Block 0690, lot 016
1375 Sutter St
- City’s use
- Commercial Office
- Built
- 1975
- Stories
- 5
- Building
- 82,250 sq ft
- Lot
- 25,800 sq ft
- Zoning
- NC3
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2019 | Expired or cancelled withdrawn Dec 2019 | 1375 Sutter St | suite #406: selective demo and partial t.i. work to include demolition of walls and doors as indicated on drawings. carpet removal in extg break rooms and floor finish. change in main toilet room. no structural work. no exterior work and no hazardous materials on site.Details
suite #406: selective demo and partial t.i. work to include demolition of walls and doors as indicated on drawings. carpet removal in extg break rooms and floor finish. change in main toilet room. no structural work. no exterior work and no hazardous materials on site. | $60,744 | |
| Feb 13, 2019 | Never finaled issued Jul 2019, no final | 1375 Sutter St | Herrero Builders Incorporated, Rudolph And Sletten Inc | 2nd fl - selective demo and partial ti work. work includes new accessible toilet, new accessible toilet, new partitions, ceilings and finishes and associated mepDetails
2nd fl - selective demo and partial ti work. work includes new accessible toilet, new accessible toilet, new partitions, ceilings and finishes and associated mep | $200,000 |
| Feb 20, 2018 | Completed final sign-off Apr 2018 | 1375 Sutter St | Herrero Builders Incorporated | revision pa 2017-1121-4563, new quick connect for temporary emergency generatorDetails
revision pa 2017-1121-4563, new quick connect for temporary emergency generator | |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 1355 Sutter St | Johnson Controls Inc. | ti in 1st fl, ste 110 - furnish & install modification appliances throughout ti. furnish & install & program new remote power supply, new smoke detector, duct smoke detectors, horn strobes, ceiling strobesDetails
ti in 1st fl, ste 110 - furnish & install modification appliances throughout ti. furnish & install & program new remote power supply, new smoke detector, duct smoke detectors, horn strobes, ceiling strobes | $17,578 |
| Nov 21, 2017 | Completed final sign-off Apr 2018 | 1355 Sutter St | Herrero Builders Incorporated | tenant improvement (remote electronic monitoring on level 1)Details
tenant improvement (remote electronic monitoring on level 1) | $500,000 |
| Apr 2, 2015 | Completed final sign-off Nov 2015 | 1355 Sutter St | Derry Casey Builders | voluntary access barrier removal involves remodeling 1st fl toilets for accessibilityDetails
voluntary access barrier removal involves remodeling 1st fl toilets for accessibility | $60,000 |
| Apr 2, 2015 | Completed final sign-off Nov 2015 | 1355 Sutter St | Derry Casey Builders | voluntary access barriers removal involves replacing atrium guardrails at 2nd and 3rd, 4th flrs.Details
voluntary access barriers removal involves replacing atrium guardrails at 2nd and 3rd, 4th flrs. | $30,000 |
| Sep 17, 2013 | Completed final sign-off Oct 2013 | 1355 Sutter St | Dpr Construction | 2nd floor:revision to pa #2013.0823.5120 - demo (e) partition wall, window, door, & frame. relocate (e) switch.Details
2nd floor:revision to pa #2013.0823.5120 - demo (e) partition wall, window, door, & frame. relocate (e) switch. | $2,000 |
| Aug 23, 2013 | Completed final sign-off Oct 2013 | 1355 Sutter St | Dpr Construction | revision pa# 2013-0314-2200-remodel & reconfigure (e) office space-work will include selectice demo, floor finishes, painting & minor modifications to (e) electrical system. relocate one entry door southward so as to provide 18" minimum strike edge on pull side of door to in-house training room.Details
revision pa# 2013-0314-2200-remodel & reconfigure (e) office space-work will include selectice demo, floor finishes, painting & minor modifications to (e) electrical system. relocate one entry door southward so as to provide 18" minimum strike edge on pull side of door to in-house training room. | $25,000 |
| Jul 31, 2013 | Never finaled issued Sep 2013, no final | 1355 Sutter St | D Kelly Construction Inc. | add exit signage & lighting, as directed by fire marshalDetails
add exit signage & lighting, as directed by fire marshal | $50,000 |
