Robert Gerson
- Listed as
- architect, designer
- Firm
- Siol
- Based in
- San Francisco
- On San Francisco permits
- Jun 2013 to Sep 2026
69 permits since 2000 (architect on 67 permits, designer on 2 permits): 43 completed, 7 in progress, 10 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Oct 2026 | 646 06th Av | Cbs Construction Inc. | consolidating (e) water closet and bathrooms on floors 1 and 2 to create 2 (n) primary ensuite bathrooms, 2 (n) primary walk in closets, (n) washer and ventless dryer on 2nd floor. (n) lighting in bathrooms and closets.Details
consolidating (e) water closet and bathrooms on floors 1 and 2 to create 2 (n) primary ensuite bathrooms, 2 (n) primary walk in closets, (n) washer and ventless dryer on 2nd floor. (n) lighting in bathrooms and closets. | $40,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 646 06th Av | Cbs Construction Inc. | interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & subDetails
interior remodel of duplex including: relocating (e) kitchen for each unit. creating 1 (n) full bathroom per uni. creating (n) office (n) sfpa 13d compliant sprinkler system throughout. (n) 400 amp electrical service & sub | $350,000 |
| Jun 30, 2026 | In progress issued Aug 2026 | 101 Genebern Wy | Kasas Builders Inc | 1st fl.interior remodel:(n) open kitchen /living room, powder room & bathroom. 2nd fl:interior renovation:(e) bedrooms,living room and bathroom and a (n) primary bathroom, closet and stair location. replacing existing windows and adding a (n) rear window, rear slider door and solatube skylights.Details
1st fl.interior remodel:(n) open kitchen /living room, powder room & bathroom. 2nd fl:interior renovation:(e) bedrooms,living room and bathroom and a (n) primary bathroom, closet and stair location. replacing existing windows and adding a (n) rear window, rear slider door and solatube skylights. | $560,000 |
| May 19, 2026 | In progress issued May 2026 | 2121 Divisadero St | Design Line Construction | create 1 new bathroom on 2nd/fDetails
create 1 new bathroom on 2nd/f | $23,000 |
| Apr 30, 2026 | In progress issued Jun 2026 | 3580 Clay St | Matarozzi/Pelsinger Builders Inc. | interior renovation of 4th fl which includes renovation of e 1 bath, 1 family room, 1 bedroom and 1 new laundry room and 1/2 bathDetails
interior renovation of 4th fl which includes renovation of e 1 bath, 1 family room, 1 bedroom and 1 new laundry room and 1/2 bath | $270,000 |
| Aug 5, 2025 | Completed final sign-off Mar 2026 | 798 Geneva Av | revision to pa# 202412207268,& 2025022851310 unit a: remove proposed (n) pantry from scope. convert existing wall to a shear wall. replace/re-frame existing dry rot exterior stair in-kind.Details
revision to pa# 202412207268,& 2025022851310 unit a: remove proposed (n) pantry from scope. convert existing wall to a shear wall. replace/re-frame existing dry rot exterior stair in-kind. | ||
| Jun 18, 2025 | In progress issued Nov 2025 | 306 Roosevelt Wy | Barton Builders | extension at the rear of the property to include a new bathroom & laundry. removal of structural interior wall and load bearing exterior walls. replacement of (e) window along property line, new interior finishes, replacement portion of (e) deck and minor deck extensionDetails
extension at the rear of the property to include a new bathroom & laundry. removal of structural interior wall and load bearing exterior walls. replacement of (e) window along property line, new interior finishes, replacement portion of (e) deck and minor deck extension | $300,000 |
| Feb 28, 2025 | Completed final sign-off Mar 2026 | 798 Geneva Av | revision pa 202412207268 remove shearing walls at unit a, living room 101aDetails
revision pa 202412207268 remove shearing walls at unit a, living room 101a | ||
| Dec 20, 2024 | In progress issued Feb 2025 | 798 Geneva Av | unit a: remodel (e) kitchen & bathroom. replace wall btwn kitchen & foyer w/ new beam. unit b: recapture unused (abandoned) bedroom & add bathroom. unit c: no work unit d: upgrade plumbing & electrical, remove non load bearing wall in kitchen. comply w/ nov 201101381 item #5Details
