Permit GraphSan Francisco building permits since 2000

Block 3708, lot 096

55 02nd St

City’s use
Commercial Office
Built
2002
Stories
24
Building
379,330 sq ft
Lot
25,146 sq ft
Zoning
C3O
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 30, 2024Completed
final sign-off Jul 2024
55 02nd StSiemens Industry, Inc.fire only for the "alston and bird" remodel on floor 21; additions are 1 smoke detector, 1 duct detectors, 2 modules, 24 speakers, 15 speaker/strobes, and 2 strobes, 2 speaker/strobes are being relocated, ref pa# 202403117504
Details
Permit
202405303253
Status
complete
Filed
May 30, 2024
Permit issued
May 30, 2024
Final sign-off
Jul 9, 2024
Declared cost
$66,800
Address
55 02nd St

fire only for the "alston and bird" remodel on floor 21; additions are 1 smoke detector, 1 duct detectors, 2 modules, 24 speakers, 15 speaker/strobes, and 2 strobes, 2 speaker/strobes are being relocated, ref pa# 202403117504

Open the permit page

$66,800
May 30, 2024Completed
final sign-off Mar 2025
55 02nd StSiemens Industry, Inc.21/f: fire only work add 2 remote call boxes onto the (e) 2-way comm system, on floor 21 for the "alston and bird" remodel, ref permit# 202403117504.
Details
Permit
202405303257
Status
complete
Filed
May 30, 2024
Permit issued
May 30, 2024
Final sign-off
Mar 13, 2025
Declared cost
$6,004
Address
55 02nd St

21/f: fire only work add 2 remote call boxes onto the (e) 2-way comm system, on floor 21 for the "alston and bird" remodel, ref permit# 202403117504.

Open the permit page

$6,004
Apr 2, 2024Completed
final sign-off Jul 2024
55 02nd StR L H Fire Protection Inc21/f: ti improvement to an (e) fire sprinkler system. relocated concealed sprinkler (32). added (5). added recessed (4). ti ref# 202403117504
Details
Permit
202404029078
Status
complete
Filed
Apr 2, 2024
Permit issued
Apr 2, 2024
Final sign-off
Jul 17, 2024
Declared cost
$25,500
Address
55 02nd St

21/f: ti improvement to an (e) fire sprinkler system. relocated concealed sprinkler (32). added (5). added recessed (4). ti ref# 202403117504

Open the permit page

$25,500
Mar 27, 2024Completed
final sign-off Jul 2024
55 02nd StPrincipal Builders Inc.ref 202403117504- deferred mep for office ti
Details
Permit
202403278769
Status
complete
Filed
Mar 27, 2024
Permit issued
Apr 2, 2024
Final sign-off
Jul 31, 2024
Declared cost
$835,200
Address
55 02nd St

ref 202403117504- deferred mep for office ti

Open the permit page

$835,200
Mar 11, 2024Completed
final sign-off Jul 2024
55 02nd StPrincipal Builders Inc.floor 21 interior ti non structural partitoins, ceiling, fixtures and finishes, mep deferred
Details
Permit
202403117504
Status
complete
Filed
Mar 11, 2024
Permit issued
Mar 18, 2024
Final sign-off
Jul 31, 2024
Declared cost
$1,119,000
Address
55 02nd St

floor 21 interior ti non structural partitoins, ceiling, fixtures and finishes, mep deferred

Open the permit page

$1,119,000
Feb 21, 2024Completed
final sign-off Jul 2024
55 02nd StPrincipal Builders Inc.21/f: partial demo of interior walls (non structural) ab-017. vacant floor
Details
Permit
202402216302
Status
complete
Filed
Feb 21, 2024
Permit issued
Feb 23, 2024
Final sign-off
Jul 31, 2024
Declared cost
$18,360
Address
55 02nd St

21/f: partial demo of interior walls (non structural) ab-017. vacant floor

Open the permit page

$18,360
Aug 1, 2023Never finaled
issued Aug 2023, no final
55 02nd StSiemens Industry, Inc.fire work only to obtain an as built permit for original permit pa 2022-0902-1784 for the remodel on floor 20. no devices were added
Details
Permit
202308013370
Status
issued
Filed
Aug 1, 2023
Permit issued
Aug 3, 2023
Address
55 02nd St

fire work only to obtain an as built permit for original permit pa 2022-0902-1784 for the remodel on floor 20. no devices were added

Open the permit page

Jun 21, 2023Never finaled
issued Jun 2023, no final
55 02nd StSiemens Industry, Inc.17/f: (2) speaker/strobes @ outdoor terrace. no ref bpa#(f/a addition only)
Details
Permit
202306210463
Status
issued
Filed
Jun 21, 2023
Permit issued
Jun 22, 2023
Declared cost
$1,922
Address
55 02nd St

17/f: (2) speaker/strobes @ outdoor terrace. no ref bpa#(f/a addition only)

Open the permit page

$1,922
Feb 7, 2023Never finaled
issued Feb 2023, no final
55 02nd StSiemens Industry, Inc.20th fl - fire only work to add a strobe for the restroom remodel; ref pa 2022-1018-4541
Details
Permit
202302071480
Status
issued
Filed
Feb 7, 2023
Permit issued
Feb 7, 2023
Declared cost
$621
Address
55 02nd St

20th fl - fire only work to add a strobe for the restroom remodel; ref pa 2022-1018-4541

Open the permit page

$621
Jan 20, 2023Completed
final sign-off Jul 2023
55 02nd StPeacock Construction17/f: minor demo of doors/finishes, accessibility upgrades to terrace, new nonstructural partitions, doors & finishes
Details
Permit
202301200451
Status
complete
Filed
Jan 20, 2023
Permit issued
Jan 26, 2023
Final sign-off
Jul 7, 2023
Declared cost
$130,000
Address
55 02nd St

17/f: minor demo of doors/finishes, accessibility upgrades to terrace, new nonstructural partitions, doors & finishes

Open the permit page

$130,000
Jan 5, 2023Completed
final sign-off Jul 2024
55 02nd StGolden Gate Fire Protection Incfire sprinklers; relocate 4 pendent sprinklers on the 19th floor restrooms. relocate pendent sprinklers on the 21st floor restrooms. t.i. ref #202212148250
Details
Permit
202301059692
Status
complete
Filed
Jan 5, 2023
Permit issued
Jan 5, 2023
Final sign-off
Jul 16, 2024
Declared cost
$4,400
Address
55 02nd St

fire sprinklers; relocate 4 pendent sprinklers on the 19th floor restrooms. relocate pendent sprinklers on the 21st floor restrooms. t.i. ref #202212148250

Open the permit page

$4,400
Dec 23, 2022Completed
final sign-off Jan 2023
55 02nd StAnderson, Rowe & Buckley, Inc.fire sprinkler only for 2022 1018 4541. add 1 pendent, 1 up right for restroom for axinn sf 20th fl
Details
Permit
202212239082
Status
complete
Filed
Dec 23, 2022
Permit issued
Dec 23, 2022
Final sign-off
Jan 4, 2023
Declared cost
$1,200
Address
55 02nd St

fire sprinkler only for 2022 1018 4541. add 1 pendent, 1 up right for restroom for axinn sf 20th fl

Open the permit page

$1,200
Dec 14, 2022Never finaled
issued Jan 2023, no final
55 02nd StM C S Construction Services19th and 21st floor restroom remodel including removal of non-structural partitions, finishes, light fixtures, plumbing fixtures and accesories. electrical drawings included
Details
Permit
202212148250
Status
issued
Filed
Dec 14, 2022
Permit issued
Jan 3, 2023
Declared cost
$118,289
Address
55 02nd St

19th and 21st floor restroom remodel including removal of non-structural partitions, finishes, light fixtures, plumbing fixtures and accesories. electrical drawings included

Open the permit page

$118,289
Nov 21, 2022Never finaled
issued Dec 2022, no final
55 02nd StSkyline Construction20/f: electrical work for t.i. ref to bpa#202210184541
Details
Permit
202211216953
Status
issued
Filed
Nov 21, 2022
Permit issued
Dec 13, 2022
Declared cost
$3,000
Address
55 02nd St

20/f: electrical work for t.i. ref to bpa#202210184541

Open the permit page

$3,000
Nov 21, 2022Never finaled
issued Dec 2022, no final
55 02nd StSkyline Construction20/f: mech work for t.i. on 20th fl. ref to 202210184541.
Details
Permit
202211216939
Status
issued
Filed
Nov 21, 2022
Permit issued
Dec 13, 2022
Declared cost
$5,000
Address
55 02nd St

20/f: mech work for t.i. on 20th fl. ref to 202210184541.

Open the permit page

$5,000
Nov 18, 2022Never finaled
issued Nov 2022, no final
55 02nd StSiemens Industry, Inc.19th fl - fire only work for the _suite 1975" remodel. additions are 1 smoke detector, 4 spekaer/strobes, add 1 strobe ref pa 2022-1006-3900
Details
Permit
202211186798
Status
issued
Filed
Nov 18, 2022
Permit issued
Nov 18, 2022
Declared cost
$3,720
Address
55 02nd St

19th fl - fire only work for the _suite 1975" remodel. additions are 1 smoke detector, 4 spekaer/strobes, add 1 strobe ref pa 2022-1006-3900

Open the permit page

$3,720
Nov 15, 2022Completed
final sign-off Apr 2023
55 02nd StM C S Construction Servicesste 1975 mechanical and electrical scope under office tenant improvement project reference permit 202210063900
Details
Permit
202211156572
Status
complete
Filed
Nov 15, 2022
Permit issued
Nov 22, 2022
Final sign-off
Apr 5, 2023
Declared cost
$44,000
Address
55 02nd St

ste 1975 mechanical and electrical scope under office tenant improvement project reference permit 202210063900

Open the permit page

$44,000
Oct 31, 2022Completed
final sign-off Nov 2022
55 02nd StR L H Fire Protection Incfire sprinkler permit - relocate 3 add 2 and delete 1 pendent sprinklers on the 19th fl. ref pa 2022-1006-3900
Details
Permit
202210315477
Status
complete
Filed
Oct 31, 2022
Permit issued
Oct 31, 2022
Final sign-off
Nov 15, 2022
Declared cost
$2,000
Address
55 02nd St

fire sprinkler permit - relocate 3 add 2 and delete 1 pendent sprinklers on the 19th fl. ref pa 2022-1006-3900

Open the permit page

$2,000
Oct 18, 2022Never finaled
issued Oct 2022, no final
55 02nd StSkyline Construction20/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferred
Details
Permit
202210184541
Status
issued
Filed
Oct 18, 2022
Permit issued
Oct 28, 2022
Declared cost
$20,000
Address
55 02nd St

20/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferred

Open the permit page

$20,000
Oct 14, 2022Completed
final sign-off Jul 2023
55 02nd StC B F Incpower lighting a signal. reference 202206156443.
Details
Permit
202210144352
Status
complete
Filed
Oct 14, 2022
Permit issued
Oct 26, 2022
Final sign-off
Jul 6, 2023
Declared cost
$55,000
Address
55 02nd St

power lighting a signal. reference 202206156443.

Open the permit page

$55,000
Oct 6, 2022Completed
final sign-off Apr 2023
55 02nd StM C S Construction Services19/f: spec suite - scope of work includes minor demo of non structural paritions, doors, ceiling files, light fixtures, mill work and finishes. construction includes new non structural paritions, doors ceiling tiles, lgiht fixtures, millwork and finsihes.
Details
Permit
202210063900
Status
complete
Filed
Oct 6, 2022
Permit issued
Oct 13, 2022
Final sign-off
Apr 5, 2023
Declared cost
$125,000
Address
55 02nd St

19/f: spec suite - scope of work includes minor demo of non structural paritions, doors, ceiling files, light fixtures, mill work and finishes. construction includes new non structural paritions, doors ceiling tiles, lgiht fixtures, millwork and finsihes.

Open the permit page

$125,000
Sep 22, 2022Never finaled
issued Sep 2022, no final
55 02nd StMaguire Inc Dba Lahue And Associates20/f: evacuation signs (4)
Details
Permit
202209222914
Status
issued
Filed
Sep 22, 2022
Permit issued
Sep 27, 2022
Declared cost
$1,690
Address
55 02nd St

20/f: evacuation signs (4)

Open the permit page

$1,690
Sep 21, 2022Completed
final sign-off Jul 2023
55 02nd StPeacock Construction23rd fl - hvac modifications to support interior ti ref pa 2022-0615-6443
Details
Permit
202209212828
Status
complete
Filed
Sep 21, 2022
Permit issued
Sep 26, 2022
Final sign-off
Jul 17, 2023
Declared cost
$37,000
Address
55 02nd St

23rd fl - hvac modifications to support interior ti ref pa 2022-0615-6443

Open the permit page

$37,000
Sep 15, 2022Completed
final sign-off Dec 2022
55 02nd StSiemens Industry, Inc.fire only work for the "energy foundation" remodel on fl 24 additions are 14 duct detectors, 9 speakers/strobes, and the relocation of 3 speaker/strobes, ref pa# 202206166472
Details
Permit
202209152474
Status
complete
Filed
Sep 15, 2022
Permit issued
Sep 15, 2022
Final sign-off
Dec 16, 2022
Declared cost
$31,000
Address
55 02nd St

fire only work for the "energy foundation" remodel on fl 24 additions are 14 duct detectors, 9 speakers/strobes, and the relocation of 3 speaker/strobes, ref pa# 202206166472

Open the permit page

$31,000
Sep 7, 2022Completed
final sign-off Dec 2022
55 02nd StR L H Fire Protection Inc24th fl. tenant inmprovement of the (e) fire sprinkler system (10) new pendent sprinklers, (10) new upright sprinklers, (15) relocated pendent sprinkers, (1) deleted upright sprinkler. ref ti permit 202206166472.
Details
Permit
202209071948
Status
complete
Filed
Sep 7, 2022
Permit issued
Sep 7, 2022
Final sign-off
Dec 16, 2022
Declared cost
$4,000
Address
55 02nd St

24th fl. tenant inmprovement of the (e) fire sprinkler system (10) new pendent sprinklers, (10) new upright sprinklers, (15) relocated pendent sprinkers, (1) deleted upright sprinkler. ref ti permit 202206166472.

