- Jun 2007 to Aug 2026
182 permits since 2000 (architect on 180 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 111 completed, 2 in progress, 42 never finaled, 27 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 182.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 3620 Balboa St | to comply with nov# 202547558. commercial: fire damage repair in kind, new electrical service. residential: new egress stairs, new kitchenette, new bathroom, new lighting.Details
to comply with nov# 202547558. commercial: fire damage repair in kind, new electrical service. residential: new egress stairs, new kitchenette, new bathroom, new lighting. | $125,000 | |
| Mar 24, 2026 | In progress filed Mar 2026, not yet issued | 888 Fell St | install (n) deck at rear at 2nd level condo, replace (e) window with door. approved under variance# 2022-002640var.Details
install (n) deck at rear at 2nd level condo, replace (e) window with door. approved under variance# 2022-002640var. | $30,000 | |
| Nov 18, 2025 | Completed final sign-off Aug 2026 | 1240 Diamond St | Bright Moon Construction | remodeling of (e) primary bathroom.Details
remodeling of (e) primary bathroom. | $35,000 |
| Oct 22, 2025 | Completed final sign-off Apr 2026 | 217 Montgomery St | Richlen Construction | ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes.Details
ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes. | $125,000 |
| Sep 8, 2025 | Expired or cancelled cancelled Apr 2026 | 3632 26th St | legalize (e) 2 story single unit adu in the rear of property.Details
legalize (e) 2 story single unit adu in the rear of property. | $60,000 | |
| Apr 30, 2025 | Completed final sign-off Dec 2025 | 1466 44th Av | Buhler Construction | renovation of ground level/garge to include (n) bedrm, bath, laundry and storage areas; structural work include new partial floor slab and new posts; new lighting mechanical work under separate permitDetails
renovation of ground level/garge to include (n) bedrm, bath, laundry and storage areas; structural work include new partial floor slab and new posts; new lighting mechanical work under separate permit | $150,000 |
| Nov 5, 2024 | Completed final sign-off Jul 2026 | 2937 24th St | Ren Lei Construction Co | renovation of (e) bakery/limited restaurant and new equipment, lighting, hvac plumving, electrical finishes, accessible lift and accessible restroom. no exterior changes. not a change of use.Details
renovation of (e) bakery/limited restaurant and new equipment, lighting, hvac plumving, electrical finishes, accessible lift and accessible restroom. no exterior changes. not a change of use. | $175,000 |
| Oct 16, 2024 | Completed final sign-off May 2025 | 2341 Vallejo St | Fahan Construction Inc | residential renovation renovate (e) top fl bathroom, add new top fl. bathroom renovate (e) closet, new lighting, new structural work at closet, no exterior changesDetails
residential renovation renovate (e) top fl bathroom, add new top fl. bathroom renovate (e) closet, new lighting, new structural work at closet, no exterior changes | $50,000 |
| Oct 16, 2024 | Completed final sign-off Sep 2025 | 1775 Silver Av | revision to permit#: 202010227165 - revise bathroom new water heater, revise heating unit. no exterior changes.Details
revision to permit#: 202010227165 - revise bathroom new water heater, revise heating unit. no exterior changes. | $10,000 | |
| Jun 10, 2024 | Completed final sign-off Sep 2025 | 1775 Silver Av | ref to pa: 202010227165: add 2 footings to ground floor.Details
ref to pa: 202010227165: add 2 footings to ground floor. | $5,000 | |
| Mar 26, 2024 | Completed final sign-off Nov 2024 | 14 Parsons St | Buhler Construction | replace (e) garage door with new wider garage door, including structural work.Details
replace (e) garage door with new wider garage door, including structural work. | $25,000 |
| Mar 20, 2024 | Completed final sign-off Sep 2024 | 100 01st St | Richlen Construction | restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changesDetails
restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes | $75,000 |
| Dec 5, 2023 | Completed final sign-off Mar 2024 | 2217 Fillmore St | S & H Renovations | apt 2 on 3/f: revision to pa# 202303234309. renovate kitchen, relocate bathroom and laundry, relocate bedroom. new finishes and fixtures. no exterior changes, hvac work deferred submittal. non structural work.Details
apt 2 on 3/f: revision to pa# 202303234309. renovate kitchen, relocate bathroom and laundry, relocate bedroom. new finishes and fixtures. no exterior changes, hvac work deferred submittal. non structural work. | |
| Sep 26, 2023 | Completed final sign-off Apr 2024 | 374 Golden Gate Av | Mendez-Ortiz Contractors | ground fl retail. new exterior storefront and accessible entrance per abe# 2023092228707. no work for tenant interiorDetails
ground fl retail. new exterior storefront and accessible entrance per abe# 2023092228707. no work for tenant interior | $35,000 |
