Block 3708, lot 096
55 02nd St
- City’s use
- Commercial Office
- Built
- 2002
- Stories
- 24
- Building
- 379,330 sq ft
- Lot
- 25,146 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2024 | Completed final sign-off Jul 2024 | 55 02nd St | Siemens Industry, Inc. | fire only for the "alston and bird" remodel on floor 21; additions are 1 smoke detector, 1 duct detectors, 2 modules, 24 speakers, 15 speaker/strobes, and 2 strobes, 2 speaker/strobes are being relocated, ref pa# 202403117504Details
fire only for the "alston and bird" remodel on floor 21; additions are 1 smoke detector, 1 duct detectors, 2 modules, 24 speakers, 15 speaker/strobes, and 2 strobes, 2 speaker/strobes are being relocated, ref pa# 202403117504 | $66,800 |
| May 30, 2024 | Completed final sign-off Mar 2025 | 55 02nd St | Siemens Industry, Inc. | 21/f: fire only work add 2 remote call boxes onto the (e) 2-way comm system, on floor 21 for the "alston and bird" remodel, ref permit# 202403117504.Details
21/f: fire only work add 2 remote call boxes onto the (e) 2-way comm system, on floor 21 for the "alston and bird" remodel, ref permit# 202403117504. | $6,004 |
| Apr 2, 2024 | Completed final sign-off Jul 2024 | 55 02nd St | R L H Fire Protection Inc | 21/f: ti improvement to an (e) fire sprinkler system. relocated concealed sprinkler (32). added (5). added recessed (4). ti ref# 202403117504Details
21/f: ti improvement to an (e) fire sprinkler system. relocated concealed sprinkler (32). added (5). added recessed (4). ti ref# 202403117504 | $25,500 |
| Mar 27, 2024 | Completed final sign-off Jul 2024 | 55 02nd St | Principal Builders Inc. | ref 202403117504- deferred mep for office tiDetails
ref 202403117504- deferred mep for office ti | $835,200 |
| Mar 11, 2024 | Completed final sign-off Jul 2024 | 55 02nd St | Principal Builders Inc. | floor 21 interior ti non structural partitoins, ceiling, fixtures and finishes, mep deferredDetails
floor 21 interior ti non structural partitoins, ceiling, fixtures and finishes, mep deferred | $1,119,000 |
| Feb 21, 2024 | Completed final sign-off Jul 2024 | 55 02nd St | Principal Builders Inc. | 21/f: partial demo of interior walls (non structural) ab-017. vacant floorDetails
21/f: partial demo of interior walls (non structural) ab-017. vacant floor | $18,360 |
| Aug 1, 2023 | Never finaled issued Aug 2023, no final | 55 02nd St | Siemens Industry, Inc. | fire work only to obtain an as built permit for original permit pa 2022-0902-1784 for the remodel on floor 20. no devices were addedDetails
fire work only to obtain an as built permit for original permit pa 2022-0902-1784 for the remodel on floor 20. no devices were added | |
| Jun 21, 2023 | Never finaled issued Jun 2023, no final | 55 02nd St | Siemens Industry, Inc. | 17/f: (2) speaker/strobes @ outdoor terrace. no ref bpa#(f/a addition only)Details
17/f: (2) speaker/strobes @ outdoor terrace. no ref bpa#(f/a addition only) | $1,922 |
| Feb 7, 2023 | Never finaled issued Feb 2023, no final | 55 02nd St | Siemens Industry, Inc. | 20th fl - fire only work to add a strobe for the restroom remodel; ref pa 2022-1018-4541Details
20th fl - fire only work to add a strobe for the restroom remodel; ref pa 2022-1018-4541 | $621 |
| Jan 20, 2023 | Completed final sign-off Jul 2023 | 55 02nd St | Peacock Construction | 17/f: minor demo of doors/finishes, accessibility upgrades to terrace, new nonstructural partitions, doors & finishesDetails
17/f: minor demo of doors/finishes, accessibility upgrades to terrace, new nonstructural partitions, doors & finishes | $130,000 |
| Jan 5, 2023 | Completed final sign-off Jul 2024 | 55 02nd St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 4 pendent sprinklers on the 19th floor restrooms. relocate pendent sprinklers on the 21st floor restrooms. t.i. ref #202212148250Details
fire sprinklers; relocate 4 pendent sprinklers on the 19th floor restrooms. relocate pendent sprinklers on the 21st floor restrooms. t.i. ref #202212148250 | $4,400 |
| Dec 23, 2022 | Completed final sign-off Jan 2023 | 55 02nd St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only for 2022 1018 4541. add 1 pendent, 1 up right for restroom for axinn sf 20th flDetails
fire sprinkler only for 2022 1018 4541. add 1 pendent, 1 up right for restroom for axinn sf 20th fl | $1,200 |
| Dec 14, 2022 | Never finaled issued Jan 2023, no final | 55 02nd St | M C S Construction Services | 19th and 21st floor restroom remodel including removal of non-structural partitions, finishes, light fixtures, plumbing fixtures and accesories. electrical drawings includedDetails
19th and 21st floor restroom remodel including removal of non-structural partitions, finishes, light fixtures, plumbing fixtures and accesories. electrical drawings included | $118,289 |
| Nov 21, 2022 | Never finaled issued Dec 2022, no final | 55 02nd St | Skyline Construction | 20/f: electrical work for t.i. ref to bpa#202210184541Details
20/f: electrical work for t.i. ref to bpa#202210184541 | $3,000 |
| Nov 21, 2022 | Never finaled issued Dec 2022, no final | 55 02nd St | Skyline Construction | 20/f: mech work for t.i. on 20th fl. ref to 202210184541.Details
20/f: mech work for t.i. on 20th fl. ref to 202210184541. | $5,000 |
| Nov 18, 2022 | Never finaled issued Nov 2022, no final | 55 02nd St | Siemens Industry, Inc. | 19th fl - fire only work for the _suite 1975" remodel. additions are 1 smoke detector, 4 spekaer/strobes, add 1 strobe ref pa 2022-1006-3900Details
19th fl - fire only work for the _suite 1975" remodel. additions are 1 smoke detector, 4 spekaer/strobes, add 1 strobe ref pa 2022-1006-3900 | $3,720 |
| Nov 15, 2022 | Completed final sign-off Apr 2023 | 55 02nd St | M C S Construction Services | ste 1975 mechanical and electrical scope under office tenant improvement project reference permit 202210063900Details
ste 1975 mechanical and electrical scope under office tenant improvement project reference permit 202210063900 | $44,000 |
| Oct 31, 2022 | Completed final sign-off Nov 2022 | 55 02nd St | R L H Fire Protection Inc | fire sprinkler permit - relocate 3 add 2 and delete 1 pendent sprinklers on the 19th fl. ref pa 2022-1006-3900Details
fire sprinkler permit - relocate 3 add 2 and delete 1 pendent sprinklers on the 19th fl. ref pa 2022-1006-3900 | $2,000 |
| Oct 18, 2022 | Never finaled issued Oct 2022, no final | 55 02nd St | Skyline Construction | 20/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferredDetails
20/f ti provide a single- user restroom which includes demolishing of non-str partitions + building new non str partitions. . revised mep fire alarm life safety sprinklers under separate permited/deferred | $20,000 |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 55 02nd St | C B F Inc | power lighting a signal. reference 202206156443.Details
power lighting a signal. reference 202206156443. | $55,000 |
| Oct 6, 2022 | Completed final sign-off Apr 2023 | 55 02nd St | M C S Construction Services | 19/f: spec suite - scope of work includes minor demo of non structural paritions, doors, ceiling files, light fixtures, mill work and finishes. construction includes new non structural paritions, doors ceiling tiles, lgiht fixtures, millwork and finsihes.Details
19/f: spec suite - scope of work includes minor demo of non structural paritions, doors, ceiling files, light fixtures, mill work and finishes. construction includes new non structural paritions, doors ceiling tiles, lgiht fixtures, millwork and finsihes. | $125,000 |
| Sep 22, 2022 | Never finaled issued Sep 2022, no final | 55 02nd St | Maguire Inc Dba Lahue And Associates | 20/f: evacuation signs (4)Details
20/f: evacuation signs (4) | $1,690 |
| Sep 21, 2022 | Completed final sign-off Jul 2023 | 55 02nd St | Peacock Construction | 23rd fl - hvac modifications to support interior ti ref pa 2022-0615-6443Details
23rd fl - hvac modifications to support interior ti ref pa 2022-0615-6443 | $37,000 |
| Sep 15, 2022 | Completed final sign-off Dec 2022 | 55 02nd St | Siemens Industry, Inc. | fire only work for the "energy foundation" remodel on fl 24 additions are 14 duct detectors, 9 speakers/strobes, and the relocation of 3 speaker/strobes, ref pa# 202206166472Details
fire only work for the "energy foundation" remodel on fl 24 additions are 14 duct detectors, 9 speakers/strobes, and the relocation of 3 speaker/strobes, ref pa# 202206166472 | $31,000 |
| Sep 7, 2022 | Completed final sign-off Dec 2022 | 55 02nd St | R L H Fire Protection Inc | 24th fl. tenant inmprovement of the (e) fire sprinkler system (10) new pendent sprinklers, (10) new upright sprinklers, (15) relocated pendent sprinkers, (1) deleted upright sprinkler. ref ti permit 202206166472.Details
24th fl. tenant inmprovement of the (e) fire sprinkler system (10) new pendent sprinklers, (10) new upright sprinklers, (15) relocated pendent sprinkers, (1) deleted upright sprinkler. ref ti permit 202206166472. | $4,000 |
| Sep 2, 2022 | Completed final sign-off Sep 2022 | 55 02nd St | Golden Gate Fire Protection Inc | 23/f: relocate 4 uprights on 23rd fl. ref t.i. 202206156443.Details
23/f: relocate 4 uprights on 23rd fl. ref t.i. 202206156443. | $2,100 |
