Derry Casey Builders
- Based in
- San Francisco
- On San Francisco permits
- Dec 2003 to Apr 2018
- Last 24 months
- 0 permits filed
173 permits since 2000: 130 completed, 21 never finaled, 22 expired or cancelled.
Of the 21 never-finaled permits, 5 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 173.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2018 | Completed final sign-off Aug 2019 | 450 Sutter St | suite 2314 approx 785 sq ft arch-interior tenant improvements incl (n) non-bearing partition, fixtures & finishes in (e) tenant suite at 23rd flr to acommodate medical office. no change of use. mep, lighting,life safety work performed on a design basis as required & submitted separately, no med gasDetails
suite 2314 approx 785 sq ft arch-interior tenant improvements incl (n) non-bearing partition, fixtures & finishes in (e) tenant suite at 23rd flr to acommodate medical office. no change of use. mep, lighting,life safety work performed on a design basis as required & submitted separately, no med gas | $68,530 |
| Mar 14, 2018 | Completed final sign-off Aug 2019 | 450 Sutter St | 8th flr, suite 808, ~1100 sq ft - ti non bearing partitions, finishes & fixtures in (e) tenant suite to accomodate a dental office - relocation of tenant from another suite w/in bld. mep/loghting/life safety under sep permit as builts. no exteriot work. not oshpd, fire/med gas under separate permitDetails
8th flr, suite 808, ~1100 sq ft - ti non bearing partitions, finishes & fixtures in (e) tenant suite to accomodate a dental office - relocation of tenant from another suite w/in bld. mep/loghting/life safety under sep permit as builts. no exteriot work. not oshpd, fire/med gas under separate permit | $81,444 |
| Feb 1, 2018 | Completed final sign-off Dec 2018 | 2299 Post St | interior remodel to create 3 offices and upgrade existing non ada restroom to ada complianceDetails
interior remodel to create 3 offices and upgrade existing non ada restroom to ada compliance | $84,000 |
| Jan 30, 2018 | Never finaled issued Feb 2018, no final | 166 Geary St | 13th fl - ti of a physician's private office. scope to include new milwork, countertops and fixtures. new finishes throughout, paint; new power, lighting and controlsDetails
13th fl - ti of a physician's private office. scope to include new milwork, countertops and fixtures. new finishes throughout, paint; new power, lighting and controls | $75,000 |
| Jan 25, 2018 | Expired or cancelled expired Feb 2021 | 450 Sutter St | electrical t-24 deferred from app#201510018539.electrical ti plans n/a for maherDetails
electrical t-24 deferred from app#201510018539.electrical ti plans n/a for maher | |
| Dec 6, 2017 | Completed final sign-off May 2018 | 450 Sutter St | #825. deferred submittal for electrical t24 for bpa 2017-1020-1770Details
#825. deferred submittal for electrical t24 for bpa 2017-1020-1770 | |
| Nov 21, 2017 | Completed final sign-off May 2018 | 450 Sutter St | suite #1338: interior t.i. including (n) non-bearing partitions, fixtures & finishes in (e) tenant suite on 13th fl to accomodate a medical office build out. mep & lighting & life safety work performed on a design build basis as required & submitted as sep. permits. no exterior work. maher naDetails
suite #1338: interior t.i. including (n) non-bearing partitions, fixtures & finishes in (e) tenant suite on 13th fl to accomodate a medical office build out. mep & lighting & life safety work performed on a design build basis as required & submitted as sep. permits. no exterior work. maher na | $25,290 |
| Oct 20, 2017 | Completed final sign-off May 2018 | 450 Sutter St | unit 825: interior tenant improvement including new non bearing partitions, fixtures, finishes in e tenant suite on 8th fl to accommodate new dermatology office. mep lighting, life safety on desisn build basis as req and submitted as separate permits. no exterior work. maher n/a.Details
unit 825: interior tenant improvement including new non bearing partitions, fixtures, finishes in e tenant suite on 8th fl to accommodate new dermatology office. mep lighting, life safety on desisn build basis as req and submitted as separate permits. no exterior work. maher n/a. | $71,107 |
| Oct 12, 2017 | Completed final sign-off Jun 2019 | 1070 Green St | interior remodel of kitchen, master bath, bath 1 and bath 2. add new closet. new lighting, elec at remodeled areasDetails
interior remodel of kitchen, master bath, bath 1 and bath 2. add new closet. new lighting, elec at remodeled areas | $500,000 |
| Oct 6, 2017 | Completed final sign-off May 2018 | 1770 Lombard St | soft story retrofit performed in accordance to 2012 iebc appendix chapter a4Details