| Jul 10, 2023 | Completed final sign-off Nov 2023 | 1710 Castro St | Del Rey Construction Inc | renovate kitchen-new cabinets, new lighting, remove post & wall in kitchen, replace with beams, bathroom-new tile, remove bath door.Details
renovate kitchen-new cabinets, new lighting, remove post & wall in kitchen, replace with beams, bathroom-new tile, remove bath door. | $55,000 |
| Apr 5, 2023 | Completed final sign-off Jul 2023 | 1906 Market St | Cookline Construction Inc | e restaurant on gr fl change out equipment. revise front service counterDetails
e restaurant on gr fl change out equipment. revise front service counter | $15,000 |
| Mar 31, 2023 | Completed final sign-off Dec 2024 | 65 Heather Av | S & H Renovations | to comply with nov 202301641 legalize home office on ground floor. verify existing partitions, new lighting, removal of 1 sink; closure of existing drain and addition of wall heater in (n) home office. 3-5-24- replace window in kind in office roomDetails
to comply with nov 202301641 legalize home office on ground floor. verify existing partitions, new lighting, removal of 1 sink; closure of existing drain and addition of wall heater in (n) home office. 3-5-24- replace window in kind in office room | $5,000 |
| Mar 23, 2023 | Completed final sign-off Mar 2024 | 2217 Fillmore St | S & H Renovations | apt 2: apt renovation - renovate kitchen, 2 bathrooms, structural work, replace 1 (e) lightwell window, new lighting, no exterior changes. no changes to mech. window not visible from streetDetails
apt 2: apt renovation - renovate kitchen, 2 bathrooms, structural work, replace 1 (e) lightwell window, new lighting, no exterior changes. no changes to mech. window not visible from street | $125,000 |
| Mar 14, 2023 | Completed final sign-off Nov 2023 | 839 Geary St | Mendez-Ortiz Contractors | g/f: retail storefront replacement including new accessible entrance to match (e) opposite entrance. to comply with accessible business entrance program ord 51-16. ref abe 202303096262Details
g/f: retail storefront replacement including new accessible entrance to match (e) opposite entrance. to comply with accessible business entrance program ord 51-16. ref abe 202303096262 | $35,000 |
| Jul 29, 2022 | Completed final sign-off Nov 2023 | 718 Columbus Av | renovation of (e) retail: new pasta prep area, dish area, new checkout, new lighting, new retail shelves. no exterior changes, no change of use.Details
renovation of (e) retail: new pasta prep area, dish area, new checkout, new lighting, new retail shelves. no exterior changes, no change of use. | $65,000 | |
| May 12, 2022 | Completed final sign-off Aug 2022 | 3296 Sacramento St | Ap- Build Inc | addition of staff kitchenette to (e) retail. no change to mechanical, no exterior changes. amend to pa 202112154503 for additional work.Details
addition of staff kitchenette to (e) retail. no change to mechanical, no exterior changes. amend to pa 202112154503 for additional work. | $10,000 |
| May 11, 2022 | Completed final sign-off Dec 2022 | 549 Irving St | Concore Development Group | tenant improvement of existing restaurant including new partitions, new equipment, new finishes, renovated lighting. no change to exterior. no change to mechanical.Details
tenant improvement of existing restaurant including new partitions, new equipment, new finishes, renovated lighting. no change to exterior. no change to mechanical. | $35,000 |
| Apr 22, 2022 | Completed final sign-off Jul 2022 | 2505 03rd St | Pacific Rim Design + Build | tenant improvement (e) restaurant inc (n) partitions, lighting, equipment, transaction counter, and revised ada restroom. no change to exterior, no change to hvac.Details
tenant improvement (e) restaurant inc (n) partitions, lighting, equipment, transaction counter, and revised ada restroom. no change to exterior, no change to hvac. | $50,000 |
| Mar 28, 2022 | Expired or cancelled withdrawn Nov 2023 | 526 Columbus Av | Sean Rattigan Construction | full restaurant ti, includes new cooking, prep, dishwashing, dining, ada restroom, mechanical systems, finishes & equipment. no exterior changes except at the entrance, change of use approved.Details
full restaurant ti, includes new cooking, prep, dishwashing, dining, ada restroom, mechanical systems, finishes & equipment. no exterior changes except at the entrance, change of use approved. | $125,000 |
| Mar 4, 2022 | Expired or cancelled cancelled Jan 2026 | 888 Fell St | new rear deck at 2nd level condo. replace (e) window with door.Details
new rear deck at 2nd level condo. replace (e) window with door. | $30,000 | |
| Dec 21, 2021 | Never finaled filed Dec 2021, never issued | 2399 Folsom St | legalize a 5th dwelling unit per ordinance 43-14 at the g/f for existing 4 apt, 3 story bldg per planning code section 207.3 per pa# 201610281421Details
legalize a 5th dwelling unit per ordinance 43-14 at the g/f for existing 4 apt, 3 story bldg per planning code section 207.3 per pa# 201610281421 | $125,000 | |