unit a: remodel (e) kitchen & bathroom. replace wall btwn kitchen & foyer w/ new beam. unit b: recapture unused (abandoned) bedroom & add bathroom. unit c: no work unit d: upgrade plumbing & electrical, remove non load bearing wall in kitchen. comply w/ nov 201101381 item #5 | $300,000 | |
| Oct 23, 2024 | Completed final sign-off Jan 2026 | 300 Beale St | Reeb Design & Build Inc | interior remodel of (1) bathroom, and kitchen with new layout. removal of (e) non bearing walls and install of (n) interior partitoin walls. removal of (e) fireplace, new lighting and switches per plan.Details
interior remodel of (1) bathroom, and kitchen with new layout. removal of (e) non bearing walls and install of (n) interior partitoin walls. removal of (e) fireplace, new lighting and switches per plan. | $470,000 |
| Sep 23, 2024 | Completed final sign-off Dec 2024 | 85 Duboce Av | Endora Builders | unit 204: full bathroom remodel: update new walk-in shower & all new fixtures, finihes, cabinerty w/ e) plumbing location remain. replace wall light & ceiling vent in-kind. add 1 outlet & 2 recessed lights. replace light fixture in bathroom, primary bedroom & living rmDetails
unit 204: full bathroom remodel: update new walk-in shower & all new fixtures, finihes, cabinerty w/ e) plumbing location remain. replace wall light & ceiling vent in-kind. add 1 outlet & 2 recessed lights. replace light fixture in bathroom, primary bedroom & living rm | $40,000 |
| Aug 8, 2024 | Completed final sign-off Sep 2025 | 1325 Indiana St | Mars Construction And Remodeling | unit #8: interior remodel of a lofted condominium on 2nd fl. bedroom and ensuite are being updated with new fixtures, finishes, and cabinetry. addition of storage at entry.Details
unit #8: interior remodel of a lofted condominium on 2nd fl. bedroom and ensuite are being updated with new fixtures, finishes, and cabinetry. addition of storage at entry. | $40,000 |
| May 16, 2024 | Completed final sign-off Jun 2025 | 3433 Sacramento St | Mascheroni Construction | unit 2: kitchen remodel with new layout and appliances. bath remodel of fixtures and finishes. installation of new furnace, water heater, and overhead lighting. replacement of (4) windows at rear facade. scope of work is limited to unit 2.Details
unit 2: kitchen remodel with new layout and appliances. bath remodel of fixtures and finishes. installation of new furnace, water heater, and overhead lighting. replacement of (4) windows at rear facade. scope of work is limited to unit 2. | $40,000 |
| Mar 26, 2024 | Completed final sign-off Apr 2024 | 182 Hartford St | Mascheroni Construction | revision to permit 202206075763 to show closet removed from room 104 and room shown as office.Details
revision to permit 202206075763 to show closet removed from room 104 and room shown as office. | |
| Dec 1, 2023 | Completed final sign-off Apr 2024 | 787 Rhode Island St | administrative permit for planning change of use of one community parking garage to one off street parking space. no change of occupancy, no construction.Details
administrative permit for planning change of use of one community parking garage to one off street parking space. no change of occupancy, no construction. | ||
| Sep 27, 2023 | Completed final sign-off Mar 2024 | 182 Hartford St | Mascheroni Construction | new fence @ rear to replace (e) alone south property line. new lowered seating area w/ gas fire pit. install drip irrigation & low voltage landscape light. soil amendent, new planting, & mulchingDetails
new fence @ rear to replace (e) alone south property line. new lowered seating area w/ gas fire pit. install drip irrigation & low voltage landscape light. soil amendent, new planting, & mulching | $50,000 |
| Dec 6, 2022 | Completed final sign-off Dec 2023 | 3664 22nd St | Upscale Construction Inc. | remodel penthouse bathroom. removal of e fireplace and expansion closet. penthouse flrs updated to n hardwood flrs. e penthouse window,door & front siding at balcony to be replaced due to water damage. addition of n sauna at 1st flr patio. e slider & e window at 1st flr replaced. deck & stair updateDetails