soft story retrofit performed in accordance to 2012 iebc appendix chapter a4 | $150,000 |
| Aug 11, 2017 | Completed final sign-off Sep 2017 | 1070 Green St | replacing glazing in kind 11 windows not visible from the street.Details
replacing glazing in kind 11 windows not visible from the street. | $25,000 |
| Aug 7, 2017 | Completed final sign-off Jan 2019 | 2340 Clay St | 2nd, 3rd & 7th floors only - voluntary access barriers removal in common areas.Details
2nd, 3rd & 7th floors only - voluntary access barriers removal in common areas. | $100,000 |
| Jul 28, 2017 | Completed final sign-off Mar 2019 | 1070 Green St | remove finishes, floor, base, cabinets, incl. soft demo exploratory. demo for sturctural observation 500 sq ft. no structural work. no wall modification.Details
remove finishes, floor, base, cabinets, incl. soft demo exploratory. demo for sturctural observation 500 sq ft. no structural work. no wall modification. | $30,000 |
| Jun 15, 2017 | Completed final sign-off Jun 2017 | 305 Russia Av | to obtain final inspection for work approved under pa#200606264969. all work is complete.Details
to obtain final inspection for work approved under pa#200606264969. all work is complete. | |
| Jun 6, 2017 | Completed final sign-off Jun 2019 | 1070 Green St | demo (e) non bearing partitions, cabinetry, finishes. replace in kind aluminum windows, install new windows at northeast corner,install (n) windows at northeast corner, enlarge (e) northwest balcony, install new sliding doors and windows at northwest balcony.Details
demo (e) non bearing partitions, cabinetry, finishes. replace in kind aluminum windows, install new windows at northeast corner,install (n) windows at northeast corner, enlarge (e) northwest balcony, install new sliding doors and windows at northwest balcony. | $200,000 |
| Jun 1, 2017 | Expired or cancelled expired Feb 2021 | 450 Sutter St | 14th fl: deferred submittal for electrical t-24 for #201702179626 unit #1415 and #201702179628 unit #1440.Details
14th fl: deferred submittal for electrical t-24 for #201702179626 unit #1415 and #201702179628 unit #1440. | |
| Jun 1, 2017 | Expired or cancelled expired Feb 2021 | 450 Sutter St | 13th fl: deferred submittal for electrical t-24 for #201703222065 unit #1330 and #201704184290 unit #1341. maher na.Details
13th fl: deferred submittal for electrical t-24 for #201703222065 unit #1330 and #201704184290 unit #1341. maher na. | |
| Apr 18, 2017 | Completed final sign-off Oct 2017 | 450 Sutter St | suite #1341: interior tenant improvement including new non bearing partitions, fixutures in e tenant suite on 13th fl to accommodate new medical office. mechanical, elec, plumbing, lighting, life safety on design build basis as req and submitted as separate permits. no exterior workDetails
suite #1341: interior tenant improvement including new non bearing partitions, fixutures in e tenant suite on 13th fl to accommodate new medical office. mechanical, elec, plumbing, lighting, life safety on design build basis as req and submitted as separate permits. no exterior work | $31,687 |
| Mar 22, 2017 | Completed final sign-off Oct 2017 | 450 Sutter St | 13th floor - interior tenant improvements including (n) demising wall, (n) non bearing partitions, fixtures and finishes in (e) tenant suite to accommodate a (n) medical practice. mechanical, electrical, plumbing, lighting & life safety work performed in a design build bases as req and submittedDetails
13th floor - interior tenant improvements including (n) demising wall, (n) non bearing partitions, fixtures and finishes in (e) tenant suite to accommodate a (n) medical practice. mechanical, electrical, plumbing, lighting & life safety work performed in a design build bases as req and submitted | $128,636 |
| Feb 17, 2017 | Completed final sign-off Oct 2017 | 450 Sutter St | suite #1440: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw plastic surg. office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work.Details
suite #1440: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw plastic surg. office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work. | $32,893 |
| Feb 17, 2017 | Completed final sign-off Oct 2017 | 450 Sutter St | suite #1415: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw dermatology office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work.Details
suite #1415: interior t.i. including nw non-bearing partitions, fixtures & finishes in extg tenant suite on 14th flr to accomodate a nw dermatology office. mech, elec, plmg, lighting & life safety work performed on a design bild basis as required & sumitted as seperate permits. no exterior work. | $32,302 |