| Dec 15, 2021 | Completed final sign-off Aug 2022 | 3296 Sacramento St | Ap- Build Inc | interior t.i - new partitions, new lighting, new casework, new sink, new bathroom sink, new finishes.Details
interior t.i - new partitions, new lighting, new casework, new sink, new bathroom sink, new finishes. | $110,000 |
| Nov 8, 2021 | Never finaled filed Nov 2021, never issued | 2738 Great Hy | addition of rear exterior stair, new exterior door on 2nd lvl, new structural bracing of back wall.Details
addition of rear exterior stair, new exterior door on 2nd lvl, new structural bracing of back wall. | $35,000 | |
| Oct 18, 2021 | Completed final sign-off Dec 2022 | 1747 40th Av | Fahan Construction Inc | remove back patio cover, install new rear deck, new back double door, new hot tub. replace rear window.Details
remove back patio cover, install new rear deck, new back double door, new hot tub. replace rear window. | $15,000 |
| Jun 25, 2021 | Completed final sign-off Oct 2021 | 2108 Chestnut St | Buhler Construction | front entrance program - addition of automatic door actuators & opener. accessible business entrance programe per ordinance 51-16.Details
front entrance program - addition of automatic door actuators & opener. accessible business entrance programe per ordinance 51-16. | $5,000 |
| May 26, 2021 | Completed final sign-off Apr 2022 | 56 Presidio Av | Centric Building Inc. | new exterior walkway, stairs, fence and gate. including structrual garden wallDetails
new exterior walkway, stairs, fence and gate. including structrual garden wall | $75,000 |
| Oct 22, 2020 | Completed final sign-off Sep 2025 | 1775 Silver Av | Landmark Construction Inc. | legalization of existing ground floor unit per ordinance 43-14 & renovation of kitchen in this unit.Details
legalization of existing ground floor unit per ordinance 43-14 & renovation of kitchen in this unit. | $12,500 |
| May 20, 2020 | Completed final sign-off Mar 2021 | 2949 Pacific Av | Hughes & Company Construction, Inc | tenant improvement of 2nd floor apartment, including renovattion of kitchen and 2 existing bathrooms, addition of new bathroom, new laundry, new wet bar, new lighting and new finishes. no hvac changes. no exterior changes.Details
tenant improvement of 2nd floor apartment, including renovattion of kitchen and 2 existing bathrooms, addition of new bathroom, new laundry, new wet bar, new lighting and new finishes. no hvac changes. no exterior changes. | $75,000 |
| Feb 27, 2020 | Completed final sign-off Jun 2021 | 2738 Great Hy | Fahan Construction | exterior, rear patio renovation include new grill, remove and replace hot tub, new panels, new rinse shower, new wall treatment and 6' fencing.Details
exterior, rear patio renovation include new grill, remove and replace hot tub, new panels, new rinse shower, new wall treatment and 6' fencing. | $15,000 |
| Jan 31, 2020 | Completed final sign-off May 2021 | 8 Octavia St | Angotti & Reilly Inc. | ground fl retail interior ti - new partitions, doors, lighting, restrooms, hvac & finishes. no exterior work. (e) vacant space.Details
ground fl retail interior ti - new partitions, doors, lighting, restrooms, hvac & finishes. no exterior work. (e) vacant space. | $75,000 |
| Dec 23, 2019 | Completed final sign-off Jun 2021 | 2084 Chestnut St | Del Rey Construction Inc | interior t.i. work includes upgrade accessible restroom, fire/life safty, non load bearing partitions and finishes.Details
interior t.i. work includes upgrade accessible restroom, fire/life safty, non load bearing partitions and finishes. | $120,000 |
| Dec 18, 2019 | Completed final sign-off Aug 2020 | 760 San Jose Av | Forsythe General Contractors | interior residential renovation invluding renovate kitchen, new partitions, structural work, new lighting, new finishes & fixtures. no exterior work. interior remodel, open stairs between levels, room on ground floor with full bath and 3-foot wet bar with 12" sink.Details
interior residential renovation invluding renovate kitchen, new partitions, structural work, new lighting, new finishes & fixtures. no exterior work. interior remodel, open stairs between levels, room on ground floor with full bath and 3-foot wet bar with 12" sink. | $75,000 |
| Dec 4, 2019 | Expired or cancelled cancelled Jan 2026 | 59 09th St | ground floor demolition of fixtures and finishes of e restaurant. no ext changes, no structural workDetails
ground floor demolition of fixtures and finishes of e restaurant. no ext changes, no structural work | $12,000 | |
| Dec 4, 2019 | Completed final sign-off May 2023 | 245 Jefferson St | Buhler Construction | to comply with the accessible business entrance program abe#201904185698. restaurant entance, repair front entrance threshold per requirements of front entrance compliance programDetails
to comply with the accessible business entrance program abe#201904185698. restaurant entance, repair front entrance threshold per requirements of front entrance compliance program | $5,000 |
