38 permits since 2000 (authorized agent-others on 27 permits, pmt consultant/expediter on 8 permits, designer on 2 permits, engineer on 1 permit): 25 completed, 6 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 28, 2015 | Completed final sign-off Sep 2018 | 1339 Francisco St | Phollies Inc | structural work on ground only. legalization and for structural infill under seperate permit per app#201512114904Details
structural work on ground only. legalization and for structural infill under seperate permit per app#201512114904 | $5,000 |
| Dec 28, 2015 | Completed final sign-off Feb 2017 | 1337 Francisco St | Phollies Inc | revision to app#201509156977. revision framing to match actual site conditions. delete footing work and repair special inspection change to sheet s3 only.Details
revision to app#201509156977. revision framing to match actual site conditions. delete footing work and repair special inspection change to sheet s3 only. | |
| Dec 9, 2015 | Completed final sign-off Jun 2016 | 425 Market St | Fisher Development Inc | 19th floor: ti to (e) office space - non structural walls. finishes - electrical, mechanical, plumbing ada accessibility upgrade.Details
19th floor: ti to (e) office space - non structural walls. finishes - electrical, mechanical, plumbing ada accessibility upgrade. | $4,290,000 |
| Nov 9, 2015 | Expired or cancelled cancelled Jan 2020 | 55 John St | unit legalization per ord #43-14. legalize unit at basement.Details
unit legalization per ord #43-14. legalize unit at basement. | $50,000 | |
| Oct 27, 2015 | Completed final sign-off Feb 2016 | 600 Townsend St | C C I Commercial Construction & Improv | revision to app#201506290156. reduction of work.Details
revision to app#201506290156. reduction of work. | |
| Oct 27, 2015 | Never finaled issued Oct 2015, no final | 1111 Connecticut St | William Spencer Company | interior t.i. modifications of extg bldg to accomodate occupancy of new tenant maintaning extg occupancy of bldg as an warehouse/distibution facility with supporting office.Details
interior t.i. modifications of extg bldg to accomodate occupancy of new tenant maintaning extg occupancy of bldg as an warehouse/distibution facility with supporting office. | $144,000 |
| Sep 11, 2015 | Completed final sign-off Dec 2015 | 1535 Jones St | Grand Industries Inc | provide temporary support for the (e) distressed retaining wallDetails
provide temporary support for the (e) distressed retaining wall | $20,000 |
| Aug 28, 2015 | Completed final sign-off Jun 2024 | 2337 Taraval St | H D Construction Company | erect 3 stories of 2 dwelling units, type 5 construction w/ commercial space.Details
erect 3 stories of 2 dwelling units, type 5 construction w/ commercial space. | $300,000 |
| Aug 21, 2015 | Completed final sign-off May 2016 | 690 Folsom St | Arco Murray Design Build | indoor table tennis club build out of an (e) shell. indoor and outdoor court with viewing areas, dining areas, bar, kitchen, food/beverage stroage & bathrooms, including but not limited to built in furniture and interior walls and finishes.Details
indoor table tennis club build out of an (e) shell. indoor and outdoor court with viewing areas, dining areas, bar, kitchen, food/beverage stroage & bathrooms, including but not limited to built in furniture and interior walls and finishes. | $1,200,000 |
| Aug 4, 2015 | Completed final sign-off Jun 2016 | 703 Market St | C C I Commercial Construction & Improv | furnish and install one new steam to hot water heat exchanger. furnish and install new 2 new hot water circulating pumps. furnish and install new heating hot water risers from the basement to the 21st floor with/stub outs on all floors. ref app#201507010454Details
furnish and install one new steam to hot water heat exchanger. furnish and install new 2 new hot water circulating pumps. furnish and install new heating hot water risers from the basement to the 21st floor with/stub outs on all floors. ref app#201507010454 | $200,000 |
| Jul 27, 2015 | Completed final sign-off Jan 2018 | 210 Post St | Build Group Inc. | interior non-structural demo to remove previous ti in advance of a new ti. new walls, floors, fixtures, lighting, mep & finishes.Details
interior non-structural demo to remove previous ti in advance of a new ti. new walls, floors, fixtures, lighting, mep & finishes. | $3,700,000 |
| Jul 22, 2015 | Expired or cancelled withdrawn Jun 2017 | 1150 Sutter St | structural framing for new gym. ref app#201506189295. remove 2 extg cross wall at 1st floor only. in extg umb bldg and replace with a new moment frame. n/a for maher.Details
