Block 4269, lot 023
2937 24th St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 4,339 sq ft
- Lot
- 3,349 sq ft
- Zoning
- 24MISS
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 2937 24th St | to obtain final inspection for work approved under pa# 201812107922 and 201904228565Details
to obtain final inspection for work approved under pa# 201812107922 and 201904228565 | ||
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 2937 24th St | Ha Fire Protection | modify hood & duct fire suppression systemDetails
modify hood & duct fire suppression system | $2,000 |
| Jun 11, 2025 | Completed final sign-off Jul 2025 | 2937 24th St | Ningzhi Hu Signs Company | 2 plastic face with logo 48" x 72" "cinderella russian bakery and cafe"Details
2 plastic face with logo 48" x 72" "cinderella russian bakery and cafe" | $1,600 |
| Nov 5, 2024 | Completed final sign-off Jul 2026 | 2937 24th St | Ren Lei Construction Co | renovation of (e) bakery/limited restaurant and new equipment, lighting, hvac plumving, electrical finishes, accessible lift and accessible restroom. no exterior changes. not a change of use.Details
renovation of (e) bakery/limited restaurant and new equipment, lighting, hvac plumving, electrical finishes, accessible lift and accessible restroom. no exterior changes. not a change of use. | $175,000 |
| Jun 22, 2022 | Completed final sign-off Mar 2024 | 2937 24th St | Pineda Construction Inc | remove and replace approx 500sf of interior drywall/sheetrock on walls/ceilings due to water/mold damage inkind. no structural work. no layout/wall modifications.Details
remove and replace approx 500sf of interior drywall/sheetrock on walls/ceilings due to water/mold damage inkind. no structural work. no layout/wall modifications. | $23,000 |
| Jul 24, 2019 | Expired or cancelled withdrawn Oct 2024 | 2937 24th St | existing bakery restaurant t.i. include new ada restroom, new ada entrance, new equip, new lighting, new counter service counter, new roof top equip, new windows. no change of use.Details
existing bakery restaurant t.i. include new ada restroom, new ada entrance, new equip, new lighting, new counter service counter, new roof top equip, new windows. no change of use. | $225,000 | |
| Apr 22, 2019 | Completed final sign-off Aug 2019 | 2933 24th St | Frisco Bay Construction Inc. | remodel 2 bathrooms, kitchen, install new subpanel & lights & outlets.Details
remodel 2 bathrooms, kitchen, install new subpanel & lights & outlets. | $48,000 |
| Apr 22, 2019 | Never finaled issued Apr 2019, no final | 2937 24th St | Frisco Bay Construction Inc. | amend pa 201812107922. stucco siding repair.Details
amend pa 201812107922. stucco siding repair. | $6,000 |
| Dec 10, 2018 | Never finaled issued Dec 2018, no final | 2937 24th St | Frisco Bay Construction Inc. | remodel bathroom and kitchen in kind, replace 7 windows - new subpanel outlets and switches for kitchen. double hung wood materials. project is on 2nd floor. all work in residential dwelling.Details
remodel bathroom and kitchen in kind, replace 7 windows - new subpanel outlets and switches for kitchen. double hung wood materials. project is on 2nd floor. all work in residential dwelling. | $22,000 |
| Nov 6, 2015 | Expired or cancelled cancelled Jan 2026 | 2937 24th St | fire damage. replace drywall, insulation, door, floor sheathing, stair framing, & floor joist. all work repair in kind.Details
fire damage. replace drywall, insulation, door, floor sheathing, stair framing, & floor joist. all work repair in kind. | $10,000 | |
| Jul 10, 2013 | Never finaled filed Jul 2013, never issued | 2937 24th St | addition of bar counter to (e) bakery counter, new ceiling & lighting in public area (less than 50% of fixtures changing), accessibility upgrades to restrooms, new atm machine to comply with nov# 201032173Details
addition of bar counter to (e) bakery counter, new ceiling & lighting in public area (less than 50% of fixtures changing), accessibility upgrades to restrooms, new atm machine to comply with nov# 201032173 | $30,000 | |
| Jan 26, 2011 | Completed final sign-off Sep 2012 | 2937 24th St | to obtain final inspection for work approved under app #9913098. all work is complete.Details
to obtain final inspection for work approved under app #9913098. all work is complete. | ||
| May 9, 2000 | Completed final sign-off Jul 2000 | 2937 24th St | Har Bro Of No. California | remove & replace tile damaged by auto. no structural workDetails
remove & replace tile damaged by auto. no structural work | $3,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Frisco Bay Construction Inc. (3), Ha Fire Protection, Har Bro Of No. California, Ningzhi Hu Signs Company, Pineda Construction Inc, Ren Lei Construction Co
- Architects
- Christopher Sullivan (2), Robert Gerson
- Engineers
- Matthew Wang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.