| Dec 2, 2019 | Never finaled issued Jan 2021, no final | 2084 Chestnut St | Del Rey Construction Inc | core & shell upgrade to reconfigure storefront to accomodate a single tenant space. renovation of existing 2 story bldg combining 2 grounf floor retail entrances into 1 entrance. uncover existing clerestory windows & add exterior awningDetails
core & shell upgrade to reconfigure storefront to accomodate a single tenant space. renovation of existing 2 story bldg combining 2 grounf floor retail entrances into 1 entrance. uncover existing clerestory windows & add exterior awning | $95,000 |
| Oct 22, 2019 | Completed final sign-off Oct 2022 | 1030 Polk St | Pacific Rim Design + Build | revision to pa 2019-0415-8034 add basement storage rooms and lighting for restaurant, no exterior changes. basement is unconditioned storage spaces. exit signs/emer lighting under sep permit.Details
revision to pa 2019-0415-8034 add basement storage rooms and lighting for restaurant, no exterior changes. basement is unconditioned storage spaces. exit signs/emer lighting under sep permit. | $5,000 |
| Oct 2, 2019 | Expired or cancelled cancelled Jan 2026 | 532 Jessie St | for health department purposes, clarify window as pass thru window. pass through window approved on 201906062743, but not called out as pass through as intended.Details
for health department purposes, clarify window as pass thru window. pass through window approved on 201906062743, but not called out as pass through as intended. | ||
| Sep 12, 2019 | Expired or cancelled withdrawn Nov 2019 | 2084 Chestnut St | core & shell upgrade to reconfigure storefront to accomodate a singel tenant space. renovation of (e) 2 story building. combine 2 ground floor retail entrances into 1 entrance. uncover (e) clearstory windows. add exterior awning. ** maher: n/a **Details
core & shell upgrade to reconfigure storefront to accomodate a singel tenant space. renovation of (e) 2 story building. combine 2 ground floor retail entrances into 1 entrance. uncover (e) clearstory windows. add exterior awning. ** maher: n/a ** | $95,000 | |
| Sep 11, 2019 | Expired or cancelled cancelled Jan 2026 | 65 Taylor St | t.i. on ground & b/ fl. new foot/facial massage, coffee bar, yoga studio, accessiible restrooms, platform lift, staff rooms, new partitions, lighting, mechanical, electrical & plumbing, no exterior changesDetails
t.i. on ground & b/ fl. new foot/facial massage, coffee bar, yoga studio, accessiible restrooms, platform lift, staff rooms, new partitions, lighting, mechanical, electrical & plumbing, no exterior changes | $250,000 | |
| Jul 31, 2019 | Completed final sign-off Jan 2021 | 1 Jones St | Landmark Construction Inc. | change (e) approved basement break room kitchenette to an events kitchen - including new equipment, new finishes, and new plumbing & electrical. no exterior changes. rev to pa #201210101737.Details
change (e) approved basement break room kitchenette to an events kitchen - including new equipment, new finishes, and new plumbing & electrical. no exterior changes. rev to pa #201210101737. | $35,000 |
| Jul 24, 2019 | Expired or cancelled withdrawn Oct 2024 | 2937 24th St | existing bakery restaurant t.i. include new ada restroom, new ada entrance, new equip, new lighting, new counter service counter, new roof top equip, new windows. no change of use.Details
existing bakery restaurant t.i. include new ada restroom, new ada entrance, new equip, new lighting, new counter service counter, new roof top equip, new windows. no change of use. | $225,000 | |
| Jul 3, 2019 | Expired or cancelled cancelled Jan 2026 | 1 Jones St | basement: covert (e) storage room into addition of one accessible restroom. no exterior changes. maher n/a.Details
basement: covert (e) storage room into addition of one accessible restroom. no exterior changes. maher n/a. | $15,000 | |
| Jul 1, 2019 | Completed final sign-off Nov 2019 | 1155 Valencia St | Bracelin Company | front facade paint, wood plank around retail at ground level, new front entrance at apartments.Details
front facade paint, wood plank around retail at ground level, new front entrance at apartments. | $10,000 |
| Jun 6, 2019 | Completed final sign-off Sep 2019 | 532 Jessie St | Pacific Rim Design + Build | renovation of extg commissary kitchen, include 2 new hoos, new equipment, ada restroom renovation, new roof equipment, new front window.Details
renovation of extg commissary kitchen, include 2 new hoos, new equipment, ada restroom renovation, new roof equipment, new front window. | $85,000 |
| Jun 5, 2019 | Expired or cancelled cancelled Mar 2022 | 526 Columbus Av | conditional use for group floor restaurant,new accessable restroom, new kitchen, new dinning, work includes basement prep and storage.Details
conditional use for group floor restaurant,new accessable restroom, new kitchen, new dinning, work includes basement prep and storage. | $275,000 | |