Open the permit page

$4,000
Sep 2, 2022Completed
final sign-off Sep 2022
55 02nd StGolden Gate Fire Protection Inc23/f: relocate 4 uprights on 23rd fl. ref t.i. 202206156443.
Details
Permit
202209021833
Status
complete
Filed
Sep 2, 2022
Permit issued
Sep 6, 2022
Final sign-off
Sep 13, 2022
Declared cost
$2,100
Address
55 02nd St

23/f: relocate 4 uprights on 23rd fl. ref t.i. 202206156443.

Open the permit page

$2,100
Sep 2, 2022Completed
final sign-off Sep 2023
55 02nd StSiemens Industry, Inc.20/f: "a,v, & r llp" remodel, addition of (11) smoke detectors, (6) duct detectors, (14) modules, (29) speaker/strobes, (1) strobe, & (2)2-way comm stations. ref bpa#202205124059
Details
Permit
202209021784
Status
complete
Filed
Sep 2, 2022
Permit issued
Sep 2, 2022
Final sign-off
Sep 1, 2023
Declared cost
$43,300
Address
55 02nd St

20/f: "a,v, & r llp" remodel, addition of (11) smoke detectors, (6) duct detectors, (14) modules, (29) speaker/strobes, (1) strobe, & (2)2-way comm stations. ref bpa#202205124059

Open the permit page

$43,300
Aug 30, 2022Completed
final sign-off May 2023
55 02nd StNovo Construction Inc24/f: revision to pa# 202206166472 for non structural revisions to men's and all gender restrooms. scope of work: (n) partitions, relocate plumbing fixtures, lights and hvac venting in restroom area only.
Details
Permit
202208301544
Status
complete
Filed
Aug 30, 2022
Permit issued
Sep 1, 2022
Final sign-off
May 19, 2023
Declared cost
$8,000
Address
55 02nd St

24/f: revision to pa# 202206166472 for non structural revisions to men's and all gender restrooms. scope of work: (n) partitions, relocate plumbing fixtures, lights and hvac venting in restroom area only.

Open the permit page

$8,000
Aug 4, 2022Never finaled
filed Aug 2022, never issued
55 02nd StSiemens Industry, Inc.20/f: fire only work for "a,v, & h" remodel. additions are 11 smoke detectors, 7 duct detectors, 14 modules, 28 speaker/strobes, and 3 strobes. ref permit 202205124059.
Details
Permit
202208049884
Status
filed
Filed
Aug 4, 2022
Declared cost
$44,300
Address
55 02nd St

20/f: fire only work for "a,v, & h" remodel. additions are 11 smoke detectors, 7 duct detectors, 14 modules, 28 speaker/strobes, and 3 strobes. ref permit 202205124059.

Open the permit page

$44,300
Jul 5, 2022Completed
final sign-off Aug 2022
55 02nd StAnderson, Rowe & Buckley, Inc.20/f: relocate 49 pendents & 31 uprights & add 2 pendents; 2 uprights for anxinn. ref 202205124059.
Details
Permit
202207057708
Status
complete
Filed
Jul 5, 2022
Permit issued
Jul 5, 2022
Final sign-off
Aug 8, 2022
Declared cost
$39,500
Address
55 02nd St

20/f: relocate 49 pendents & 31 uprights & add 2 pendents; 2 uprights for anxinn. ref 202205124059.

Open the permit page

$39,500
Jun 16, 2022Completed
final sign-off Jun 2023
55 02nd StNovo Construction Inc24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.
Details
Permit
202206166472
Status
complete
Filed
Jun 16, 2022
Permit issued
Jul 21, 2022
Final sign-off
Jun 8, 2023
Declared cost
$650,000
Address
55 02nd St

24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.

Open the permit page

$650,000
Jun 15, 2022Completed
final sign-off Jul 2023
55 02nd StPeacock Construction23rd fl - tenant improvement: removal of non structural partitions and finishes, millwork and plumbing fixtures; mep,fire life safety and sprinkler under separate permit
Details
Permit
202206156443
Status
complete
Filed
Jun 15, 2022
Permit issued
Aug 4, 2022
Final sign-off
Jul 17, 2023
Declared cost
$250,000
Address
55 02nd St

23rd fl - tenant improvement: removal of non structural partitions and finishes, millwork and plumbing fixtures; mep,fire life safety and sprinkler under separate permit

Open the permit page

$250,000
May 27, 2022Completed
final sign-off Jul 2022
55 02nd StGolden Gate Fire Protection Incfl 1, 3, 16, 17: fire sprinklers. relocate 7 pendent sprinklers on 1st fl and relocate 4 pendents on 3rd, 16th, & 17th fl. ref pa# 202203220555.
Details
Permit
202205275142
Status
complete
Filed
May 27, 2022
Permit issued
Jun 6, 2022
Final sign-off
Jul 13, 2022
Declared cost
$9,975
Address
55 02nd St

fl 1, 3, 16, 17: fire sprinklers. relocate 7 pendent sprinklers on 1st fl and relocate 4 pendents on 3rd, 16th, & 17th fl. ref pa# 202203220555.

Open the permit page

$9,975
May 12, 2022Never finaled
issued May 2022, no final
55 02nd StSkyline Construction20th fl: ti includes demo of non str partitions and building new non-str partitions, included all new or revised meps, life safety and sprinklers under seperate permit. (bldg fully sprinklered)
Details
Permit
202205124059
Status
issued
Filed
May 12, 2022
Permit issued
May 31, 2022
Declared cost
$1,000,250
Address
55 02nd St

20th fl: ti includes demo of non str partitions and building new non-str partitions, included all new or revised meps, life safety and sprinklers under seperate permit. (bldg fully sprinklered)

Open the permit page

$1,000,250
Apr 21, 2022Completed
final sign-off Jun 2022
55 02nd StSiemens Industry, Inc.fl 4: fire only work for the "intercom" remodel. additions and replacement s are 12 smoke detectors, 2 duct detectors, 11 modules, 51 speakers / strobes, & 8 strobes. ref pa# 202201045364
Details
Permit
202204212662
Status
complete
Filed
Apr 21, 2022
Permit issued
Apr 21, 2022
Final sign-off
Jun 9, 2022
Declared cost
$48,500
Address
55 02nd St

fl 4: fire only work for the "intercom" remodel. additions and replacement s are 12 smoke detectors, 2 duct detectors, 11 modules, 51 speakers / strobes, & 8 strobes. ref pa# 202201045364

Open the permit page

$48,500
Apr 1, 2022Completed
final sign-off Dec 2022
55 02nd StM C S Construction Servicesfloors 1,3,16,17: title 24 electrical compliances to add lighting and power to restrooms. ref t.i. pa202203220555. maher n/a.
Details
Permit
202204011370
Status
complete
Filed
Apr 1, 2022
Permit issued
Apr 1, 2022
Final sign-off
Dec 27, 2022
Declared cost
$39,000
Address
55 02nd St

floors 1,3,16,17: title 24 electrical compliances to add lighting and power to restrooms. ref t.i. pa202203220555. maher n/a.

Open the permit page

$39,000
Mar 22, 2022Completed
final sign-off Dec 2022
55 02nd StM C S Construction Servicesfloors 1,3,16,17: t.i., removal of nonstructural partitions finishes, light fixtures, plumbing & accessores, upgrades to 1,3,16&17 floors, core restrooms. mep & fire life safety under separate permit
Details
Permit
202203220555
Status
complete
Filed
Mar 22, 2022
Permit issued
Apr 1, 2022
Final sign-off
Dec 27, 2022
Declared cost
$450,000
Address
55 02nd St

floors 1,3,16,17: t.i., removal of nonstructural partitions finishes, light fixtures, plumbing & accessores, upgrades to 1,3,16&17 floors, core restrooms. mep & fire life safety under separate permit

Open the permit page

$450,000
Mar 15, 2022Completed
final sign-off Apr 2022
55 02nd StR L H Fire Protection Incfire sprinkler: install 57 pendents and 101 uprights sprinklers on the 4/f. ref pa 202001045364.
Details
Permit
202203150010
Status
complete
Filed
Mar 15, 2022
Permit issued
Mar 25, 2022
Final sign-off
Apr 21, 2022
Declared cost
$35,000
Address
55 02nd St

fire sprinkler: install 57 pendents and 101 uprights sprinklers on the 4/f. ref pa 202001045364.

Open the permit page

$35,000
Feb 14, 2022Completed
final sign-off Jul 2022
55 02nd StPrincipal Builders Inc.4/f: deferred mep associated with ti permit 202201045364.
Details
Permit
202202147901
Status
complete
Filed
Feb 14, 2022
Permit issued
Mar 11, 2022
Final sign-off
Jul 6, 2022
Address
55 02nd St

4/f: deferred mep associated with ti permit 202201045364.

Open the permit page

Jan 11, 2022Completed
final sign-off Mar 2022
55 02nd StSiemens Industry, Inc.fire only for the intercom canteen remodel on floor 5; additions are 3 duct detectors, 1 module, 1 speaker/strobes, and 4 strobes. ref pa# 202012221525.
Details
Permit
202201115711
Status
complete
Filed
Jan 11, 2022
Permit issued
Jan 11, 2022
Final sign-off
Mar 24, 2022
Declared cost
$18,400
Address
55 02nd St

fire only for the intercom canteen remodel on floor 5; additions are 3 duct detectors, 1 module, 1 speaker/strobes, and 4 strobes. ref pa# 202012221525.

Open the permit page

$18,400
Jan 6, 2022Completed
final sign-off Feb 2022
55 02nd StR L H Fire Protection Incfire sprinkler permit. relocate 50, add 30 and delete 8 sprinklers on the 05th fl. ti 202212221525
Details
Permit
202201065457
Status
complete
Filed
Jan 6, 2022
Permit issued
Jan 6, 2022
Final sign-off
Feb 9, 2022
Declared cost
$25,000
Address
55 02nd St

fire sprinkler permit. relocate 50, add 30 and delete 8 sprinklers on the 05th fl. ti 202212221525

Open the permit page

$25,000
Jan 6, 2022Completed
final sign-off Jun 2022
55 02nd StSiemens Industry, Inc.floors 5,22,23,25,26: fire only work to install expansion equipment for the existing 2-way communications system and to add call stations. no reference permit.
Details
Permit
202201065440
Status
complete
Filed
Jan 6, 2022
Permit issued
Jan 6, 2022
Final sign-off
Jun 22, 2022
Declared cost
$5,500
Address
55 02nd St

floors 5,22,23,25,26: fire only work to install expansion equipment for the existing 2-way communications system and to add call stations. no reference permit.

Open the permit page

$5,500
Jan 4, 2022Completed
final sign-off Sep 2022
55 02nd StPrincipal Builders Inc.4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipment
Details
Permit
202201045364
Status
complete
Filed
Jan 4, 2022
Permit issued
Feb 28, 2022
Final sign-off
Sep 1, 2022
Declared cost
$2,366,525
Address
55 02nd St

4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipment

Open the permit page

$2,366,525
Dec 7, 2021Completed
final sign-off Sep 2022
55 02nd StPrincipal Builders Inc.5/f - revison to permit# 2020-1222-1525, additional office & conference room scope added into existing open office.
Details
Permit
202112073896
Status
complete
Filed
Dec 7, 2021
Permit issued
Dec 23, 2021
Final sign-off
Sep 1, 2022
Address
55 02nd St

5/f - revison to permit# 2020-1222-1525, additional office & conference room scope added into existing open office.

Open the permit page

Aug 11, 2021Completed
final sign-off Aug 2022
55 02nd StPrincipal Builders Inc.5th floor: deferred mep to t.i. app# 202012221525
Details
Permit
202108116225
Status
complete
Filed
Aug 11, 2021
Permit issued
Aug 18, 2021
Final sign-off
Aug 1, 2022
Address
55 02nd St

5th floor: deferred mep to t.i. app# 202012221525

Open the permit page

Jul 29, 2021Completed
final sign-off Jul 2022
55 02nd StPrincipal Builders Inc.demo of only e non structural partitons, associated power and telecome outlets, plumbing and finishes per ab-017 per ab-017
Details
Permit
202107295363
Status
complete
Filed
Jul 29, 2021
Permit issued
Aug 26, 2021
Final sign-off
Jul 6, 2022
Declared cost
$16,000
Address
55 02nd St

demo of only e non structural partitons, associated power and telecome outlets, plumbing and finishes per ab-017 per ab-017

Open the permit page

$16,000
Mar 23, 2021Completed
final sign-off Apr 2021
55 02nd StAyoob & Peery Plumbing Co Incadd (3) sprinkler per t.i. ref#: 2020-1216-1140 job#: 21-612
Details
Permit
202103237092
Status
complete
Filed
Mar 23, 2021
Permit issued
Apr 8, 2021
Final sign-off
Apr 28, 2021
Declared cost
$1,575
Address
55 02nd St

add (3) sprinkler per t.i. ref#: 2020-1216-1140 job#: 21-612

Open the permit page

$1,575
Dec 22, 2020Completed
final sign-off Sep 2022
55 02nd StPrincipal Builders Inc.5th fl: t.i. work includes non-structural interior demolition + new partitions, creation of a servery, cafe, i.t. help desk, restrooms, mother's room + associated finishes fixtures. m.e.p. deferred.
Details
Permit
202012221525
Status
complete
Filed
Dec 22, 2020
Permit issued
Mar 26, 2021
Final sign-off
Sep 1, 2022
Declared cost
$800,000
Address
55 02nd St

5th fl: t.i. work includes non-structural interior demolition + new partitions, creation of a servery, cafe, i.t. help desk, restrooms, mother's room + associated finishes fixtures. m.e.p. deferred.

Open the permit page

$800,000
Dec 16, 2020Never finaled
issued Feb 2021, no final
55 02nd StM C S Construction Services1/f-2/f: ti for furred partitions, wall finish, & wall base revision. mep and fire sprinkler deffered.
Details
Permit
202012161140
Status
issued
Filed
Dec 16, 2020
Permit issued
Feb 9, 2021
Declared cost
$130,000
Address
55 02nd St

1/f-2/f: ti for furred partitions, wall finish, & wall base revision. mep and fire sprinkler deffered.