| Feb 6, 2017 | Never finaled issued Feb 2017, no final | 1625 Van Ness Av | to obtain final inspection for work approved under pa #201303121979. all work is complete.Details
to obtain final inspection for work approved under pa #201303121979. all work is complete. | |
| Jan 13, 2017 | Never finaled issued Jan 2017, no final | 1625 Van Ness Av | renew for final 201304235213Details
renew for final 201304235213 | |
| Oct 28, 2016 | Completed final sign-off Mar 2019 | 1070 Green St | exploratory demo to locate structural members. maintain all fire resistance rating at all times.Details
exploratory demo to locate structural members. maintain all fire resistance rating at all times. | $500 |
| Oct 24, 2016 | Completed final sign-off Jul 2017 | 2240 Green St | voluntary foundation stregthening maher na; soil report 2374 -iri by murray engineeringDetails
voluntary foundation stregthening maher na; soil report 2374 -iri by murray engineering | $129,890 |
| Oct 21, 2016 | Expired or cancelled expired Feb 2021 | 450 Sutter St | 8th flr, suite 840: deffered electrical for 201603182499 maher naDetails
8th flr, suite 840: deffered electrical for 201603182499 maher na | |
| Oct 13, 2016 | Completed final sign-off Jul 2017 | 2100 Webster St | 4/f #404: voluntary access barriers removal, provide accessible signs, remodel exam. room to fully accessible exam. room, install automatic door operator, lower service counter.Details
4/f #404: voluntary access barriers removal, provide accessible signs, remodel exam. room to fully accessible exam. room, install automatic door operator, lower service counter. | $80,000 |
| Oct 5, 2016 | Completed final sign-off Jul 2017 | 2240 Green St | mandatory soft story retrofit per soft story mandate using fema p807. maher not reqDetails
mandatory soft story retrofit per soft story mandate using fema p807. maher not req | $129,890 |
| Sep 20, 2016 | Completed final sign-off Jan 2017 | 2230 Francisco St | unit 112. kitchen remodel in kind. no alteration of wall, window & door.Details
unit 112. kitchen remodel in kind. no alteration of wall, window & door. | $20,000 |
| Aug 31, 2016 | Completed final sign-off Sep 2017 | 2100 Webster St | ste. #115- provide voluntary access barriers remodel; provide accessible signs, remodel exam 4 to be accessible, lower service counters to accessible.Details
ste. #115- provide voluntary access barriers remodel; provide accessible signs, remodel exam 4 to be accessible, lower service counters to accessible. | $20,000 |
| Aug 29, 2016 | Completed final sign-off May 2017 | 1400 17th St | construct new exterior wall with plywood sheathing, not visible from streetDetails
construct new exterior wall with plywood sheathing, not visible from street | $65,000 |
| Jul 21, 2016 | Completed final sign-off Jan 2017 | 1 Daniel Burnham Ct | unit # 300a - submitalfor bpa # 201604275855. mech plans for approved arch permit set n/a maher ord. 155-13Details
unit # 300a - submitalfor bpa # 201604275855. mech plans for approved arch permit set n/a maher ord. 155-13 | |
| Jun 22, 2016 | Completed final sign-off Nov 2016 | 2340 Clay St | 2nd floor: remodel 3 offices to provide full accessibility including accessible cabinetry, hand sinks, outlets & switches, door & room sinage.includes waiting room mahjer naDetails
2nd floor: remodel 3 offices to provide full accessibility including accessible cabinetry, hand sinks, outlets & switches, door & room sinage.includes waiting room mahjer na | $68,000 |
| Jun 21, 2016 | Never finaled issued Jul 2016, no final | 243 Vallejo St | revision to ref pa 2015 1109 2172 revise electrical planDetails
revision to ref pa 2015 1109 2172 revise electrical plan | |
| Jun 17, 2016 | Completed final sign-off Jul 2016 | 450 Sutter St | 4/f- (n) interior demising wall in (e) tenant suite to accommodate (n) x-ray machine. electrical, plumbing, life safety work performed on design build basis submitted as seperate permit. no exterior or mechanical work. n/a ordinance #155-13Details
4/f- (n) interior demising wall in (e) tenant suite to accommodate (n) x-ray machine. electrical, plumbing, life safety work performed on design build basis submitted as seperate permit. no exterior or mechanical work. n/a ordinance #155-13 | $22,968 |
| Jun 9, 2016 | Completed final sign-off Jun 2017 | 220 Battery St | three (3) new mechanical louvers on side of building; ref: 201207245568 mech work under sep permit.new gate for gas rise, new door; maher n/aDetails
three (3) new mechanical louvers on side of building; ref: 201207245568 mech work under sep permit.new gate for gas rise, new door; maher n/a | $3,000 |