remodel penthouse bathroom. removal of e fireplace and expansion closet. penthouse flrs updated to n hardwood flrs. e penthouse window,door & front siding at balcony to be replaced due to water damage. addition of n sauna at 1st flr patio. e slider & e window at 1st flr replaced. deck & stair update | $150,000 |
| Nov 4, 2022 | Completed final sign-off Jun 2023 | 419 10th St | change of use from b to a2 and increase in occupancy. new ada soap dispenser. bathroom sign at 2nd fl bathroom; new storage @ roof deck.Details
change of use from b to a2 and increase in occupancy. new ada soap dispenser. bathroom sign at 2nd fl bathroom; new storage @ roof deck. | $1,600 | |
| Aug 29, 2022 | Expired or cancelled withdrawn Jan 2025 | 798 Geneva Av | 1/f-unit a and b: renovation to existing units. structural, plumbing, mechanical, and electrical work for renovated units only. mep to be design build.Details
1/f-unit a and b: renovation to existing units. structural, plumbing, mechanical, and electrical work for renovated units only. mep to be design build. | $100,000 | |
| Jun 7, 2022 | Completed final sign-off Apr 2024 | 182 Hartford St | Mascheroni Construction | basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet.Details
basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet. | $400,000 |
| Apr 12, 2022 | Completed final sign-off Jun 2023 | 542 Valley St | Reeb Design & Build Inc | rev to pa# 2021-0525-1032: addition of rear retaining walls, new deck revision, and a new fire rated windowDetails
rev to pa# 2021-0525-1032: addition of rear retaining walls, new deck revision, and a new fire rated window | $50,000 |
| Dec 15, 2021 | Never finaled filed Dec 2021, never issued | 697 Rhode Island St | renovation of existing(2)bed(1)bath unit to a(2)bed(1.5)bath unit (unit #2) renovation is of the unit at the rear of the site which is on both the 1st floor&basement level. it is not related to adu or legalizationDetails
renovation of existing(2)bed(1)bath unit to a(2)bed(1.5)bath unit (unit #2) renovation is of the unit at the rear of the site which is on both the 1st floor&basement level. it is not related to adu or legalization | $250,000 | |
| Dec 14, 2021 | Never finaled filed Dec 2021, never issued | 697 Rhode Island St | renovation and legalization of (e) studio unit basement level unit (1) per ordinance 43-14 plan set travel together with 202112144425, 202112144435, & 202112154459Details
renovation and legalization of (e) studio unit basement level unit (1) per ordinance 43-14 plan set travel together with 202112144425, 202112144435, & 202112154459 | $150,000 | |
| Dec 14, 2021 | Never finaled filed Dec 2021, never issued | 697 Rhode Island St | renovation of (1) studio accessory dwelling unit per ordinance 162.16 (unit #3) for a building total of (3) units. ceiling between unit 1 and unit 3 to be upgraded to a 1-hour rated assembly per information sheet fs-05. plan set travel together with 202112144425, 202112144435, & 202112154459Details
renovation of (1) studio accessory dwelling unit per ordinance 162.16 (unit #3) for a building total of (3) units. ceiling between unit 1 and unit 3 to be upgraded to a 1-hour rated assembly per information sheet fs-05. plan set travel together with 202112144425, 202112144435, & 202112154459 | $150,000 | |
| Nov 16, 2021 | Completed final sign-off Sep 2022 | 47 Levant St | David Peck Construction | revision to pa 2020-0303-5976. small bathroom window shall be eliminated. the remaining window shall be sheathed and strapped around and the closet sheathing may be eliminated. minor plumbing fenestrationDetails
revision to pa 2020-0303-5976. small bathroom window shall be eliminated. the remaining window shall be sheathed and strapped around and the closet sheathing may be eliminated. minor plumbing fenestration | $1,000 |
| Sep 16, 2020 | Expired or cancelled cancelled Jan 2026 | 1310 Pacific Av | Crown Construction San Francisco | new roofdeck w/42" guardrails around skylight & @ side sebacks. new 42" high planter to be located @ rear of deckDetails
