Stephen Medina
- Listed as
- authorized agent-others, engineer, pmt consultant/expediter
- On San Francisco permits
- Jan 2013 to Apr 2017
27 permits since 2000 (authorized agent-others on 17 permits, pmt consultant/expediter on 9 permits, engineer on 1 permit): 20 completed, 2 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2017 | Never finaled issued May 2017, no final | 1910 Fillmore St | Selvig Development, Melo Willard Tabudlo Dba Dreamt Design | limited interior repair and maintanance of extg space. no change of use or occupancy.Details
limited interior repair and maintanance of extg space. no change of use or occupancy. | $25,000 |
| Jan 30, 2017 | Completed final sign-off Apr 2017 | 565 24th Av | proposed 4'-6" high painted metal fence with 5" square support posts, approx 19'-8 1/2" wide fence to be 2 sets of tri-fold panels on casters. thumbturn release on interior side of locks for egress 1/2" sq metal picket design.Details
proposed 4'-6" high painted metal fence with 5" square support posts, approx 19'-8 1/2" wide fence to be 2 sets of tri-fold panels on casters. thumbturn release on interior side of locks for egress 1/2" sq metal picket design. | $5,000 | |
| Dec 22, 2016 | Completed final sign-off Oct 2019 | 20 Rousseau St | demo: new doorway in interior concrete wall. construction: carbon fiber retrofit wrap to restore shear and bending capacity in wall. ** maher: n/a **Details
demo: new doorway in interior concrete wall. construction: carbon fiber retrofit wrap to restore shear and bending capacity in wall. ** maher: n/a ** | $100,000 | |
| Dec 21, 2016 | Never finaled issued Feb 2017, no final | 2340 Clay St | A C F Construction Inc. | 5th floor: revision to 2015-1211-4881 -barrier removal: provide new han washing fixture, new wall supports. fire alarm deferred.Details
5th floor: revision to 2015-1211-4881 -barrier removal: provide new han washing fixture, new wall supports. fire alarm deferred. | $147,863 |
| Jul 21, 2016 | Completed final sign-off Jan 2017 | 1 Daniel Burnham Ct | Derry Casey Builders | unit # 300a - submitalfor bpa # 201604275855. mech plans for approved arch permit set n/a maher ord. 155-13Details
unit # 300a - submitalfor bpa # 201604275855. mech plans for approved arch permit set n/a maher ord. 155-13 | |
| Dec 10, 2015 | Completed final sign-off Jun 2016 | 2186 Geary Bl | Derry Casey Builders | revision/modification to pa #201403100340 - install 2 new awnings & wall tile at exterior of bldg. new address above awning under separate permit.Details
revision/modification to pa #201403100340 - install 2 new awnings & wall tile at exterior of bldg. new address above awning under separate permit. | $35,000 |
| Nov 3, 2015 | Completed final sign-off Oct 2016 | 246 28th St | Mulhall Construction Inc. | seismic soft story retrofit per mandated program design criteria carried out in accordance with 2012 iebc appendix a-4Details
seismic soft story retrofit per mandated program design criteria carried out in accordance with 2012 iebc appendix a-4 | $20,000 |
| Oct 22, 2015 | Completed final sign-off Jun 2016 | 1445 14th Av | interior remodel to include non-structural walls.Details
interior remodel to include non-structural walls. | $12,000 | |
| Oct 14, 2015 | Completed final sign-off Oct 2015 | 427 Parker Av | to verify unit count for 2 units for administrative purpose only. no construction under this permit.Details
to verify unit count for 2 units for administrative purpose only. no construction under this permit. | ||
| Oct 1, 2015 | Completed final sign-off Mar 2018 | 450 Sutter St | Derry Casey Builders | 8th flr: new accessible restrooms & showers for common use of building occupants,new mail area & phone rooms for use by bldg occupants.new accessible ramps to (e)bldg areas,elec,plmbg,light & l/s work performed on a design built basis as reqd &submitted as separate permit,no exterior work; maher n/aDetails
8th flr: new accessible restrooms & showers for common use of building occupants,new mail area & phone rooms for use by bldg occupants.new accessible ramps to (e)bldg areas,elec,plmbg,light & l/s work performed on a design built basis as reqd &submitted as separate permit,no exterior work; maher n/a | $53,361 |
| Sep 23, 2015 | Completed final sign-off Jun 2016 | 55 02nd St | Skanska Usa Building Inc | interior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms. deferred submittal for structural flooring system.Details
interior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms. deferred submittal for structural flooring system. | $800,000 |
| Jul 29, 2015 | Expired or cancelled cancelled Jan 2026 | 2305 Scott St | infill light well at 2nd floor for new bathoom.Details
infill light well at 2nd floor for new bathoom. | $20,000 | |
| May 28, 2015 | Completed final sign-off Jan 2016 | 193 Bright St | to clear nov #2015-42681. remove unwarratned work. remove elec wires that have never been hooked up to any panel. remove framing, remove dry wall.Details
to clear nov #2015-42681. remove unwarratned work. remove elec wires that have never been hooked up to any panel. remove framing, remove dry wall. | $1,000 | |
| May 4, 2015 | Completed final sign-off Sep 2015 | 1378 Portola Dr | Mulhall Construction Inc. | conversion of extg basement "rooms down" conversion to include new bedroom and bathroom. french doors from extg bedroom to new landing to extg deck. remove extg wood beam and post and replace with new steel beam and post with new foundation; no building expansionDetails
