Block 0294, lot 006
210 Post St
- City’s use
- Commercial Office
- Built
- 1905
- Stories
- 11
- Units
- 3
- Rooms
- 24 bathrooms
- Building
- 96,870 sq ft
- Lot
- 8,433 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
71 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 210 Post St | Padraig Devlin Construction | stucco repair. 20-30 shallow patches on exterior stucco on post and grant, using mesh and stucco repair. not visible from street.Details
stucco repair. 20-30 shallow patches on exterior stucco on post and grant, using mesh and stucco repair. not visible from street. | $80,000 |
| Dec 23, 2025 | Completed final sign-off Feb 2026 | 210 Post St | Bevilacqua & Sons | to comply with nov#202548248 to repair drywall material at rear stairwell from 1st floor to basement with type x 5/8. due to water damage.Details
to comply with nov#202548248 to repair drywall material at rear stairwell from 1st floor to basement with type x 5/8. due to water damage. | $10,000 |
| May 16, 2024 | In progress filed May 2024, not yet issued | 200 Post St | ground floor: interior renovation of existing demiseo retail space.Details
ground floor: interior renovation of existing demiseo retail space. | $100,000 | |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 210 Post St | street spaceDetails
street space | ||
| Dec 27, 2019 | Never finaled issued Jan 2020, no final | 210 Post St | Red Hawk Fire & Security Ca Llc | fire alarm ti on mezz level. removeal of 1 smoke det, 1 horn strobe due to elevator modification. mezzanine no longer serve as a level. existing layout, no refDetails
fire alarm ti on mezz level. removeal of 1 smoke det, 1 horn strobe due to elevator modification. mezzanine no longer serve as a level. existing layout, no ref | $2,000 |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 210 Post St | Red Hawk Fire & Security Ca Llc | ref pa# 201809180591 & 201803224364; fire alarm t.i. on 2nd fl. & 11th fl. restroom, 2nd fl. revision to (e) storbe in bathrooms, add (2) new strobes on 11th fl.Details
ref pa# 201809180591 & 201803224364; fire alarm t.i. on 2nd fl. & 11th fl. restroom, 2nd fl. revision to (e) storbe in bathrooms, add (2) new strobes on 11th fl. | $1,500 |
| Aug 12, 2019 | Completed final sign-off Nov 2019 | 210 Post St | Red Hawk Fire & Security Ca Llc | fire sprinkler as builts 201903114833Details
fire sprinkler as builts 201903114833 | |
| May 9, 2019 | Completed final sign-off Feb 2020 | 210 Post St | Canning Electric Inc | adding lighting and gfi outlets forrestroom remodel on 2nd & 11th fl.Details
adding lighting and gfi outlets forrestroom remodel on 2nd & 11th fl. | $30,000 |
| Mar 11, 2019 | Completed final sign-off Nov 2019 | 210 Post St | Red Hawk Fire & Security Ca Llc | add sprinklers to new restrooms on floors 2 and 11Details
add sprinklers to new restrooms on floors 2 and 11 | $4,560 |
| Feb 22, 2019 | Completed final sign-off May 2019 | 210 Post St | Red Hawk Fire & Security Ca Llc | as builts for relocate bathroom notification permit #201609228486 ref permit #201712206966Details
as builts for relocate bathroom notification permit #201609228486 ref permit #201712206966 | |
| Feb 14, 2019 | Never finaled issued Feb 2019, no final | 210 Post St | street spaceDetails
street space | ||
| Sep 18, 2018 | Completed final sign-off Feb 2020 | 210 Post St | P 3 Construction & Remodeling Inc | revision to pa 2018-0322-4364. 2nd floor only: 1 ada bathroom &1 gender neutral non-ada. 11th floor only: women's bathroom ada-toilet.Details
revision to pa 2018-0322-4364. 2nd floor only: 1 ada bathroom &1 gender neutral non-ada. 11th floor only: women's bathroom ada-toilet. | $33,000 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 210 Post St | street space w/mtaDetails
street space w/mta | ||
| Mar 22, 2018 | Never finaled issued Jul 2018, no final | 210 Post St | P 3 Construction & Remodeling Inc | revision to 201609228486, change from 2 ada baths on each floor to 1 on each floorDetails
revision to 201609228486, change from 2 ada baths on each floor to 1 on each floor | |
| Feb 15, 2018 | Completed final sign-off Mar 2019 | 210 Post St | P 3 Construction & Remodeling Inc | title 24 for pa #201609228486Details
title 24 for pa #201609228486 | $80,000 |
| Jan 25, 2018 | Never finaled issued Jan 2018, no final | 210 Post St | street space w/mtaDetails
street space w/mta | ||
| Jan 11, 2018 | Expired or cancelled cancelled Jan 2026 | 210 Post St | toilet fixture replacement on alternate floors for ada for record keepingDetails
toilet fixture replacement on alternate floors for ada for record keeping | ||