Open the permit page

$130,000
Aug 10, 2020Never finaled
issued Aug 2020, no final
55 02nd StGolden Gate Fire Protection Incfire sprinklers, relocate 24 pendents and relocate 43 upright on the 24th floor. relocate 2 pendents on the 19th floor. relocate 4 pendents and relocate 11 uprights on the basement level. 201912119253 for basement, 201912300972 for 19th floor, 201912119253 for the 24th floor.
Details
Permit
202008101466
Status
issued
Filed
Aug 10, 2020
Permit issued
Aug 18, 2020
Declared cost
$44,100
Address
55 02nd St

fire sprinklers, relocate 24 pendents and relocate 43 upright on the 24th floor. relocate 2 pendents on the 19th floor. relocate 4 pendents and relocate 11 uprights on the basement level. 201912119253 for basement, 201912300972 for 19th floor, 201912119253 for the 24th floor.

Open the permit page

$44,100
Aug 4, 2020Completed
final sign-off Jan 2021
55 02nd StSiemens Industry, Inc.upgrade to the life safety system by replacing all 10 existing fire alarm panels, as well as replacing internal cards at the sffd annunciator and the firefighter's fan & damper panel; a status display annunciator and cellular dialer will be added. no reference building permit application number.
Details
Permit
202008041070
Status
complete
Filed
Aug 4, 2020
Permit issued
Sep 10, 2020
Final sign-off
Jan 8, 2021
Declared cost
$29,000
Address
55 02nd St

upgrade to the life safety system by replacing all 10 existing fire alarm panels, as well as replacing internal cards at the sffd annunciator and the firefighter's fan & damper panel; a status display annunciator and cellular dialer will be added. no reference building permit application number.

Open the permit page

$29,000
Jul 27, 2020Completed
final sign-off Mar 2021
55 02nd StSiemens Industry, Inc.fire alarm addition of 3 modules for fsd control on the basement parking level. ref pa# 201912119253
Details
Permit
202007270828
Status
complete
Filed
Jul 27, 2020
Permit issued
Aug 12, 2020
Final sign-off
Mar 1, 2021
Declared cost
$1,500
Address
55 02nd St

fire alarm addition of 3 modules for fsd control on the basement parking level. ref pa# 201912119253

Open the permit page

$1,500
Jul 7, 2020Completed
final sign-off May 2021
55 02nd StField Construction Inc.concrete saw cutting for new plumbing work ref 201912119253
Details
Permit
202007079715
Status
complete
Filed
Jul 7, 2020
Permit issued
Jul 15, 2020
Final sign-off
May 19, 2021
Declared cost
$125,000
Address
55 02nd St

concrete saw cutting for new plumbing work ref 201912119253

Open the permit page

$125,000
Jul 7, 2020Completed
final sign-off May 2021
55 02nd StField Construction Inc.suite #1950; hvac modifications for new spec suite ref pa# 201912300972
Details
Permit
202007079746
Status
complete
Filed
Jul 7, 2020
Permit issued
Jul 19, 2020
Final sign-off
May 10, 2021
Declared cost
$80,000
Address
55 02nd St

suite #1950; hvac modifications for new spec suite ref pa# 201912300972

Open the permit page

$80,000
Jul 7, 2020Completed
final sign-off May 2021
55 02nd StField Construction Inc.19th fl, ste 1950 - lighting, power and t-24 upgrades. ref pa 2019-1230-0972
Details
Permit
202007079743
Status
complete
Filed
Jul 7, 2020
Permit issued
Nov 19, 2020
Final sign-off
May 10, 2021
Declared cost
$125,000
Address
55 02nd St

19th fl, ste 1950 - lighting, power and t-24 upgrades. ref pa 2019-1230-0972

Open the permit page

$125,000
Jul 7, 2020Completed
final sign-off May 2021
55 02nd StField Construction Inc.hvac upgrades with new vavs ref 201912119253
Details
Permit
202007079708
Status
complete
Filed
Jul 7, 2020
Permit issued
Oct 6, 2020
Final sign-off
May 19, 2021
Declared cost
$85,500
Address
55 02nd St

hvac upgrades with new vavs ref 201912119253

Open the permit page

$85,500
Jul 7, 2020Completed
final sign-off May 2021
55 02nd StField Construction Inc.24th floor: lighting, power and t-24 upgrades. ref app#201912119252.
Details
Permit
202007079736
Status
complete
Filed
Jul 7, 2020
Permit issued
Feb 23, 2021
Final sign-off
May 10, 2021
Declared cost
$150,000
Address
55 02nd St

24th floor: lighting, power and t-24 upgrades. ref app#201912119252.

Open the permit page

$150,000
Jul 7, 2020Completed
final sign-off May 2021
55 02nd StField Construction Inc.hvac upgrades with new vav's for a spec suite on the 24th fl. ref pa #201912119252. maher na
Details
Permit
202007079753
Status
complete
Filed
Jul 7, 2020
Permit issued
Dec 2, 2020
Final sign-off
May 10, 2021
Declared cost
$85,000
Address
55 02nd St

hvac upgrades with new vav's for a spec suite on the 24th fl. ref pa #201912119252. maher na

Open the permit page

$85,000
Jul 7, 2020Completed
final sign-off Apr 2021
55 02nd StField Construction Inc.basement: lighting, power andt-24 upgrades. ref app#201912119253
Details
Permit
202007079730
Status
complete
Filed
Jul 7, 2020
Permit issued
Mar 16, 2021
Final sign-off
Apr 15, 2021
Declared cost
$125,000
Address
55 02nd St

basement: lighting, power andt-24 upgrades. ref app#201912119253

Open the permit page

$125,000
Mar 12, 2020Completed
final sign-off Mar 2021
55 02nd StSiemens Industry, Inc.fire alarm work to obtain permit #2 for the "fitness/spec suites", remodel at basement level, floors 19 and 24; the revisions are to change some ceiling speaker/strobes to wall devices and to replace 3 wall strobes with weatherproof in the basement unit. no devices added, ref pa 2019-@003-9252 (24);
Details
Permit
202003126845
Status
complete
Filed
Mar 12, 2020
Permit issued
Mar 12, 2020
Final sign-off
Mar 1, 2021
Address
55 02nd St

fire alarm work to obtain permit #2 for the "fitness/spec suites", remodel at basement level, floors 19 and 24; the revisions are to change some ceiling speaker/strobes to wall devices and to replace 3 wall strobes with weatherproof in the basement unit. no devices added, ref pa 2019-@003-9252 (24);

Open the permit page

Feb 27, 2020Completed
final sign-off Mar 2021
55 02nd StSiemens Industry, Inc.fire alarm work for fitness/spec suite remodel on basement parking level 1, floor 19,add 24, addition are 2 smoke detectors, 1 module, 29 speaker/strobes 8 strobes. permit 201912119252, 201912119253, 201912300972
Details
Permit
202002275537
Status
complete
Filed
Feb 27, 2020
Permit issued
Feb 27, 2020
Final sign-off
Mar 1, 2021
Declared cost
$24,580
Address
55 02nd St

fire alarm work for fitness/spec suite remodel on basement parking level 1, floor 19,add 24, addition are 2 smoke detectors, 1 module, 29 speaker/strobes 8 strobes. permit 201912119252, 201912119253, 201912300972

Open the permit page

$24,580
Dec 30, 2019Completed
final sign-off May 2021
55 02nd StField Construction Inc.19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terrace
Details
Permit
201912300972
Status
complete
Filed
Dec 30, 2019
Permit issued
Jan 16, 2020
Final sign-off
May 10, 2021
Declared cost
$385,000
Address
55 02nd St

19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terrace

Open the permit page

$385,000
Dec 11, 2019Completed
final sign-off May 2021
55 02nd StField Construction Inc.basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher na
Details
Permit
201912119253
Status
complete
Filed
Dec 11, 2019
Permit issued
Jan 29, 2020
Final sign-off
May 19, 2021
Declared cost
$1,100,000
Address
55 02nd St

basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher na

Open the permit page

$1,100,000
Dec 11, 2019Completed
final sign-off May 2021
55 02nd StField Construction Inc.demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroom
Details
Permit
201912119252
Status
complete
Filed
Dec 11, 2019
Permit issued
Jan 16, 2020
Final sign-off
May 10, 2021
Declared cost
$1,250,000
Address
55 02nd St

demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroom

Open the permit page

$1,250,000
Aug 6, 2019Never finaled
issued Aug 2019, no final
55 02nd StCodesign Llc15/f: add (1) interior window to (e) conference room.
Details
Permit
201908067979
Status
issued
Filed
Aug 6, 2019
Permit issued
Aug 15, 2019
Declared cost
$3,500
Address
55 02nd St

15/f: add (1) interior window to (e) conference room.

Open the permit page

$3,500
May 24, 2019Completed
final sign-off Jun 2019
55 02nd StSiemens Industry, Inc.1st floor: fire alarm work for "suite 150" remodel on floor 1; addition is 1 duct detector to replace an existing one at a heat pump. ref pa 2019-0128-1445
Details
Permit
201905241600
Status
complete
Filed
May 24, 2019
Permit issued
May 24, 2019
Final sign-off
Jun 14, 2019
Declared cost
$1,585
Address
55 02nd St

1st floor: fire alarm work for "suite 150" remodel on floor 1; addition is 1 duct detector to replace an existing one at a heat pump. ref pa 2019-0128-1445

Open the permit page

$1,585
May 20, 2019Completed
final sign-off Aug 2019
55 02nd StThomas Swan Sign Co Incnon elec wall projecting sign
Details
Permit
201905201066
Status
complete
Filed
May 20, 2019
Permit issued
May 28, 2019
Final sign-off
Aug 28, 2019
Declared cost
$5,000
Address
55 02nd St

non elec wall projecting sign

Open the permit page

$5,000
May 20, 2019Never finaled
issued May 2019, no final
55 02nd StThomas Swan Sign Co Incwindow vinyl signs
Details
Permit
201905201065
Status
issued
Filed
May 20, 2019
Permit issued
May 28, 2019
Declared cost
$1,000
Address
55 02nd St

window vinyl signs

Open the permit page

$1,000
May 20, 2019Completed
final sign-off Aug 2019
55 02nd StThomas Swan Sign Co Incelectric wall sign
Details
Permit
201905201067
Status
complete
Filed
May 20, 2019
Permit issued
May 28, 2019
Final sign-off
Aug 28, 2019
Declared cost
$5,000
Address
55 02nd St

electric wall sign

Open the permit page

$5,000
May 3, 2019Completed
final sign-off Jul 2020
55 02nd StSiemens Industry, Inc.ref pa# 201902153100; fire alarm work for the "intercom" remodel of floor 5; additions are 4 smoke detectors, 2 modules, 7 speakers/strobes, 2 strobes, and the relocation of 2 speaker/strobes. n/a for maher.
Details
Permit
201905039631
Status
complete
Filed
May 3, 2019
Permit issued
May 3, 2019
Final sign-off
Jul 16, 2020
Declared cost
$9,170
Address
55 02nd St

ref pa# 201902153100; fire alarm work for the "intercom" remodel of floor 5; additions are 4 smoke detectors, 2 modules, 7 speakers/strobes, 2 strobes, and the relocation of 2 speaker/strobes. n/a for maher.

Open the permit page

$9,170
May 2, 2019Completed
final sign-off May 2019
55 02nd StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system ti 4 relocated sprinklers. n/a for maher.
Details
Permit
201905029508
Status
complete
Filed
May 2, 2019
Permit issued
May 2, 2019
Final sign-off
May 30, 2019
Declared cost
$2,000
Address
55 02nd St

existing fire sprinkler system ti 4 relocated sprinklers. n/a for maher.

Open the permit page

$2,000
Apr 23, 2019Completed
final sign-off Sep 2022
55 02nd StPrincipal Builders Inc.revision to 201902153100 to reconfigure proposed layout of floor plan
Details
Permit
201904238682
Status
complete
Filed
Apr 23, 2019
Permit issued
May 3, 2019
Final sign-off
Sep 13, 2022
Address
55 02nd St

revision to 201902153100 to reconfigure proposed layout of floor plan

Open the permit page

Apr 22, 2019Completed
final sign-off Sep 2022
55 02nd StPrincipal Builders Inc.mep title 24 to install new lighting, power, hvac systems with plumbing ref 201902153100 on 5th fl. maher not req
Details
Permit
201904228605
Status
complete
Filed
Apr 22, 2019
Permit issued
May 3, 2019
Final sign-off
Sep 13, 2022
Declared cost
$342,480
Address
55 02nd St

mep title 24 to install new lighting, power, hvac systems with plumbing ref 201902153100 on 5th fl. maher not req

Open the permit page

$342,480
Apr 19, 2019Completed
final sign-off Jul 2019
55 02nd StR L H Fire Protection Inc5th flr. fire sprinklers. relocate 35, add 4 and delete 9 sprinklers. ref t.i pa 201902153100.
Details
Permit
201904198441
Status
complete
Filed
Apr 19, 2019
Permit issued
Apr 19, 2019
Final sign-off
Jul 19, 2019
Declared cost
$8,000
Address
55 02nd St

5th flr. fire sprinklers. relocate 35, add 4 and delete 9 sprinklers. ref t.i pa 201902153100.

Open the permit page

$8,000
Apr 16, 2019Completed
final sign-off Jun 2019
55 02nd StGotham Bay Constructionrevision to 201901281445 to show changes in design due to value engineering
Details
Permit
201904168142
Status
complete
Filed
Apr 16, 2019
Permit issued
May 10, 2019
Final sign-off
Jun 20, 2019
Address
55 02nd St

revision to 201901281445 to show changes in design due to value engineering

Open the permit page

Apr 4, 2019Never finaled
issued Aug 2019, no final
55 02nd StSiemens Industry, Inc.2-way communication system installation including 4 call box stations, one each on 4 separate floors.
Details
Permit
201904047079
Status
issued
Filed
Apr 4, 2019
Permit issued
Aug 6, 2019
Declared cost
$18,500
Address
55 02nd St

2-way communication system installation including 4 call box stations, one each on 4 separate floors.