conversion of extg basement "rooms down" conversion to include new bedroom and bathroom. french doors from extg bedroom to new landing to extg deck. remove extg wood beam and post and replace with new steel beam and post with new foundation; no building expansion | $70,000 |
| Apr 22, 2015 | Expired or cancelled withdrawn Nov 2022 | 3532 20th St | renovation of extg dental office. new partitions to create 2 new operatories, prep area, reception, waiting room. new sinks and dental equipment. portable gas system under separate applicationDetails
renovation of extg dental office. new partitions to create 2 new operatories, prep area, reception, waiting room. new sinks and dental equipment. portable gas system under separate application | $20,000 | |
| Apr 22, 2015 | Completed final sign-off Dec 2015 | 1570 24th Av | A And K Zhou Inc | revision to app#201503181175. revise detail 3/ as site condition shows shared neighboring foundation.Details
revision to app#201503181175. revise detail 3/ as site condition shows shared neighboring foundation. | |
| Apr 13, 2015 | Completed final sign-off Nov 2015 | 1615 Funston Av | Cht Properties Development | kitchen remodel: relocate sink and appliances, add new bar counter. bath remodel: relocate toilet and shower, new landscape deck structural: remove wall between dining: kichen, new beam and new shearwalls for future 2nd floor extension.Details
kitchen remodel: relocate sink and appliances, add new bar counter. bath remodel: relocate toilet and shower, new landscape deck structural: remove wall between dining: kichen, new beam and new shearwalls for future 2nd floor extension. | $55,000 |
| Dec 9, 2014 | Completed final sign-off Apr 2016 | 2300 California St | D Kelly Construction Inc. | voluntary accessibilty barrier removal. upgrade extg elevators.Details
voluntary accessibilty barrier removal. upgrade extg elevators. | $180,000 |
| Oct 1, 2014 | Expired or cancelled withdrawn Oct 2014 | 50 Oakwood St | foundation work app#201312033195. foundation only.Details
foundation work app#201312033195. foundation only. | ||
| Sep 22, 2014 | Expired or cancelled expired Jul 2018 | 427 Kirkham St | C G Adams Construction | proposed 3rd story addition to provide 2 new children bedrooms and shared bathroom plus new master suite with bathroom and walk in closet. ground floor to be converted to habitable space with guest room and utility room.Details
proposed 3rd story addition to provide 2 new children bedrooms and shared bathroom plus new master suite with bathroom and walk in closet. ground floor to be converted to habitable space with guest room and utility room. | $120,000 |
| Jul 11, 2014 | Completed final sign-off Jun 2016 | 2299 Post St | Derry Casey Builders | revision to app#201403100343. revise parking stall layout to accomodate required ada parking. ref pa#8209443 & 201407141184Details
revision to app#201403100343. revise parking stall layout to accomodate required ada parking. ref pa#8209443 & 201407141184 | |
| Jul 1, 2014 | Expired or cancelled expired Jul 2018 | 2901 Broadway | Level 10 Construction Lp | revisions to app#201306109080. interior work only. as built plans. n/a for the maher ordinance #155-13Details
revisions to app#201306109080. interior work only. as built plans. n/a for the maher ordinance #155-13 | |
| Feb 4, 2014 | Completed final sign-off Dec 2017 | 1580 Valencia St | provide ada upgrades for extg elvators provide new interiors elvator cab finishes. upgrade electrical services and provide new elevator equipment in machine room.n/a for the maher ordinance #155-13Details
provide ada upgrades for extg elvators provide new interiors elvator cab finishes. upgrade electrical services and provide new elevator equipment in machine room.n/a for the maher ordinance #155-13 | $834,700 | |
| Jan 24, 2014 | Completed final sign-off Jul 2014 | 3814 Cesar Chavez St | Aidan Mc Cracken Const Inc. | kitchen and bathroom remodel at both units. construction of new deck at rear less than 30" above grade. post removal & voluntary seismic strengthening at garage.Details
kitchen and bathroom remodel at both units. construction of new deck at rear less than 30" above grade. post removal & voluntary seismic strengthening at garage. | $100,000 |
| Dec 30, 2013 | Completed final sign-off Apr 2014 | 3838 California St | Herrero Builders Incorporated | differed mep from previous permit. in reference to app#201312113888.Details
differed mep from previous permit. in reference to app#201312113888. | $6,000 |
| Nov 14, 2013 | Completed final sign-off May 2014 | 411 Valencia St | Gotham Bay Construction | install ada restroom, mezzanine storage area. convert extg fixed transoms to operable awning windows, new flooring.Details
install ada restroom, mezzanine storage area. convert extg fixed transoms to operable awning windows, new flooring. | $10,000 |
| Jan 7, 2013 | Completed final sign-off Apr 2013 | 230 Lakeview Av | Mulhall Construction Inc. | voluntary seismic strengthening new concrete stem wall extension voluntary frame strengthening.Details
voluntary seismic strengthening new concrete stem wall extension voluntary frame strengthening. | $12,000 |