| Jun 5, 2019 | Completed final sign-off May 2020 | 3591 20th St | Smart Building Inc. | change out in kind & refurbish (e) windows & doors to comply w/ requirement of article 10 "liberty hill" historic neighborhood, work done on ground floor retail only. interior work done under separate permit.**maher n/a**Details
change out in kind & refurbish (e) windows & doors to comply w/ requirement of article 10 "liberty hill" historic neighborhood, work done on ground floor retail only. interior work done under separate permit.**maher n/a** | $12,000 |
| May 24, 2019 | Never finaled issued Jul 2019, no final | 1030 Polk St | administrative permit to change from limitted use to full restaurant to add on-site alcohol. ref dph #9581. ref app#201904158034. n/a for maherDetails
administrative permit to change from limitted use to full restaurant to add on-site alcohol. ref dph #9581. ref app#201904158034. n/a for maher | ||
| May 20, 2019 | Expired or cancelled expired Apr 2024 | 1235 09th Av | Buhler Construction | renovate extg restaurant/grocery, replace kitchen, replace hood, revise extg ada restroom, new lighting, new mechanical, electrical,plmg. no change of use.Details
renovate extg restaurant/grocery, replace kitchen, replace hood, revise extg ada restroom, new lighting, new mechanical, electrical,plmg. no change of use. | $145,000 |
| May 20, 2019 | Completed final sign-off Jun 2021 | 2738 Great Hy | Fahan Construction | residential renovation including renovation kitchen, renovate powder room, renovate master bath, new structural, and new lighting. no exterior change.Details
residential renovation including renovation kitchen, renovate powder room, renovate master bath, new structural, and new lighting. no exterior change. | $125,000 |
| Apr 17, 2019 | Completed final sign-off Nov 2020 | 215 Dorland St | Gngc Builders Inc | resodential reno - new stairs, new nathroom new laundry new struct work new window and new finishesDetails
resodential reno - new stairs, new nathroom new laundry new struct work new window and new finishes | $125,000 |
| Apr 15, 2019 | Completed final sign-off Oct 2022 | 1030 Polk St | Pacific Rim Design + Build | change of use: tenant improvement - limited restaurant - new kitchen, new restrooms, new lighting, new customer services counter, new dining area, new side exit door. .Details
change of use: tenant improvement - limited restaurant - new kitchen, new restrooms, new lighting, new customer services counter, new dining area, new side exit door. . | $225,000 |
| Apr 15, 2019 | Completed final sign-off May 2020 | 3591 20th St | Smart Building Inc. | ti shell - new ada restroom, new drywall, new electrical & plm, uncover (e) boarded-up windows, new ceilingDetails
ti shell - new ada restroom, new drywall, new electrical & plm, uncover (e) boarded-up windows, new ceiling | $25,000 |
| Apr 8, 2019 | Never finaled issued Dec 2019, no final | 15 Waverly Pl | Buhler Construction | repair (e) fire escape. no other changes.Details
repair (e) fire escape. no other changes. | $7,500 |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 387 Arguello Bl | Cookline Construction Inc, Quayle And Company | installation of new awnings to replace former extg awnings.Details
installation of new awnings to replace former extg awnings. | $7,500 |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 387 Arguello Bl | Cookline Construction Inc, Quayle And Company | painting for non-structural sign (breck's)Details
painting for non-structural sign (breck's) | $250 |
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 526 Columbus Av | City Structures Inc. | demolition of non-structural, fixtures, finishes, abandoned lighting, drop ceiling. no extrerior work. work in basement and restaurant space only. n/a for maher.Details
demolition of non-structural, fixtures, finishes, abandoned lighting, drop ceiling. no extrerior work. work in basement and restaurant space only. n/a for maher. | $15,000 |
| Jan 30, 2019 | Completed final sign-off May 2019 | 740 Diamond St | remove (e) skylight in (e) top floor bathroom, and replace with solar tube.Details
remove (e) skylight in (e) top floor bathroom, and replace with solar tube. | $10,000 | |
| Jan 16, 2019 | Completed final sign-off Apr 2019 | 269 Jefferson St | Buhler Construction | interior retail tenant improvement including new partitions, renovate restroom, new lighting, new finishes, renovate ceiling. no exterior changes.Details
interior retail tenant improvement including new partitions, renovate restroom, new lighting, new finishes, renovate ceiling. no exterior changes. | $75,000 |
| Dec 12, 2018 | Completed final sign-off Jun 2019 | 2716 Pine St | Buhler Construction | revision to 201810102840. renovation of (e) condo 2nd flr - relocate kitchen add bedroom add laundry, closet, renovate bathroom. no ext. work.Details
revision to 201810102840. renovation of (e) condo 2nd flr - relocate kitchen add bedroom add laundry, closet, renovate bathroom. no ext. work. | $45,000 |