Open the permit page

$18,500
Mar 1, 2019Completed
final sign-off Oct 2019
55 02nd StSiemens Industry, Inc.26/f: f/a work for the "intercom" remodel. add 1 smoke detctor, 26 speark/strobes, 3 strobes,1 strobe power supply and 1 2-way comm call box. maher n/a. ref pa# 201812138240
Details
Permit
201903014129
Status
complete
Filed
Mar 1, 2019
Permit issued
Mar 1, 2019
Final sign-off
Oct 28, 2019
Declared cost
$20,915
Address
55 02nd St

26/f: f/a work for the "intercom" remodel. add 1 smoke detctor, 26 speark/strobes, 3 strobes,1 strobe power supply and 1 2-way comm call box. maher n/a. ref pa# 201812138240

Open the permit page

$20,915
Mar 1, 2019Completed
final sign-off Jul 2020
55 02nd StSiemens Industry, Inc.ref pa# 201812138239; fire alarm work for the "intercom" remodel on fl 25, additions are 1 smoke detector 26 speaker/strobes, 3 strobes, and 1 2-way call box
Details
Permit
201903014128
Status
complete
Filed
Mar 1, 2019
Permit issued
Mar 1, 2019
Final sign-off
Jul 7, 2020
Declared cost
$19,330
Address
55 02nd St

ref pa# 201812138239; fire alarm work for the "intercom" remodel on fl 25, additions are 1 smoke detector 26 speaker/strobes, 3 strobes, and 1 2-way call box

Open the permit page

$19,330
Feb 26, 2019Never finaled
issued Feb 2019, no final
55 02nd StMetropolitan Electrical Constructionremove and replace 1 light in 17th fl in 1 office and replace 2 lights on 16th floor with 1 light
Details
Permit
201902263809
Status
issued
Filed
Feb 26, 2019
Permit issued
Feb 26, 2019
Declared cost
$3,492
Address
55 02nd St

remove and replace 1 light in 17th fl in 1 office and replace 2 lights on 16th floor with 1 light

Open the permit page

$3,492
Feb 15, 2019Completed
final sign-off Sep 2022
55 02nd StPrincipal Builders Inc.5th fl - ti to demo and construct new walls, doors, millwork, ceilings, finishes. mep and fire sprinklers, life safety on separate permit
Details
Permit
201902153100
Status
complete
Filed
Feb 15, 2019
Permit issued
Feb 21, 2019
Final sign-off
Sep 13, 2022
Declared cost
$370,000
Address
55 02nd St

5th fl - ti to demo and construct new walls, doors, millwork, ceilings, finishes. mep and fire sprinklers, life safety on separate permit

Open the permit page

$370,000
Feb 12, 2019Completed
final sign-off Mar 2019
55 02nd StAnderson, Rowe & Buckley, Inc.on 25th and 26th floors - existing fire sprinkler systmes ti. 25th fl - add 8 sprinklers, relocated 22 sprinklers. ref pa 2018-1213-8239; 26th fl - added 8 sprinklers, relocated 21 sprinklers ref pa 2018-1213-8240
Details
Permit
201902122656
Status
complete
Filed
Feb 12, 2019
Permit issued
Feb 12, 2019
Final sign-off
Mar 22, 2019
Declared cost
$29,500
Address
55 02nd St

on 25th and 26th floors - existing fire sprinkler systmes ti. 25th fl - add 8 sprinklers, relocated 22 sprinklers. ref pa 2018-1213-8239; 26th fl - added 8 sprinklers, relocated 21 sprinklers ref pa 2018-1213-8240

Open the permit page

$29,500
Feb 7, 2019Completed
final sign-off Jun 2022
55 02nd StPrincipal Builders Inc.25th fl - mep to install mechanical and plumbintg systems, lighting and power to 25th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8239 for ti work
Details
Permit
201902072364
Status
complete
Filed
Feb 7, 2019
Permit issued
Feb 7, 2019
Final sign-off
Jun 24, 2022
Declared cost
$323,316
Address
55 02nd St

25th fl - mep to install mechanical and plumbintg systems, lighting and power to 25th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8239 for ti work

Open the permit page

$323,316
Feb 7, 2019Completed
final sign-off Jun 2022
55 02nd StPrincipal Builders Inc.26th fl - mep to install mechanical and plumbintg systems, lighting and power to 26th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8240 for ti work
Details
Permit
201902072366
Status
complete
Filed
Feb 7, 2019
Permit issued
Feb 7, 2019
Final sign-off
Jun 24, 2022
Declared cost
$323,316
Address
55 02nd St

26th fl - mep to install mechanical and plumbintg systems, lighting and power to 26th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8240 for ti work

Open the permit page

$323,316
Jan 29, 2019Completed
final sign-off Feb 2019
55 02nd StSiemens Industry, Inc.on 2nd floor - ref pa# 201804095852; fire alarm "as-built" permit to indicate a relay addition and matrix correction, for the "intercom phase 2" remodel on fl. 2, per the sffd testing inspectors. n/a for maher.
Details
Permit
201901291454
Status
complete
Filed
Jan 29, 2019
Permit issued
Jan 29, 2019
Final sign-off
Feb 15, 2019
Declared cost
$530
Address
55 02nd St

on 2nd floor - ref pa# 201804095852; fire alarm "as-built" permit to indicate a relay addition and matrix correction, for the "intercom phase 2" remodel on fl. 2, per the sffd testing inspectors. n/a for maher.

Open the permit page

$530
Jan 28, 2019Completed
final sign-off Jun 2019
55 02nd StGotham Bay Constructionsuite 150: interior ti to inlcude new paritions, finishes, fixtures, furniture, casework, millwork, equipment and mep
Details
Permit
201901281445
Status
complete
Filed
Jan 28, 2019
Permit issued
Mar 19, 2019
Final sign-off
Jun 20, 2019
Declared cost
$225,000
Address
55 02nd St

suite 150: interior ti to inlcude new paritions, finishes, fixtures, furniture, casework, millwork, equipment and mep

Open the permit page

$225,000
Dec 13, 2018Completed
final sign-off Jun 2022
55 02nd StPrincipal Builders Inc.26th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit
Details
Permit
201812138240
Status
complete
Filed
Dec 13, 2018
Permit issued
Feb 1, 2019
Final sign-off
Jun 24, 2022
Declared cost
$899,000
Address
55 02nd St

26th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit

Open the permit page

$899,000
Dec 13, 2018Completed
final sign-off Jun 2022
55 02nd StPrincipal Builders Inc.25th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit
Details
Permit
201812138239
Status
complete
Filed
Dec 13, 2018
Permit issued
Feb 1, 2019
Final sign-off
Jun 24, 2022
Declared cost
$899,000
Address
55 02nd St

25th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit

Open the permit page

$899,000
Dec 6, 2018Completed
final sign-off Feb 2019
55 02nd StPrincipal Builders Inc.25/26f: demo of interior walls, doors, millwork, glazing and finishes. space to remain unoccupied under ab-017 ada to be provided w/ti work. maher n/a.
Details
Permit
201812067653
Status
complete
Filed
Dec 6, 2018
Permit issued
Dec 6, 2018
Final sign-off
Feb 6, 2019
Declared cost
$113,875
Address
55 02nd St

25/26f: demo of interior walls, doors, millwork, glazing and finishes. space to remain unoccupied under ab-017 ada to be provided w/ti work. maher n/a.

Open the permit page

$113,875
Nov 19, 2018Completed
final sign-off Jan 2019
55 02nd StC B 2 Builders Incorporated25-26/f:upgrade restrooms to ada compliance: demo partitons and replace with floor-to-ceiling toilet, partitions, relocate accesssories. ada barrier removal. n/a maher
Details
Permit
201811196229
Status
complete
Filed
Nov 19, 2018
Permit issued
Nov 19, 2018
Final sign-off
Jan 16, 2019
Declared cost
$27,800
Address
55 02nd St

25-26/f:upgrade restrooms to ada compliance: demo partitons and replace with floor-to-ceiling toilet, partitions, relocate accesssories. ada barrier removal. n/a maher

Open the permit page

$27,800
Oct 10, 2018Completed
final sign-off Dec 2018
55 02nd StSiemens Industry, Inc.19th fl - fire alarm work for permit #2 on the suite 1925. additions are 4 duct detectors at fau-powered boxes. fa permit #1 was done work app 2018-0725-5459 and 2018-0716-4654
Details
Permit
201810102709
Status
complete
Filed
Oct 10, 2018
Permit issued
Oct 10, 2018
Final sign-off
Dec 11, 2018
Declared cost
$6,340
Address
55 02nd St

19th fl - fire alarm work for permit #2 on the suite 1925. additions are 4 duct detectors at fau-powered boxes. fa permit #1 was done work app 2018-0725-5459 and 2018-0716-4654

Open the permit page

$6,340
Oct 5, 2018Completed
final sign-off Jan 2019
55 02nd StSiemens Industry, Inc.fire alarm work for ultimate software remodel on floor 23, additions are 2 smoke detectors, 16 duct detectors, 1 strobe power supply, 27 speaker strobes, 2 strobes
Details
Permit
201810052373
Status
complete
Filed
Oct 5, 2018
Permit issued
Oct 9, 2018
Final sign-off
Jan 25, 2019
Declared cost
$46,430
Address
55 02nd St

fire alarm work for ultimate software remodel on floor 23, additions are 2 smoke detectors, 16 duct detectors, 1 strobe power supply, 27 speaker strobes, 2 strobes

Open the permit page

$46,430
Oct 5, 2018Completed
final sign-off Jan 2019
55 02nd StSiemens Industry, Inc.fire alarm work for the ultimate software remodel floor 22, additions are 8 smoke detectors,12 duct detectors, 1 strobe power supply, 30 speak/strobes
Details
Permit
201810052369
Status
complete
Filed
Oct 5, 2018
Permit issued
Oct 9, 2018
Final sign-off
Jan 25, 2019
Declared cost
$39,940
Address
55 02nd St

fire alarm work for the ultimate software remodel floor 22, additions are 8 smoke detectors,12 duct detectors, 1 strobe power supply, 30 speak/strobes

Open the permit page

$39,940
Sep 12, 2018Never finaled
issued Apr 2019, no final
55 02nd StOrr Protection Systems Incroom 2220. furnish & install fire proinert 2 clean agent suppression system. furnish & install fire shp pro suppression control panel to control clean agent system. provide & install smoke devices, manual release, abort station, monitoring & av devices. maher n/a.
Details
Permit
201809129842
Status
issued
Filed
Sep 12, 2018
Permit issued
Apr 3, 2019
Declared cost
$18,000
Address
55 02nd St

room 2220. furnish & install fire proinert 2 clean agent suppression system. furnish & install fire shp pro suppression control panel to control clean agent system. provide & install smoke devices, manual release, abort station, monitoring & av devices. maher n/a.

Open the permit page

$18,000
Sep 5, 2018Completed
final sign-off Dec 2019
55 02nd StPrincipal Builders Inc.revision to pa 201806182102. 22nd flr. change layout of proposed game room and restrooms.
Details
Permit
201809059145
Status
complete
Filed
Sep 5, 2018
Permit issued
Sep 7, 2018
Final sign-off
Dec 5, 2019
Declared cost
$40,000
Address
55 02nd St

revision to pa 201806182102. 22nd flr. change layout of proposed game room and restrooms.

Open the permit page

$40,000
Aug 20, 2018Never finaled
issued Oct 2018, no final
55 02nd Stnew electrical, mechanical , and security devices, luminaires and lighting control devices/ add 1 fan powered box, add 1 exhaust fan, add ceiling diffusers rework duct districbution and air balance
Details
Permit
201808207765
Status
issued
Filed
Aug 20, 2018
Permit issued
Oct 11, 2018
Declared cost
$100,000
Address
55 02nd St

new electrical, mechanical , and security devices, luminaires and lighting control devices/ add 1 fan powered box, add 1 exhaust fan, add ceiling diffusers rework duct districbution and air balance

Open the permit page

$100,000
Aug 16, 2018Completed
final sign-off Oct 2018
55 02nd StAnderson, Rowe & Buckley, Inc.sprinklers for 22nd and 23rd floors- ref pa # 201806182102 & 201806182100; existing fire sprinkler syst. t.t. 22nd floor 19 added sprinklers and 23rd floor 4 added sprinklers, 67 relocated sprinklers 83 relocated sprinklers
Details
Permit
201808167482
Status
complete
Filed
Aug 16, 2018
Permit issued
Aug 16, 2018
Final sign-off
Oct 17, 2018
Declared cost
$86,500
Address
55 02nd St

sprinklers for 22nd and 23rd floors- ref pa # 201806182102 & 201806182100; existing fire sprinkler syst. t.t. 22nd floor 19 added sprinklers and 23rd floor 4 added sprinklers, 67 relocated sprinklers 83 relocated sprinklers

Open the permit page

$86,500
Aug 9, 2018Completed
final sign-off Aug 2018
55 02nd StGolden Gate Fire Protection Inc19th fl: fire sprinkler only, relocate 18 pendents, add 2 pendents, remove 3 pendents maher not req
Details
Permit
201808096869
Status
complete
Filed
Aug 9, 2018
Permit issued
Aug 9, 2018
Final sign-off
Aug 27, 2018
Declared cost
$10,600
Address
55 02nd St

19th fl: fire sprinkler only, relocate 18 pendents, add 2 pendents, remove 3 pendents maher not req

Open the permit page

$10,600
Jul 25, 2018Completed
final sign-off Sep 2018
55 02nd StSiemens Industry, Inc.fire alarm work for the suite 1925 remodel on floor 19, additions are 7 speaker strobes. ref#201807164654. n/a for maher.
Details
Permit
201807255459
Status
complete
Filed
Jul 25, 2018
Permit issued
Jul 25, 2018
Final sign-off
Sep 21, 2018
Declared cost
$4,445
Address
55 02nd St

fire alarm work for the suite 1925 remodel on floor 19, additions are 7 speaker strobes. ref#201807164654. n/a for maher.

