house, repairng water damaged wood and stucco about 8x10 feet. no structural work. | $5,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 2021 Judah St | one bathroom renovation. no structural work.Details
one bathroom renovation. no structural work. | $14,500 |
| Jun 14, 2022 | Completed final sign-off Apr 2023 | 2438 18th Av | one kitchen renovation and upgrade 200 amp electrical service main. no structural work.Details
one kitchen renovation and upgrade 200 amp electrical service main. no structural work. | $28,000 |
| Apr 19, 2022 | Completed final sign-off Aug 2022 | 273 Pixley St | (1) bathroom renovation, no structural work.Details
(1) bathroom renovation, no structural work. | $10,000 |
| Nov 23, 2021 | Completed final sign-off May 2022 | 18 Seminole Av | one kitchen renovation and no structural workDetails
one kitchen renovation and no structural work | $25,000 |
| Nov 23, 2021 | Completed final sign-off Nov 2023 | 2455 18th Av | add fiber cement siding shingles in back of wall around 600 square feet and no structural workDetails
add fiber cement siding shingles in back of wall around 600 square feet and no structural work | $8,000 |
| Oct 19, 2020 | Completed final sign-off May 2021 | 3337 Steiner St | apt 3: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures.Details
apt 3: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures. | $25,000 |
| Sep 2, 2020 | Completed final sign-off Nov 2020 | 27 Riverton Dr | g/f: remodel (e) bathroom & replace laminate floor, painting.Details
g/f: remodel (e) bathroom & replace laminate floor, painting. | $4,500 |
| Aug 20, 2020 | Completed final sign-off May 2021 | 3337 Steiner St | apt 2: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures.Details
apt 2: remodel of (e) bathroom & kitchen. upgrade all electrical throughout & plumbing fixtures. | $22,000 |
| Jul 14, 2020 | Completed final sign-off Dec 2020 | 2821 Polk St | back house replace siding. about 400 sq ft in kindDetails
back house replace siding. about 400 sq ft in kind | $15,000 |
| Jun 5, 2020 | Completed final sign-off Dec 2020 | 2821 Polk St | #3: remodel kitchen & 1-1/2 bathroom. replace 4 windows at back (nonstreet visible) rewire all electrical. replace hardwood floor & painting.Details
#3: remodel kitchen & 1-1/2 bathroom. replace 4 windows at back (nonstreet visible) rewire all electrical. replace hardwood floor & painting. | $49,000 |
| Mar 13, 2020 | Completed final sign-off May 2021 | 3337 Steiner St | apt 4: remodel kitchen and bathroom, laundry room, rewire electrical; in-kind replacement.Details
apt 4: remodel kitchen and bathroom, laundry room, rewire electrical; in-kind replacement. | $40,000 |
| Feb 13, 2020 | Completed final sign-off Mar 2020 | 70 Margaret Av | kitchen remodel at 2nd fl. high efficioncy lighting. no structural work.Details
kitchen remodel at 2nd fl. high efficioncy lighting. no structural work. | $18,000 |
| Oct 1, 2019 | Completed final sign-off Dec 2019 | 2658 40th Av | to obtain a final inspection for work approved under pa#201709290034. all work is complete.Details
to obtain a final inspection for work approved under pa#201709290034. all work is complete. | |
| Oct 1, 2019 | Completed final sign-off Feb 2020 | 2821 Polk St | #1: remodel kitchen & two full bathroom. rewire all electrical. replace hardwood floor & painting.Details
#1: remodel kitchen & two full bathroom. rewire all electrical. replace hardwood floor & painting. | $45,000 |
| Jun 3, 2019 | Completed final sign-off Sep 2019 | 2821 Polk St | #2: remodel kitchen & bathroom. rewire all electrical. replace hardwood floor and painting.Details
#2: remodel kitchen & bathroom. rewire all electrical. replace hardwood floor and painting. | $38,000 |
| May 8, 2019 | Completed final sign-off Jan 2020 | 451 38th Av | revise application #201708296254 to change floor layout within bldg envelope. rearrange rooms and stairs, add a bath on 2nd floor. rearrange rooms on 1st floor.Details
revise application #201708296254 to change floor layout within bldg envelope. rearrange rooms and stairs, add a bath on 2nd floor. rearrange rooms on 1st floor. | $12,000 |
| Feb 27, 2019 | Completed final sign-off Mar 2019 | 1540 Sacramento St | repair building facade caused by car accident (match in kind); all work around existing damaged window opening at ground level; reinstall existing window in original location at ground level, replace damaged brick around window opening in kind.Details