| Dec 10, 2018 | Expired or cancelled withdrawn Oct 2022 | 36 Aladdin Tr | response to nov #201890782,#201892321 and #201892301. add new market rate unit in basement.Details
response to nov #201890782,#201892321 and #201892301. add new market rate unit in basement. | $78,000 | |
| Nov 26, 2018 | Never finaled issued Dec 2018, no final | 2415 03rd St | M C S Construction Services | revision 201809170507: double wall partitions changed to single wall; revision to lighting, revision to outlets. remove furred out wallsDetails
revision 201809170507: double wall partitions changed to single wall; revision to lighting, revision to outlets. remove furred out walls | |
| Oct 24, 2018 | Never finaled issued Dec 2018, no final | 2272 Chestnut St | Pacific Rim Design + Build | installation of new recessed gas vault 4x7ft in s/w on scott street for new gas service for the space at 2272 chestnut st. as req by pge.ref ti pa201807114318. no work on building facade .,maher n/a.Details
installation of new recessed gas vault 4x7ft in s/w on scott street for new gas service for the space at 2272 chestnut st. as req by pge.ref ti pa201807114318. no work on building facade .,maher n/a. | $10,000 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 14 Havens St | Fahan Construction | exploratory demolition permit: demo extg 2'x2' maximum area including partitions fixtures, finishes and area next to exist'g footing, backfill holes after exploratory work is completed. no exterior work.Details
exploratory demolition permit: demo extg 2'x2' maximum area including partitions fixtures, finishes and area next to exist'g footing, backfill holes after exploratory work is completed. no exterior work. | $1,000 |
| Sep 24, 2018 | Completed final sign-off Apr 2019 | 377 Clipper St | Fahan Construction | renovation of single family residentce - new windows replace in kind, new master bath, renovate (e) upstairs bath, new closets, new lightingDetails
renovation of single family residentce - new windows replace in kind, new master bath, renovate (e) upstairs bath, new closets, new lighting | $60,000 |
| Sep 17, 2018 | Never finaled issued Oct 2018, no final | 2415 03rd St | M C S Construction Services | interior t.i.-renovation of (e) aiv studio including 2 new studios, new acoustical treatments, partitions, lighting, new doors, renovate (e) ada restroom. no exterior changes, mep permits are separate.Details
interior t.i.-renovation of (e) aiv studio including 2 new studios, new acoustical treatments, partitions, lighting, new doors, renovate (e) ada restroom. no exterior changes, mep permits are separate. | $115,000 |
| Aug 15, 2018 | Never finaled issued Jan 2019, no final | 1849 Union St | Tommy K Woo | due to water damage, wood rot, replace exterior lean to in rear of reisdential building. replace footings, new walls back door roofDetails
due to water damage, wood rot, replace exterior lean to in rear of reisdential building. replace footings, new walls back door roof | $30,000 |
| Jul 11, 2018 | Never finaled issued Aug 2018, no final | 2272 Chestnut St | Pacific Rim Design + Build | interior ti - restaurant - new: cookline, dining, accessible restroom, lighting, hvac, new structural work. exterior work under sep permit. this permit includes mech & lightingDetails
interior ti - restaurant - new: cookline, dining, accessible restroom, lighting, hvac, new structural work. exterior work under sep permit. this permit includes mech & lighting | $150,000 |
| May 31, 2018 | Completed final sign-off Aug 2023 | 172 21st Av | Jb Builders | remove & replace deck at back of house, note of enforcement #8581-enf. comply with nov #200684924Details
remove & replace deck at back of house, note of enforcement #8581-enf. comply with nov #200684924 | $30,000 |
| May 8, 2018 | Completed final sign-off Jun 2018 | 400 Page St | S & H Renovations | #206: revision to approved permit #2201803264641. rmeove requirement to modify sill of (e) in nested bedroom. maher ord 155-13 naDetails
#206: revision to approved permit #2201803264641. rmeove requirement to modify sill of (e) in nested bedroom. maher ord 155-13 na | |
| May 7, 2018 | Completed final sign-off May 2019 | 1170 Sacramento St | Paul Ryan Associates, Centric Building Inc. | renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes.Details
renovation of unit 18d including renovate of ktiche, bathroom,s laundry, new partitions, lighting, fixtures and finished. no change to mechanical system, no exterior changes. | $350,000 |
| Apr 17, 2018 | Expired or cancelled cancelled Nov 2022 | 15 Hermann St | relocation of electric service, new electrical panelDetails
relocation of electric service, new electrical panel | $40,000 | |
| Apr 6, 2018 | Never finaled filed Apr 2018, never issued | 55 Laguna St | r&r () 2 doors that currently swing into the space scope is to change the swing of both doors out for fire egress. both doors are reqd for exiting, since the is an assembly occupancy, one of the doors will be accessible, interior improvements under sep permit. maher n/aDetails