Open the permit page

$4,445
Jul 16, 2018Completed
final sign-off Nov 2018
55 02nd StC B 2 Builders Incorporatedspec suite 1925 on 19th fl: ti includes building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design build under separate permit. building is "fully sprinklered". maher na
Details
Permit
201807164654
Status
complete
Filed
Jul 16, 2018
Permit issued
Jul 23, 2018
Final sign-off
Nov 7, 2018
Declared cost
$384,692
Address
55 02nd St

spec suite 1925 on 19th fl: ti includes building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design build under separate permit. building is "fully sprinklered". maher na

Open the permit page

$384,692
Jun 21, 2018Completed
final sign-off Nov 2018
55 02nd StC B 2 Builders Incorporatedada restroom upgrades on 22nd and 23rd floors. installation of new accessories, niche in partition, widening of stall doors. n/a for maher
Details
Permit
201806212549
Status
complete
Filed
Jun 21, 2018
Permit issued
Jul 3, 2018
Final sign-off
Nov 8, 2018
Declared cost
$6,200
Address
55 02nd St

ada restroom upgrades on 22nd and 23rd floors. installation of new accessories, niche in partition, widening of stall doors. n/a for maher

Open the permit page

$6,200
Jun 18, 2018Completed
final sign-off Dec 2019
55 02nd StPrincipal Builders Inc.ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher na
Details
Permit
201806182100
Status
complete
Filed
Jun 18, 2018
Permit issued
Jul 25, 2018
Final sign-off
Dec 5, 2019
Declared cost
$690,000
Address
55 02nd St

ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher na

Open the permit page

$690,000
Jun 18, 2018Completed
final sign-off Dec 2019
55 02nd StPrincipal Builders Inc.ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher na
Details
Permit
201806182102
Status
complete
Filed
Jun 18, 2018
Permit issued
Jul 25, 2018
Final sign-off
Dec 5, 2019
Declared cost
$690,000
Address
55 02nd St

ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher na

Open the permit page

$690,000
May 21, 2018Completed
final sign-off Feb 2019
55 02nd StSiemens Industry, Inc.fire alarm work for the "intercom" remodel on floor 2; additions are 1 smoke director, 25 speaker/strobes, and 2 strobes. ref pa 2018-0409-5852. n/a for maher.
Details
Permit
201805219607
Status
complete
Filed
May 21, 2018
Permit issued
May 21, 2018
Final sign-off
Feb 15, 2019
Declared cost
$17,600
Address
55 02nd St

fire alarm work for the "intercom" remodel on floor 2; additions are 1 smoke director, 25 speaker/strobes, and 2 strobes. ref pa 2018-0409-5852. n/a for maher.

Open the permit page

$17,600
May 16, 2018Completed
final sign-off Jun 2018
55 02nd StR L H Fire Protection Increlocate 14, add 15 and delete 25 pendent sprinklers. relocate 81 and add 2 upright sprinklers on the 2nd fl. ref# 201804095852
Details
Permit
201805169251
Status
complete
Filed
May 16, 2018
Permit issued
May 16, 2018
Final sign-off
Jun 11, 2018
Declared cost
$29,000
Address
55 02nd St

relocate 14, add 15 and delete 25 pendent sprinklers. relocate 81 and add 2 upright sprinklers on the 2nd fl. ref# 201804095852

Open the permit page

$29,000
May 7, 2018Never finaled
issued May 2018, no final
55 02nd StPrincipal Builders Inc.2nd flr -t-24 mechanical to install new lighting mechanical, and plumbing systems on 2nd flr. installing 2 (n) heat pumps, 10 (n) vav boxes, low pressure duct work and condesor water piping. ref 201804095852 maher na
Details
Permit
201805078364
Status
issued
Filed
May 7, 2018
Permit issued
May 8, 2018
Declared cost
$697,928
Address
55 02nd St

2nd flr -t-24 mechanical to install new lighting mechanical, and plumbing systems on 2nd flr. installing 2 (n) heat pumps, 10 (n) vav boxes, low pressure duct work and condesor water piping. ref 201804095852 maher na

Open the permit page

$697,928
Apr 9, 2018Completed
final sign-off May 2019
55 02nd StPrincipal Builders Inc.2nd floor: construction of new partition, glazing, doors, millwork, finishes. mep on seperate permit. life safty and sprinklers on seperate pemit. n/a for maher.
Details
Permit
201804095852
Status
complete
Filed
Apr 9, 2018
Permit issued
Apr 18, 2018
Final sign-off
May 3, 2019
Declared cost
$682,841
Address
55 02nd St

2nd floor: construction of new partition, glazing, doors, millwork, finishes. mep on seperate permit. life safty and sprinklers on seperate pemit. n/a for maher.

Open the permit page

$682,841
Apr 6, 2018Completed
final sign-off Apr 2018
55 02nd StC B 2 Builders Incorporated5/f -bathroom - ada upgrades, niche in wall, replace grab bars
Details
Permit
201804065697
Status
complete
Filed
Apr 6, 2018
Permit issued
Apr 6, 2018
Final sign-off
Apr 24, 2018
Declared cost
$3,018
Address
55 02nd St

5/f -bathroom - ada upgrades, niche in wall, replace grab bars

Open the permit page

$3,018
Mar 12, 2018Completed
final sign-off Apr 2018
55 02nd StC B 2 Builders Incorporated2/f: bathroom ada upgrades: niche in wall, replace grab bars. maher na
Details
Permit
201803123392
Status
complete
Filed
Mar 12, 2018
Permit issued
Mar 12, 2018
Final sign-off
Apr 5, 2018
Declared cost
$3,018
Address
55 02nd St

2/f: bathroom ada upgrades: niche in wall, replace grab bars. maher na

Open the permit page

$3,018
Feb 21, 2018Completed
final sign-off Apr 2018
55 02nd StPrincipal Builders Inc.interior demo of partitions, doors, millwork and finishes. space to remain vacant under ab-017. ada will be addressed under separate ti permit. maher n/a
Details
Permit
201802211878
Status
complete
Filed
Feb 21, 2018
Permit issued
Feb 28, 2018
Final sign-off
Apr 27, 2018
Declared cost
$111,000
Address
55 02nd St

interior demo of partitions, doors, millwork and finishes. space to remain vacant under ab-017. ada will be addressed under separate ti permit. maher n/a

Open the permit page

$111,000
Jan 23, 2018Never finaled
issued Jan 2018, no final
55 02nd StSiemens Industry, Inc.fire alarm work for the "huntsworth" remodel on floor 3; additions are 1 smoke detector, 4 speaker/strobes, and 1 strobe. ref pa 2017-1215-6546 n/a for maher.
Details
Permit
201801239212
Status
issued
Filed
Jan 23, 2018
Permit issued
Jan 23, 2018
Declared cost
$3,600
Address
55 02nd St

fire alarm work for the "huntsworth" remodel on floor 3; additions are 1 smoke detector, 4 speaker/strobes, and 1 strobe. ref pa 2017-1215-6546 n/a for maher.

Open the permit page

$3,600
Jan 8, 2018Completed
final sign-off Jan 2018
55 02nd StAyoob & Peery Plumbing Co Inc3rd flr ste 325: - relocate 4 fire sprinklers per to 201712156546. maher na
Details
Permit
201801088040
Status
complete
Filed
Jan 8, 2018
Permit issued
Jan 8, 2018
Final sign-off
Jan 17, 2018
Declared cost
$860
Address
55 02nd St

3rd flr ste 325: - relocate 4 fire sprinklers per to 201712156546. maher na

Open the permit page

$860
Dec 15, 2017Completed
final sign-off Feb 2018
55 02nd StC B 2 Builders Incorporated3rd fl, ste 325 ti including demo of non-structural partitions and build (n) non structural partitions. meps, life safety and sprinklers under separate permit if needed
Details
Permit
201712156546
Status
complete
Filed
Dec 15, 2017
Permit issued
Dec 27, 2017
Final sign-off
Feb 16, 2018
Declared cost
$34,815
Address
55 02nd St

3rd fl, ste 325 ti including demo of non-structural partitions and build (n) non structural partitions. meps, life safety and sprinklers under separate permit if needed

Open the permit page

$34,815
Nov 17, 2017Never finaled
issued Nov 2017, no final
55 02nd StSkyline Construction5/f -mechanical & electrical work for tenant imnprovement; ref #201710110935
Details
Permit
201711174222
Status
issued
Filed
Nov 17, 2017
Permit issued
Nov 28, 2017
Declared cost
$5,000
Address
55 02nd St

5/f -mechanical & electrical work for tenant imnprovement; ref #201710110935

Open the permit page

$5,000
Nov 16, 2017Never finaled
issued Nov 2017, no final
55 02nd StSiemens Industry, Inc.5th floor: fire alarm work for the "intercom phase 2" for additions of 10 speaker/strobes and 1 strobe. ref app#201710110935. n/a for maher
Details
Permit
201711164112
Status
issued
Filed
Nov 16, 2017
Permit issued
Nov 16, 2017
Declared cost
$6,985
Address
55 02nd St

5th floor: fire alarm work for the "intercom phase 2" for additions of 10 speaker/strobes and 1 strobe. ref app#201710110935. n/a for maher

Open the permit page

$6,985
Nov 13, 2017Completed
final sign-off Nov 2017
55 02nd StSiemens Industry, Inc.fire alarm work for the partial area remodel in the rubicon tenant space on floor 19. 1 speaker strobe relocated due wo new wall partitons no new devices ref 201710302565; n/a maher
Details
Permit
201711133764
Status
complete
Filed
Nov 13, 2017
Permit issued
Nov 13, 2017
Final sign-off
Nov 27, 2017
Declared cost
$635
Address
55 02nd St

fire alarm work for the partial area remodel in the rubicon tenant space on floor 19. 1 speaker strobe relocated due wo new wall partitons no new devices ref 201710302565; n/a maher

Open the permit page

$635
Nov 2, 2017Completed
final sign-off Dec 2017
55 02nd StR L H Fire Protection Inc5/f- fire sprinlker 41 pendent changed to upright, 2 added pendents, 8 add uprights ref 201710110935. n/a maher
Details
Permit
201711022989
Status
complete
Filed
Nov 2, 2017
Permit issued
Nov 2, 2017
Final sign-off
Dec 4, 2017
Declared cost
$11,976
Address
55 02nd St

5/f- fire sprinlker 41 pendent changed to upright, 2 added pendents, 8 add uprights ref 201710110935. n/a maher

Open the permit page

$11,976
Oct 30, 2017Completed
final sign-off Nov 2017
55 02nd StC C I Commercial Construction & Improvref app# 201710030279 to install pressure duct work. install 2 new supply grill. rebalance the valves. n/a for maher
Details
Permit
201710302593
Status
complete
Filed
Oct 30, 2017
Permit issued
Oct 31, 2017
Final sign-off
Nov 22, 2017
Declared cost
$20,000
Address
55 02nd St

ref app# 201710030279 to install pressure duct work. install 2 new supply grill. rebalance the valves. n/a for maher

Open the permit page

$20,000
Oct 30, 2017Completed
final sign-off Nov 2017
55 02nd StGolden Gate Fire Protection Incfire sprinklers only: relocate 4 sprinkler pendents for rpp office on the 19th fl. ref pa#201710030279. maher na
Details
Permit
201710302565
Status
complete
Filed
Oct 30, 2017
Permit issued
Oct 30, 2017
Final sign-off
Nov 13, 2017
Declared cost
$1,000
Address
55 02nd St

fire sprinklers only: relocate 4 sprinkler pendents for rpp office on the 19th fl. ref pa#201710030279. maher na

Open the permit page

$1,000
Oct 11, 2017Completed
final sign-off Apr 2018
55 02nd StSkyline Construction5th fl - interior non-structural partitions, glazing doors, millwork. mep, life safety, fire sprinkler under separate permit
Details
Permit
201710110935
Status
complete
Filed
Oct 11, 2017
Permit issued
Nov 14, 2017
Final sign-off
Apr 24, 2018
Declared cost
$682,941
Address
55 02nd St

5th fl - interior non-structural partitions, glazing doors, millwork. mep, life safety, fire sprinkler under separate permit

Open the permit page

$682,941
Oct 3, 2017Completed
final sign-off Jan 2018
55 02nd StC C I Commercial Construction & Improvselective demo of light fixture, construct of non-load structural partition. relocate 2 supply register and 3 return register. no title 24 required.electrical: install 2 new walls seconces in office 106. no title 24 required. n/a for maher
Details
Permit
201710030279
Status
complete
Filed
Oct 3, 2017
Permit issued
Oct 6, 2017
Final sign-off
Jan 17, 2018
Declared cost
$70,000
Address
55 02nd St

selective demo of light fixture, construct of non-load structural partition. relocate 2 supply register and 3 return register. no title 24 required.electrical: install 2 new walls seconces in office 106. no title 24 required. n/a for maher

Open the permit page

$70,000
Sep 18, 2017Completed
final sign-off Mar 2018
55 02nd StHathaway Dinwiddie Co.6th fl - revision to pa 2016-1209-4653 correcting restroom foot clearance requirements in disabled access stalls. mens and womens restrooms
Details
Permit
201709188873
Status
complete
Filed
Sep 18, 2017
Permit issued
Sep 26, 2017
Final sign-off
Mar 2, 2018
Address
55 02nd St

6th fl - revision to pa 2016-1209-4653 correcting restroom foot clearance requirements in disabled access stalls. mens and womens restrooms

Open the permit page

Aug 2, 2017Completed
final sign-off Oct 2017
55 02nd StSiemens Industry, Inc.fire alarm work for the "arent fox" remodel on floor 20; additions are 5 duct detectors, 1 module, 4 speaker/strobes and the relocation of 4 speaker/strobes. ref pa 2017-0614-9292. maher na
Details
Permit
201708023601
Status
complete
Filed
Aug 2, 2017
Permit issued
Aug 2, 2017
Final sign-off
Oct 12, 2017
Declared cost
$5,350
Address
55 02nd St

fire alarm work for the "arent fox" remodel on floor 20; additions are 5 duct detectors, 1 module, 4 speaker/strobes and the relocation of 4 speaker/strobes. ref pa 2017-0614-9292. maher na

Open the permit page

$5,350
Jul 11, 2017Completed
final sign-off Sep 2017
55 02nd StPribuss Engineering Inc20th fl: fs ti - relocate 34 sprinklers heads, add 6 sprinkler heads, total of 40 heads. ref #201706149292. maher na
Details
Permit
201707111571
Status
complete
Filed
Jul 11, 2017
Permit issued
Jul 17, 2017
Final sign-off
Sep 19, 2017
Declared cost
$20,560
Address
55 02nd St

20th fl: fs ti - relocate 34 sprinklers heads, add 6 sprinkler heads, total of 40 heads. ref #201706149292. maher na

Open the permit page

$20,560
Jun 29, 2017Never finaled
issued Jun 2017, no final
55 02nd StMetropolitan Electrical Constructionelectrical revision to pa 2017-0425-4878 & mep permit 2017-0214-9322. alter description of light fixtures & delete (16) fixtures, ref pa 2016-1130-3736
Details
Permit
201706290747
Status
issued
Filed
Jun 29, 2017
Permit issued
Jun 29, 2017
Address
55 02nd St

electrical revision to pa 2017-0425-4878 & mep permit 2017-0214-9322. alter description of light fixtures & delete (16) fixtures, ref pa 2016-1130-3736

Open the permit page

Jun 14, 2017Completed
final sign-off Nov 2017
55 02nd StC B 2 Builders Incorporatedtenant improvement of office space on the 20th floor.
Details
Permit
201706149292
Status
complete
Filed
Jun 14, 2017
Permit issued
Jul 7, 2017
Final sign-off
Nov 21, 2017
Declared cost
$500,000
Address
55 02nd St

tenant improvement of office space on the 20th floor.

