Block 6532, lot 016
3632 26th St
- City’s use
- Multi-Family Residential
- Built
- 1920
- Stories
- 3
- Units
- 4
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 2,763 sq ft
- Lot
- 3,367 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2025 | Expired or cancelled cancelled Apr 2026 | 3632 26th St | legalize (e) 2 story single unit adu in the rear of property.Details
legalize (e) 2 story single unit adu in the rear of property. | $60,000 | |
| Aug 18, 2023 | Completed final sign-off Jun 2025 | 3632 26th St | B M S Cat Llc | to obtain final inspection for work approved under pa#201904258962. all work is complete.Details
to obtain final inspection for work approved under pa#201904258962. all work is complete. | |
| Apr 25, 2019 | Expired or cancelled expired Jun 2025 | 3632 26th St | Bms Cat | fire, smoke , water damage repairt to interior spaces of unit 2 hallway, utility room using like for like approachDetails
fire, smoke , water damage repairt to interior spaces of unit 2 hallway, utility room using like for like approach | $20,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 3632 26th St | Union Pacific Construction Inc | apt #4: bathroom remodel, like for like. repair rotten deck.Details
apt #4: bathroom remodel, like for like. repair rotten deck. | $66,000 |
| Jul 10, 2014 | Never finaled issued Jul 2014, no final | 3632 26th St | Union Pacific Construction Inc | units #4&1: replace (1) rear facing window, #4: clean refinish hardwood floors in kind, run some new elec breaks to #4, add some kitchen cabinets, paint inside, need ground wires for plugs in #4, work for these 2 units only, no changes to doors; apt 1 kitchen cabinets, paint and cleanDetails
units #4&1: replace (1) rear facing window, #4: clean refinish hardwood floors in kind, run some new elec breaks to #4, add some kitchen cabinets, paint inside, need ground wires for plugs in #4, work for these 2 units only, no changes to doors; apt 1 kitchen cabinets, paint and clean | $20,000 |
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 3632 26th St | replace damaged sheetrock in common bathroom, apply new linoleum floor shower room, toilet room, apartment 3 and 4. replace leaking bathtub, with stand up shower and handrails. new sheetrock. replace light fixture apt #3 and 4 and common area kitchen. replace stove and counter top kitchen(3rd fl).Details
replace damaged sheetrock in common bathroom, apply new linoleum floor shower room, toilet room, apartment 3 and 4. replace leaking bathtub, with stand up shower and handrails. new sheetrock. replace light fixture apt #3 and 4 and common area kitchen. replace stove and counter top kitchen(3rd fl). | $5,000 | |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 3632 26th St | vinal insulated siding to be applied to 2 sides, 16x18 rear wall & side wall. not visible from street.Details
vinal insulated siding to be applied to 2 sides, 16x18 rear wall & side wall. not visible from street. | $5,100 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.