new roofdeck w/42" guardrails around skylight & @ side sebacks. new 42" high planter to be located @ rear of deck | $10,000 |
| Aug 24, 2020 | Expired or cancelled cancelled Jan 2026 | 710 Powell St | new gate at powell street entryDetails
new gate at powell street entry | ||
| Mar 10, 2020 | Completed final sign-off Jan 2021 | 3664 22nd St | Upscale Construction Inc. | scope of work includes an interior remodel of kitchen and kid's bathrooms (302 & 307) and putting new finished floor throughout the second floor.Details
scope of work includes an interior remodel of kitchen and kid's bathrooms (302 & 307) and putting new finished floor throughout the second floor. | $1,050,000 |
| Mar 3, 2020 | Completed final sign-off Sep 2022 | 47 Levant St | David Peck Construction | master bathrom redesign with new windows at the perimeter wall. new perimeter window frame at dining zone on 3rd fl. replace living room (e) sliding door opening with a (n) glass door system.Details
master bathrom redesign with new windows at the perimeter wall. new perimeter window frame at dining zone on 3rd fl. replace living room (e) sliding door opening with a (n) glass door system. | $40,000 |
| Jul 8, 2019 | Expired or cancelled cancelled Jan 2026 | 1569 Masonic Av | work in the front yard to include a new fence, new man gate, new driveway, and new garage doorDetails
work in the front yard to include a new fence, new man gate, new driveway, and new garage door | $8,000 | |
| May 30, 2019 | Completed final sign-off Dec 2019 | 55 Terrace Dr | O Donoghue Construction Inc. | interior remodel of (e) 1st fl. to include a new half bath and a new exterior door on the west elevattion.Details
interior remodel of (e) 1st fl. to include a new half bath and a new exterior door on the west elevattion. | $5,000 |
| Jan 28, 2019 | Completed final sign-off Nov 2019 | 55 Terrace Dr | Kanler Inc | remodel of sfd interior scope to include enlargement of (e) kitchen space, addition of interior staircase from 2nd to 3rd floor. remodel of bathrooms plus additional master suite on 3rd fl. exterior work to include replacement in-kind of windows plus removal of (e) kitchen door.Details
remodel of sfd interior scope to include enlargement of (e) kitchen space, addition of interior staircase from 2nd to 3rd floor. remodel of bathrooms plus additional master suite on 3rd fl. exterior work to include replacement in-kind of windows plus removal of (e) kitchen door. | $150,000 |
| Jan 25, 2019 | Never finaled issued Feb 2019, no final | 75 14th St | Narrowback Construction Co. | tenant improvements to include new non bearing partition walls for workshop and storage spaces. mep and sprinklers to be design buildDetails
tenant improvements to include new non bearing partition walls for workshop and storage spaces. mep and sprinklers to be design build | $50,000 |
| Oct 2, 2018 | Completed final sign-off Feb 2020 | 425 10th St | Sf Hills Construction, Inc. | revision to 201504163789 to include revised entry and egress door swingsDetails
revision to 201504163789 to include revised entry and egress door swings | |
| Sep 10, 2018 | Completed final sign-off Sep 2021 | 1822 42nd Av | revision 201808086778 replace 2 windows at street. replace alum clad wood windows. left window replace in kind w slider and right window replaced in kind 2 casements with picture window in middleDetails
revision 201808086778 replace 2 windows at street. replace alum clad wood windows. left window replace in kind w slider and right window replaced in kind 2 casements with picture window in middle | $1,000 | |
| Sep 5, 2018 | Completed final sign-off Oct 2019 | 549 El Camino Del Mar | Upscale Construction Inc. | revision to 201707252943 as-built structural changes at district inspectors request. revised t24 & energy inspector forms per built conditions.Details
revision to 201707252943 as-built structural changes at district inspectors request. revised t24 & energy inspector forms per built conditions. | |