| Sep 2, 2022 | Completed final sign-off Sep 2023 | 55 02nd St | Siemens Industry, Inc. | 20/f: "a,v, & r llp" remodel, addition of (11) smoke detectors, (6) duct detectors, (14) modules, (29) speaker/strobes, (1) strobe, & (2)2-way comm stations. ref bpa#202205124059Details
20/f: "a,v, & r llp" remodel, addition of (11) smoke detectors, (6) duct detectors, (14) modules, (29) speaker/strobes, (1) strobe, & (2)2-way comm stations. ref bpa#202205124059 | $43,300 |
| Aug 30, 2022 | Completed final sign-off May 2023 | 55 02nd St | Novo Construction Inc | 24/f: revision to pa# 202206166472 for non structural revisions to men's and all gender restrooms. scope of work: (n) partitions, relocate plumbing fixtures, lights and hvac venting in restroom area only.Details
24/f: revision to pa# 202206166472 for non structural revisions to men's and all gender restrooms. scope of work: (n) partitions, relocate plumbing fixtures, lights and hvac venting in restroom area only. | $8,000 |
| Aug 4, 2022 | Never finaled filed Aug 2022, never issued | 55 02nd St | Siemens Industry, Inc. | 20/f: fire only work for "a,v, & h" remodel. additions are 11 smoke detectors, 7 duct detectors, 14 modules, 28 speaker/strobes, and 3 strobes. ref permit 202205124059.Details
20/f: fire only work for "a,v, & h" remodel. additions are 11 smoke detectors, 7 duct detectors, 14 modules, 28 speaker/strobes, and 3 strobes. ref permit 202205124059. | $44,300 |
| Jul 5, 2022 | Completed final sign-off Aug 2022 | 55 02nd St | Anderson, Rowe & Buckley, Inc. | 20/f: relocate 49 pendents & 31 uprights & add 2 pendents; 2 uprights for anxinn. ref 202205124059.Details
20/f: relocate 49 pendents & 31 uprights & add 2 pendents; 2 uprights for anxinn. ref 202205124059. | $39,500 |
| Jun 16, 2022 | Completed final sign-off Jun 2023 | 55 02nd St | Novo Construction Inc | 24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.Details
24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg. | $650,000 |
| Jun 15, 2022 | Completed final sign-off Jul 2023 | 55 02nd St | Peacock Construction | 23rd fl - tenant improvement: removal of non structural partitions and finishes, millwork and plumbing fixtures; mep,fire life safety and sprinkler under separate permitDetails
23rd fl - tenant improvement: removal of non structural partitions and finishes, millwork and plumbing fixtures; mep,fire life safety and sprinkler under separate permit | $250,000 |
| May 27, 2022 | Completed final sign-off Jul 2022 | 55 02nd St | Golden Gate Fire Protection Inc | fl 1, 3, 16, 17: fire sprinklers. relocate 7 pendent sprinklers on 1st fl and relocate 4 pendents on 3rd, 16th, & 17th fl. ref pa# 202203220555.Details
fl 1, 3, 16, 17: fire sprinklers. relocate 7 pendent sprinklers on 1st fl and relocate 4 pendents on 3rd, 16th, & 17th fl. ref pa# 202203220555. | $9,975 |
| May 12, 2022 | Never finaled issued May 2022, no final | 55 02nd St | Skyline Construction | 20th fl: ti includes demo of non str partitions and building new non-str partitions, included all new or revised meps, life safety and sprinklers under seperate permit. (bldg fully sprinklered)Details
20th fl: ti includes demo of non str partitions and building new non-str partitions, included all new or revised meps, life safety and sprinklers under seperate permit. (bldg fully sprinklered) | $1,000,250 |
| Apr 21, 2022 | Completed final sign-off Jun 2022 | 55 02nd St | Siemens Industry, Inc. | fl 4: fire only work for the "intercom" remodel. additions and replacement s are 12 smoke detectors, 2 duct detectors, 11 modules, 51 speakers / strobes, & 8 strobes. ref pa# 202201045364Details
fl 4: fire only work for the "intercom" remodel. additions and replacement s are 12 smoke detectors, 2 duct detectors, 11 modules, 51 speakers / strobes, & 8 strobes. ref pa# 202201045364 | $48,500 |
| Apr 1, 2022 | Completed final sign-off Dec 2022 | 55 02nd St | M C S Construction Services | floors 1,3,16,17: title 24 electrical compliances to add lighting and power to restrooms. ref t.i. pa202203220555. maher n/a.Details
floors 1,3,16,17: title 24 electrical compliances to add lighting and power to restrooms. ref t.i. pa202203220555. maher n/a. | $39,000 |
| Mar 22, 2022 | Completed final sign-off Dec 2022 | 55 02nd St | M C S Construction Services | floors 1,3,16,17: t.i., removal of nonstructural partitions finishes, light fixtures, plumbing & accessores, upgrades to 1,3,16&17 floors, core restrooms. mep & fire life safety under separate permitDetails
floors 1,3,16,17: t.i., removal of nonstructural partitions finishes, light fixtures, plumbing & accessores, upgrades to 1,3,16&17 floors, core restrooms. mep & fire life safety under separate permit | $450,000 |
| Mar 15, 2022 | Completed final sign-off Apr 2022 | 55 02nd St | R L H Fire Protection Inc | fire sprinkler: install 57 pendents and 101 uprights sprinklers on the 4/f. ref pa 202001045364.Details
fire sprinkler: install 57 pendents and 101 uprights sprinklers on the 4/f. ref pa 202001045364. | $35,000 |
| Feb 14, 2022 | Completed final sign-off Jul 2022 | 55 02nd St | Principal Builders Inc. | 4/f: deferred mep associated with ti permit 202201045364.Details
4/f: deferred mep associated with ti permit 202201045364. | |
| Jan 11, 2022 | Completed final sign-off Mar 2022 | 55 02nd St | Siemens Industry, Inc. | fire only for the intercom canteen remodel on floor 5; additions are 3 duct detectors, 1 module, 1 speaker/strobes, and 4 strobes. ref pa# 202012221525.Details
fire only for the intercom canteen remodel on floor 5; additions are 3 duct detectors, 1 module, 1 speaker/strobes, and 4 strobes. ref pa# 202012221525. | $18,400 |
| Jan 6, 2022 | Completed final sign-off Feb 2022 | 55 02nd St | R L H Fire Protection Inc | fire sprinkler permit. relocate 50, add 30 and delete 8 sprinklers on the 05th fl. ti 202212221525Details
fire sprinkler permit. relocate 50, add 30 and delete 8 sprinklers on the 05th fl. ti 202212221525 | $25,000 |
| Jan 6, 2022 | Completed final sign-off Jun 2022 | 55 02nd St | Siemens Industry, Inc. | floors 5,22,23,25,26: fire only work to install expansion equipment for the existing 2-way communications system and to add call stations. no reference permit.Details
floors 5,22,23,25,26: fire only work to install expansion equipment for the existing 2-way communications system and to add call stations. no reference permit. | $5,500 |
| Jan 4, 2022 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | 4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipmentDetails
4th fl - interior tenant improvement to include (n) non structural partitions, finishes, lighting & equipment | $2,366,525 |
| Dec 7, 2021 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | 5/f - revison to permit# 2020-1222-1525, additional office & conference room scope added into existing open office.Details
5/f - revison to permit# 2020-1222-1525, additional office & conference room scope added into existing open office. | |
| Aug 11, 2021 | Completed final sign-off Aug 2022 | 55 02nd St | Principal Builders Inc. | 5th floor: deferred mep to t.i. app# 202012221525Details
5th floor: deferred mep to t.i. app# 202012221525 | |
| Jul 29, 2021 | Completed final sign-off Jul 2022 | 55 02nd St | Principal Builders Inc. | demo of only e non structural partitons, associated power and telecome outlets, plumbing and finishes per ab-017 per ab-017Details
demo of only e non structural partitons, associated power and telecome outlets, plumbing and finishes per ab-017 per ab-017 | $16,000 |
| Mar 23, 2021 | Completed final sign-off Apr 2021 | 55 02nd St | Ayoob & Peery Plumbing Co Inc | add (3) sprinkler per t.i. ref#: 2020-1216-1140 job#: 21-612Details
add (3) sprinkler per t.i. ref#: 2020-1216-1140 job#: 21-612 | $1,575 |
| Dec 22, 2020 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | 5th fl: t.i. work includes non-structural interior demolition + new partitions, creation of a servery, cafe, i.t. help desk, restrooms, mother's room + associated finishes fixtures. m.e.p. deferred.Details
5th fl: t.i. work includes non-structural interior demolition + new partitions, creation of a servery, cafe, i.t. help desk, restrooms, mother's room + associated finishes fixtures. m.e.p. deferred. | $800,000 |
| Dec 16, 2020 | Never finaled issued Feb 2021, no final | 55 02nd St | M C S Construction Services | 1/f-2/f: ti for furred partitions, wall finish, & wall base revision. mep and fire sprinkler deffered.Details
1/f-2/f: ti for furred partitions, wall finish, & wall base revision. mep and fire sprinkler deffered. | $130,000 |
| Aug 10, 2020 | Never finaled issued Aug 2020, no final | 55 02nd St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 24 pendents and relocate 43 upright on the 24th floor. relocate 2 pendents on the 19th floor. relocate 4 pendents and relocate 11 uprights on the basement level. 201912119253 for basement, 201912300972 for 19th floor, 201912119253 for the 24th floor.Details
fire sprinklers, relocate 24 pendents and relocate 43 upright on the 24th floor. relocate 2 pendents on the 19th floor. relocate 4 pendents and relocate 11 uprights on the basement level. 201912119253 for basement, 201912300972 for 19th floor, 201912119253 for the 24th floor. | $44,100 |