Open the permit page

$500,000
Jun 9, 2017Completed
final sign-off Apr 2018
55 02nd StPrincipal Builders Inc.t-24 electrical to relocate and replace lighting fixture on floors 19,22,23,25, & 26. please refer to app#201704204443 for t.i. work.
Details
Permit
201706098960
Status
complete
Filed
Jun 9, 2017
Permit issued
Jun 29, 2017
Final sign-off
Apr 12, 2018
Declared cost
$150,000
Address
55 02nd St

t-24 electrical to relocate and replace lighting fixture on floors 19,22,23,25, & 26. please refer to app#201704204443 for t.i. work.

Open the permit page

$150,000
May 23, 2017Completed
final sign-off Jun 2017
55 02nd StPrincipal Builders Inc.18/f- revision to egress plan for pa#201705116308 - assembly area adjusted for fixed furniture which brings down the area occupancy load. n/a ordinance #155-13
Details
Permit
201705237410
Status
complete
Filed
May 23, 2017
Permit issued
May 26, 2017
Final sign-off
Jun 26, 2017
Address
55 02nd St

18/f- revision to egress plan for pa#201705116308 - assembly area adjusted for fixed furniture which brings down the area occupancy load. n/a ordinance #155-13

Open the permit page

May 19, 2017Completed
final sign-off Feb 2018
55 02nd StHathaway Dinwiddie Co.deferred submittal for operable partition installation. ref pa 2016-01209-4653
Details
Permit
201705197062
Status
complete
Filed
May 19, 2017
Permit issued
May 19, 2017
Final sign-off
Feb 26, 2018
Declared cost
$10,000
Address
55 02nd St

deferred submittal for operable partition installation. ref pa 2016-01209-4653

Open the permit page

$10,000
May 18, 2017Completed
final sign-off Aug 2017
55 02nd StPrincipal Builders Inc.18th floor - title- 24 mep to relocate & add new equipment. ref pa #201705116308. no new fsd's. n/a maher ordinance
Details
Permit
201705187015
Status
complete
Filed
May 18, 2017
Permit issued
May 19, 2017
Final sign-off
Aug 10, 2017
Declared cost
$290,000
Address
55 02nd St

18th floor - title- 24 mep to relocate & add new equipment. ref pa #201705116308. no new fsd's. n/a maher ordinance

Open the permit page

$290,000
May 11, 2017Completed
final sign-off Feb 2018
55 02nd StPrincipal Builders Inc.18th fl- selective demo of non structural partitions and building new non structural partitions. (new or revised meps and l.s. & sprinkler design build and submitted separate). building fully sprinklered rr and shower work. maher not req
Details
Permit
201705116308
Status
complete
Filed
May 11, 2017
Permit issued
May 18, 2017
Final sign-off
Feb 26, 2018
Declared cost
$225,630
Address
55 02nd St

18th fl- selective demo of non structural partitions and building new non structural partitions. (new or revised meps and l.s. & sprinkler design build and submitted separate). building fully sprinklered rr and shower work. maher not req

Open the permit page

$225,630
May 4, 2017Completed
final sign-off Sep 2017
55 02nd StSiemens Industry, Inc.18th flr: fire alarm add 13 speaker/strobes and 5 strobes ref 2017-0327-2401 maher na
Details
Permit
201705045643
Status
complete
Filed
May 4, 2017
Permit issued
May 4, 2017
Final sign-off
Sep 26, 2017
Declared cost
$9,180
Address
55 02nd St

18th flr: fire alarm add 13 speaker/strobes and 5 strobes ref 2017-0327-2401 maher na

Open the permit page

$9,180
Apr 25, 2017Never finaled
issued Apr 2017, no final
55 02nd StSkyline Constructionelectrical revision to mep pa 2017-0214-9322. alter description of light fixtures ref pa 2016-1130-3736. n/a for maher.
Details
Permit
201704254878
Status
issued
Filed
Apr 25, 2017
Permit issued
Apr 25, 2017
Address
55 02nd St

electrical revision to mep pa 2017-0214-9322. alter description of light fixtures ref pa 2016-1130-3736. n/a for maher.

Open the permit page

Apr 20, 2017Completed
final sign-off Jun 2017
55 02nd StPrincipal Builders Inc.19/f, 22/f, 23/f, 25/f, 26/f- construction of partition doors, ceiling and finishes. mep to be submitted seperately, sprinkler and life safety to be submitted seperately. n/a ordinance #155-13
Details
Permit
201704204443
Status
complete
Filed
Apr 20, 2017
Permit issued
Apr 20, 2017
Final sign-off
Jun 2, 2017
Declared cost
$738,590
Address
55 02nd St

19/f, 22/f, 23/f, 25/f, 26/f- construction of partition doors, ceiling and finishes. mep to be submitted seperately, sprinkler and life safety to be submitted seperately. n/a ordinance #155-13

Open the permit page

$738,590
Apr 20, 2017Completed
final sign-off Jun 2017
55 02nd StPribuss Engineering Inc22/f, 23/f, 25/f, 26/f- fire sprinkler t.i. under pa#201704204443, relocate 97, add 2, total 99. n/a ordinance #155-13
Details
Permit
201704204465
Status
complete
Filed
Apr 20, 2017
Permit issued
Apr 26, 2017
Final sign-off
Jun 1, 2017
Declared cost
$51,215
Address
55 02nd St

22/f, 23/f, 25/f, 26/f- fire sprinkler t.i. under pa#201704204443, relocate 97, add 2, total 99. n/a ordinance #155-13

Open the permit page

$51,215
Apr 4, 2017Completed
final sign-off May 2017
55 02nd StPribuss Engineering Inc18th fl: fire sprinkler ti relocate 19, add 3, total 22. ref ti 2017-0327-2401.
Details
Permit
201704043125
Status
complete
Filed
Apr 4, 2017
Permit issued
Apr 6, 2017
Final sign-off
May 31, 2017
Declared cost
$11,322
Address
55 02nd St

18th fl: fire sprinkler ti relocate 19, add 3, total 22. ref ti 2017-0327-2401.

Open the permit page

$11,322
Mar 27, 2017Completed
final sign-off Aug 2017
55 02nd StPrincipal Builders Inc.18th flr - ti includes selective demo of non structural partitions. bldg is fully sprinklersed. floor is not occupied ab-017 maher na
Details
Permit
201703272401
Status
complete
Filed
Mar 27, 2017
Permit issued
Apr 3, 2017
Final sign-off
Aug 10, 2017
Declared cost
$59,000
Address
55 02nd St

18th flr - ti includes selective demo of non structural partitions. bldg is fully sprinklersed. floor is not occupied ab-017 maher na

Open the permit page

$59,000
Feb 23, 2017Completed
final sign-off Apr 2017
55 02nd StGolden Gate Fire Protection Inc6th flr: fire sprinlker 145 pendent sprinklers ti ref 201612094653 maher na
Details
Permit
201702239924
Status
complete
Filed
Feb 23, 2017
Permit issued
Feb 23, 2017
Final sign-off
Apr 3, 2017
Declared cost
$76,125
Address
55 02nd St

6th flr: fire sprinlker 145 pendent sprinklers ti ref 201612094653 maher na

Open the permit page

$76,125
Feb 14, 2017Completed
final sign-off Aug 2017
55 02nd StSkyline Constructionmechanical & electrical for ti on the 5th floor. ref pa 2016-1130-3736
Details
Permit
201702149322
Status
complete
Filed
Feb 14, 2017
Permit issued
Mar 2, 2017
Final sign-off
Aug 24, 2017
Declared cost
$98,000
Address
55 02nd St

mechanical & electrical for ti on the 5th floor. ref pa 2016-1130-3736

Open the permit page

$98,000
Feb 13, 2017Completed
final sign-off Mar 2017
55 02nd StSiemens Industry, Inc.fire alarm work for the interiorcom remodel on floor 5. additoins are 9 speaker strobes and 3 strobes ref 201611303736
Details
Permit
201702139228
Status
complete
Filed
Feb 13, 2017
Permit issued
Feb 16, 2017
Final sign-off
Mar 3, 2017
Declared cost
$6,120
Address
55 02nd St

fire alarm work for the interiorcom remodel on floor 5. additoins are 9 speaker strobes and 3 strobes ref 201611303736

Open the permit page

$6,120
Jan 23, 2017Completed
final sign-off Feb 2017
55 02nd StR L H Fire Protection Inc5/f- fire sprinkler permit, relocate 10, add 5 and delete 1 pendent sprinkler. t.i. pa# 201611303736. n/a ordinance #155-13
Details
Permit
201701237648
Status
complete
Filed
Jan 23, 2017
Permit issued
Jan 23, 2017
Final sign-off
Feb 2, 2017
Declared cost
$4,700
Address
55 02nd St

5/f- fire sprinkler permit, relocate 10, add 5 and delete 1 pendent sprinkler. t.i. pa# 201611303736. n/a ordinance #155-13

Open the permit page

$4,700
Jan 10, 2017Completed
final sign-off Apr 2017
55 02nd StSiemens Industry, Inc.0n 6th floor - fire alarm work for kpmg remodel. additions are 6 smoke detectors, 3 duct detectors, 1 strobe power supply, 33 speaker/strobes, 6 strobes
Details
Permit
201701106796
Status
complete
Filed
Jan 10, 2017
Permit issued
Jan 10, 2017
Final sign-off
Apr 21, 2017
Declared cost
$27,420
Address
55 02nd St

0n 6th floor - fire alarm work for kpmg remodel. additions are 6 smoke detectors, 3 duct detectors, 1 strobe power supply, 33 speaker/strobes, 6 strobes

Open the permit page

$27,420
Dec 9, 2016Completed
final sign-off Feb 2018
55 02nd StHathaway Dinwiddie Co.6/f- meps and security for pa#201612094653. n/a ordinance #155-13
Details
Permit
201612094656
Status
complete
Filed
Dec 9, 2016
Permit issued
Dec 29, 2016
Final sign-off
Feb 26, 2018
Declared cost
$750,000
Address
55 02nd St

6/f- meps and security for pa#201612094653. n/a ordinance #155-13

Open the permit page

$750,000
Dec 9, 2016Completed
final sign-off Mar 2018
55 02nd StHathaway Dinwiddie Co.6/f- t.i. including offices, break area and elevator lobby, (n) vanities, lavatories and flush valves at (e) restrooms. meps and security under seperate permit. n/a ordinance #155-13
Details
Permit
201612094653
Status
complete
Filed
Dec 9, 2016
Permit issued
Dec 20, 2016
Final sign-off
Mar 2, 2018
Declared cost
$1,322,475
Address
55 02nd St

6/f- t.i. including offices, break area and elevator lobby, (n) vanities, lavatories and flush valves at (e) restrooms. meps and security under seperate permit. n/a ordinance #155-13

Open the permit page

$1,322,475
Nov 30, 2016Completed
final sign-off Aug 2017
55 02nd StSkyline Construction5th floor: ti - consists of new non structural partition, glazing, doors, millwork. mep/fire/life safety under sep permit maher na
Details
Permit
201611303736
Status
complete
Filed
Nov 30, 2016
Permit issued
Dec 1, 2016
Final sign-off
Aug 24, 2017
Declared cost
$682,841
Address
55 02nd St

5th floor: ti - consists of new non structural partition, glazing, doors, millwork. mep/fire/life safety under sep permit maher na

Open the permit page

$682,841
Oct 27, 2016Never finaled
issued Oct 2016, no final
55 02nd StC B 2 Builders Incorporated1st floor - title 24 lighting, ref 20160906850
Details
Permit
201610271266
Status
issued
Filed
Oct 27, 2016
Permit issued
Oct 27, 2016
Address
55 02nd St

1st floor - title 24 lighting, ref 20160906850

Open the permit page

Oct 20, 2016Completed
final sign-off Oct 2016
55 02nd StSiemens Industry, Inc.fire alarm work for the "hines" remodel on floor 1; additions are (2) speaker/strobes. ref ti# 2016-0906-6850.
Details
Permit
201610200740
Status
complete
Filed
Oct 20, 2016
Permit issued
Oct 21, 2016
Final sign-off
Oct 26, 2016
Declared cost
$1,040
Address
55 02nd St

fire alarm work for the "hines" remodel on floor 1; additions are (2) speaker/strobes. ref ti# 2016-0906-6850.

Open the permit page

$1,040
Sep 30, 2016Completed
final sign-off Oct 2016
55 02nd StGolden Gate Fire Protection Inc1st flr: fire sprinkler only. relocate 5 pendents for new ceiling - for hines maher na
Details
Permit
201609309246
Status
complete
Filed
Sep 30, 2016
Permit issued
Sep 30, 2016
Final sign-off
Oct 18, 2016
Declared cost
$2,500
Address
55 02nd St

1st flr: fire sprinkler only. relocate 5 pendents for new ceiling - for hines maher na

Open the permit page

$2,500
Sep 6, 2016Never finaled
issued Sep 2016, no final
55 02nd StC B 2 Builders Incorporated1st floor t.i. - (n) non-structural partitions, all new or revised meps, ls & sp will be design build & submitted separately. (bldg fully sprinklered). n/a maher ordinance
Details
Permit
201609066850
Status
issued
Filed
Sep 6, 2016
Permit issued
Sep 23, 2016
Declared cost
$89,950
Address
55 02nd St

1st floor t.i. - (n) non-structural partitions, all new or revised meps, ls & sp will be design build & submitted separately. (bldg fully sprinklered). n/a maher ordinance

Open the permit page

$89,950
Jun 9, 2016Completed
final sign-off Jul 2016
55 02nd StSiemens Industry, Inc.fire alarm work for the floor 19 ti remodel; additions are 6 speaker/strobes. ref pa 2016-0525-8343
Details
Permit
201606099467
Status
complete
Filed
Jun 9, 2016
Permit issued
Jun 9, 2016
Final sign-off
Jul 5, 2016
Declared cost
$3,050
Address
55 02nd St

fire alarm work for the floor 19 ti remodel; additions are 6 speaker/strobes. ref pa 2016-0525-8343

Open the permit page

$3,050
Jun 8, 2016Completed
final sign-off Jun 2016
55 02nd StSkanska Usa Building Incto permit 'systems furniture' for pa 2015-0923-7786.
Details
Permit
201606089420
Status
complete
Filed
Jun 8, 2016
Permit issued
Jun 9, 2016
Final sign-off
Jun 16, 2016
Address
55 02nd St

to permit 'systems furniture' for pa 2015-0923-7786.