| Aug 8, 2018 | Completed final sign-off Sep 2021 | 1822 42nd Av | addition of wall & entry door at 1st fl. remodel of kitchen, bathroom & powder room at 2nd fl. removal and addition of windows on side and rear of building.Details
addition of wall & entry door at 1st fl. remodel of kitchen, bathroom & powder room at 2nd fl. removal and addition of windows on side and rear of building. | $100,000 | |
| Mar 27, 2018 | Completed final sign-off Jun 2018 | 1476 Haight St | material refinishing, and minor electrical upgrades.Details
material refinishing, and minor electrical upgrades. | $30,000 | |
| Feb 9, 2018 | Completed final sign-off Sep 2018 | 75 14th St | Narrowback Construction Co. | revision to app#201609066864: enclosed office space at extg mazzanine. n/a for maherDetails
revision to app#201609066864: enclosed office space at extg mazzanine. n/a for maher | $5,000 |
| Nov 15, 2017 | Expired or cancelled expired Aug 2024 | 1812 Anza St | horizontal addition @ rear to 75% of lot coverage. creation of 3rd level legal unit on 1st & basement floors. addition of 1 bedroom, 2 bath, living room & media room.Details
horizontal addition @ rear to 75% of lot coverage. creation of 3rd level legal unit on 1st & basement floors. addition of 1 bedroom, 2 bath, living room & media room. | $200,000 | |
| Nov 8, 2017 | Completed final sign-off Sep 2019 | 785 Rhode Island St | Pop Construction A Parnership | 2 bath remodel including new finishes, fixturesDetails
2 bath remodel including new finishes, fixtures | $30,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2018 | 75 14th St | Narrowback Construction Co. | rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maherDetails
rev. to bpa# 201609066864. relocate egress corridor reconfigure bathroom and kitchenette and replace 1 existing solid core door with glazed door, new glazed egress door, new glazed roll up door mep deferred; n/a maher | $10,000 |
| Sep 13, 2017 | Expired or cancelled cancelled Jan 2026 | 794 Rhode Island St | W J L Construction Inc | revision to pa #201503241699 - revise curb width from 10'-0" to 12'-0" on 20th street.Details
revision to pa #201503241699 - revise curb width from 10'-0" to 12'-0" on 20th street. | |
| Aug 1, 2017 | Never finaled issued Aug 2017, no final | 413 10th St | Sf Hills Construction, Inc. | replace exterior brick facade in kind. use is catering. n/a ordinance #155-13Details
replace exterior brick facade in kind. use is catering. n/a ordinance #155-13 | $40,000 |
| Jul 25, 2017 | Completed final sign-off Oct 2019 | 549 El Camino Del Mar | Upscale Construction Inc. | interior remodel on all floors. no change to building footprints. exterior alterations on some windows and doors. layout changes. sprinkler throughout.Details
interior remodel on all floors. no change to building footprints. exterior alterations on some windows and doors. layout changes. sprinkler throughout. | $400,000 |
| Jun 30, 2017 | Completed final sign-off Sep 2018 | 75 14th St | Narrowback Construction Co. | mezzanine structural related to building pa 2016-0906-6864Details
mezzanine structural related to building pa 2016-0906-6864 | |
| Mar 7, 2017 | Completed final sign-off Dec 2017 | 424 Treat Av | ti- entrance accessible path of travel, and ground flr bathroom to be accessible w/addition of ada shower to ground flr bathroom. 2nd flr auxiliary office and bathroom to be remodeled maher naDetails
ti- entrance accessible path of travel, and ground flr bathroom to be accessible w/addition of ada shower to ground flr bathroom. 2nd flr auxiliary office and bathroom to be remodeled maher na | $120,000 | |
| Feb 21, 2017 | Completed final sign-off Sep 2021 | 1310 Pacific Av | Crown Construction San Francisco | tenant improvements to existing vacant commercial space to office. improvements to include: new storefront, lighting/electrical, meeting & work spaces. no change to bldg footprint.Details
tenant improvements to existing vacant commercial space to office. improvements to include: new storefront, lighting/electrical, meeting & work spaces. no change to bldg footprint. | $35,000 |