| Apr 27, 2016 | Completed final sign-off Aug 2016 | 1 Daniel Burnham Ct | #300a - t.i.: reduce area of existing suite, remove existing lounge & millwork, enlarge (e) meeting room. mep modifications under seperate permit. n/a ordinance #155-13Details
#300a - t.i.: reduce area of existing suite, remove existing lounge & millwork, enlarge (e) meeting room. mep modifications under seperate permit. n/a ordinance #155-13 | $76,000 |
| Mar 30, 2016 | Completed final sign-off Nov 2016 | 2401 Clay St | decorative railing & guardrail extension & parking screening section 136.c16Details
decorative railing & guardrail extension & parking screening section 136.c16 | $150,000 |
| Mar 18, 2016 | Completed final sign-off May 2017 | 450 Sutter St | 8th flr: new interior ti including demising walls and new finishes in (e) suite and expansion into adjacent suite. ele/plumb/fire/life safety undersep permit. maher naDetails
8th flr: new interior ti including demising walls and new finishes in (e) suite and expansion into adjacent suite. ele/plumb/fire/life safety undersep permit. maher na | $45,392 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 2299 Post St | common area- replace existing chainlink fence with new 4'-0" high stell fence; maher n/aDetails
common area- replace existing chainlink fence with new 4'-0" high stell fence; maher n/a | $4,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 2186 Geary Bl | common area- replace existing chain link fence with new 7'-0" high steel fence.Details
common area- replace existing chain link fence with new 7'-0" high steel fence. | $8,000 |
| Mar 4, 2016 | Completed final sign-off Aug 2016 | 243 Vallejo St | revision/modifications to app#201511092172. remove 2 concrete beams at roof and install 2 steel beam in same location.Details
revision/modifications to app#201511092172. remove 2 concrete beams at roof and install 2 steel beam in same location. | $22,000 |
| Feb 18, 2016 | Never finaled issued Dec 2017, no final | 207 Powell St | t24 clacs deferred from bpa 2015-0925-8099Details
t24 clacs deferred from bpa 2015-0925-8099 | |
| Feb 16, 2016 | Never finaled issued Mar 2016, no final | 336 Ofarrell St | interior demolition only removal of extg non-bearing walls and ceilings to prepare space for new tenant. improvements under separate permit per ab-017. n/a for maher.Details
interior demolition only removal of extg non-bearing walls and ceilings to prepare space for new tenant. improvements under separate permit per ab-017. n/a for maher. | $5,000 |
| Dec 18, 2015 | Completed final sign-off Apr 2016 | 1035 Howard St | repair fire damage in kind approx. 1600sf at front of bldg. to comply with nov#201577021Details
repair fire damage in kind approx. 1600sf at front of bldg. to comply with nov#201577021 | $50,000 |
| Dec 15, 2015 | Completed final sign-off Mar 2017 | 999 Green St | #2102 - remodel of (e) kitchen , (e) master bath, (e) hall bath , (e) powder room, master closet bed closets, hall closets. all workj is non-structural only.Details
#2102 - remodel of (e) kitchen , (e) master bath, (e) hall bath , (e) powder room, master closet bed closets, hall closets. all workj is non-structural only. | $50,000 |
| Dec 10, 2015 | Completed final sign-off Jun 2016 | 2186 Geary Bl | revision/modification to pa #201403100340 - install 2 new awnings & wall tile at exterior of bldg. new address above awning under separate permit.Details
revision/modification to pa #201403100340 - install 2 new awnings & wall tile at exterior of bldg. new address above awning under separate permit. | $35,000 |
| Dec 10, 2015 | Never finaled issued Mar 2017, no final | 2299 Post St | revision/modification to pa #201403100343 - install 2 new awnings & wall tile at exterior of bldg. new address above awning under separate permit. n/a maher ordinanceDetails
revision/modification to pa #201403100343 - install 2 new awnings & wall tile at exterior of bldg. new address above awning under separate permit. n/a maher ordinance | $50,000 |
| Dec 8, 2015 | Expired or cancelled cancelled Jan 2026 | 243 Vallejo St | revision/modifications to pa #201511092172 - modify existing roof framing for new hvac units.Details
revision/modifications to pa #201511092172 - modify existing roof framing for new hvac units. | |
| Nov 25, 2015 | Completed final sign-off Jan 2016 | 1200 Van Ness Av | suite 200: office ti title 24 ref pa 2015-0723-2309. maher naDetails
suite 200: office ti title 24 ref pa 2015-0723-2309. maher na | $80,000 |
| Nov 12, 2015 | Completed final sign-off Feb 2017 | 3266 Mission St | underpinning for work in pa#201409085647Details
underpinning for work in pa#201409085647 | $37,000 |