| Dec 20, 2017 | Completed final sign-off Oct 2020 | 210 Post St | Red Hawk Fire & Security Ca Llc | ref 201707242697 original fa permit replace (e) notifier panel w/new 640 panel. add 1 new cellular communicater. record set for harry winsten space ii & (e) high rise conditions w/preappDetails
ref 201707242697 original fa permit replace (e) notifier panel w/new 640 panel. add 1 new cellular communicater. record set for harry winsten space ii & (e) high rise conditions w/preapp | |
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 210 Post St | street space permitDetails
street space permit | ||
| Nov 21, 2017 | Completed final sign-off Jan 2018 | 210 Post St | Rcm Fire Protection Inc. | revision to 201706088809, to replace pump per app#201706088809. t.i. ref app#201507272539Details
revision to 201706088809, to replace pump per app#201706088809. t.i. ref app#201507272539 | $80,000 |
| Oct 23, 2017 | Completed final sign-off Jan 2018 | 210 Post St | Garnett Signs Llc | floors 1 & 2: installing 8 evac signs. maher n/a.Details
floors 1 & 2: installing 8 evac signs. maher n/a. | $3,200 |
| Sep 18, 2017 | Completed final sign-off Jan 2018 | 210 Post St | Build Group Inc. | revision to app#201507272539. mep work revision. provide rated-shaft for ductwork between basement & ground floorDetails
revision to app#201507272539. mep work revision. provide rated-shaft for ductwork between basement & ground floor | |
| Sep 18, 2017 | Never finaled issued Dec 2017, no final | 210 Post St | Build Group Inc. | reference app#201507272539 to replace fire pumps in kindDetails
reference app#201507272539 to replace fire pumps in kind | $5,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 210 Post St | street spaceDetails
street space | ||
| Jul 24, 2017 | Completed final sign-off Jan 2018 | 210 Post St | Red Hawk Fire & Security Ca Llc | add 61 new smoke det add 1 new heat det, 1 new power spuply 6 new pull stations, 18 control relays for heat pumps shutdow full area notification, sub, ground, mezza floorsDetails
add 61 new smoke det add 1 new heat det, 1 new power spuply 6 new pull stations, 18 control relays for heat pumps shutdow full area notification, sub, ground, mezza floors | $20,000 |
| Jun 30, 2017 | Completed final sign-off Jan 2018 | 210 Post St | Build Group Inc. | revision to bpa 2015-0727-2539 interior work only; redesign basement levelDetails
revision to bpa 2015-0727-2539 interior work only; redesign basement level | $35,000 |
| Jun 8, 2017 | Completed final sign-off Jan 2018 | 210 Post St | Rcm Fire Protection Inc. | upgrade & modify existing basement fire sprinkler system, replace existing firepump and extend system to protect ground floorDetails
upgrade & modify existing basement fire sprinkler system, replace existing firepump and extend system to protect ground floor | $189,000 |
| Mar 14, 2017 | Never finaled issued Mar 2017, no final | 210 Post St | street space/mtaDetails
street space/mta | ||
| Oct 24, 2016 | Completed final sign-off Jan 2018 | 210 Post St | Build Group Inc. | demo (e) canopyDetails
demo (e) canopy | $500 |
| Oct 24, 2016 | Completed final sign-off Apr 2017 | 210 Post St | Build Group Inc. | install barricade exteriorDetails
install barricade exterior | $500 |
| Sep 23, 2016 | Completed final sign-off Mar 2017 | 210 Post St | Fisher Development Inc | demo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539Details
demo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539 | $5,000 |
| Sep 22, 2016 | Completed final sign-off Feb 2020 | 210 Post St | P 3 Construction & Remodeling Inc | replace extg toilet fixtures, partitions, and sinks. barrier removal at bathrooms on floors 2 to 11.Details
replace extg toilet fixtures, partitions, and sinks. barrier removal at bathrooms on floors 2 to 11. | $50,000 |
| Aug 22, 2016 | Expired or cancelled cancelled Jan 2026 | 210 Post St | erect (13) non-electric single faced display case signages.Details
erect (13) non-electric single faced display case signages. | $200 | |
| Aug 22, 2016 | Expired or cancelled cancelled Jan 2026 | 210 Post St | erect (2) non-electric single faced brass letter signs.Details
erect (2) non-electric single faced brass letter signs. | $200 | |
| Aug 22, 2016 | Expired or cancelled cancelled Jan 2026 | 210 Post St | erect (3) non-electric single faced door/window brass logo signs.Details
erect (3) non-electric single faced door/window brass logo signs. | $100 | |
| Aug 22, 2016 | Never finaled filed Aug 2016, never issued | 210 Post St | erect 3 non-electric single faced brass plague signs.Details
erect 3 non-electric single faced brass plague signs. | $200 | |
| Aug 22, 2016 | Never finaled issued Oct 2017, no final | 210 Post St | Tim Rhones Installation Department | erect 6 electric single faced signs.Details