r&r () 2 doors that currently swing into the space scope is to change the swing of both doors out for fire egress. both doors are reqd for exiting, since the is an assembly occupancy, one of the doors will be accessible, interior improvements under sep permit. maher n/a | $10,000 | |
| Mar 26, 2018 | Completed final sign-off Jun 2018 | 400 Page St | S & H Renovations | renovation of unit #206 on the 2nd floor including new bedroom, renovate kitchen and bath, new lighting. no exterior changes. n/a maherDetails
renovation of unit #206 on the 2nd floor including new bedroom, renovate kitchen and bath, new lighting. no exterior changes. n/a maher | $30,000 |
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 942 Hayes St | Hon's Construction Inc. | renovation of unit 34 including new bedroom, renovate kitchen and bath, new lighting. no exterior changes. n/a for maherDetails
renovation of unit 34 including new bedroom, renovate kitchen and bath, new lighting. no exterior changes. n/a for maher | $30,000 |
| Mar 9, 2018 | Completed final sign-off Jul 2018 | 980 Bush St | Hon's Construction Inc. | renovation of unit 512 including new bedroom, new laundry, renovate kitchen and bath, new lighting. no exterior changes. n/a for maherDetails
renovation of unit 512 including new bedroom, new laundry, renovate kitchen and bath, new lighting. no exterior changes. n/a for maher | $40,000 |
| Feb 15, 2018 | Expired or cancelled cancelled Jan 2026 | 1018 Valencia St | Carlo Construction And Development | renovation of ground floor retail including new partitions, new lighting, new finishes, new exterior facade, new accessible restroom, replace tile & subfloor. heating under sep permit.(dumb water installed for bsmt to 1st fl.)Details
renovation of ground floor retail including new partitions, new lighting, new finishes, new exterior facade, new accessible restroom, replace tile & subfloor. heating under sep permit.(dumb water installed for bsmt to 1st fl.) | $110,000 |
| Feb 7, 2018 | Expired or cancelled cancelled Jan 2026 | 3060 26th St | renovation of (e) 1/2 bath on main floor; 2nd level - add new shower, relocate toilet and vanity sink, add new lighting, remove small service stair to garage, add new closet. no exterior changesDetails
renovation of (e) 1/2 bath on main floor; 2nd level - add new shower, relocate toilet and vanity sink, add new lighting, remove small service stair to garage, add new closet. no exterior changes | $30,000 | |
| Jan 29, 2018 | Never finaled issued Dec 2018, no final | 2272 Chestnut St | Pacific Rim Design + Build | change of use -planning permit - from limited restaurant to full restaurant. for alcohol permit planning review only. tenant improvement under separate permit. (for gound floor business). scope includes exterior changes. ref pa #2018-0711-4318. **maher** n/aDetails
change of use -planning permit - from limited restaurant to full restaurant. for alcohol permit planning review only. tenant improvement under separate permit. (for gound floor business). scope includes exterior changes. ref pa #2018-0711-4318. **maher** n/a | |
| Jan 25, 2018 | Never finaled issued Mar 2019, no final | 705 06th Av | Buhler Construction | remove (e) ground fl, garage, add new 2 bed, 2 bath market rate apartment, including kitchen, living rm, laundry, lighting and heating.curb cut to be removed. sprinkler deferred.Details
remove (e) ground fl, garage, add new 2 bed, 2 bath market rate apartment, including kitchen, living rm, laundry, lighting and heating.curb cut to be removed. sprinkler deferred. | $125,000 |
| Jan 10, 2018 | Expired or cancelled expired Oct 2025 | 2656 Van Ness Av | Strong Builders Construction Inc. | renovation of apt #10 on the 2nd fl, including (1) new bedroom, new laundry, renovate kichen & bath, new lighting, no exterior changes. maher naDetails
renovation of apt #10 on the 2nd fl, including (1) new bedroom, new laundry, renovate kichen & bath, new lighting, no exterior changes. maher na | $40,000 |
| Jan 10, 2018 | Completed final sign-off Jul 2018 | 525 Leavenworth St | D-Finity Construction Inc | renovation of apt #25 on the 2nd fl, including (1) new bedroom, laundry, renovate kichen & bath, new lighting, no exterior changes.Details
renovation of apt #25 on the 2nd fl, including (1) new bedroom, laundry, renovate kichen & bath, new lighting, no exterior changes. | $30,000 |
| Dec 13, 2017 | Completed final sign-off Jul 2018 | 535 Leavenworth St | D-Finity Construction Inc | renovation of unit #2 on 2nd floor including new bedroom, new laundry, renovated kitchen, bath, new lighting, no exterior changes. n/a for maherDetails
renovation of unit #2 on 2nd floor including new bedroom, new laundry, renovated kitchen, bath, new lighting, no exterior changes. n/a for maher | $30,000 |