| Nov 9, 2015 | Completed final sign-off Aug 2016 | 243 Vallejo St | modification/revisions to permit 2015-0728-2666. onstall new posts and beams at mezzanine floor framing. modify 2nd floor framing new stairsDetails
modification/revisions to permit 2015-0728-2666. onstall new posts and beams at mezzanine floor framing. modify 2nd floor framing new stairs | |
| Oct 30, 2015 | Completed final sign-off May 2016 | 1580 Valencia St | demo, combine suites 801 and 802, include 3 accessible exame rooms, 1 office, 1 accessible toilet room- includes mep- sprinklers and fire alarm.Details
demo, combine suites 801 and 802, include 3 accessible exame rooms, 1 office, 1 accessible toilet room- includes mep- sprinklers and fire alarm. | $448,000 |
| Oct 29, 2015 | Completed final sign-off Jan 2016 | 1580 Valencia St | umbrella permit for high rise sprinkler retrofit ord 377-93 ref 201312275102Details
umbrella permit for high rise sprinkler retrofit ord 377-93 ref 201312275102 | |
| Oct 27, 2015 | Expired or cancelled cancelled Jan 2026 | 62 Oakwood St | apt #3, remodel (e) bedroom apt to become 2 bed, 1 bath; relocate kitchen; (n) windows & space heat/ all interior work, not visble from street.Details
apt #3, remodel (e) bedroom apt to become 2 bed, 1 bath; relocate kitchen; (n) windows & space heat/ all interior work, not visble from street. | $62,500 |
| Oct 7, 2015 | Expired or cancelled expired Feb 2021 | 450 Sutter St | 17th flr: t-24 for bpa 201504173995, all electrical work under previous permit; maher n/aDetails
17th flr: t-24 for bpa 201504173995, all electrical work under previous permit; maher n/a | |
| Oct 1, 2015 | Completed final sign-off Mar 2018 | 450 Sutter St | 8th flr: new accessible restrooms & showers for common use of building occupants,new mail area & phone rooms for use by bldg occupants.new accessible ramps to (e)bldg areas,elec,plmbg,light & l/s work performed on a design built basis as reqd &submitted as separate permit,no exterior work; maher n/aDetails
8th flr: new accessible restrooms & showers for common use of building occupants,new mail area & phone rooms for use by bldg occupants.new accessible ramps to (e)bldg areas,elec,plmbg,light & l/s work performed on a design built basis as reqd &submitted as separate permit,no exterior work; maher n/a | $53,361 |
| Oct 1, 2015 | Completed final sign-off Jun 2016 | 1525 Cortland Av | ti- production ber brewery and accessory tasting toom. work includes: ada upgrade to path of travel, new ada bathrooms, installation of brewery equipment. buildin fully sprinklered, sep mep. maher naDetails
ti- production ber brewery and accessory tasting toom. work includes: ada upgrade to path of travel, new ada bathrooms, installation of brewery equipment. buildin fully sprinklered, sep mep. maher na | $250,000 |
| Sep 25, 2015 | Completed final sign-off May 2018 | 207 Powell St | lessee ti to office space on 6th floor. maher naDetails
lessee ti to office space on 6th floor. maher na | $177,000 |
| Aug 21, 2015 | Completed final sign-off Feb 2016 | 1200 Van Ness Av | revision to 2015-0804-3241 - modifications to creat a temporary construction office. louvers only. no structural work. n/a maher ord. # 155-13Details
revision to 2015-0804-3241 - modifications to creat a temporary construction office. louvers only. no structural work. n/a maher ord. # 155-13 | |
| Jul 31, 2015 | Expired or cancelled cancelled Jan 2026 | 450 Sutter St | revision to 201502279528 for light fixtures, revisions to title 24 calculations maher not reqDetails
revision to 201502279528 for light fixtures, revisions to title 24 calculations maher not req | $270,000 |
| Jul 28, 2015 | Completed final sign-off Aug 2016 | 243 Vallejo St | interior remodeling of an existing 2-story building, relocate existing stairs to 2/f, upgrade existing stairs to mezzanine, upgrade existing restrooms, create new breakroom, replace existing guardrail at mezzanine.Details
interior remodeling of an existing 2-story building, relocate existing stairs to 2/f, upgrade existing stairs to mezzanine, upgrade existing restrooms, create new breakroom, replace existing guardrail at mezzanine. | $175,000 |
| Jul 23, 2015 | Completed final sign-off Feb 2016 | 1200 Van Ness Av | #200- office tenant improvement, new partitions, doors & finishes. mep. under seperate permit. n/a ordinance #155-13Details
#200- office tenant improvement, new partitions, doors & finishes. mep. under seperate permit. n/a ordinance #155-13 | $850,000 |