| Aug 4, 2020 | Completed final sign-off Jan 2021 | 55 02nd St | Siemens Industry, Inc. | upgrade to the life safety system by replacing all 10 existing fire alarm panels, as well as replacing internal cards at the sffd annunciator and the firefighter's fan & damper panel; a status display annunciator and cellular dialer will be added. no reference building permit application number.Details
upgrade to the life safety system by replacing all 10 existing fire alarm panels, as well as replacing internal cards at the sffd annunciator and the firefighter's fan & damper panel; a status display annunciator and cellular dialer will be added. no reference building permit application number. | $29,000 |
| Jul 27, 2020 | Completed final sign-off Mar 2021 | 55 02nd St | Siemens Industry, Inc. | fire alarm addition of 3 modules for fsd control on the basement parking level. ref pa# 201912119253Details
fire alarm addition of 3 modules for fsd control on the basement parking level. ref pa# 201912119253 | $1,500 |
| Jul 7, 2020 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | concrete saw cutting for new plumbing work ref 201912119253Details
concrete saw cutting for new plumbing work ref 201912119253 | $125,000 |
| Jul 7, 2020 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | suite #1950; hvac modifications for new spec suite ref pa# 201912300972Details
suite #1950; hvac modifications for new spec suite ref pa# 201912300972 | $80,000 |
| Jul 7, 2020 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | 19th fl, ste 1950 - lighting, power and t-24 upgrades. ref pa 2019-1230-0972Details
19th fl, ste 1950 - lighting, power and t-24 upgrades. ref pa 2019-1230-0972 | $125,000 |
| Jul 7, 2020 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | hvac upgrades with new vavs ref 201912119253Details
hvac upgrades with new vavs ref 201912119253 | $85,500 |
| Jul 7, 2020 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | 24th floor: lighting, power and t-24 upgrades. ref app#201912119252.Details
24th floor: lighting, power and t-24 upgrades. ref app#201912119252. | $150,000 |
| Jul 7, 2020 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | hvac upgrades with new vav's for a spec suite on the 24th fl. ref pa #201912119252. maher naDetails
hvac upgrades with new vav's for a spec suite on the 24th fl. ref pa #201912119252. maher na | $85,000 |
| Jul 7, 2020 | Completed final sign-off Apr 2021 | 55 02nd St | Field Construction Inc. | basement: lighting, power andt-24 upgrades. ref app#201912119253Details
basement: lighting, power andt-24 upgrades. ref app#201912119253 | $125,000 |
| Mar 12, 2020 | Completed final sign-off Mar 2021 | 55 02nd St | Siemens Industry, Inc. | fire alarm work to obtain permit #2 for the "fitness/spec suites", remodel at basement level, floors 19 and 24; the revisions are to change some ceiling speaker/strobes to wall devices and to replace 3 wall strobes with weatherproof in the basement unit. no devices added, ref pa 2019-@003-9252 (24);Details
fire alarm work to obtain permit #2 for the "fitness/spec suites", remodel at basement level, floors 19 and 24; the revisions are to change some ceiling speaker/strobes to wall devices and to replace 3 wall strobes with weatherproof in the basement unit. no devices added, ref pa 2019-@003-9252 (24); | |
| Feb 27, 2020 | Completed final sign-off Mar 2021 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for fitness/spec suite remodel on basement parking level 1, floor 19,add 24, addition are 2 smoke detectors, 1 module, 29 speaker/strobes 8 strobes. permit 201912119252, 201912119253, 201912300972Details
fire alarm work for fitness/spec suite remodel on basement parking level 1, floor 19,add 24, addition are 2 smoke detectors, 1 module, 29 speaker/strobes 8 strobes. permit 201912119252, 201912119253, 201912300972 | $24,580 |
| Dec 30, 2019 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | 19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terraceDetails
19th fl - minor demolition of non structural partitions, doors, ceiling tiles, light fixtures, millwork, finishes. new non structural partitoins, doors, ceiling tiles, light fixtures, millwork, finishes, accessibility upgrades to restroom and terrace | $385,000 |
| Dec 11, 2019 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher naDetails
basement: demolition of existing chain link fence & construction of new non-structural partitions, doors, frames, ceilings, lighting, plumbing & finishes for gym, bike storage & locker area. new single use shower/toilet rooms. deferred: life safety, fire sprinklers, fire alarm, mep. maher na | $1,100,000 |
| Dec 11, 2019 | Completed final sign-off May 2021 | 55 02nd St | Field Construction Inc. | demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroomDetails
demolition of non strucutral paritions, doors, ceiling tiles, brid, light fix, millwork, finishes. new non struc partitions, doors, ceiling, lt fixt, millwork, finishes, accessibility upgrades to restroom | $1,250,000 |
| Aug 6, 2019 | Never finaled issued Aug 2019, no final | 55 02nd St | Codesign Llc | 15/f: add (1) interior window to (e) conference room.Details
15/f: add (1) interior window to (e) conference room. | $3,500 |
| May 24, 2019 | Completed final sign-off Jun 2019 | 55 02nd St | Siemens Industry, Inc. | 1st floor: fire alarm work for "suite 150" remodel on floor 1; addition is 1 duct detector to replace an existing one at a heat pump. ref pa 2019-0128-1445Details
1st floor: fire alarm work for "suite 150" remodel on floor 1; addition is 1 duct detector to replace an existing one at a heat pump. ref pa 2019-0128-1445 | $1,585 |
| May 20, 2019 | Completed final sign-off Aug 2019 | 55 02nd St | Thomas Swan Sign Co Inc | non elec wall projecting signDetails
non elec wall projecting sign | $5,000 |
| May 20, 2019 | Never finaled issued May 2019, no final | 55 02nd St | Thomas Swan Sign Co Inc | window vinyl signsDetails
window vinyl signs | $1,000 |
| May 20, 2019 | Completed final sign-off Aug 2019 | 55 02nd St | Thomas Swan Sign Co Inc | electric wall signDetails
electric wall sign | $5,000 |
| May 3, 2019 | Completed final sign-off Jul 2020 | 55 02nd St | Siemens Industry, Inc. | ref pa# 201902153100; fire alarm work for the "intercom" remodel of floor 5; additions are 4 smoke detectors, 2 modules, 7 speakers/strobes, 2 strobes, and the relocation of 2 speaker/strobes. n/a for maher.Details
ref pa# 201902153100; fire alarm work for the "intercom" remodel of floor 5; additions are 4 smoke detectors, 2 modules, 7 speakers/strobes, 2 strobes, and the relocation of 2 speaker/strobes. n/a for maher. | $9,170 |
| May 2, 2019 | Completed final sign-off May 2019 | 55 02nd St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti 4 relocated sprinklers. n/a for maher.Details
existing fire sprinkler system ti 4 relocated sprinklers. n/a for maher. | $2,000 |
| Apr 23, 2019 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | revision to 201902153100 to reconfigure proposed layout of floor planDetails
revision to 201902153100 to reconfigure proposed layout of floor plan | |
| Apr 22, 2019 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | mep title 24 to install new lighting, power, hvac systems with plumbing ref 201902153100 on 5th fl. maher not reqDetails
mep title 24 to install new lighting, power, hvac systems with plumbing ref 201902153100 on 5th fl. maher not req | $342,480 |
| Apr 19, 2019 | Completed final sign-off Jul 2019 | 55 02nd St | R L H Fire Protection Inc | 5th flr. fire sprinklers. relocate 35, add 4 and delete 9 sprinklers. ref t.i pa 201902153100.Details
5th flr. fire sprinklers. relocate 35, add 4 and delete 9 sprinklers. ref t.i pa 201902153100. | $8,000 |
| Apr 16, 2019 | Completed final sign-off Jun 2019 | 55 02nd St | Gotham Bay Construction | revision to 201901281445 to show changes in design due to value engineeringDetails
revision to 201901281445 to show changes in design due to value engineering | |
| Apr 4, 2019 | Never finaled issued Aug 2019, no final | 55 02nd St | Siemens Industry, Inc. | 2-way communication system installation including 4 call box stations, one each on 4 separate floors.Details
2-way communication system installation including 4 call box stations, one each on 4 separate floors. | $18,500 |
| Mar 1, 2019 | Completed final sign-off Oct 2019 | 55 02nd St | Siemens Industry, Inc. | 26/f: f/a work for the "intercom" remodel. add 1 smoke detctor, 26 speark/strobes, 3 strobes,1 strobe power supply and 1 2-way comm call box. maher n/a. ref pa# 201812138240Details
26/f: f/a work for the "intercom" remodel. add 1 smoke detctor, 26 speark/strobes, 3 strobes,1 strobe power supply and 1 2-way comm call box. maher n/a. ref pa# 201812138240 | $20,915 |
| Mar 1, 2019 | Completed final sign-off Jul 2020 | 55 02nd St | Siemens Industry, Inc. | ref pa# 201812138239; fire alarm work for the "intercom" remodel on fl 25, additions are 1 smoke detector 26 speaker/strobes, 3 strobes, and 1 2-way call boxDetails
ref pa# 201812138239; fire alarm work for the "intercom" remodel on fl 25, additions are 1 smoke detector 26 speaker/strobes, 3 strobes, and 1 2-way call box | $19,330 |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 55 02nd St | Metropolitan Electrical Construction | remove and replace 1 light in 17th fl in 1 office and replace 2 lights on 16th floor with 1 lightDetails