| Jan 13, 2017 | Completed final sign-off Jan 2019 | 1814 Anza St | bathroom remodel and new laundry room.Details
bathroom remodel and new laundry room. | $10,000 | |
| Jan 10, 2017 | Expired or cancelled cancelled Jan 2026 | 35 Valmar Tr | new door from kitchen to patio in existing window locationDetails
new door from kitchen to patio in existing window location | ||
| Dec 22, 2016 | Completed final sign-off Feb 2018 | 542 Pennsylvania Av | Takoma Carpentry & Remodeling | new roof deck on top of (e) 3rd flr flat. new construction to include new parapet walls and guardrail, new spiral stairscase, new retractable skylightDetails
new roof deck on top of (e) 3rd flr flat. new construction to include new parapet walls and guardrail, new spiral stairscase, new retractable skylight | $30,000 |
| Dec 21, 2016 | Completed final sign-off Sep 2021 | 1312 Pacific Av | Crown Construction San Francisco | remodel of (e) unit and vertical addition of two stories above existing unit & commerical unit on 3rd & 4th floor and roof deck, new facade material & rear interial drieway. building foot print to remain unchanged. addition of one unit.Details
remodel of (e) unit and vertical addition of two stories above existing unit & commerical unit on 3rd & 4th floor and roof deck, new facade material & rear interial drieway. building foot print to remain unchanged. addition of one unit. | $300,000 |
| Nov 2, 2016 | Never finaled issued Nov 2016, no final | 151 Alice B Toklas Pl | American Technologies Inc, Barton Builders | unit #512: kitchen remodel to include island and dropped ceiling to faciliate new lighting plan.Details
unit #512: kitchen remodel to include island and dropped ceiling to faciliate new lighting plan. | $20,000 |
| Sep 6, 2016 | Completed final sign-off Sep 2018 | 75 14th St | remodel & conversion of a single pdr workshop to two pdr workshops. addition of new mezzanine new lobby entrance, 4 new accessory offices (750 sqft total); 2 lunchrooms & 6 bathrooms; replace doors & skylights. ** maher: n/a **Details
remodel & conversion of a single pdr workshop to two pdr workshops. addition of new mezzanine new lobby entrance, 4 new accessory offices (750 sqft total); 2 lunchrooms & 6 bathrooms; replace doors & skylights. ** maher: n/a ** | $400,000 | |
| Jul 29, 2016 | Expired or cancelled withdrawn Sep 2016 | 75 14th St | remodel of (e) workshop. per pdr use, new mezzanine shall be no more than 1/3 overall floor area.Details
remodel of (e) workshop. per pdr use, new mezzanine shall be no more than 1/3 overall floor area. | $800,000 | |
| Jun 8, 2016 | Completed final sign-off Apr 2017 | 1383 Church St | De Star Construction | bathroom remodels on 2nd and 3rd floor. n/a for maher.Details
bathroom remodels on 2nd and 3rd floor. n/a for maher. | $60,000 |
| Jun 8, 2016 | Completed final sign-off Aug 2017 | 2711 18th St | Kg Bell Construction Inc | unit #25: remodel of extg bathroom, closet, and kitchen.Details
unit #25: remodel of extg bathroom, closet, and kitchen. | $50,000 |
| May 20, 2016 | Completed final sign-off Mar 2018 | 363 Monticello St | new family room, laundry room, bathroom & storage room in rear of garage. one car parking to remain in garageDetails
new family room, laundry room, bathroom & storage room in rear of garage. one car parking to remain in garage | $50,000 | |
| Mar 14, 2016 | Completed final sign-off Mar 2017 | 482 Hayes St | Diego Brothers Inc. | change of use from restaurant & bar to bar. remove ktichen, add bar & ada bathroom, move existing bathroom.Details
change of use from restaurant & bar to bar. remove ktichen, add bar & ada bathroom, move existing bathroom. | $50,000 |
| Jan 13, 2016 | Completed final sign-off Feb 2020 | 425 10th St | Sf Hills Construction, Inc. | demolition of interior finishes and framing in preparation for permit #201504163789. ok to demo interior pursuant to ab-017 as building shall remain vacant prior to construction. n/a for maher.Details