| Dec 13, 2017 | Expired or cancelled cancelled Jan 2026 | 55 Laguna St | construction of new restaurant in newly renovated shell. including new cook, prep and dish area, new service counter, new restrooms, new partitions, new lighting and new mep. no exterior changes. n/a for maher.Details
construction of new restaurant in newly renovated shell. including new cook, prep and dish area, new service counter, new restrooms, new partitions, new lighting and new mep. no exterior changes. n/a for maher. | $100,000 | |
| Nov 28, 2017 | Completed final sign-off Apr 2018 | 400 Page St | S & H Renovations | renovation of unit 301 on the 3rd fl. addition of bedroom and laundry. renovate kitchen and bath, new lighting, no exterior changesDetails
renovation of unit 301 on the 3rd fl. addition of bedroom and laundry. renovate kitchen and bath, new lighting, no exterior changes | $45,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2018 | 2656 Van Ness Av | Strong Builders Construction Inc. | renovation of apt #9 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher naDetails
renovation of apt #9 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher na | $50,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2018 | 525 Leavenworth St | D F K Y Construction Inc | unit 15-2/f: renovation includes new bedroom, new laundry, kitchen and bath, new lighting, revised heating. no exterior work.Details
unit 15-2/f: renovation includes new bedroom, new laundry, kitchen and bath, new lighting, revised heating. no exterior work. | $40,000 |
| Nov 6, 2017 | Completed final sign-off Jun 2018 | 861 Sutter St | D F K Y Construction Inc | unit 305-3/f: renovation, new bedroom, launry, renovated kitchen and bath, new lighting, revised heating, no exterior changesDetails
unit 305-3/f: renovation, new bedroom, launry, renovated kitchen and bath, new lighting, revised heating, no exterior changes | $35,000 |
| Nov 6, 2017 | Completed final sign-off Apr 2018 | 980 Bush St | Hon's Construction Inc. | renovation unit 514 5th fl includes new bedroom, new bath, new laundry, renovated kitche, bath, lighting, revised heating, no exterior changesDetails
renovation unit 514 5th fl includes new bedroom, new bath, new laundry, renovated kitche, bath, lighting, revised heating, no exterior changes | $45,000 |
| Nov 6, 2017 | Completed final sign-off Jun 2018 | 2656 Van Ness Av | Strong Builders Construction Inc. | renovation apt 14 2nd fl includes new bedroom, new laundry, new bath, reonvated kitchen, renovated bath, new lighting, revised heating, no exterior changesDetails
renovation apt 14 2nd fl includes new bedroom, new laundry, new bath, reonvated kitchen, renovated bath, new lighting, revised heating, no exterior changes | $45,000 |
| Nov 6, 2017 | Completed final sign-off Mar 2018 | 861 Sutter St | D F K Y Construction Inc | renovation of apt #509 on top floor including new bedroom, new laundry, renovated kitchen and bath, new lighting, revised heating, no exterior changesDetails
renovation of apt #509 on top floor including new bedroom, new laundry, renovated kitchen and bath, new lighting, revised heating, no exterior changes | $45,000 |
| Nov 6, 2017 | Expired or cancelled expired Dec 2019 | 861 Sutter St | D F K Y Construction Inc | #501- renovation of apt 501 5th lvel including new bedroom, new bath, renovated kitchen, bath, new lighting, revised heating, no ext changesDetails
#501- renovation of apt 501 5th lvel including new bedroom, new bath, renovated kitchen, bath, new lighting, revised heating, no ext changes | $45,000 |
| Oct 25, 2017 | Completed final sign-off Mar 2018 | 535 Leavenworth St | D F K Y Construction Inc | unit 1, g/f: renovation including new bedroom, new bathroom, new laundry. relocate and renovate kitchen and bathroom. new lighting, revised heating. no exterior changes. maher ord 155-13 naDetails
unit 1, g/f: renovation including new bedroom, new bathroom, new laundry. relocate and renovate kitchen and bathroom. new lighting, revised heating. no exterior changes. maher ord 155-13 na | $35,000 |
| Oct 20, 2017 | Expired or cancelled withdrawn Nov 2017 | 3060 26th St | addition of adu- accesory dwelling unit in (e) storage/garage on ground lvl. add shower to 2nd level bath. repair rotted posts & pickets & roof on both decks.Details
addition of adu- accesory dwelling unit in (e) storage/garage on ground lvl. add shower to 2nd level bath. repair rotted posts & pickets & roof on both decks. | $150,000 | |
| Oct 6, 2017 | Completed final sign-off Oct 2017 | 168 Clinton Pk | Pascual Construction Inc Dba Sure Line P | comply with nov 201774411: replace fireplace insert, furnace no exterior workDetails
comply with nov 201774411: replace fireplace insert, furnace no exterior work | $2,500 |
| Aug 16, 2017 | Completed final sign-off Mar 2018 | 942 Hayes St | S & H Renovations | unit c: revision to pa #201704063360 - addition of new bedroom, and new bathroom. relocate front door. unit c is on the ground fl.Details
unit c: revision to pa #201704063360 - addition of new bedroom, and new bathroom. relocate front door. unit c is on the ground fl. | $30,000 |