repair building facade caused by car accident (match in kind); all work around existing damaged window opening at ground level; reinstall existing window in original location at ground level, replace damaged brick around window opening in kind. | $6,000 |
| Feb 20, 2019 | Never finaled issued May 2019, no final | 2658 40th Av | extend walls to grade below (e) building room foot print, (1965 sf) repair damaged deck & construct new deck (985 sf) to connect w/ (e) deck, new bathroomDetails
extend walls to grade below (e) building room foot print, (1965 sf) repair damaged deck & construct new deck (985 sf) to connect w/ (e) deck, new bathroom | $10,000 |
| Sep 24, 2018 | Completed final sign-off Mar 2020 | 2146 18th Av | remodel bathroom at 2nd floor. remodel kitchen. no change in existing floor plan.Details
remodel bathroom at 2nd floor. remodel kitchen. no change in existing floor plan. | $24,000 |
| Sep 24, 2018 | Completed final sign-off Sep 2018 | 2268 Filbert St | replace 15 windows at front alum clad wood replacment double hung. no change in existing openings.Details
replace 15 windows at front alum clad wood replacment double hung. no change in existing openings. | $18,000 |
| Sep 24, 2018 | Completed final sign-off Jan 2019 | 1930 31st Av | remodel bathroom at 2nd floor. remodel kitchen, add lighting. replace existing furnace with new furnace. no change of existing floor plan.Details
remodel bathroom at 2nd floor. remodel kitchen, add lighting. replace existing furnace with new furnace. no change of existing floor plan. | $37,040 |
| Jul 12, 2018 | Completed final sign-off Aug 2019 | 727 16th Av | re-arrange rooms, add baths, relocate stairs on 2nd fl. relocate kitchen, dining & living room to 1st fl. relocate/replace furnace, water heater & washer dryer. upgrade electrical & plumbing systemDetails
re-arrange rooms, add baths, relocate stairs on 2nd fl. relocate kitchen, dining & living room to 1st fl. relocate/replace furnace, water heater & washer dryer. upgrade electrical & plumbing system | $150,000 |
| Jun 21, 2018 | Completed final sign-off Oct 2018 | 27 Garcia Av | remove kitvchen on 2/f, no change to walls & opening layout, add efficacy lighting, remodel bathroomDetails
remove kitvchen on 2/f, no change to walls & opening layout, add efficacy lighting, remodel bathroom | $25,000 |
| Jun 21, 2018 | Completed final sign-off Jul 2018 | 1657 12th Av | remodel bathroom. replace furnaceDetails
remodel bathroom. replace furnace | $7,800 |
| Dec 27, 2017 | Never finaled issued May 2018, no final | 1657 12th Av | remodel kitchen area and convert part of the liner wall (partition wall) into short wall and counter on 2nd floor per plan. no structural work.Details
remodel kitchen area and convert part of the liner wall (partition wall) into short wall and counter on 2nd floor per plan. no structural work. | $8,000 |
| Nov 7, 2017 | Completed final sign-off Mar 2018 | 5527 California St | remodel kitchen at east unit and reiwre electrical upgrade 200amp service, inkind, same location.Details
remodel kitchen at east unit and reiwre electrical upgrade 200amp service, inkind, same location. | $48,000 |
| Sep 29, 2017 | Never finaled issued Sep 2017, no final | 2658 40th Av | remodel 2 full bathr at 2nd fl. remodel kitchen and replace new furnaceDetails
remodel 2 full bathr at 2nd fl. remodel kitchen and replace new furnace | $40,000 |
| May 12, 2017 | Completed final sign-off Jul 2017 | 1426 41st Av | remodel kitchen on 2/f.Details
remodel kitchen on 2/f. | $8,900 |
| Mar 17, 2017 | Completed final sign-off Jan 2018 | 411 34th Av | remodel (e) kitchen, replace cabinets, fixtures & countertop and construct one new bath room (size 3x7'-6") on the 3rd floor. remodel (e) bathroom.Details
remodel (e) kitchen, replace cabinets, fixtures & countertop and construct one new bath room (size 3x7'-6") on the 3rd floor. remodel (e) bathroom. | $25,000 |
| Sep 21, 2015 | Completed final sign-off Apr 2016 | 1449 14th Av | replace termite dry rot wood on right side in front of house 90 square feet. replace stucco front in kind.Details
replace termite dry rot wood on right side in front of house 90 square feet. replace stucco front in kind. | $2,000 |
| Sep 16, 2015 | Completed final sign-off Dec 2015 | 642 Peralta Av | repair wood dry-rot at front of building beneath two windows (two bays in from north), replace wood siding in kind only where dry rot repair exists. window replacement, 8 at front (fiberglass, colored to match exsiting aluminum in profile and operation), and 8 vinyl in the rear.Details