Open the permit page

May 25, 2016Never finaled
issued May 2016, no final
55 02nd StNovo Construction Inc19th floor tenant improvement to include the demolitishing of non-structural partitions. n/a ordinance #155-13
Details
Permit
201605258343
Status
issued
Filed
May 25, 2016
Permit issued
May 26, 2016
Declared cost
$118,923
Address
55 02nd St

19th floor tenant improvement to include the demolitishing of non-structural partitions. n/a ordinance #155-13

Open the permit page

$118,923
May 4, 2016Never finaled
issued May 2016, no final
55 02nd StIlluminated Creations Dba Ellis & Ellisinstall (1) non-illuminated wall sign for "sutter health"; n/a maher ord. 155-13
Details
Permit
201605046465
Status
issued
Filed
May 4, 2016
Permit issued
May 25, 2016
Declared cost
$2,500
Address
55 02nd St

install (1) non-illuminated wall sign for "sutter health"; n/a maher ord. 155-13

Open the permit page

$2,500
Feb 1, 2016Completed
final sign-off Jun 2016
55 02nd StSiemens Industry, Inc.1/f:fire alarm work for spmf care center ti project on floor 1, additions are 1 smoke det, 1 duct detector,21 speaker strobes, and 4 strobes
Details
Permit
201602018426
Status
complete
Filed
Feb 1, 2016
Permit issued
Feb 1, 2016
Final sign-off
Jun 13, 2016
Declared cost
$13,700
Address
55 02nd St

1/f:fire alarm work for spmf care center ti project on floor 1, additions are 1 smoke det, 1 duct detector,21 speaker strobes, and 4 strobes

Open the permit page

$13,700
Jan 29, 2016Completed
final sign-off Apr 2016
55 02nd StAllied Fire Protectionon 1st floor - provide earthquake/seismic bracing calcs for fire sprinkler system that was approved & installed under pa 2015-1208-4404. maher na
Details
Permit
201601298358
Status
complete
Filed
Jan 29, 2016
Permit issued
Jan 29, 2016
Final sign-off
Apr 18, 2016
Address
55 02nd St

on 1st floor - provide earthquake/seismic bracing calcs for fire sprinkler system that was approved & installed under pa 2015-1208-4404. maher na

Open the permit page

Jan 25, 2016Completed
final sign-off Jun 2016
55 02nd StSkanska Usa Building Incdeferred submittal for access floor system for app#201509237786. permit for floor system only. all other work approved under previous permit. n/a for maher.
Details
Permit
201601257898
Status
complete
Filed
Jan 25, 2016
Permit issued
Feb 3, 2016
Final sign-off
Jun 21, 2016
Address
55 02nd St

deferred submittal for access floor system for app#201509237786. permit for floor system only. all other work approved under previous permit. n/a for maher.

Open the permit page

Dec 8, 2015Completed
final sign-off Apr 2016
55 02nd StAllied Fire Protectionfire sprinkler t.i. "sutter health"- add (9) fire sprinklers, relocate (46). t.i. pa#201509237786. n/a ordinance #155-13- separate permit required for siemsic calc's
Details
Permit
201512084404
Status
complete
Filed
Dec 8, 2015
Permit issued
Jan 6, 2016
Final sign-off
Apr 22, 2016
Declared cost
$27,500
Address
55 02nd St

fire sprinkler t.i. "sutter health"- add (9) fire sprinklers, relocate (46). t.i. pa#201509237786. n/a ordinance #155-13- separate permit required for siemsic calc's

Open the permit page

$27,500
Nov 30, 2015Completed
final sign-off Jan 2016
55 02nd StSkyline Constructionbasement: revision to app#201507211995 and 201509046155 to change occupant load calcs and open office to dining area. ref app#201509046155 and 201507211995. n/a for maher.
Details
Permit
201511303690
Status
complete
Filed
Nov 30, 2015
Permit issued
Jan 19, 2016
Final sign-off
Jan 27, 2016
Address
55 02nd St

basement: revision to app#201507211995 and 201509046155 to change occupant load calcs and open office to dining area. ref app#201509046155 and 201507211995. n/a for maher.

Open the permit page

Nov 24, 2015Never finaled
issued Nov 2015, no final
55 02nd Ststreet space
Details
Permit
M640567
Status
issued
Filed
Nov 24, 2015
Permit issued
Nov 24, 2015
Address
55 02nd St

street space

Open the permit page

Nov 20, 2015Never finaled
filed Nov 2015, never issued
55 02nd Ststreet space
Details
Permit
M639667
Status
filed
Filed
Nov 20, 2015
Address
55 02nd St

street space

Open the permit page

Oct 30, 2015Completed
final sign-off Nov 2015
55 02nd StR L H Fire Protection Inc3rd floor fire sprinkler permit - relocate 3, add 1 & delete 1 pendent sprinkler. relcoate 1 & add 1 upright sprinkler. ref #201509167144. n/a maher ordinance
Details
Permit
201510301239
Status
complete
Filed
Oct 30, 2015
Permit issued
Oct 30, 2015
Final sign-off
Nov 16, 2015
Declared cost
$1,834
Address
55 02nd St

3rd floor fire sprinkler permit - relocate 3, add 1 & delete 1 pendent sprinkler. relcoate 1 & add 1 upright sprinkler. ref #201509167144. n/a maher ordinance

Open the permit page

$1,834
Oct 29, 2015Never finaled
issued Oct 2015, no final
55 02nd StSwinerton Builders3rd floor - revision to pa #201509167144 - changing room name to tele/server on sheets a3.03, a4.03, a6.03,m2.1. n/a maher ordinance
Details
Permit
201510291099
Status
issued
Filed
Oct 29, 2015
Permit issued
Oct 30, 2015
Address
55 02nd St

3rd floor - revision to pa #201509167144 - changing room name to tele/server on sheets a3.03, a4.03, a6.03,m2.1. n/a maher ordinance

Open the permit page

Oct 29, 2015Completed
final sign-off Dec 2015
55 02nd StSiemens Industry, Inc.fire alarm work for the "monster" ti remodel on floor 3; additions are 1 smoke detector, 2 duct detectors, 2 modules, 16 speaker/strobes, and 4 speakers. ref pa 2015-0916-7144. maher na
Details
Permit
201510291092
Status
complete
Filed
Oct 29, 2015
Permit issued
Oct 29, 2015
Final sign-off
Dec 2, 2015
Declared cost
$12,800
Address
55 02nd St

fire alarm work for the "monster" ti remodel on floor 3; additions are 1 smoke detector, 2 duct detectors, 2 modules, 16 speaker/strobes, and 4 speakers. ref pa 2015-0916-7144. maher na

Open the permit page

$12,800
Sep 23, 2015Completed
final sign-off Jun 2016
55 02nd StSkanska Usa Building Incinterior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms. deferred submittal for structural flooring system.
Details
Permit
201509237786
Status
complete
Filed
Sep 23, 2015
Permit issued
Nov 20, 2015
Final sign-off
Jun 21, 2016
Declared cost
$800,000
Address
55 02nd St

interior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms. deferred submittal for structural flooring system.

Open the permit page

$800,000
Sep 23, 2015Completed
final sign-off Sep 2015
55 02nd StSiemens Industry, Inc.4th floor: ti - fire alarm additions of 1 stoke power supply, 2 modules & 47 speaker/strobes. maher na
Details
Permit
201509237744
Status
complete
Filed
Sep 23, 2015
Permit issued
Sep 23, 2015
Final sign-off
Sep 30, 2015
Declared cost
$26,500
Address
55 02nd St

4th floor: ti - fire alarm additions of 1 stoke power supply, 2 modules & 47 speaker/strobes. maher na

Open the permit page

$26,500
Sep 18, 2015Never finaled
issued Sep 2015, no final
55 02nd St4th floor evacuation plan; adding (4) new evacuation signs to replace existing.
Details
Permit
201509187388
Status
issued
Filed
Sep 18, 2015
Permit issued
Sep 18, 2015
Declared cost
$1,200
Address
55 02nd St

4th floor evacuation plan; adding (4) new evacuation signs to replace existing.

Open the permit page

$1,200
Sep 16, 2015Completed
final sign-off Apr 2016
55 02nd StSwinerton Builders3rd floor: provide cubicles, add two offices, provide i.t. room. minor lighting modifications, install 2 water cooled heat pump, provide power to servers. maher na
Details
Permit
201509167144
Status
complete
Filed
Sep 16, 2015
Permit issued
Oct 7, 2015
Final sign-off
Apr 1, 2016
Declared cost
$190,000
Address
55 02nd St

3rd floor: provide cubicles, add two offices, provide i.t. room. minor lighting modifications, install 2 water cooled heat pump, provide power to servers. maher na

Open the permit page

$190,000
Sep 4, 2015Completed
final sign-off Jan 2016
55 02nd StSkyline Constructionrevision to pa 2015-0721-1995 reconfigure of phone rooms and addition of 2 new phone rooms mep included
Details
Permit
201509046155
Status
complete
Filed
Sep 4, 2015
Permit issued
Sep 18, 2015
Final sign-off
Jan 21, 2016
Declared cost
$5,000
Address
55 02nd St

revision to pa 2015-0721-1995 reconfigure of phone rooms and addition of 2 new phone rooms mep included

Open the permit page

$5,000
Sep 1, 2015Completed
final sign-off Sep 2015
55 02nd StPribuss Engineering Inc4th floor: fire sprinkler t.i. work under gc permit #201507211995. total heads 138. n/a for maher.
Details
Permit
201509015819
Status
complete
Filed
Sep 1, 2015
Permit issued
Sep 3, 2015
Final sign-off
Sep 16, 2015
Declared cost
$50,430
Address
55 02nd St

4th floor: fire sprinkler t.i. work under gc permit #201507211995. total heads 138. n/a for maher.

Open the permit page

$50,430
Jul 21, 2015Completed
final sign-off Jan 2016
55 02nd StSkyline Constructiontenant improvement 4th fl, new partitions, lighting, mep
Details
Permit
201507211995
Status
complete
Filed
Jul 21, 2015
Permit issued
Aug 4, 2015
Final sign-off
Jan 21, 2016
Declared cost
$500,000
Address
55 02nd St

tenant improvement 4th fl, new partitions, lighting, mep

Open the permit page

$500,000
Jul 13, 2015Completed
final sign-off Jan 2016
55 02nd StSkyline Construction4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13
Details
Permit
201507131278
Status
complete
Filed
Jul 13, 2015
Permit issued
Jul 13, 2015
Final sign-off
Jan 21, 2016
Declared cost
$30,000
Address
55 02nd St

4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13

Open the permit page

$30,000
Apr 6, 2015Completed
final sign-off May 2015
55 02nd StGolden Gate Fire Protection Incfire sprinkler only - relocate and add sprinkler heads for kpmg on the 7th and 8th floor. 7th - 171 fire sprinkler pendents add; 8th - 190 fire sprinkler pendents add
Details
Permit
201504062865
Status
complete
Filed
Apr 6, 2015
Permit issued
Apr 6, 2015
Final sign-off
May 14, 2015
Declared cost
$180,500
Address
55 02nd St

fire sprinkler only - relocate and add sprinkler heads for kpmg on the 7th and 8th floor. 7th - 171 fire sprinkler pendents add; 8th - 190 fire sprinkler pendents add

Open the permit page

$180,500
Feb 27, 2015Completed
final sign-off May 2015
55 02nd StSiemens Industry, Inc.fire alarm work for the floor 8"kpmg" ti remodel, additions are 7 smoke detectors, 5 duct detectors, 3 speakers, 32 speaker/strobes and 8 strobes maher - not req'd
Details
Permit
201502279486
Status
complete
Filed
Feb 27, 2015
Permit issued
Feb 27, 2015
Final sign-off
May 28, 2015
Declared cost
$27,250
Address
55 02nd St

fire alarm work for the floor 8"kpmg" ti remodel, additions are 7 smoke detectors, 5 duct detectors, 3 speakers, 32 speaker/strobes and 8 strobes maher - not req'd

Open the permit page

$27,250
Feb 27, 2015Completed
final sign-off May 2015
55 02nd StSiemens Industry, Inc.fire alarm work for the floor 7"kpmg" ti remodel, additions are 4 smoke detectors, 5 duct detectors, 4 speakers, 36 speaker/strobes and 13 strobes maher - not req'd
Details
Permit
201502279485
Status
complete
Filed
Feb 27, 2015
Permit issued
Feb 27, 2015
Final sign-off
May 28, 2015
Declared cost
$31,500
Address
55 02nd St

fire alarm work for the floor 7"kpmg" ti remodel, additions are 4 smoke detectors, 5 duct detectors, 4 speakers, 36 speaker/strobes and 13 strobes maher - not req'd

Open the permit page

$31,500
Feb 25, 2015Completed
final sign-off Mar 2015
55 02nd StGolden Gate Fire Protection Inc3rd floor: relocate 45 upright sprinklers. ti #201411191934. n/a for the maher
Details
Permit
201502259269
Status
complete
Filed
Feb 25, 2015
Permit issued
Feb 25, 2015
Final sign-off
Mar 5, 2015
Declared cost
$20,600
Address
55 02nd St

3rd floor: relocate 45 upright sprinklers. ti #201411191934. n/a for the maher

Open the permit page

$20,600
Feb 5, 2015Completed
final sign-off Feb 2015
55 02nd StSiemens Industry, Inc.9th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 4 relay modules. t.i. app#201406239127
Details
Permit
201502057558
Status
complete
Filed
Feb 5, 2015
Permit issued
Feb 5, 2015
Final sign-off
Feb 13, 2015
Declared cost
$1,800
Address
55 02nd St

9th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 4 relay modules. t.i. app#201406239127

Open the permit page

$1,800
Feb 5, 2015Completed
final sign-off Feb 2015
55 02nd StSiemens Industry, Inc.10th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 3 smoke detectors and 5 relay modules. ref permit #201406239127
Details
Permit
201502057557
Status
complete
Filed
Feb 5, 2015
Permit issued
Feb 5, 2015
Final sign-off
Feb 13, 2015
Declared cost
$3,750
Address
55 02nd St