remove and replace 1 light in 17th fl in 1 office and replace 2 lights on 16th floor with 1 light | $3,492 |
| Feb 15, 2019 | Completed final sign-off Sep 2022 | 55 02nd St | Principal Builders Inc. | 5th fl - ti to demo and construct new walls, doors, millwork, ceilings, finishes. mep and fire sprinklers, life safety on separate permitDetails
5th fl - ti to demo and construct new walls, doors, millwork, ceilings, finishes. mep and fire sprinklers, life safety on separate permit | $370,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 55 02nd St | Anderson, Rowe & Buckley, Inc. | on 25th and 26th floors - existing fire sprinkler systmes ti. 25th fl - add 8 sprinklers, relocated 22 sprinklers. ref pa 2018-1213-8239; 26th fl - added 8 sprinklers, relocated 21 sprinklers ref pa 2018-1213-8240Details
on 25th and 26th floors - existing fire sprinkler systmes ti. 25th fl - add 8 sprinklers, relocated 22 sprinklers. ref pa 2018-1213-8239; 26th fl - added 8 sprinklers, relocated 21 sprinklers ref pa 2018-1213-8240 | $29,500 |
| Feb 7, 2019 | Completed final sign-off Jun 2022 | 55 02nd St | Principal Builders Inc. | 25th fl - mep to install mechanical and plumbintg systems, lighting and power to 25th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8239 for ti workDetails
25th fl - mep to install mechanical and plumbintg systems, lighting and power to 25th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8239 for ti work | $323,316 |
| Feb 7, 2019 | Completed final sign-off Jun 2022 | 55 02nd St | Principal Builders Inc. | 26th fl - mep to install mechanical and plumbintg systems, lighting and power to 26th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8240 for ti workDetails
26th fl - mep to install mechanical and plumbintg systems, lighting and power to 26th floor ti. update architectural sheet to revise non-infringement statement. please refer to pa 2018-1213-8240 for ti work | $323,316 |
| Jan 29, 2019 | Completed final sign-off Feb 2019 | 55 02nd St | Siemens Industry, Inc. | on 2nd floor - ref pa# 201804095852; fire alarm "as-built" permit to indicate a relay addition and matrix correction, for the "intercom phase 2" remodel on fl. 2, per the sffd testing inspectors. n/a for maher.Details
on 2nd floor - ref pa# 201804095852; fire alarm "as-built" permit to indicate a relay addition and matrix correction, for the "intercom phase 2" remodel on fl. 2, per the sffd testing inspectors. n/a for maher. | $530 |
| Jan 28, 2019 | Completed final sign-off Jun 2019 | 55 02nd St | Gotham Bay Construction | suite 150: interior ti to inlcude new paritions, finishes, fixtures, furniture, casework, millwork, equipment and mepDetails
suite 150: interior ti to inlcude new paritions, finishes, fixtures, furniture, casework, millwork, equipment and mep | $225,000 |
| Dec 13, 2018 | Completed final sign-off Jun 2022 | 55 02nd St | Principal Builders Inc. | 26th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permitDetails
26th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit | $899,000 |
| Dec 13, 2018 | Completed final sign-off Jun 2022 | 55 02nd St | Principal Builders Inc. | 25th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permitDetails
25th flr - ti to construct new partitions, doors. glazing, millwork and finishes. mep/fire/life safety under sep permit | $899,000 |
| Dec 6, 2018 | Completed final sign-off Feb 2019 | 55 02nd St | Principal Builders Inc. | 25/26f: demo of interior walls, doors, millwork, glazing and finishes. space to remain unoccupied under ab-017 ada to be provided w/ti work. maher n/a.Details
25/26f: demo of interior walls, doors, millwork, glazing and finishes. space to remain unoccupied under ab-017 ada to be provided w/ti work. maher n/a. | $113,875 |
| Nov 19, 2018 | Completed final sign-off Jan 2019 | 55 02nd St | C B 2 Builders Incorporated | 25-26/f:upgrade restrooms to ada compliance: demo partitons and replace with floor-to-ceiling toilet, partitions, relocate accesssories. ada barrier removal. n/a maherDetails
25-26/f:upgrade restrooms to ada compliance: demo partitons and replace with floor-to-ceiling toilet, partitions, relocate accesssories. ada barrier removal. n/a maher | $27,800 |
| Oct 10, 2018 | Completed final sign-off Dec 2018 | 55 02nd St | Siemens Industry, Inc. | 19th fl - fire alarm work for permit #2 on the suite 1925. additions are 4 duct detectors at fau-powered boxes. fa permit #1 was done work app 2018-0725-5459 and 2018-0716-4654Details
19th fl - fire alarm work for permit #2 on the suite 1925. additions are 4 duct detectors at fau-powered boxes. fa permit #1 was done work app 2018-0725-5459 and 2018-0716-4654 | $6,340 |
| Oct 5, 2018 | Completed final sign-off Jan 2019 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for ultimate software remodel on floor 23, additions are 2 smoke detectors, 16 duct detectors, 1 strobe power supply, 27 speaker strobes, 2 strobesDetails
fire alarm work for ultimate software remodel on floor 23, additions are 2 smoke detectors, 16 duct detectors, 1 strobe power supply, 27 speaker strobes, 2 strobes | $46,430 |
| Oct 5, 2018 | Completed final sign-off Jan 2019 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the ultimate software remodel floor 22, additions are 8 smoke detectors,12 duct detectors, 1 strobe power supply, 30 speak/strobesDetails
fire alarm work for the ultimate software remodel floor 22, additions are 8 smoke detectors,12 duct detectors, 1 strobe power supply, 30 speak/strobes | $39,940 |
| Sep 12, 2018 | Never finaled issued Apr 2019, no final | 55 02nd St | Orr Protection Systems Inc | room 2220. furnish & install fire proinert 2 clean agent suppression system. furnish & install fire shp pro suppression control panel to control clean agent system. provide & install smoke devices, manual release, abort station, monitoring & av devices. maher n/a.Details
room 2220. furnish & install fire proinert 2 clean agent suppression system. furnish & install fire shp pro suppression control panel to control clean agent system. provide & install smoke devices, manual release, abort station, monitoring & av devices. maher n/a. | $18,000 |
| Sep 5, 2018 | Completed final sign-off Dec 2019 | 55 02nd St | Principal Builders Inc. | revision to pa 201806182102. 22nd flr. change layout of proposed game room and restrooms.Details
revision to pa 201806182102. 22nd flr. change layout of proposed game room and restrooms. | $40,000 |
| Aug 20, 2018 | Never finaled issued Oct 2018, no final | 55 02nd St | new electrical, mechanical , and security devices, luminaires and lighting control devices/ add 1 fan powered box, add 1 exhaust fan, add ceiling diffusers rework duct districbution and air balanceDetails
new electrical, mechanical , and security devices, luminaires and lighting control devices/ add 1 fan powered box, add 1 exhaust fan, add ceiling diffusers rework duct districbution and air balance | $100,000 | |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 55 02nd St | Anderson, Rowe & Buckley, Inc. | sprinklers for 22nd and 23rd floors- ref pa # 201806182102 & 201806182100; existing fire sprinkler syst. t.t. 22nd floor 19 added sprinklers and 23rd floor 4 added sprinklers, 67 relocated sprinklers 83 relocated sprinklersDetails
sprinklers for 22nd and 23rd floors- ref pa # 201806182102 & 201806182100; existing fire sprinkler syst. t.t. 22nd floor 19 added sprinklers and 23rd floor 4 added sprinklers, 67 relocated sprinklers 83 relocated sprinklers | $86,500 |
| Aug 9, 2018 | Completed final sign-off Aug 2018 | 55 02nd St | Golden Gate Fire Protection Inc | 19th fl: fire sprinkler only, relocate 18 pendents, add 2 pendents, remove 3 pendents maher not reqDetails
19th fl: fire sprinkler only, relocate 18 pendents, add 2 pendents, remove 3 pendents maher not req | $10,600 |
| Jul 25, 2018 | Completed final sign-off Sep 2018 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the suite 1925 remodel on floor 19, additions are 7 speaker strobes. ref#201807164654. n/a for maher.Details
fire alarm work for the suite 1925 remodel on floor 19, additions are 7 speaker strobes. ref#201807164654. n/a for maher. | $4,445 |
| Jul 16, 2018 | Completed final sign-off Nov 2018 | 55 02nd St | C B 2 Builders Incorporated | spec suite 1925 on 19th fl: ti includes building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design build under separate permit. building is "fully sprinklered". maher naDetails
spec suite 1925 on 19th fl: ti includes building new non-structural partitions. all new or revised hvac, electrical, plumbing, and life safety work will be design build under separate permit. building is "fully sprinklered". maher na | $384,692 |
| Jun 21, 2018 | Completed final sign-off Nov 2018 | 55 02nd St | C B 2 Builders Incorporated | ada restroom upgrades on 22nd and 23rd floors. installation of new accessories, niche in partition, widening of stall doors. n/a for maherDetails
ada restroom upgrades on 22nd and 23rd floors. installation of new accessories, niche in partition, widening of stall doors. n/a for maher | $6,200 |
| Jun 18, 2018 | Completed final sign-off Dec 2019 | 55 02nd St | Principal Builders Inc. | ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher naDetails
