Christopher Eric Diller
- Listed as
- engineer
- Firm
- Cnr Engineering
- On San Francisco permits
- Jul 2017 to Feb 2019
5 permits since 2000 (engineer on 5 permits): 3 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 55 02nd St | Metropolitan Electrical Construction | remove and replace 1 light in 17th fl in 1 office and replace 2 lights on 16th floor with 1 lightDetails
remove and replace 1 light in 17th fl in 1 office and replace 2 lights on 16th floor with 1 light | $3,492 |
| Feb 15, 2018 | Completed final sign-off Mar 2019 | 210 Post St | P 3 Construction & Remodeling Inc | title 24 for pa #201609228486Details
title 24 for pa #201609228486 | $80,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2018 | 650 California St | Gci, Inc | 20th fl mep plans -(suite 2025 & 2050)- (1) new vav boxes, (4) transfer air fans, demo existing electrical & installation of new lighting power. ref pa #201709299904. fire under separate permits maher naDetails
20th fl mep plans -(suite 2025 & 2050)- (1) new vav boxes, (4) transfer air fans, demo existing electrical & installation of new lighting power. ref pa #201709299904. fire under separate permits maher na | $250,000 |
| Aug 8, 2017 | Never finaled issued Aug 2017, no final | 333 Bush St | Plant Construction Co, Lp | 1/f lobby- removal and replace of lighting fixtures in the lobby and new lighting controls, all circuits are existing to remain. t.i. pa#201703232221//vif emergency lighting in the lobby ti areaDetails
1/f lobby- removal and replace of lighting fixtures in the lobby and new lighting controls, all circuits are existing to remain. t.i. pa#201703232221//vif emergency lighting in the lobby ti area | $10,000 |
| Jul 12, 2017 | Completed final sign-off Feb 2018 | 345 California St | Gci, Inc | ste 2100 - mechanical and electrical - relocate diffusers, rebalance existing vav boxes to serve new zones. install 1 new vav box & new low side ductwork. demo & install of existing lighting & electricalDetails
ste 2100 - mechanical and electrical - relocate diffusers, rebalance existing vav boxes to serve new zones. install 1 new vav box & new low side ductwork. demo & install of existing lighting & electrical |