10th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 3 smoke detectors and 5 relay modules. ref permit #201406239127

Open the permit page

$3,750
Dec 4, 2014Completed
final sign-off Jan 2015
55 02nd StGolden Gate Fire Protection Increlocate 153 pendent sprinklers on 9/f. relocate 150 pendent sprinklers on 10/f. n/a #155-13
Details
Permit
201412042999
Status
complete
Filed
Dec 4, 2014
Permit issued
Dec 4, 2014
Final sign-off
Jan 26, 2015
Declared cost
$156,045
Address
55 02nd St

relocate 153 pendent sprinklers on 9/f. relocate 150 pendent sprinklers on 10/f. n/a #155-13

Open the permit page

$156,045
Nov 25, 2014Completed
final sign-off Feb 2015
55 02nd StSiemens Industry, Inc.on 9th floor - fire alarm work for the kpmg ti on floor 9. 4 duct detectors, 1 strobe powr supply, 9 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not req
Details
Permit
201411252427
Status
complete
Filed
Nov 25, 2014
Permit issued
Nov 25, 2014
Final sign-off
Feb 20, 2015
Declared cost
$33,000
Address
55 02nd St

on 9th floor - fire alarm work for the kpmg ti on floor 9. 4 duct detectors, 1 strobe powr supply, 9 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not req

Open the permit page

$33,000
Nov 25, 2014Completed
final sign-off Feb 2015
55 02nd StSiemens Industry, Inc.on 10th floor - fire alarm work for the kpmg ti on floor 10. 4 duct detectors, 1 strobe powr supply, 6 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not req
Details
Permit
201411252429
Status
complete
Filed
Nov 25, 2014
Permit issued
Nov 25, 2014
Final sign-off
Feb 20, 2015
Declared cost
$31,800
Address
55 02nd St

on 10th floor - fire alarm work for the kpmg ti on floor 10. 4 duct detectors, 1 strobe powr supply, 6 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not req

Open the permit page

$31,800
Nov 19, 2014Completed
final sign-off May 2015
55 02nd StC B 2 Builders Incorporated3rd floor: interior demo of extg ceiling grid and tile , extg flex hvac ducting, extg lighting fixtures, carpet, vct etc (ab--017)
Details
Permit
201411191934
Status
complete
Filed
Nov 19, 2014
Permit issued
Jan 7, 2015
Final sign-off
May 14, 2015
Declared cost
$15,000
Address
55 02nd St

3rd floor: interior demo of extg ceiling grid and tile , extg flex hvac ducting, extg lighting fixtures, carpet, vct etc (ab--017)

Open the permit page

$15,000
Sep 26, 2014Expired or cancelled
cancelled Mar 2020
55 02nd Stinstallation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 adpa-1921-18-20 hfb antenna. install 1 gps antenna. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201409267437
Status
cancelled
Filed
Sep 26, 2014
Declared cost
$35,000
Address
55 02nd St

installation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 adpa-1921-18-20 hfb antenna. install 1 gps antenna. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$35,000
Jul 18, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.11th floor revision to 201404163367. change of wall configuration per plan. maher n/a.
Details
Permit
201407181584
Status
complete
Filed
Jul 18, 2014
Permit issued
Aug 20, 2014
Final sign-off
Feb 18, 2016
Address
55 02nd St

11th floor revision to 201404163367. change of wall configuration per plan. maher n/a.

Open the permit page

Jul 14, 2014Never finaled
issued Jul 2014, no final
55 02nd StGolden Gate Fire Protection Increlocate 130 pendent sprinklers on the 11th fl upgrade end of line bracing and earthquake brading. n/a ordinance #155-13.
Details
Permit
201407141203
Status
issued
Filed
Jul 14, 2014
Permit issued
Jul 15, 2014
Declared cost
$66,950
Address
55 02nd St

relocate 130 pendent sprinklers on the 11th fl upgrade end of line bracing and earthquake brading. n/a ordinance #155-13.

Open the permit page

$66,950
Jun 27, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.7th & 8th floor: mep 201406279671 tenant improvement. h/a maher ord. # 155-13
Details
Permit
201406279678
Status
complete
Filed
Jun 27, 2014
Permit issued
Feb 3, 2015
Final sign-off
Feb 18, 2016
Declared cost
$1,200,000
Address
55 02nd St

7th & 8th floor: mep 201406279671 tenant improvement. h/a maher ord. # 155-13

Open the permit page

$1,200,000
Jun 27, 2014Completed
final sign-off Oct 2016
55 02nd StHathaway Dinwiddie Co.7th and 8th fl: ti to include open office, enclosed offices, break area, meeting rooms, elevator lobby. restroom work. mech elec sep permit. n/a maher ord. # 155-13
Details
Permit
201406279671
Status
complete
Filed
Jun 27, 2014
Permit issued
Feb 3, 2015
Final sign-off
Oct 24, 2016
Declared cost
$1,425,000
Address
55 02nd St

7th and 8th fl: ti to include open office, enclosed offices, break area, meeting rooms, elevator lobby. restroom work. mech elec sep permit. n/a maher ord. # 155-13

Open the permit page

$1,425,000
Jun 24, 2014Completed
final sign-off May 2015
55 02nd StSiemens Industry, Inc.11th floor: fire alarm work for kpmg t.i. additions are 1 smoke detectors, 5 duct detectors, 29 speaker/strobes, 10 strobes, and one relay module. ref app#201404163367. n/a for the maher ordinance #155-13
Details
Permit
201406249184
Status
complete
Filed
Jun 24, 2014
Permit issued
Jun 24, 2014
Final sign-off
May 28, 2015
Declared cost
$21,700
Address
55 02nd St

11th floor: fire alarm work for kpmg t.i. additions are 1 smoke detectors, 5 duct detectors, 29 speaker/strobes, 10 strobes, and one relay module. ref app#201404163367. n/a for the maher ordinance #155-13

Open the permit page

$21,700
Jun 23, 2014Completed
final sign-off Mar 2016
55 02nd StHathaway Dinwiddie Co.t.i. to includes office spaces, break room area, meeting rooms, elevator lobby & restroom work. new mech, electrical, plumbing under seperate permit. life safety, sprinkler under separate permit. n/a ordinance #155-13
Details
Permit
201406239127
Status
complete
Filed
Jun 23, 2014
Permit issued
Sep 26, 2014
Final sign-off
Mar 17, 2016
Declared cost
$1,425,000
Address
55 02nd St

t.i. to includes office spaces, break room area, meeting rooms, elevator lobby & restroom work. new mech, electrical, plumbing under seperate permit. life safety, sprinkler under separate permit. n/a ordinance #155-13

Open the permit page

$1,425,000
Jun 23, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.mechanical work for pa#201406239127. n/a ordinance #155-13
Details
Permit
201406239133
Status
complete
Filed
Jun 23, 2014
Permit issued
Sep 26, 2014
Final sign-off
Feb 23, 2016
Declared cost
$1,200,000
Address
55 02nd St

mechanical work for pa#201406239127. n/a ordinance #155-13

Open the permit page

$1,200,000
May 28, 2014Completed
final sign-off Jul 2015
55 02nd StThomas Swan Sign Co Inc5 evacuation plan maps, floors 9, 10, 11, 12 & 14. n/a ordinance #155-13
Details
Permit
201405286813
Status
complete
Filed
May 28, 2014
Permit issued
May 29, 2014
Final sign-off
Jul 7, 2015
Declared cost
$1,500
Address
55 02nd St

5 evacuation plan maps, floors 9, 10, 11, 12 & 14. n/a ordinance #155-13

Open the permit page

$1,500
May 14, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.mechanical electrical & plumbing work for project under pa#201404163367, n/a ordinance #155-13.
Details
Permit
201405145735
Status
complete
Filed
May 14, 2014
Permit issued
Aug 20, 2014
Final sign-off
Feb 18, 2016
Declared cost
$750,000
Address
55 02nd St

mechanical electrical & plumbing work for project under pa#201404163367, n/a ordinance #155-13.

Open the permit page

$750,000
Apr 16, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.11th floor: t.i. to include reception area,open office, work stations, reprographic center, employee break area,meeting rooms, training room, phone rooms, support space, restrooms and elevator lobby, hvac electrical, life safty, sprinklers under separate permit.
Details
Permit
201404163367
Status
complete
Filed
Apr 16, 2014
Permit issued
May 14, 2014
Final sign-off
Feb 18, 2016
Declared cost
$977,130
Address
55 02nd St

11th floor: t.i. to include reception area,open office, work stations, reprographic center, employee break area,meeting rooms, training room, phone rooms, support space, restrooms and elevator lobby, hvac electrical, life safty, sprinklers under separate permit.

Open the permit page

$977,130
Mar 19, 2014Completed
final sign-off May 2014
55 02nd StSiemens Industry, Inc.addition of 4 duct detectors, 1 relay module, 7 speakers, 29 speaker/strobes, 10 strobes for the kpmg remodel on the 14th fl all new devices connect to life safety system. referenced mechanical 2014.0121.6657 and ti 2014.0113.6092. compliance w/ordinance #155-13 not required
Details
Permit
201403191077
Status
complete
Filed
Mar 19, 2014
Permit issued
Mar 28, 2014
Final sign-off
May 12, 2014
Declared cost
$25,900
Address
55 02nd St

addition of 4 duct detectors, 1 relay module, 7 speakers, 29 speaker/strobes, 10 strobes for the kpmg remodel on the 14th fl all new devices connect to life safety system. referenced mechanical 2014.0121.6657 and ti 2014.0113.6092. compliance w/ordinance #155-13 not required

Open the permit page

$25,900
Mar 19, 2014Completed
final sign-off May 2014
55 02nd StSiemens Industry, Inc.addition of 4 duct detectors, 1 relay module, 7 speakers, 31 speaker/strobes, 9 strobes for kpmg remodel on floor 12. all devices connect onto (e) life safety system. ref # mechanical & t.i. #201401216657, #201401136092. compliance w/ordinance #155-13 not required
Details
Permit
201403191078
Status
complete
Filed
Mar 19, 2014
Permit issued
Mar 28, 2014
Final sign-off
May 8, 2014
Declared cost
$26,400
Address
55 02nd St

addition of 4 duct detectors, 1 relay module, 7 speakers, 31 speaker/strobes, 9 strobes for kpmg remodel on floor 12. all devices connect onto (e) life safety system. ref # mechanical & t.i. #201401216657, #201401136092. compliance w/ordinance #155-13 not required

Open the permit page

$26,400
Mar 14, 2014Completed
final sign-off Apr 2014
55 02nd StGolden Gate Fire Protection Increlocate 163 penedent sprinklers on the 12th floor. relocate 149 pendents and 1 upright on the 14th floor. ref arch. app# 2014.0113.6092
Details
Permit
201403140758
Status
complete
Filed
Mar 14, 2014
Permit issued
Mar 14, 2014
Final sign-off
Apr 9, 2014
Declared cost
$161,195
Address
55 02nd St

relocate 163 penedent sprinklers on the 12th floor. relocate 149 pendents and 1 upright on the 14th floor. ref arch. app# 2014.0113.6092

Open the permit page

$161,195
Jan 13, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd.
Details
Permit
201401136092
Status
complete
Filed
Jan 13, 2014
Permit issued
Jan 27, 2014
Final sign-off
Feb 23, 2016
Declared cost
$1,200,000
Address
55 02nd St

12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd.

Open the permit page

$1,200,000
Jan 13, 2014Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd.
Details
Permit
201401136097
Status
complete
Filed
Jan 13, 2014
Permit issued
Feb 12, 2014
Final sign-off
Feb 18, 2016
Declared cost
$47,000
Address
55 02nd St

12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd.

Open the permit page

$47,000
Dec 11, 2013Completed
final sign-off Feb 2016
55 02nd StHathaway Dinwiddie Co.(12 & 14th floor). demo only of applied finishes. non-structural partitions, hvac, electrical, plumbing and life safety equipment on two floors. t.i under separate permit. bldg is fully sprinklered. per ab-017
Details
Permit
201312113864
Status
complete
Filed
Dec 11, 2013
Permit issued
Dec 20, 2013
Final sign-off
Feb 23, 2016
Declared cost
$190,000
Address
55 02nd St

(12 & 14th floor). demo only of applied finishes. non-structural partitions, hvac, electrical, plumbing and life safety equipment on two floors. t.i under separate permit. bldg is fully sprinklered. per ab-017

Open the permit page

$190,000
Aug 14, 2013Never finaled
issued Aug 2013, no final
55 02nd StGolden Gate Fire Protection Inc15th floor fire sprinkler - relocate 42 pendent sprinkler heads, relocate 9 upright heads. ref pa #2013.07.02.0941
Details
Permit
201308144268
Status
issued
Filed
Aug 14, 2013
Permit issued
Aug 15, 2013
Declared cost
$26,265
Address
55 02nd St

15th floor fire sprinkler - relocate 42 pendent sprinkler heads, relocate 9 upright heads. ref pa #2013.07.02.0941

Open the permit page

$26,265
Jul 2, 2013Completed
final sign-off Mar 2014
55 02nd StNovo Construction Inc15th floor full floor tenant improvement to include selective demolitoins, partitions, ceiling finishes. mep,life safety & fire sprinkler under separate permit.
Details
Permit
201307020941
Status
complete
Filed
Jul 2, 2013
Permit issued
Jul 2, 2013
Final sign-off
Mar 4, 2014
Declared cost
$758,000
Address
55 02nd St

15th floor full floor tenant improvement to include selective demolitoins, partitions, ceiling finishes. mep,life safety & fire sprinkler under separate permit.

Open the permit page

$758,000
Jun 5, 2013Completed
final sign-off Jul 2013
55 02nd StSkyline Construction15th floor-selective demolition of (e) non load bearing partitions, gyp board ceiling, light fixtures, floor finishes, millwork & plumbing fixtures
Details
Permit
201306058730
Status
complete
Filed
Jun 5, 2013
Permit issued
Jun 6, 2013
Final sign-off
Jul 23, 2013
Declared cost
$65,000
Address
55 02nd St

15th floor-selective demolition of (e) non load bearing partitions, gyp board ceiling, light fixtures, floor finishes, millwork & plumbing fixtures

Open the permit page

$65,000

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.

Filter the results