repair wood dry-rot at front of building beneath two windows (two bays in from north), replace wood siding in kind only where dry rot repair exists. window replacement, 8 at front (fiberglass, colored to match exsiting aluminum in profile and operation), and 8 vinyl in the rear. | $25,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 234 Orizaba Av | remodel 2nd floor master bathroom. replace four windows two rear two front and whole house rewire. all street facing windows to be aluminum wood clad windows.Details
remodel 2nd floor master bathroom. replace four windows two rear two front and whole house rewire. all street facing windows to be aluminum wood clad windows. | $18,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 89 Barcelona Av | remodel downstair kitchen/bathroom, replace hardwood floor, painting, replace dry rot deck at rear, less than 50% in kind. electrical & plumbing work under seperate permit.Details
remodel downstair kitchen/bathroom, replace hardwood floor, painting, replace dry rot deck at rear, less than 50% in kind. electrical & plumbing work under seperate permit. | $28,000 |
| Jul 13, 2015 | Completed final sign-off Nov 2015 | 234 Orizaba Av | add bedroom, family room and bath on 1st floor. new painting on 2nd floor.Details
add bedroom, family room and bath on 1st floor. new painting on 2nd floor. | $32,000 |
| Jul 13, 2015 | Completed final sign-off Jan 2016 | 696 08th Av | add family room and full bath on 1st floor. replace cabinets in 1 1/2 baths and kitchen on 2nd floor, replace sheetrocks on 2/f.Details
add family room and full bath on 1st floor. replace cabinets in 1 1/2 baths and kitchen on 2nd floor, replace sheetrocks on 2/f. | $68,000 |
| Apr 27, 2015 | Completed final sign-off Mar 2016 | 414 Myra Wy | dry rot repair of stucco at front of house replace new front door in kindDetails
dry rot repair of stucco at front of house replace new front door in kind | $3,000 |
| Apr 27, 2015 | Completed final sign-off Jul 2015 | 309 Dellbrook Av | remodel kitchen & 2nd flr bathroom, opening & wall layout, kitchen lighting 50% wattage high efficacy; bathroom lighting,high efficacy or controlled by manual-on sensor & high efficacy main.Details
remodel kitchen & 2nd flr bathroom, opening & wall layout, kitchen lighting 50% wattage high efficacy; bathroom lighting,high efficacy or controlled by manual-on sensor & high efficacy main. | $15,000 |
| Mar 9, 2015 | Completed final sign-off Sep 2015 | 94 Stanton St | remodel 2/f bathroom, replace (3) windows back, replace kitchen granite counter top, paint exterior house, no walls moved/removed/added. all layouts to remain unchanged.Details
remodel 2/f bathroom, replace (3) windows back, replace kitchen granite counter top, paint exterior house, no walls moved/removed/added. all layouts to remain unchanged. | $19,000 |
| Mar 9, 2015 | Completed final sign-off Jul 2015 | 2091 28th Av | dry rot repair of stucco at front. replace 2 front windows with aluminium wood clad windows in kind.Details
dry rot repair of stucco at front. replace 2 front windows with aluminium wood clad windows in kind. | $6,500 |
| Nov 24, 2014 | Completed final sign-off Mar 2015 | 2091 28th Av | remodel 2nd floor bathroom. no structural work - same locationDetails
remodel 2nd floor bathroom. no structural work - same location | $5,000 |
| Oct 24, 2014 | Completed final sign-off Mar 2015 | 2091 28th Av | add and legalize 2 bedrooms and bathroom on 1st flr: and paint on both floors.Details
add and legalize 2 bedrooms and bathroom on 1st flr: and paint on both floors. | $32,000 |
| Oct 2, 2014 | Completed final sign-off Apr 2015 | 245 Hazelwood Av | remodel 2nd floor & bathroom, additional work to bpa 201409257284.Details
remodel 2nd floor & bathroom, additional work to bpa 201409257284. | $12,000 |
| Sep 25, 2014 | Completed final sign-off May 2015 | 245 Hazelwood Av | remodel and legalize family room and full bath on ground fl. replace sheetrock and new paint on both floorsDetails
remodel and legalize family room and full bath on ground fl. replace sheetrock and new paint on both floors | $35,000 |
| Aug 27, 2014 | Completed final sign-off Dec 2014 | 70 Encanto Av | replace lightwell floor tile & repair dry rot, approx. 90 sq.ft., replace water heater, replace new flu vents, new gas line.Details
replace lightwell floor tile & repair dry rot, approx. 90 sq.ft., replace water heater, replace new flu vents, new gas line. | $3,000 |
| Aug 4, 2014 | Completed final sign-off Nov 2014 | 2084 Union St | remove existing exterior damaged stairs and rebuild new stairs.Details