erect 6 electric single faced signs. | $1,000 |
| Aug 22, 2016 | Never finaled issued Oct 2017, no final | 210 Post St | Tim Rhones Installation Department | erect 2 non-electric single faced signsDetails
erect 2 non-electric single faced signs | $100 |
| Sep 22, 2015 | Never finaled filed Sep 2015, never issued | 210 Post St | infill e skylight in lightwellDetails
infill e skylight in lightwell | $10,000 | |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 210 Post St | street space permitDetails
street space permit | ||
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 210 Post St | street spaceDetails
street space | ||
| Aug 18, 2015 | Completed final sign-off Jan 2018 | 210 Post St | Build Group Inc. | installation of security camera, awning, and new ventilation grate; removal of security gates; removal of door on grant ave, r&r 1st flr storefront windows, paint removal, repair and paint window frames, repair and refinishe wood trim & brass finish around post st entranceDetails
installation of security camera, awning, and new ventilation grate; removal of security gates; removal of door on grant ave, r&r 1st flr storefront windows, paint removal, repair and paint window frames, repair and refinishe wood trim & brass finish around post st entrance | $751,200 |
| Jul 27, 2015 | Completed final sign-off Jan 2018 | 210 Post St | Build Group Inc. | interior non-structural demo to remove previous ti in advance of a new ti. new walls, floors, fixtures, lighting, mep & finishes.Details
interior non-structural demo to remove previous ti in advance of a new ti. new walls, floors, fixtures, lighting, mep & finishes. | $3,700,000 |
| Jul 27, 2015 | Never finaled issued Aug 2015, no final | 210 Post St | Fisher Development Inc | (n) storefront system at ground level, (n) signage for (n) t.i.Details
(n) storefront system at ground level, (n) signage for (n) t.i. | $200,000 |
| Jun 9, 2015 | Never finaled filed Jun 2015, never issued | 210 Post St | basement, mezz, 1st,2nd,3rd flr - demolition of select (e) ceilings, partitions, & remove (e) flooring, select plumbing fixtures, select bldg systems no longer in use. relocate (e) bldg systems where they interfere with proposed shell & core work.Details
basement, mezz, 1st,2nd,3rd flr - demolition of select (e) ceilings, partitions, & remove (e) flooring, select plumbing fixtures, select bldg systems no longer in use. relocate (e) bldg systems where they interfere with proposed shell & core work. | $20,000 | |
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 207 Grant Av | Iaconi Construction | minor revision to 201502067684 lighting specifications and title 24 calculationsDetails
minor revision to 201502067684 lighting specifications and title 24 calculations | |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 207 Grant Av | mta permitDetails
mta permit | ||
| Feb 6, 2015 | Completed final sign-off Apr 2015 | 207 Grant Av | Iaconi Construction | interior renovation of existing retail space, work includes finish changes, (n) non structural partitions, (n) minor mechanical duct modifications, (n) electrical and lighting, (n) signage to be under separate permit.Details
interior renovation of existing retail space, work includes finish changes, (n) non structural partitions, (n) minor mechanical duct modifications, (n) electrical and lighting, (n) signage to be under separate permit. | $110,000 |
| Feb 3, 2015 | Completed final sign-off Apr 2015 | 207 Grant Av | Iaconi Construction | minor non-structural interior demolition permit of (e) retial space. work includes demonlition of non structural partitions, eleectrical and lighting. no change to exterior. access upgrade will be included in subsquent interior improvement per sfbc ab-017.Details
minor non-structural interior demolition permit of (e) retial space. work includes demonlition of non structural partitions, eleectrical and lighting. no change to exterior. access upgrade will be included in subsquent interior improvement per sfbc ab-017. | $5,000 |
| Dec 22, 2014 | Expired or cancelled withdrawn Feb 2015 | 207 Grant Av | interior renovation of existing retail space work includes finish changes, (n) non-structural partitions, (n) structural mezzanine, (n) minor mechanical duct relcoations, (n) electrical & lighting. no change to exterior. signage under separate permit.Details
interior renovation of existing retail space work includes finish changes, (n) non-structural partitions, (n) structural mezzanine, (n) minor mechanical duct relcoations, (n) electrical & lighting. no change to exterior. signage under separate permit. | $215,000 | |