ti on 23rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. maher na | $690,000 |
| Jun 18, 2018 | Completed final sign-off Dec 2019 | 55 02nd St | Principal Builders Inc. | ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher naDetails
ti on 22rd fl build out 11,500sf in a class a high rise bldg w/fully sprinkler w/complete life safety, scope consist of non-load beaing partitions, safety glaze panel w/aluminum frame, new doors, ceiling, millwork and finishes throughout. full flr demo. maher na | $690,000 |
| May 21, 2018 | Completed final sign-off Feb 2019 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the "intercom" remodel on floor 2; additions are 1 smoke director, 25 speaker/strobes, and 2 strobes. ref pa 2018-0409-5852. n/a for maher.Details
fire alarm work for the "intercom" remodel on floor 2; additions are 1 smoke director, 25 speaker/strobes, and 2 strobes. ref pa 2018-0409-5852. n/a for maher. | $17,600 |
| May 16, 2018 | Completed final sign-off Jun 2018 | 55 02nd St | R L H Fire Protection Inc | relocate 14, add 15 and delete 25 pendent sprinklers. relocate 81 and add 2 upright sprinklers on the 2nd fl. ref# 201804095852Details
relocate 14, add 15 and delete 25 pendent sprinklers. relocate 81 and add 2 upright sprinklers on the 2nd fl. ref# 201804095852 | $29,000 |
| May 7, 2018 | Never finaled issued May 2018, no final | 55 02nd St | Principal Builders Inc. | 2nd flr -t-24 mechanical to install new lighting mechanical, and plumbing systems on 2nd flr. installing 2 (n) heat pumps, 10 (n) vav boxes, low pressure duct work and condesor water piping. ref 201804095852 maher naDetails
2nd flr -t-24 mechanical to install new lighting mechanical, and plumbing systems on 2nd flr. installing 2 (n) heat pumps, 10 (n) vav boxes, low pressure duct work and condesor water piping. ref 201804095852 maher na | $697,928 |
| Apr 9, 2018 | Completed final sign-off May 2019 | 55 02nd St | Principal Builders Inc. | 2nd floor: construction of new partition, glazing, doors, millwork, finishes. mep on seperate permit. life safty and sprinklers on seperate pemit. n/a for maher.Details
2nd floor: construction of new partition, glazing, doors, millwork, finishes. mep on seperate permit. life safty and sprinklers on seperate pemit. n/a for maher. | $682,841 |
| Apr 6, 2018 | Completed final sign-off Apr 2018 | 55 02nd St | C B 2 Builders Incorporated | 5/f -bathroom - ada upgrades, niche in wall, replace grab barsDetails
5/f -bathroom - ada upgrades, niche in wall, replace grab bars | $3,018 |
| Mar 12, 2018 | Completed final sign-off Apr 2018 | 55 02nd St | C B 2 Builders Incorporated | 2/f: bathroom ada upgrades: niche in wall, replace grab bars. maher naDetails
2/f: bathroom ada upgrades: niche in wall, replace grab bars. maher na | $3,018 |
| Feb 21, 2018 | Completed final sign-off Apr 2018 | 55 02nd St | Principal Builders Inc. | interior demo of partitions, doors, millwork and finishes. space to remain vacant under ab-017. ada will be addressed under separate ti permit. maher n/aDetails
interior demo of partitions, doors, millwork and finishes. space to remain vacant under ab-017. ada will be addressed under separate ti permit. maher n/a | $111,000 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the "huntsworth" remodel on floor 3; additions are 1 smoke detector, 4 speaker/strobes, and 1 strobe. ref pa 2017-1215-6546 n/a for maher.Details
fire alarm work for the "huntsworth" remodel on floor 3; additions are 1 smoke detector, 4 speaker/strobes, and 1 strobe. ref pa 2017-1215-6546 n/a for maher. | $3,600 |
| Jan 8, 2018 | Completed final sign-off Jan 2018 | 55 02nd St | Ayoob & Peery Plumbing Co Inc | 3rd flr ste 325: - relocate 4 fire sprinklers per to 201712156546. maher naDetails
3rd flr ste 325: - relocate 4 fire sprinklers per to 201712156546. maher na | $860 |
| Dec 15, 2017 | Completed final sign-off Feb 2018 | 55 02nd St | C B 2 Builders Incorporated | 3rd fl, ste 325 ti including demo of non-structural partitions and build (n) non structural partitions. meps, life safety and sprinklers under separate permit if neededDetails
3rd fl, ste 325 ti including demo of non-structural partitions and build (n) non structural partitions. meps, life safety and sprinklers under separate permit if needed | $34,815 |
| Nov 17, 2017 | Never finaled issued Nov 2017, no final | 55 02nd St | Skyline Construction | 5/f -mechanical & electrical work for tenant imnprovement; ref #201710110935Details
5/f -mechanical & electrical work for tenant imnprovement; ref #201710110935 | $5,000 |
| Nov 16, 2017 | Never finaled issued Nov 2017, no final | 55 02nd St | Siemens Industry, Inc. | 5th floor: fire alarm work for the "intercom phase 2" for additions of 10 speaker/strobes and 1 strobe. ref app#201710110935. n/a for maherDetails
5th floor: fire alarm work for the "intercom phase 2" for additions of 10 speaker/strobes and 1 strobe. ref app#201710110935. n/a for maher | $6,985 |
| Nov 13, 2017 | Completed final sign-off Nov 2017 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the partial area remodel in the rubicon tenant space on floor 19. 1 speaker strobe relocated due wo new wall partitons no new devices ref 201710302565; n/a maherDetails
fire alarm work for the partial area remodel in the rubicon tenant space on floor 19. 1 speaker strobe relocated due wo new wall partitons no new devices ref 201710302565; n/a maher | $635 |
| Nov 2, 2017 | Completed final sign-off Dec 2017 | 55 02nd St | R L H Fire Protection Inc | 5/f- fire sprinlker 41 pendent changed to upright, 2 added pendents, 8 add uprights ref 201710110935. n/a maherDetails
5/f- fire sprinlker 41 pendent changed to upright, 2 added pendents, 8 add uprights ref 201710110935. n/a maher | $11,976 |
| Oct 30, 2017 | Completed final sign-off Nov 2017 | 55 02nd St | C C I Commercial Construction & Improv | ref app# 201710030279 to install pressure duct work. install 2 new supply grill. rebalance the valves. n/a for maherDetails
ref app# 201710030279 to install pressure duct work. install 2 new supply grill. rebalance the valves. n/a for maher | $20,000 |
| Oct 30, 2017 | Completed final sign-off Nov 2017 | 55 02nd St | Golden Gate Fire Protection Inc | fire sprinklers only: relocate 4 sprinkler pendents for rpp office on the 19th fl. ref pa#201710030279. maher naDetails
fire sprinklers only: relocate 4 sprinkler pendents for rpp office on the 19th fl. ref pa#201710030279. maher na | $1,000 |
| Oct 11, 2017 | Completed final sign-off Apr 2018 | 55 02nd St | Skyline Construction | 5th fl - interior non-structural partitions, glazing doors, millwork. mep, life safety, fire sprinkler under separate permitDetails
5th fl - interior non-structural partitions, glazing doors, millwork. mep, life safety, fire sprinkler under separate permit | $682,941 |
| Oct 3, 2017 | Completed final sign-off Jan 2018 | 55 02nd St | C C I Commercial Construction & Improv | selective demo of light fixture, construct of non-load structural partition. relocate 2 supply register and 3 return register. no title 24 required.electrical: install 2 new walls seconces in office 106. no title 24 required. n/a for maherDetails
selective demo of light fixture, construct of non-load structural partition. relocate 2 supply register and 3 return register. no title 24 required.electrical: install 2 new walls seconces in office 106. no title 24 required. n/a for maher | $70,000 |
| Sep 18, 2017 | Completed final sign-off Mar 2018 | 55 02nd St | Hathaway Dinwiddie Co. | 6th fl - revision to pa 2016-1209-4653 correcting restroom foot clearance requirements in disabled access stalls. mens and womens restroomsDetails
6th fl - revision to pa 2016-1209-4653 correcting restroom foot clearance requirements in disabled access stalls. mens and womens restrooms | |
| Aug 2, 2017 | Completed final sign-off Oct 2017 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the "arent fox" remodel on floor 20; additions are 5 duct detectors, 1 module, 4 speaker/strobes and the relocation of 4 speaker/strobes. ref pa 2017-0614-9292. maher naDetails
fire alarm work for the "arent fox" remodel on floor 20; additions are 5 duct detectors, 1 module, 4 speaker/strobes and the relocation of 4 speaker/strobes. ref pa 2017-0614-9292. maher na | $5,350 |
| Jul 11, 2017 | Completed final sign-off Sep 2017 | 55 02nd St | Pribuss Engineering Inc | 20th fl: fs ti - relocate 34 sprinklers heads, add 6 sprinkler heads, total of 40 heads. ref #201706149292. maher naDetails
20th fl: fs ti - relocate 34 sprinklers heads, add 6 sprinkler heads, total of 40 heads. ref #201706149292. maher na | $20,560 |
| Jun 29, 2017 | Never finaled issued Jun 2017, no final | 55 02nd St | Metropolitan Electrical Construction | electrical revision to pa 2017-0425-4878 & mep permit 2017-0214-9322. alter description of light fixtures & delete (16) fixtures, ref pa 2016-1130-3736Details
electrical revision to pa 2017-0425-4878 & mep permit 2017-0214-9322. alter description of light fixtures & delete (16) fixtures, ref pa 2016-1130-3736 | |
| Jun 14, 2017 | Completed final sign-off Nov 2017 | 55 02nd St | C B 2 Builders Incorporated | tenant improvement of office space on the 20th floor.Details