| Jun 30, 2015 | Completed final sign-off Aug 2016 | 243 Vallejo St | exterior modification of the (e) entrance. install (n) entry door, sidelights & transom window. install (n) roll-up security grille. recess entry facade. install (n) awning & exterior lighting. awning & signage. apply privacy film on windows.Details
exterior modification of the (e) entrance. install (n) entry door, sidelights & transom window. install (n) roll-up security grille. recess entry facade. install (n) awning & exterior lighting. awning & signage. apply privacy film on windows. | $25,000 |
| Jun 5, 2015 | Completed final sign-off Oct 2017 | 70 Oak Grove St | disabled access barrier removal by constructing (n) 2 stop passenger elevator for access to/from 2nd fl & remodel (e) 2nd fl single user restrooms & restriping parking lot. mechanical, electrical, plumbing & fire alarm are under separate permit.Details
disabled access barrier removal by constructing (n) 2 stop passenger elevator for access to/from 2nd fl & remodel (e) 2nd fl single user restrooms & restriping parking lot. mechanical, electrical, plumbing & fire alarm are under separate permit. | $145,000 |
| Jun 3, 2015 | Completed final sign-off Nov 2015 | 2811 Golden Gate Av | kitchen remodel, 2 bath remodel. replace 2 windows and all doors, add new skylight at 3rd flDetails
kitchen remodel, 2 bath remodel. replace 2 windows and all doors, add new skylight at 3rd fl | $80,000 |
| May 7, 2015 | Completed final sign-off Jul 2015 | 2936 Lyon St | remove sheetrock, framing and siding destroyed by the fire and install new framing and sheetrock. to comply with notic of violation #201544291 (fire damage)Details
remove sheetrock, framing and siding destroyed by the fire and install new framing and sheetrock. to comply with notic of violation #201544291 (fire damage) | $30,000 |
| Apr 17, 2015 | Expired or cancelled expired Feb 2021 | 450 Sutter St | 17th flr: #1708: revision to bpa 2014 1125 2545 - ele work. maher -not req'dDetails
17th flr: #1708: revision to bpa 2014 1125 2545 - ele work. maher -not req'd | |
| Apr 2, 2015 | Completed final sign-off Nov 2015 | 1355 Sutter St | voluntary access barrier removal involves remodeling 1st fl toilets for accessibilityDetails
voluntary access barrier removal involves remodeling 1st fl toilets for accessibility | $60,000 |
| Apr 2, 2015 | Completed final sign-off Nov 2015 | 1355 Sutter St | voluntary access barriers removal involves replacing atrium guardrails at 2nd and 3rd, 4th flrs.Details
voluntary access barriers removal involves replacing atrium guardrails at 2nd and 3rd, 4th flrs. | $30,000 |
| Mar 25, 2015 | Completed final sign-off Mar 2015 | 2037 Scott St | revision to pa 201312164294, reduce scope of work on original permit, remove grade beams, remove straps; revisions are clouded by delta 2. maher n/aDetails
revision to pa 201312164294, reduce scope of work on original permit, remove grade beams, remove straps; revisions are clouded by delta 2. maher n/a | |
| Mar 2, 2015 | Never finaled issued Mar 2015, no final | 2240 Lyon St | repair interior water damage, new sheetrock, insulation wood trims, painting, patch/repair carpeting, refinish (e) hardwood flooring to match.Details
repair interior water damage, new sheetrock, insulation wood trims, painting, patch/repair carpeting, refinish (e) hardwood flooring to match. | $35,000 |
| Feb 27, 2015 | Expired or cancelled expired Feb 2021 | 450 Sutter St | suite #1003: interior tenant remodel of 10th flr offices to accomodate new waiting room and reception area, exam rooms, offices, breakroom and storage. no exterior work, note: building is equipped with partial automatic sprinkler system (not fully sprinklered) ; maher n/aDetails
suite #1003: interior tenant remodel of 10th flr offices to accomodate new waiting room and reception area, exam rooms, offices, breakroom and storage. no exterior work, note: building is equipped with partial automatic sprinkler system (not fully sprinklered) ; maher n/a | $268,811 |
| Dec 23, 2014 | Completed final sign-off Jun 2016 | 2299 Post St | interior tenant improvement of offices #207,208 & 209: replace flooring replace suspended ceiling, install new lighting & upgrade restroom; maher n/aDetails
interior tenant improvement of offices #207,208 & 209: replace flooring replace suspended ceiling, install new lighting & upgrade restroom; maher n/a | $110,505 |
| Dec 12, 2014 | Never finaled issued Dec 2014, no final | 16 Spruce St | replace garage door in-kind on spruce street side. not visible.Details
replace garage door in-kind on spruce street side. not visible. | $2,800 |
| Dec 11, 2014 | Completed final sign-off Dec 2014 | 3800 Clay St | renew 9301088 for final inspection. all work completeDetails
renew 9301088 for final inspection. all work complete | |