| Jul 11, 2013 | Completed final sign-off Aug 2013 | 1355 Sutter St | all work on 3/f #300 & #321- remodel & reconfiguration of existing office space to include selective demolition, new partitions, floor finishes, painting, ceiling, lighting and minor modifications to existing electrical system. mep seperate permitDetails
all work on 3/f #300 & #321- remodel & reconfiguration of existing office space to include selective demolition, new partitions, floor finishes, painting, ceiling, lighting and minor modifications to existing electrical system. mep seperate permit | $260,000 | |
| Apr 29, 2013 | Completed final sign-off Aug 2013 | 1355 Sutter St | Dpr Construction | #100,220,221 remodel and reconfiguration of extg office space. selective demolition, new partitions, floor finishes, painting, ceiling, lighting and minor modifications to extg electrical system.Details
#100,220,221 remodel and reconfiguration of extg office space. selective demolition, new partitions, floor finishes, painting, ceiling, lighting and minor modifications to extg electrical system. | $240,000 |
| Apr 24, 2013 | Completed final sign-off Jul 2013 | 1355 Sutter St | D Kelly Construction Inc. | fire alarm panel replacement for new elevators. existing devices to be replaced with new. alarm includes sprinkler monitoringDetails
fire alarm panel replacement for new elevators. existing devices to be replaced with new. alarm includes sprinkler monitoring | $35,000 |
| Mar 14, 2013 | Completed final sign-off Apr 2014 | 1375 Sutter St | voluntary access barriers removal involves upgrades sanitary facilities, parking, doors, etc.Details
voluntary access barriers removal involves upgrades sanitary facilities, parking, doors, etc. | $250,000 | |
| Feb 12, 2013 | Expired or cancelled cancelled Jan 2026 | 1375 Sutter St | suite 305 and 307revision to app#201210091571. change med prep room into ada bathroom.Details
suite 305 and 307revision to app#201210091571. change med prep room into ada bathroom. | $8,000 | |
| Oct 9, 2012 | Completed final sign-off Apr 2013 | 1375 Sutter St | D Kelly Construction Inc. | 3rd floor interior remodel of medical offices suite 305 & 307 w/connection to (e) suite 308 are occupied by single tenant. new partitions & ceiling lighting, exam rooms, storage & utility rooms, new casework, new finishes.Details
3rd floor interior remodel of medical offices suite 305 & 307 w/connection to (e) suite 308 are occupied by single tenant. new partitions & ceiling lighting, exam rooms, storage & utility rooms, new casework, new finishes. | $130,000 |
| Mar 23, 2012 | Never finaled issued Mar 2012, no final | 1375 Sutter St | Derry Casey Builders | at levels 1&2, remove existing non- accessiable doors at elevator lobbies & replace with new accessiable doors.Details
at levels 1&2, remove existing non- accessiable doors at elevator lobbies & replace with new accessiable doors. | $10,000 |
| Nov 16, 2011 | Never finaled issued Nov 2011, no final | 1355 Sutter St | street spaceDetails
street space | ||
| Oct 18, 2011 | Never finaled issued Oct 2011, no final | 1355 Sutter St | street spaceDetails
street space | ||
| Oct 17, 2011 | Never finaled issued Oct 2011, no final | 1355 Sutter St | street spaceDetails
street space | ||
| Oct 4, 2011 | Never finaled issued Oct 2011, no final | 1355 Sutter St | street spaceDetails
street space | ||
| Aug 31, 2011 | Never finaled issued Aug 2011, no final | 1355 Sutter St | street space permitDetails
street space permit | ||
| Aug 9, 2011 | Never finaled issued Aug 2011, no final | 1355 Sutter St | Centimark Corporation | reroofingDetails
reroofing | $175,500 |
| May 26, 2010 | Completed final sign-off Jul 2010 | 1375 Sutter St | D Kelly Construction Inc. | 1st. flr.: relocate (e) horizontal run of fire dry standpipe for new ceiling ht. no change in pipe length. no change in (e) fire dept. connections.Details
1st. flr.: relocate (e) horizontal run of fire dry standpipe for new ceiling ht. no change in pipe length. no change in (e) fire dept. connections. | $3,500 |