tenant improvement of office space on the 20th floor. | $500,000 |
| Jun 9, 2017 | Completed final sign-off Apr 2018 | 55 02nd St | Principal Builders Inc. | t-24 electrical to relocate and replace lighting fixture on floors 19,22,23,25, & 26. please refer to app#201704204443 for t.i. work.Details
t-24 electrical to relocate and replace lighting fixture on floors 19,22,23,25, & 26. please refer to app#201704204443 for t.i. work. | $150,000 |
| May 23, 2017 | Completed final sign-off Jun 2017 | 55 02nd St | Principal Builders Inc. | 18/f- revision to egress plan for pa#201705116308 - assembly area adjusted for fixed furniture which brings down the area occupancy load. n/a ordinance #155-13Details
18/f- revision to egress plan for pa#201705116308 - assembly area adjusted for fixed furniture which brings down the area occupancy load. n/a ordinance #155-13 | |
| May 19, 2017 | Completed final sign-off Feb 2018 | 55 02nd St | Hathaway Dinwiddie Co. | deferred submittal for operable partition installation. ref pa 2016-01209-4653Details
deferred submittal for operable partition installation. ref pa 2016-01209-4653 | $10,000 |
| May 18, 2017 | Completed final sign-off Aug 2017 | 55 02nd St | Principal Builders Inc. | 18th floor - title- 24 mep to relocate & add new equipment. ref pa #201705116308. no new fsd's. n/a maher ordinanceDetails
18th floor - title- 24 mep to relocate & add new equipment. ref pa #201705116308. no new fsd's. n/a maher ordinance | $290,000 |
| May 11, 2017 | Completed final sign-off Feb 2018 | 55 02nd St | Principal Builders Inc. | 18th fl- selective demo of non structural partitions and building new non structural partitions. (new or revised meps and l.s. & sprinkler design build and submitted separate). building fully sprinklered rr and shower work. maher not reqDetails
18th fl- selective demo of non structural partitions and building new non structural partitions. (new or revised meps and l.s. & sprinkler design build and submitted separate). building fully sprinklered rr and shower work. maher not req | $225,630 |
| May 4, 2017 | Completed final sign-off Sep 2017 | 55 02nd St | Siemens Industry, Inc. | 18th flr: fire alarm add 13 speaker/strobes and 5 strobes ref 2017-0327-2401 maher naDetails
18th flr: fire alarm add 13 speaker/strobes and 5 strobes ref 2017-0327-2401 maher na | $9,180 |
| Apr 25, 2017 | Never finaled issued Apr 2017, no final | 55 02nd St | Skyline Construction | electrical revision to mep pa 2017-0214-9322. alter description of light fixtures ref pa 2016-1130-3736. n/a for maher.Details
electrical revision to mep pa 2017-0214-9322. alter description of light fixtures ref pa 2016-1130-3736. n/a for maher. | |
| Apr 20, 2017 | Completed final sign-off Jun 2017 | 55 02nd St | Principal Builders Inc. | 19/f, 22/f, 23/f, 25/f, 26/f- construction of partition doors, ceiling and finishes. mep to be submitted seperately, sprinkler and life safety to be submitted seperately. n/a ordinance #155-13Details
19/f, 22/f, 23/f, 25/f, 26/f- construction of partition doors, ceiling and finishes. mep to be submitted seperately, sprinkler and life safety to be submitted seperately. n/a ordinance #155-13 | $738,590 |
| Apr 20, 2017 | Completed final sign-off Jun 2017 | 55 02nd St | Pribuss Engineering Inc | 22/f, 23/f, 25/f, 26/f- fire sprinkler t.i. under pa#201704204443, relocate 97, add 2, total 99. n/a ordinance #155-13Details
22/f, 23/f, 25/f, 26/f- fire sprinkler t.i. under pa#201704204443, relocate 97, add 2, total 99. n/a ordinance #155-13 | $51,215 |
| Apr 4, 2017 | Completed final sign-off May 2017 | 55 02nd St | Pribuss Engineering Inc | 18th fl: fire sprinkler ti relocate 19, add 3, total 22. ref ti 2017-0327-2401.Details
18th fl: fire sprinkler ti relocate 19, add 3, total 22. ref ti 2017-0327-2401. | $11,322 |
| Mar 27, 2017 | Completed final sign-off Aug 2017 | 55 02nd St | Principal Builders Inc. | 18th flr - ti includes selective demo of non structural partitions. bldg is fully sprinklersed. floor is not occupied ab-017 maher naDetails
18th flr - ti includes selective demo of non structural partitions. bldg is fully sprinklersed. floor is not occupied ab-017 maher na | $59,000 |
| Feb 23, 2017 | Completed final sign-off Apr 2017 | 55 02nd St | Golden Gate Fire Protection Inc | 6th flr: fire sprinlker 145 pendent sprinklers ti ref 201612094653 maher naDetails
6th flr: fire sprinlker 145 pendent sprinklers ti ref 201612094653 maher na | $76,125 |
| Feb 14, 2017 | Completed final sign-off Aug 2017 | 55 02nd St | Skyline Construction | mechanical & electrical for ti on the 5th floor. ref pa 2016-1130-3736Details
mechanical & electrical for ti on the 5th floor. ref pa 2016-1130-3736 | $98,000 |
| Feb 13, 2017 | Completed final sign-off Mar 2017 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the interiorcom remodel on floor 5. additoins are 9 speaker strobes and 3 strobes ref 201611303736Details
fire alarm work for the interiorcom remodel on floor 5. additoins are 9 speaker strobes and 3 strobes ref 201611303736 | $6,120 |
| Jan 23, 2017 | Completed final sign-off Feb 2017 | 55 02nd St | R L H Fire Protection Inc | 5/f- fire sprinkler permit, relocate 10, add 5 and delete 1 pendent sprinkler. t.i. pa# 201611303736. n/a ordinance #155-13Details
5/f- fire sprinkler permit, relocate 10, add 5 and delete 1 pendent sprinkler. t.i. pa# 201611303736. n/a ordinance #155-13 | $4,700 |
| Jan 10, 2017 | Completed final sign-off Apr 2017 | 55 02nd St | Siemens Industry, Inc. | 0n 6th floor - fire alarm work for kpmg remodel. additions are 6 smoke detectors, 3 duct detectors, 1 strobe power supply, 33 speaker/strobes, 6 strobesDetails
0n 6th floor - fire alarm work for kpmg remodel. additions are 6 smoke detectors, 3 duct detectors, 1 strobe power supply, 33 speaker/strobes, 6 strobes | $27,420 |
| Dec 9, 2016 | Completed final sign-off Feb 2018 | 55 02nd St | Hathaway Dinwiddie Co. | 6/f- meps and security for pa#201612094653. n/a ordinance #155-13Details
6/f- meps and security for pa#201612094653. n/a ordinance #155-13 | $750,000 |
| Dec 9, 2016 | Completed final sign-off Mar 2018 | 55 02nd St | Hathaway Dinwiddie Co. | 6/f- t.i. including offices, break area and elevator lobby, (n) vanities, lavatories and flush valves at (e) restrooms. meps and security under seperate permit. n/a ordinance #155-13Details
6/f- t.i. including offices, break area and elevator lobby, (n) vanities, lavatories and flush valves at (e) restrooms. meps and security under seperate permit. n/a ordinance #155-13 | $1,322,475 |
| Nov 30, 2016 | Completed final sign-off Aug 2017 | 55 02nd St | Skyline Construction | 5th floor: ti - consists of new non structural partition, glazing, doors, millwork. mep/fire/life safety under sep permit maher naDetails
5th floor: ti - consists of new non structural partition, glazing, doors, millwork. mep/fire/life safety under sep permit maher na | $682,841 |
| Oct 27, 2016 | Never finaled issued Oct 2016, no final | 55 02nd St | C B 2 Builders Incorporated | 1st floor - title 24 lighting, ref 20160906850Details
1st floor - title 24 lighting, ref 20160906850 | |
| Oct 20, 2016 | Completed final sign-off Oct 2016 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the "hines" remodel on floor 1; additions are (2) speaker/strobes. ref ti# 2016-0906-6850.Details
fire alarm work for the "hines" remodel on floor 1; additions are (2) speaker/strobes. ref ti# 2016-0906-6850. | $1,040 |
| Sep 30, 2016 | Completed final sign-off Oct 2016 | 55 02nd St | Golden Gate Fire Protection Inc | 1st flr: fire sprinkler only. relocate 5 pendents for new ceiling - for hines maher naDetails
1st flr: fire sprinkler only. relocate 5 pendents for new ceiling - for hines maher na | $2,500 |
| Sep 6, 2016 | Never finaled issued Sep 2016, no final | 55 02nd St | C B 2 Builders Incorporated | 1st floor t.i. - (n) non-structural partitions, all new or revised meps, ls & sp will be design build & submitted separately. (bldg fully sprinklered). n/a maher ordinanceDetails
1st floor t.i. - (n) non-structural partitions, all new or revised meps, ls & sp will be design build & submitted separately. (bldg fully sprinklered). n/a maher ordinance | $89,950 |
| Jun 9, 2016 | Completed final sign-off Jul 2016 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the floor 19 ti remodel; additions are 6 speaker/strobes. ref pa 2016-0525-8343Details
fire alarm work for the floor 19 ti remodel; additions are 6 speaker/strobes. ref pa 2016-0525-8343 | $3,050 |
| Jun 8, 2016 | Completed final sign-off Jun 2016 | 55 02nd St | Skanska Usa Building Inc | to permit 'systems furniture' for pa 2015-0923-7786.Details
to permit 'systems furniture' for pa 2015-0923-7786. | |
| May 25, 2016 | Never finaled issued May 2016, no final | 55 02nd St | Novo Construction Inc | 19th floor tenant improvement to include the demolitishing of non-structural partitions. n/a ordinance #155-13Details
19th floor tenant improvement to include the demolitishing of non-structural partitions. n/a ordinance #155-13 | $118,923 |
| May 4, 2016 | Never finaled issued May 2016, no final | 55 02nd St | Illuminated Creations Dba Ellis & Ellis | install (1) non-illuminated wall sign for "sutter health"; n/a maher ord. 155-13Details