| Dec 11, 2014 | Completed final sign-off Dec 2014 | 3800 Clay St | renew 9103757 for final inspection. all work is completeDetails
renew 9103757 for final inspection. all work is complete | |
| Dec 10, 2014 | Expired or cancelled suspend Jan 2016 | 2299 Post St | revision to p.a. 201403100343; voluntary seismic upgrade. shear wall added to exterior structure; maher n/aDetails
revision to p.a. 201403100343; voluntary seismic upgrade. shear wall added to exterior structure; maher n/a | $5,500 |
| Nov 25, 2014 | Completed final sign-off Nov 2015 | 450 Sutter St | #1708- new interior partitions and new finishes in existing tenant office. electrical, plumbing, lighting, energy calculations, fire sprinkler and life safety work performed on design/build basis under seperate permits as required. n/a ordinance #155-13.Details
#1708- new interior partitions and new finishes in existing tenant office. electrical, plumbing, lighting, energy calculations, fire sprinkler and life safety work performed on design/build basis under seperate permits as required. n/a ordinance #155-13. | $120,494 |
| Nov 25, 2014 | Completed final sign-off Feb 2017 | 3266 Mission St | mandatory seismic upgrade; 2012 iebc appendix a-4Details
mandatory seismic upgrade; 2012 iebc appendix a-4 | $67,320 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 1040 Mariposa St | revision to existing permit # 2014-0611-8075. interior remodel of (e) building at the 2nd floor. reconfiguration and relocation of stairs and reconfiguration of hallway and some walls, structural package only. n/a maher ordinance #155-13Details
revision to existing permit # 2014-0611-8075. interior remodel of (e) building at the 2nd floor. reconfiguration and relocation of stairs and reconfiguration of hallway and some walls, structural package only. n/a maher ordinance #155-13 | $20,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 1040 Mariposa St | revision to approved permit # 2014-0627-9823 exterior facade. new accessible way, new recessed exit door replacement of (e) ext door and replacement windows at the ground floor levelDetails
revision to approved permit # 2014-0627-9823 exterior facade. new accessible way, new recessed exit door replacement of (e) ext door and replacement windows at the ground floor level | $20,000 |
| Sep 8, 2014 | Completed final sign-off Nov 2016 | 3266 Mission St | mitigation of n.o.v. 201124081. add 2nd exit room rear of apartment bldg and install new storefront. sprinkler & mechanical under separate permit.Details
mitigation of n.o.v. 201124081. add 2nd exit room rear of apartment bldg and install new storefront. sprinkler & mechanical under separate permit. | $98,950 |
| Jul 14, 2014 | Completed final sign-off Jun 2016 | 2186 Geary Bl | revision to app#201403100340. revise parking stall layout to accomodate required ada parking. ref pa#8209443 & 201407141123Details
revision to app#201403100340. revise parking stall layout to accomodate required ada parking. ref pa#8209443 & 201407141123 | |
| Jul 11, 2014 | Completed final sign-off Jun 2016 | 2299 Post St | revision to app#201403100343. revise parking stall layout to accomodate required ada parking. ref pa#8209443 & 201407141184Details
revision to app#201403100343. revise parking stall layout to accomodate required ada parking. ref pa#8209443 & 201407141184 | |
| Jul 11, 2014 | Completed final sign-off Oct 2016 | 2186 Geary Bl | interior renovations only:new finishes at lobby/corridors and public restrooms. 1)install new carpet and tile at floors. 2)paint walls and doors. 3)remodel extg restrooms. 4)install new lights fixtures and acoustical ceiling tiles; separate permits for fire safety & sprinklerDetails
interior renovations only:new finishes at lobby/corridors and public restrooms. 1)install new carpet and tile at floors. 2)paint walls and doors. 3)remodel extg restrooms. 4)install new lights fixtures and acoustical ceiling tiles; separate permits for fire safety & sprinkler | $119,700 |
| Jul 11, 2014 | Completed final sign-off Mar 2016 | 2299 Post St | inerior renovations only:new finishes at lobby/corridors and public restrooms. 1)install new carpet and tile at floors. 2)paint walls and doors. 3)remodel extg restrooms. 4)install new lights fixtures and acoustical ceiling tiles.n/a for the maher ordinance #155-13; separate fire alarm sprinklerDetails
inerior renovations only:new finishes at lobby/corridors and public restrooms. 1)install new carpet and tile at floors. 2)paint walls and doors. 3)remodel extg restrooms. 4)install new lights fixtures and acoustical ceiling tiles.n/a for the maher ordinance #155-13; separate fire alarm sprinkler | $135,800 |
