Derry Casey Builders
- Based in
- San Francisco
- On San Francisco permits
- Dec 2003 to Apr 2018
- Last 24 months
- 0 permits filed
173 permits since 2000: 130 completed, 21 never finaled, 22 expired or cancelled.
Of the 21 never-finaled permits, 5 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 265 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2015 | Completed final sign-off Aug 2016 | 243 Vallejo St | modification/revisions to permit 2015-0728-2666. onstall new posts and beams at mezzanine floor framing. modify 2nd floor framing new stairsDetails
modification/revisions to permit 2015-0728-2666. onstall new posts and beams at mezzanine floor framing. modify 2nd floor framing new stairs | |
| Jul 28, 2015 | Completed final sign-off Aug 2016 | 243 Vallejo St | interior remodeling of an existing 2-story building, relocate existing stairs to 2/f, upgrade existing stairs to mezzanine, upgrade existing restrooms, create new breakroom, replace existing guardrail at mezzanine.Details
interior remodeling of an existing 2-story building, relocate existing stairs to 2/f, upgrade existing stairs to mezzanine, upgrade existing restrooms, create new breakroom, replace existing guardrail at mezzanine. | $175,000 |
| Oct 8, 2014 | Never finaled issued Oct 2014, no final | 1040 Mariposa St | revision to existing permit # 2014-0611-8075. interior remodel of (e) building at the 2nd floor. reconfiguration and relocation of stairs and reconfiguration of hallway and some walls, structural package only. n/a maher ordinance #155-13Details
revision to existing permit # 2014-0611-8075. interior remodel of (e) building at the 2nd floor. reconfiguration and relocation of stairs and reconfiguration of hallway and some walls, structural package only. n/a maher ordinance #155-13 | $20,000 |
| Jun 2, 2014 | Completed final sign-off Aug 2014 | 590 Pacific Av | revision to pa 2014/0425/4225. modify existing stairs configuration from 1st to 2nd floor.Details
revision to pa 2014/0425/4225. modify existing stairs configuration from 1st to 2nd floor. | $10,000 |
| Jun 26, 2006 | Expired or cancelled expired Jul 2007 | 305 Russia Av | rpair work in accordance to nov 200565587 and 200665589, 2 windows and stair landing repair. repair floors and walls. tub shower repair replacementDetails
rpair work in accordance to nov 200565587 and 200665589, 2 windows and stair landing repair. repair floors and walls. tub shower repair replacement | $21,000 |