install (1) non-illuminated wall sign for "sutter health"; n/a maher ord. 155-13 | $2,500 |
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 55 02nd St | Siemens Industry, Inc. | 1/f:fire alarm work for spmf care center ti project on floor 1, additions are 1 smoke det, 1 duct detector,21 speaker strobes, and 4 strobesDetails
1/f:fire alarm work for spmf care center ti project on floor 1, additions are 1 smoke det, 1 duct detector,21 speaker strobes, and 4 strobes | $13,700 |
| Jan 29, 2016 | Completed final sign-off Apr 2016 | 55 02nd St | Allied Fire Protection | on 1st floor - provide earthquake/seismic bracing calcs for fire sprinkler system that was approved & installed under pa 2015-1208-4404. maher naDetails
on 1st floor - provide earthquake/seismic bracing calcs for fire sprinkler system that was approved & installed under pa 2015-1208-4404. maher na | |
| Jan 25, 2016 | Completed final sign-off Jun 2016 | 55 02nd St | Skanska Usa Building Inc | deferred submittal for access floor system for app#201509237786. permit for floor system only. all other work approved under previous permit. n/a for maher.Details
deferred submittal for access floor system for app#201509237786. permit for floor system only. all other work approved under previous permit. n/a for maher. | |
| Dec 8, 2015 | Completed final sign-off Apr 2016 | 55 02nd St | Allied Fire Protection | fire sprinkler t.i. "sutter health"- add (9) fire sprinklers, relocate (46). t.i. pa#201509237786. n/a ordinance #155-13- separate permit required for siemsic calc'sDetails
fire sprinkler t.i. "sutter health"- add (9) fire sprinklers, relocate (46). t.i. pa#201509237786. n/a ordinance #155-13- separate permit required for siemsic calc's | $27,500 |
| Nov 30, 2015 | Completed final sign-off Jan 2016 | 55 02nd St | Skyline Construction | basement: revision to app#201507211995 and 201509046155 to change occupant load calcs and open office to dining area. ref app#201509046155 and 201507211995. n/a for maher.Details
basement: revision to app#201507211995 and 201509046155 to change occupant load calcs and open office to dining area. ref app#201509046155 and 201507211995. n/a for maher. | |
| Nov 24, 2015 | Never finaled issued Nov 2015, no final | 55 02nd St | street spaceDetails
street space | ||
| Nov 20, 2015 | Never finaled filed Nov 2015, never issued | 55 02nd St | street space | ||
| Oct 30, 2015 | Completed final sign-off Nov 2015 | 55 02nd St | R L H Fire Protection Inc | 3rd floor fire sprinkler permit - relocate 3, add 1 & delete 1 pendent sprinkler. relcoate 1 & add 1 upright sprinkler. ref #201509167144. n/a maher ordinanceDetails
3rd floor fire sprinkler permit - relocate 3, add 1 & delete 1 pendent sprinkler. relcoate 1 & add 1 upright sprinkler. ref #201509167144. n/a maher ordinance | $1,834 |
| Oct 29, 2015 | Never finaled issued Oct 2015, no final | 55 02nd St | Swinerton Builders | 3rd floor - revision to pa #201509167144 - changing room name to tele/server on sheets a3.03, a4.03, a6.03,m2.1. n/a maher ordinanceDetails
3rd floor - revision to pa #201509167144 - changing room name to tele/server on sheets a3.03, a4.03, a6.03,m2.1. n/a maher ordinance | |
| Oct 29, 2015 | Completed final sign-off Dec 2015 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the "monster" ti remodel on floor 3; additions are 1 smoke detector, 2 duct detectors, 2 modules, 16 speaker/strobes, and 4 speakers. ref pa 2015-0916-7144. maher naDetails
fire alarm work for the "monster" ti remodel on floor 3; additions are 1 smoke detector, 2 duct detectors, 2 modules, 16 speaker/strobes, and 4 speakers. ref pa 2015-0916-7144. maher na | $12,800 |
| Sep 23, 2015 | Completed final sign-off Jun 2016 | 55 02nd St | Skanska Usa Building Inc | interior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms. deferred submittal for structural flooring system.Details
interior renovations at ground floor level. full demo of tenant space. all new partitions, finishes, flooring , doors, ceilings, casework and new mechanical, electrical, & plumbing. 2 new bathrooms. deferred submittal for structural flooring system. | $800,000 |
| Sep 23, 2015 | Completed final sign-off Sep 2015 | 55 02nd St | Siemens Industry, Inc. | 4th floor: ti - fire alarm additions of 1 stoke power supply, 2 modules & 47 speaker/strobes. maher naDetails
4th floor: ti - fire alarm additions of 1 stoke power supply, 2 modules & 47 speaker/strobes. maher na | $26,500 |
| Sep 18, 2015 | Never finaled issued Sep 2015, no final | 55 02nd St | 4th floor evacuation plan; adding (4) new evacuation signs to replace existing.Details
4th floor evacuation plan; adding (4) new evacuation signs to replace existing. | $1,200 | |
| Sep 16, 2015 | Completed final sign-off Apr 2016 | 55 02nd St | Swinerton Builders | 3rd floor: provide cubicles, add two offices, provide i.t. room. minor lighting modifications, install 2 water cooled heat pump, provide power to servers. maher naDetails
3rd floor: provide cubicles, add two offices, provide i.t. room. minor lighting modifications, install 2 water cooled heat pump, provide power to servers. maher na | $190,000 |
| Sep 4, 2015 | Completed final sign-off Jan 2016 | 55 02nd St | Skyline Construction | revision to pa 2015-0721-1995 reconfigure of phone rooms and addition of 2 new phone rooms mep includedDetails
revision to pa 2015-0721-1995 reconfigure of phone rooms and addition of 2 new phone rooms mep included | $5,000 |
| Sep 1, 2015 | Completed final sign-off Sep 2015 | 55 02nd St | Pribuss Engineering Inc | 4th floor: fire sprinkler t.i. work under gc permit #201507211995. total heads 138. n/a for maher.Details
4th floor: fire sprinkler t.i. work under gc permit #201507211995. total heads 138. n/a for maher. | $50,430 |
| Jul 21, 2015 | Completed final sign-off Jan 2016 | 55 02nd St | Skyline Construction | tenant improvement 4th fl, new partitions, lighting, mepDetails
tenant improvement 4th fl, new partitions, lighting, mep | $500,000 |
| Jul 13, 2015 | Completed final sign-off Jan 2016 | 55 02nd St | Skyline Construction | 4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13Details
4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13 | $30,000 |
| Apr 6, 2015 | Completed final sign-off May 2015 | 55 02nd St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate and add sprinkler heads for kpmg on the 7th and 8th floor. 7th - 171 fire sprinkler pendents add; 8th - 190 fire sprinkler pendents addDetails
fire sprinkler only - relocate and add sprinkler heads for kpmg on the 7th and 8th floor. 7th - 171 fire sprinkler pendents add; 8th - 190 fire sprinkler pendents add | $180,500 |
| Feb 27, 2015 | Completed final sign-off May 2015 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the floor 8"kpmg" ti remodel, additions are 7 smoke detectors, 5 duct detectors, 3 speakers, 32 speaker/strobes and 8 strobes maher - not req'dDetails
fire alarm work for the floor 8"kpmg" ti remodel, additions are 7 smoke detectors, 5 duct detectors, 3 speakers, 32 speaker/strobes and 8 strobes maher - not req'd | $27,250 |
| Feb 27, 2015 | Completed final sign-off May 2015 | 55 02nd St | Siemens Industry, Inc. | fire alarm work for the floor 7"kpmg" ti remodel, additions are 4 smoke detectors, 5 duct detectors, 4 speakers, 36 speaker/strobes and 13 strobes maher - not req'dDetails
fire alarm work for the floor 7"kpmg" ti remodel, additions are 4 smoke detectors, 5 duct detectors, 4 speakers, 36 speaker/strobes and 13 strobes maher - not req'd | $31,500 |
| Feb 25, 2015 | Completed final sign-off Mar 2015 | 55 02nd St | Golden Gate Fire Protection Inc | 3rd floor: relocate 45 upright sprinklers. ti #201411191934. n/a for the maherDetails
3rd floor: relocate 45 upright sprinklers. ti #201411191934. n/a for the maher | $20,600 |
| Feb 5, 2015 | Completed final sign-off Feb 2015 | 55 02nd St | Siemens Industry, Inc. | 9th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 4 relay modules. t.i. app#201406239127Details
9th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 4 relay modules. t.i. app#201406239127 | $1,800 |
| Feb 5, 2015 | Completed final sign-off Feb 2015 | 55 02nd St | Siemens Industry, Inc. | 10th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 3 smoke detectors and 5 relay modules. ref permit #201406239127Details
10th floor: revised fire alarm drawing submitted for an as built permit per the sffd testing inspector, changes are the addition of 3 smoke detectors and 5 relay modules. ref permit #201406239127 | $3,750 |
| Dec 4, 2014 | Completed final sign-off Jan 2015 | 55 02nd St | Golden Gate Fire Protection Inc | relocate 153 pendent sprinklers on 9/f. relocate 150 pendent sprinklers on 10/f. n/a #155-13Details
relocate 153 pendent sprinklers on 9/f. relocate 150 pendent sprinklers on 10/f. n/a #155-13 | $156,045 |
| Nov 25, 2014 | Completed final sign-off Feb 2015 | 55 02nd St | Siemens Industry, Inc. | on 9th floor - fire alarm work for the kpmg ti on floor 9. 4 duct detectors, 1 strobe powr supply, 9 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not reqDetails
on 9th floor - fire alarm work for the kpmg ti on floor 9. 4 duct detectors, 1 strobe powr supply, 9 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not req | $33,000 |