| May 14, 2010 | Completed final sign-off Jul 2010 | 1375 Sutter St | D Kelly Construction Inc. | refer to arch pa# 2010-0423-0944-structural for t.i. of (e) 1st fl-ste 101, structural scope includes metal stud partition walls at mri & xray exam rms, overhead supports of hung equipment at exam rooms, support anchorage of ceiling at mri room, rf shield engineering shop reference drawings includedDetails
refer to arch pa# 2010-0423-0944-structural for t.i. of (e) 1st fl-ste 101, structural scope includes metal stud partition walls at mri & xray exam rms, overhead supports of hung equipment at exam rooms, support anchorage of ceiling at mri room, rf shield engineering shop reference drawings included | |
| Apr 26, 2010 | Completed final sign-off Jul 2010 | 1375 Sutter St | D Kelly Construction Inc. | 2nd floor suite 222 t.i. improvement/remodel.demolish & build new partitions & ceiling grid. add reception & chart storage, waiting room, exam rooms, offices, new finishes,power-data & lighting throughout. no structural work, m.e.p. (incl t-24) & fire life safety under separate permits.Details
2nd floor suite 222 t.i. improvement/remodel.demolish & build new partitions & ceiling grid. add reception & chart storage, waiting room, exam rooms, offices, new finishes,power-data & lighting throughout. no structural work, m.e.p. (incl t-24) & fire life safety under separate permits. | $78,724 |
| Apr 23, 2010 | Completed final sign-off Jul 2010 | 1355 Sutter St | D Kelly Construction Inc. | revision to pa# 2010-0111-4498-minor plan reconfiguration of 3 exam rooms, storage & waiting. no change in tenant program, scope of cost, no change in occupant load or sq footage, minor millwork, finish clarifications, minor construction clarificationsDetails
revision to pa# 2010-0111-4498-minor plan reconfiguration of 3 exam rooms, storage & waiting. no change in tenant program, scope of cost, no change in occupant load or sq footage, minor millwork, finish clarifications, minor construction clarifications | |
| Apr 16, 2010 | Completed final sign-off Oct 2010 | 1375 Sutter St | D Kelly Construction Inc. | ste#208 -(e) suite demo & build (n) partitions & clg. (n) waiting rm. exam rms., storage rms., restroom & off. (n) finishe, millwork & signage, expansion suite demo millwork. (n) millwork, demo door & frame @ vitals rm. add (n) curtain track. mech./elec., plumbing, life safety under separate permit.Details
ste#208 -(e) suite demo & build (n) partitions & clg. (n) waiting rm. exam rms., storage rms., restroom & off. (n) finishe, millwork & signage, expansion suite demo millwork. (n) millwork, demo door & frame @ vitals rm. add (n) curtain track. mech./elec., plumbing, life safety under separate permit. | $207,692 |
| Apr 5, 2010 | Completed final sign-off Oct 2010 | 1375 Sutter St | D Kelly Construction Inc. | cpmc. ti remodel of (e) 1st fl suite 120. demo and build new partitions and clg grid.add reception, waiting rm, lab/sample,, exam rms, chart storage, restrooms, breakeroom and offices. new finioshes, power data and lighting. mep and life saftey under separate permitDetails
cpmc. ti remodel of (e) 1st fl suite 120. demo and build new partitions and clg grid.add reception, waiting rm, lab/sample,, exam rms, chart storage, restrooms, breakeroom and offices. new finioshes, power data and lighting. mep and life saftey under separate permit | $133,377 |
| Mar 15, 2010 | Expired or cancelled expired Jan 2012 | 1375 Sutter St | D Kelly Construction Inc. | 1st floor - repair waterproof membrane and flashing at 1st floor patio (1 exterior wall) and courtyard (2 exterior walls) no new structural, no mepDetails
1st floor - repair waterproof membrane and flashing at 1st floor patio (1 exterior wall) and courtyard (2 exterior walls) no new structural, no mep | $12,488 |
| Jan 11, 2010 | Completed final sign-off Jul 2010 | 1355 Sutter St | D Kelly Construction Inc. | ti of 1st fl suite 101.demo/build new partitions/ceiling grid. add reception,2 xray exam rooms, 1 mri exam room, reception,2 xray exam rooms,1 mri exam room, reg exam rooms,restrooms,offices,break room, finishes.structral,mep,ower,data,lighting,life safety on separate permitDetails
ti of 1st fl suite 101.demo/build new partitions/ceiling grid. add reception,2 xray exam rooms, 1 mri exam room, reception,2 xray exam rooms,1 mri exam room, reg exam rooms,restrooms,offices,break room, finishes.structral,mep,ower,data,lighting,life safety on separate permit | $217,671 |