| Jun 27, 2014 | Completed final sign-off Mar 2015 | 1040 Mariposa St | exterior facade remodel to include accessible entryway, new recessed exit door replacement exterior doors new windows at gr fl level. maher not requiredDetails
exterior facade remodel to include accessible entryway, new recessed exit door replacement exterior doors new windows at gr fl level. maher not required | $139,000 |
| Jun 26, 2014 | Completed final sign-off Mar 2015 | 1040 Mariposa St | mep only to approved plans 201406057625. sprinkler under sep permit. comply with nov 201395302. nov - new air conditioner, supply fans exhaust fans, 2 fire smoke dampers on supply and exhaust; emer. lites, exit signs. n/a maher ordinance 155-13Details
mep only to approved plans 201406057625. sprinkler under sep permit. comply with nov 201395302. nov - new air conditioner, supply fans exhaust fans, 2 fire smoke dampers on supply and exhaust; emer. lites, exit signs. n/a maher ordinance 155-13 | $50,000 |
| Jun 20, 2014 | Expired or cancelled expired Feb 2021 | 450 Sutter St | 13th flr: addition of new interior partitions and new finishes on the 13th flr, ste 1300; compliance with ord 155-13 not requiredDetails
13th flr: addition of new interior partitions and new finishes on the 13th flr, ste 1300; compliance with ord 155-13 not required | $28,548 |
| Jun 11, 2014 | Completed final sign-off Apr 2015 | 1040 Mariposa St | interior remodel of an extg 2nd floor from extg non-retail green house to light manufacturing installation of non structural partitions. mep and sprinkler on seperate permit. n/a for the maher ordinance #155-13Details
interior remodel of an extg 2nd floor from extg non-retail green house to light manufacturing installation of non structural partitions. mep and sprinkler on seperate permit. n/a for the maher ordinance #155-13 | $60,000 |
| Jun 5, 2014 | Completed final sign-off Mar 2015 | 1040 Mariposa St | 1st floor:interior remodel of extg non-retail greenhouse to light manufacturing. mep and sprinklers on seperate permit. remodel rest rooms.n/a for the maher ordinance #155-13Details
1st floor:interior remodel of extg non-retail greenhouse to light manufacturing. mep and sprinklers on seperate permit. remodel rest rooms.n/a for the maher ordinance #155-13 | $410,000 |
| Jun 2, 2014 | Completed final sign-off Aug 2014 | 590 Pacific Av | revision to pa 2014/0425/4225. modify existing stairs configuration from 1st to 2nd floor.Details
revision to pa 2014/0425/4225. modify existing stairs configuration from 1st to 2nd floor. | $10,000 |
| May 29, 2014 | Completed final sign-off Oct 2014 | 135 Mississippi St | g/f - install 3 new roll up security grilles at existing opening' separate permit for fire alarm. installed behind soffit, not visible. compliance with ordinance no. 155-13 not required.Details
g/f - install 3 new roll up security grilles at existing opening' separate permit for fire alarm. installed behind soffit, not visible. compliance with ordinance no. 155-13 not required. | $25,000 |
| Apr 25, 2014 | Completed final sign-off Aug 2014 | 590 Pacific Av | build new kitchen at 1st fl. new private bath at 2nd fl. new office at 2nd flDetails
build new kitchen at 1st fl. new private bath at 2nd fl. new office at 2nd fl | $35,000 |
| Apr 9, 2014 | Completed final sign-off Apr 2014 | 4630 Geary Bl | to erect 3 wall signs same sizeDetails
to erect 3 wall signs same size | $600 |
| Mar 10, 2014 | Expired or cancelled suspend Jan 2016 | 2299 Post St | work in common. replace stucco on building & replace windows in-kind. replace entry doors.Details
work in common. replace stucco on building & replace windows in-kind. replace entry doors. | $269,700 |
| Mar 10, 2014 | Completed final sign-off Jun 2016 | 2186 Geary Bl | install new entry doors and storefront at lobby entrance common area.Details
install new entry doors and storefront at lobby entrance common area. | $21,750 |
| Jan 30, 2014 | Never finaled issued Sep 2014, no final | 220 Battery St | revision to pa#2012-05-30-1433. repaired store front system matching (e) in kind. new elevator penthouse. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.Details
revision to pa#2012-05-30-1433. repaired store front system matching (e) in kind. new elevator penthouse. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. | $50,000 |
| Dec 19, 2013 | Completed final sign-off Dec 2014 | 2039 Scott St | unit remodel including relocating the kitchen, bathroom remodel and addition of a powder room. add 3 new skylights.Details
unit remodel including relocating the kitchen, bathroom remodel and addition of a powder room. add 3 new skylights. | $110,000 |