| Nov 25, 2014 | Completed final sign-off Feb 2015 | 55 02nd St | Siemens Industry, Inc. | on 10th floor - fire alarm work for the kpmg ti on floor 10. 4 duct detectors, 1 strobe powr supply, 6 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not reqDetails
on 10th floor - fire alarm work for the kpmg ti on floor 10. 4 duct detectors, 1 strobe powr supply, 6 speakers, 42 speaker strobes, 9 strobes ref 201406239127, maher not req | $31,800 |
| Nov 19, 2014 | Completed final sign-off May 2015 | 55 02nd St | C B 2 Builders Incorporated | 3rd floor: interior demo of extg ceiling grid and tile , extg flex hvac ducting, extg lighting fixtures, carpet, vct etc (ab--017)Details
3rd floor: interior demo of extg ceiling grid and tile , extg flex hvac ducting, extg lighting fixtures, carpet, vct etc (ab--017) | $15,000 |
| Sep 26, 2014 | Expired or cancelled cancelled Mar 2020 | 55 02nd St | installation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 adpa-1921-18-20 hfb antenna. install 1 gps antenna. ** maher: compliance with ordinance no# 155-13 not required **Details
installation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 adpa-1921-18-20 hfb antenna. install 1 gps antenna. ** maher: compliance with ordinance no# 155-13 not required ** | $35,000 | |
| Jul 18, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | 11th floor revision to 201404163367. change of wall configuration per plan. maher n/a.Details
11th floor revision to 201404163367. change of wall configuration per plan. maher n/a. | |
| Jul 14, 2014 | Never finaled issued Jul 2014, no final | 55 02nd St | Golden Gate Fire Protection Inc | relocate 130 pendent sprinklers on the 11th fl upgrade end of line bracing and earthquake brading. n/a ordinance #155-13.Details
relocate 130 pendent sprinklers on the 11th fl upgrade end of line bracing and earthquake brading. n/a ordinance #155-13. | $66,950 |
| Jun 27, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | 7th & 8th floor: mep 201406279671 tenant improvement. h/a maher ord. # 155-13Details
7th & 8th floor: mep 201406279671 tenant improvement. h/a maher ord. # 155-13 | $1,200,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2016 | 55 02nd St | Hathaway Dinwiddie Co. | 7th and 8th fl: ti to include open office, enclosed offices, break area, meeting rooms, elevator lobby. restroom work. mech elec sep permit. n/a maher ord. # 155-13Details
7th and 8th fl: ti to include open office, enclosed offices, break area, meeting rooms, elevator lobby. restroom work. mech elec sep permit. n/a maher ord. # 155-13 | $1,425,000 |
| Jun 24, 2014 | Completed final sign-off May 2015 | 55 02nd St | Siemens Industry, Inc. | 11th floor: fire alarm work for kpmg t.i. additions are 1 smoke detectors, 5 duct detectors, 29 speaker/strobes, 10 strobes, and one relay module. ref app#201404163367. n/a for the maher ordinance #155-13Details
11th floor: fire alarm work for kpmg t.i. additions are 1 smoke detectors, 5 duct detectors, 29 speaker/strobes, 10 strobes, and one relay module. ref app#201404163367. n/a for the maher ordinance #155-13 | $21,700 |
| Jun 23, 2014 | Completed final sign-off Mar 2016 | 55 02nd St | Hathaway Dinwiddie Co. | t.i. to includes office spaces, break room area, meeting rooms, elevator lobby & restroom work. new mech, electrical, plumbing under seperate permit. life safety, sprinkler under separate permit. n/a ordinance #155-13Details
t.i. to includes office spaces, break room area, meeting rooms, elevator lobby & restroom work. new mech, electrical, plumbing under seperate permit. life safety, sprinkler under separate permit. n/a ordinance #155-13 | $1,425,000 |
| Jun 23, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | mechanical work for pa#201406239127. n/a ordinance #155-13Details
mechanical work for pa#201406239127. n/a ordinance #155-13 | $1,200,000 |
| May 28, 2014 | Completed final sign-off Jul 2015 | 55 02nd St | Thomas Swan Sign Co Inc | 5 evacuation plan maps, floors 9, 10, 11, 12 & 14. n/a ordinance #155-13Details
5 evacuation plan maps, floors 9, 10, 11, 12 & 14. n/a ordinance #155-13 | $1,500 |
| May 14, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | mechanical electrical & plumbing work for project under pa#201404163367, n/a ordinance #155-13.Details
mechanical electrical & plumbing work for project under pa#201404163367, n/a ordinance #155-13. | $750,000 |
| Apr 16, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | 11th floor: t.i. to include reception area,open office, work stations, reprographic center, employee break area,meeting rooms, training room, phone rooms, support space, restrooms and elevator lobby, hvac electrical, life safty, sprinklers under separate permit.Details
11th floor: t.i. to include reception area,open office, work stations, reprographic center, employee break area,meeting rooms, training room, phone rooms, support space, restrooms and elevator lobby, hvac electrical, life safty, sprinklers under separate permit. | $977,130 |
| Mar 19, 2014 | Completed final sign-off May 2014 | 55 02nd St | Siemens Industry, Inc. | addition of 4 duct detectors, 1 relay module, 7 speakers, 29 speaker/strobes, 10 strobes for the kpmg remodel on the 14th fl all new devices connect to life safety system. referenced mechanical 2014.0121.6657 and ti 2014.0113.6092. compliance w/ordinance #155-13 not requiredDetails
addition of 4 duct detectors, 1 relay module, 7 speakers, 29 speaker/strobes, 10 strobes for the kpmg remodel on the 14th fl all new devices connect to life safety system. referenced mechanical 2014.0121.6657 and ti 2014.0113.6092. compliance w/ordinance #155-13 not required | $25,900 |
| Mar 19, 2014 | Completed final sign-off May 2014 | 55 02nd St | Siemens Industry, Inc. | addition of 4 duct detectors, 1 relay module, 7 speakers, 31 speaker/strobes, 9 strobes for kpmg remodel on floor 12. all devices connect onto (e) life safety system. ref # mechanical & t.i. #201401216657, #201401136092. compliance w/ordinance #155-13 not requiredDetails
addition of 4 duct detectors, 1 relay module, 7 speakers, 31 speaker/strobes, 9 strobes for kpmg remodel on floor 12. all devices connect onto (e) life safety system. ref # mechanical & t.i. #201401216657, #201401136092. compliance w/ordinance #155-13 not required | $26,400 |
| Mar 14, 2014 | Completed final sign-off Apr 2014 | 55 02nd St | Golden Gate Fire Protection Inc | relocate 163 penedent sprinklers on the 12th floor. relocate 149 pendents and 1 upright on the 14th floor. ref arch. app# 2014.0113.6092Details
relocate 163 penedent sprinklers on the 12th floor. relocate 149 pendents and 1 upright on the 14th floor. ref arch. app# 2014.0113.6092 | $161,195 |
| Jan 13, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | 12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd.Details
12th & 14th flr t.i. includes (n) offices, open office areas, break area, meeting room etc. (n) elevator lobby upgrade, restrm upgrades, replace stair. all mech,elec,plbg,struct under separate permits. (demo under 2013.1211.3864). compliance with ordinance #155-13 not required. excavation <50 cu yd. | $1,200,000 |
| Jan 13, 2014 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | 12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd.Details
12th & 14th flr structural for project under pa #2014.0113.6092 - existing communicaiton stair being replaced. (da checklist under #2012.0418.8562) compliance with ordinance #155-13 not required. excavation <50 cu yd. | $47,000 |
| Dec 11, 2013 | Completed final sign-off Feb 2016 | 55 02nd St | Hathaway Dinwiddie Co. | (12 & 14th floor). demo only of applied finishes. non-structural partitions, hvac, electrical, plumbing and life safety equipment on two floors. t.i under separate permit. bldg is fully sprinklered. per ab-017Details
(12 & 14th floor). demo only of applied finishes. non-structural partitions, hvac, electrical, plumbing and life safety equipment on two floors. t.i under separate permit. bldg is fully sprinklered. per ab-017 | $190,000 |
| Aug 14, 2013 | Never finaled issued Aug 2013, no final | 55 02nd St | Golden Gate Fire Protection Inc | 15th floor fire sprinkler - relocate 42 pendent sprinkler heads, relocate 9 upright heads. ref pa #2013.07.02.0941Details
15th floor fire sprinkler - relocate 42 pendent sprinkler heads, relocate 9 upright heads. ref pa #2013.07.02.0941 | $26,265 |
| Jul 2, 2013 | Completed final sign-off Mar 2014 | 55 02nd St | Novo Construction Inc | 15th floor full floor tenant improvement to include selective demolitoins, partitions, ceiling finishes. mep,life safety & fire sprinkler under separate permit.Details
15th floor full floor tenant improvement to include selective demolitoins, partitions, ceiling finishes. mep,life safety & fire sprinkler under separate permit. | $758,000 |
| Jun 5, 2013 | Completed final sign-off Jul 2013 | 55 02nd St | Skyline Construction | 15th floor-selective demolition of (e) non load bearing partitions, gyp board ceiling, light fixtures, floor finishes, millwork & plumbing fixturesDetails
15th floor-selective demolition of (e) non load bearing partitions, gyp board ceiling, light fixtures, floor finishes, millwork & plumbing fixtures | $65,000 |
Find contractors for work like this