| Aug 4, 2009 | Completed final sign-off Feb 2010 | 1375 Sutter St | D Kelly Construction Inc. | 1st floor, suite 103 remodel of doctor's office: demolish & build new partitions, add exam rooms, employee break room & offices, new restrooms, new millwork & finishes, new power/data, lighting. no structural work. m.e. (incl t-24). p. & fire/life safety under separate permits.Details
1st floor, suite 103 remodel of doctor's office: demolish & build new partitions, add exam rooms, employee break room & offices, new restrooms, new millwork & finishes, new power/data, lighting. no structural work. m.e. (incl t-24). p. & fire/life safety under separate permits. | $210,000 |
| Jul 16, 2009 | Completed final sign-off Oct 2009 | 1375 Sutter St | D Kelly Construction Inc. | remodel of third floor doctor's office suite. demolish and build new partitions; add exam rooms, employee breakroom and offices, new finishes. new power-data & lighting. no structural work. mechanical, electrical(including t-24), plumbing and fire life safety under separate permit.Details
remodel of third floor doctor's office suite. demolish and build new partitions; add exam rooms, employee breakroom and offices, new finishes. new power-data & lighting. no structural work. mechanical, electrical(including t-24), plumbing and fire life safety under separate permit. | $119,000 |
| Mar 6, 2009 | Completed final sign-off Jul 2009 | 1375 Sutter St | D Kelly Construction Inc. | ti: includes renov. of 2nd. flr. ste. 201, demolish & build (n) interior non-struct. partitions (n) exam consult rms., (n) low volt data closet, (n) offices (n) finishes. elec., mech., & t24 under separate permit. modify (e) lighting, power, data, mech. no struct. accessibility upgrade to 2nd. flr..Details
ti: includes renov. of 2nd. flr. ste. 201, demolish & build (n) interior non-struct. partitions (n) exam consult rms., (n) low volt data closet, (n) offices (n) finishes. elec., mech., & t24 under separate permit. modify (e) lighting, power, data, mech. no struct. accessibility upgrade to 2nd. flr.. | $72,000 |
| Aug 29, 2008 | Completed final sign-off Oct 2008 | 1375 Sutter St | D Kelly Construction Inc. | addition of 1 new data closet room, low voltage for floors 1,2,3,4. new partitions and doors. new work includes modification of e lighting, power, data. electrical separate permit. no mechanical or plumbing work.Details
addition of 1 new data closet room, low voltage for floors 1,2,3,4. new partitions and doors. new work includes modification of e lighting, power, data. electrical separate permit. no mechanical or plumbing work. | $8,000 |
| May 23, 2008 | Completed final sign-off Jan 2009 | 1375 Sutter St | #208- ti for renovation of 2nd flr offices. demo and rebuild new partition to add exam rm and offices.ada parking stalls and path of travel upgrade.new ada restroom. modification of ex. lighting, power data, mechanical, electrical and life safety work will be under a seperate permit.Details
#208- ti for renovation of 2nd flr offices. demo and rebuild new partition to add exam rm and offices.ada parking stalls and path of travel upgrade.new ada restroom. modification of ex. lighting, power data, mechanical, electrical and life safety work will be under a seperate permit. | $115,000 | |
| Nov 8, 2002 | Completed final sign-off Jan 2003 | 1375 Sutter St | relocate existing hvac vents,install activated dampersDetails
relocate existing hvac vents,install activated dampers | $10,000 | |
| Aug 29, 2002 | Completed final sign-off Jan 2003 | 1375 Sutter St | oti-1 1st floor, el, me, lsDetails
oti-1 1st floor, el, me, ls | $20,000 | |
| Jun 29, 2001 | Expired or cancelled expired Oct 2002 | 1375 Sutter St | Macro Builder Inc | ste#416, 4/fl-non bearing walls, plumbing & electrical in (n) dental office, (n)drinking fountainDetails
ste#416, 4/fl-non bearing walls, plumbing & electrical in (n) dental office, (n)drinking fountain | $20,000 |
| May 5, 2000 | Completed final sign-off Aug 2000 | 1375 Sutter St | Bel Aire Engineering, Inc | marqueeDetails
marquee | $8,200 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.