remove existing exterior damaged stairs and rebuild new stairs. | $20,000 |
| Jul 21, 2014 | Completed final sign-off Sep 2014 | 882 45th Av | remodel kitchenDetails
remodel kitchen | $6,800 |
| Jul 15, 2014 | Completed final sign-off Dec 2015 | 1886 30th Av | remodel (e) bathroom and kitchen at 2nd floor. add new bathroom, one bedroom to be constructed at first floor.Details
remodel (e) bathroom and kitchen at 2nd floor. add new bathroom, one bedroom to be constructed at first floor. | $46,000 |
| Jun 26, 2014 | Completed final sign-off Dec 2014 | 70 Encanto Av | remodeld 2 extg bathrooms, kitchen, and closets, and add one new bathroom on 2nd floor.Details
remodeld 2 extg bathrooms, kitchen, and closets, and add one new bathroom on 2nd floor. | $53,000 |
| May 2, 2014 | Completed final sign-off May 2014 | 2536 California St | repair the back stairs dryrot & damage wood, less 50% in kind.Details
repair the back stairs dryrot & damage wood, less 50% in kind. | $3,000 |
| Mar 11, 2014 | Completed final sign-off Sep 2015 | 94 Stanton St | new deck addition to rear of (e) house. alteration to (e) basement bedroom, legalize (e) bedroom & bath.Details
new deck addition to rear of (e) house. alteration to (e) basement bedroom, legalize (e) bedroom & bath. | $20,000 |
| Jul 24, 2013 | Completed final sign-off Mar 2014 | 636 Garfield St | add rooms at g/f- construct new 1-hr rated wall to seperate the proposed 2 bedrooms, 1 full bathroom, half bathroom & storage behind garage on the ground floorDetails
add rooms at g/f- construct new 1-hr rated wall to seperate the proposed 2 bedrooms, 1 full bathroom, half bathroom & storage behind garage on the ground floor | $25,000 |
| May 29, 2013 | Completed final sign-off Aug 2013 | 2433 Larkin St | remodel kitchen in apt. #2. no structural work. new lighting comply with cec.Details
remodel kitchen in apt. #2. no structural work. new lighting comply with cec. | $15,000 |
| May 18, 2012 | Completed final sign-off Jul 2012 | 55 Clayton St | remodel kitchen on the 3/f to comply with complaint #200669450. this permit is issued to correct addres listed for the work under pa#201005182726 (57 clayton) in the same building.Details
remodel kitchen on the 3/f to comply with complaint #200669450. this permit is issued to correct addres listed for the work under pa#201005182726 (57 clayton) in the same building. | |
| Feb 23, 2012 | Completed final sign-off Jul 2012 | 2949 Clement St | remodel bathroom second floor, change light, no structural work.Details
remodel bathroom second floor, change light, no structural work. | $4,800 |
| Jul 11, 2011 | Completed final sign-off Jan 2012 | 1320 Sloat Bl | remodel kitchen. change lighting. no structural work. lighting must comply with cec 150(k)Details
remodel kitchen. change lighting. no structural work. lighting must comply with cec 150(k) | $8,500 |
| Jan 28, 2011 | Completed final sign-off Mar 2011 | 4239 Folsom St | bathroom remodel at 2nd floor, no structural work. no new lightingDetails
bathroom remodel at 2nd floor, no structural work. no new lighting | $4,500 |
| May 18, 2010 | Never finaled issued May 2010, no final | 57 Clayton St | remodel kitchen on the 3rd floor. replace counter and cabinets. new lighting must comply with cec 150. no structural work.Details
remodel kitchen on the 3rd floor. replace counter and cabinets. new lighting must comply with cec 150. no structural work. | $8,000 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 2539 35th Av | replace exterior wall & stucco, less than 50% of wall area-50ft max, replace in kindDetails
replace exterior wall & stucco, less than 50% of wall area-50ft max, replace in kind | $1,200 |
| Jun 26, 2009 | Completed final sign-off Aug 2010 | 2036 Great Hy | remove kitchen built without permit @ ground fl. to comply with nov # 200007817 dtd 1/30/09 items #2, # 3 pertaining to 2nd bldg on lot address 2036 great high way. install 2 new bedrooms, 1 full bathroom @ grd. fl.Details
remove kitchen built without permit @ ground fl. to comply with nov # 200007817 dtd 1/30/09 items #2, # 3 pertaining to 2nd bldg on lot address 2036 great high way. install 2 new bedrooms, 1 full bathroom @ grd. fl. | $5,000 |
| Apr 28, 2009 | Completed final sign-off Jul 2009 | 309 West Portal Av | convert existing retail store to beauty salon & covert existing bathrm to accessible toilet room.Details
convert existing retail store to beauty salon & covert existing bathrm to accessible toilet room. | $20,000 |