demolition of interior finishes and framing in preparation for permit #201504163789. ok to demo interior pursuant to ab-017 as building shall remain vacant prior to construction. n/a for maher. | $18,000 |
| Apr 16, 2015 | Completed final sign-off Jan 2020 | 425 10th St | Sf Hills Construction, Inc. | remodel of existing commercial building to include new photography studio, work space and bathrooms. second level to include new roof deck. ** maher: compliance with ordinance no# 155-13 not required **Details
remodel of existing commercial building to include new photography studio, work space and bathrooms. second level to include new roof deck. ** maher: compliance with ordinance no# 155-13 not required ** | $500,000 |
| Mar 24, 2015 | Completed final sign-off Dec 2018 | 794 Rhode Island St | W J L Construction Inc | remodel of (e) structure. (n) construct to include (n) 3rd floor. footprint of building to remain unchanged. (n) facade materials.Details
remodel of (e) structure. (n) construct to include (n) 3rd floor. footprint of building to remain unchanged. (n) facade materials. | $400,000 |
| Dec 22, 2014 | Completed final sign-off Mar 2015 | 415 10th St | Modern Construction Inc | tenant improvement-one ada restrm, new roll-up door to replace existing; new glazed aluminum system at interior behind roll-up door. n/a maher ordinanceDetails
tenant improvement-one ada restrm, new roll-up door to replace existing; new glazed aluminum system at interior behind roll-up door. n/a maher ordinance | $80,000 |
| Sep 22, 2014 | Expired or cancelled expired Jul 2018 | 427 Kirkham St | C G Adams Construction | proposed 3rd story addition to provide 2 new children bedrooms and shared bathroom plus new master suite with bathroom and walk in closet. ground floor to be converted to habitable space with guest room and utility room.Details
proposed 3rd story addition to provide 2 new children bedrooms and shared bathroom plus new master suite with bathroom and walk in closet. ground floor to be converted to habitable space with guest room and utility room. | $120,000 |
| Jun 4, 2014 | Completed final sign-off Jan 2015 | 527 Central Av | C H Burnham Inc | interior remodel: kitchen, bath, and new spiral staircase to replace extg. remove powder room and convert to new full bath, add office at ground floor.Details
interior remodel: kitchen, bath, and new spiral staircase to replace extg. remove powder room and convert to new full bath, add office at ground floor. | $50,000 |
| Feb 6, 2014 | Never finaled issued Feb 2014, no final | 151 Potrero Av | Michael Clarke Construction | construct new 5' wide mezzanine for artists and upgrade electrical and introdue heating into spaces. upgrade ada compliance with new front entry door, ada closing hardware and push button at exterior. n/a for maher ordinance ~kf21&~kf21&-133Details
construct new 5' wide mezzanine for artists and upgrade electrical and introdue heating into spaces. upgrade ada compliance with new front entry door, ada closing hardware and push button at exterior. n/a for maher ordinance ~kf21&~kf21&-133 | $30,000 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 2691 35th Av | Canyon Construction | revision to pa#201307091439, remove spanish tile roof, railings and chimney, replace with level roof line at 2nd floor.Details
revision to pa#201307091439, remove spanish tile roof, railings and chimney, replace with level roof line at 2nd floor. | |
| Jul 10, 2013 | Never finaled filed Jul 2013, never issued | 2937 24th St | addition of bar counter to (e) bakery counter, new ceiling & lighting in public area (less than 50% of fixtures changing), accessibility upgrades to restrooms, new atm machine to comply with nov# 201032173Details
addition of bar counter to (e) bakery counter, new ceiling & lighting in public area (less than 50% of fixtures changing), accessibility upgrades to restrooms, new atm machine to comply with nov# 201032173 | $30,000 | |
| Jun 28, 2013 | Never finaled issued Jul 2013, no final | 1352 09th Av | proposed signage for front of establishment along 9th ave.Details
proposed signage for front of establishment along 9th ave. | $100 |