| Oct 8, 2013 | Never finaled issued May 2014, no final | 209 Grant Av | Golden Gate Sign Company Inc. | erect non-electric, projecting, double-faced, non-illuminated, new sign.Details
erect non-electric, projecting, double-faced, non-illuminated, new sign. | $3,000 |
| Jul 24, 2012 | Completed final sign-off Sep 2012 | 210 Post St | Kozubek Construction | 7th floor ste 705 - build 2nd ceiling to lower elevations with 2 translucent access panels for lighting on (e) ceiling fire inspector to field verify if sprinklers and/or fire alarm work is triggered by this permit.Details
7th floor ste 705 - build 2nd ceiling to lower elevations with 2 translucent access panels for lighting on (e) ceiling fire inspector to field verify if sprinklers and/or fire alarm work is triggered by this permit. | $4,500 |
| Aug 25, 2011 | Never finaled issued Aug 2011, no final | 210 Post St | street space permit and sidewalk permitsDetails
street space permit and sidewalk permits | ||
| Aug 5, 2010 | Never finaled issued Aug 2010, no final | 210 Post St | street spaceDetails
street space | ||
| Jun 16, 2010 | Never finaled issued Aug 2010, no final | 200 Post St | Northern Sun Associates | 1st floor-relocation of (e) display cases, new wood wall panel system on west wall, alteration of (e) display cases. all work to be done on 1st floor onlyDetails
1st floor-relocation of (e) display cases, new wood wall panel system on west wall, alteration of (e) display cases. all work to be done on 1st floor only | $75,000 |
| Jun 14, 2010 | Never finaled issued Jun 2010, no final | 207 Grant Av | Abayla Contracting Services Inc | kate spade. ground floor. minor lighting and flooring, replacement for (e) retail store. no exterior workDetails
kate spade. ground floor. minor lighting and flooring, replacement for (e) retail store. no exterior work | $10,000 |
| Oct 6, 2009 | Never finaled issued Oct 2009, no final | 210 Post St | street space permitDetails
street space permit | ||
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 210 Post St | street space permit only.Details
street space permit only. | ||
| Jul 23, 2009 | Never finaled issued Jul 2009, no final | 210 Post St | street space permit.Details
street space permit. | ||
| Jul 2, 2009 | Never finaled issued Jul 2009, no final | 210 Post St | street spaceDetails
street space | ||
| Aug 24, 2004 | Completed final sign-off Dec 2004 | 210 Post St | Alpha Fire Suppression | 120 sprinkkler heade relocating on 2nd & 3rd fls no increase in office space, interior wok onlyDetails
120 sprinkkler heade relocating on 2nd & 3rd fls no increase in office space, interior wok only | $19,280 |
| May 5, 2004 | Never finaled issued May 2004, no final | 207 Grant Av | install new fan coil unit & condenser unit in existing mercantile space. install supply & return airDetails
install new fan coil unit & condenser unit in existing mercantile space. install supply & return air | $15,000 | |
| Jan 30, 2002 | Expired or cancelled expired Mar 2004 | 201 Grant Av | Plant Construction | to renew app#2000/06/29/4022 to finish all work (1/3 of full value.Details
to renew app#2000/06/29/4022 to finish all work (1/3 of full value. | $80,000 |
| Nov 30, 2000 | Expired or cancelled expired Mar 2001 | 207 Grant Av | Cps Signs | to erect sign non electric wall projecting double facedDetails
to erect sign non electric wall projecting double faced | |
| Sep 13, 2000 | Expired or cancelled expired Feb 2002 | 210 Post St | Plant Construction | oti-1,2nd fl, el,ls,spDetails
oti-1,2nd fl, el,ls,sp | $86,300 |
| Aug 31, 2000 | Completed final sign-off Jan 2001 | 207 Grant Av | fire alarm system modifications-1st floorDetails
fire alarm system modifications-1st floor | $1,200 | |
| Aug 19, 2000 | Completed final sign-off Jan 2001 | 201 Grant Av | removal of the masonry in fill in the window frame restore back to (e)conditionDetails
removal of the masonry in fill in the window frame restore back to (e)condition | $4,000 | |
| Jul 3, 2000 | Expired or cancelled expired Jul 2001 | 201 Grant Av | street spaceDetails
street space | ||
| Jun 29, 2000 | Expired or cancelled expired Mar 2002 | 201 Grant Av | Plant Construction | barrier removalDetails
barrier removal | $50,000 |
| Jun 24, 2000 | Completed final sign-off Jan 2001 | 201 Grant Av | retail stores remodel per plansDetails
retail stores remodel per plans | $150,000 | |
| May 12, 2000 | Expired or cancelled expired Sep 2000 | 201 Grant Av | Richter And Ratner Contracting Corp. | removeal of gyp-board ceiling, electrial fixtures and plaster coloumns.Details
removeal of gyp-board ceiling, electrial fixtures and plaster coloumns. | $2,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.