structural framing for new gym. ref app#201506189295. remove 2 extg cross wall at 1st floor only. in extg umb bldg and replace with a new moment frame. n/a for maher. | $10,000 | |
| Jul 8, 2015 | Completed final sign-off Feb 2016 | 1520 Fillmore St | K Bali Construction | demolition of existing interior space to include removal of all surface mounted fixture, tiles on floor, wood counter bar, kitchen plumbing fixtures, walk in refrigerator, door, and stair railing. demo to take place on both floors.Details
demolition of existing interior space to include removal of all surface mounted fixture, tiles on floor, wood counter bar, kitchen plumbing fixtures, walk in refrigerator, door, and stair railing. demo to take place on both floors. | $30,000 |
| Jul 1, 2015 | Expired or cancelled cancelled Feb 2017 | 2125 Polk St | erect a non-elecric double faced projecting sign.Details
erect a non-elecric double faced projecting sign. | $1,500 | |
| Jul 1, 2015 | Expired or cancelled cancelled Feb 2017 | 2125 Polk St | erect a non-elecric single faced wall sign.Details
erect a non-elecric single faced wall sign. | $6,000 | |
| Jun 18, 2015 | Completed final sign-off Mar 2018 | 3880 Jackson St | Plath & Company Inc | interior remodel within extg bldg including new skylight, some new windows, others to be reaplace in kind. new deck , spiral stair, sport court and wall at west yard. includes limited structural work. n/a for maher.Details
interior remodel within extg bldg including new skylight, some new windows, others to be reaplace in kind. new deck , spiral stair, sport court and wall at west yard. includes limited structural work. n/a for maher. | $100,000 |
| May 22, 2015 | Completed final sign-off Nov 2018 | 2747 19th St | Z Construction Company Inc | soft demo non structural ab-17. t.i. under separate permit. maher naDetails
soft demo non structural ab-17. t.i. under separate permit. maher na | $10,000 |
| May 12, 2015 | Expired or cancelled expired Nov 2018 | 2747 19th St | interior alterations- to existing building. occupancy is to be design offices. work includes interior addition of square footage in high-bay ceiling and exterior windows. no street front exterior work is proposed. n/a ordinance.Details
interior alterations- to existing building. occupancy is to be design offices. work includes interior addition of square footage in high-bay ceiling and exterior windows. no street front exterior work is proposed. n/a ordinance. | $100,000 | |
| May 1, 2015 | Expired or cancelled withdrawn Aug 2015 | 194 Church St | change of use. conditional use for community and social events space on 2nd floor. all existing conditions to remain. no physical changes for interior and exterior of building.Details
change of use. conditional use for community and social events space on 2nd floor. all existing conditions to remain. no physical changes for interior and exterior of building. | $1,000 | |
| Apr 28, 2015 | Completed final sign-off Jun 2017 | 2630 Mission St | Current Construction | repair to fire damage, new; 2x studs, drywall r13 insulation, ada restroom, roof framing & ceiling. remove & replace; stairs framing, storefront, roll up doors, flooring, roofing, roof shtg - to match (e), like for like. ti work under seperate permit as per ab-017.Details
repair to fire damage, new; 2x studs, drywall r13 insulation, ada restroom, roof framing & ceiling. remove & replace; stairs framing, storefront, roll up doors, flooring, roofing, roof shtg - to match (e), like for like. ti work under seperate permit as per ab-017. | $50,000 |
| Apr 23, 2015 | Completed final sign-off Dec 2016 | 2755 Mcallister St | Cullinane Plastering | demolish 2-story single family dwellingDetails
demolish 2-story single family dwelling | $10,000 |
| Mar 20, 2015 | Completed final sign-off Apr 2016 | 644 Broadway | replace (e) after hours security gate with new sliding panel gate system with exit door equipped w/panic hardwareDetails
replace (e) after hours security gate with new sliding panel gate system with exit door equipped w/panic hardware | $6,500 | |
| Feb 18, 2015 | Completed final sign-off Jan 2017 | 525 Jersey St | Design Line Construction | interior renovation & rear facade to be re-cladded. 1.(e)interior walls will be demoished & or reconfigured. 2)(n) finishes, fixtures & appliances will be installed. 2.exterior window opening to remain, 2) exterior rear facade re-cladded w/nw windows. nfpa 13r sprinkler under separate permit.Details
interior renovation & rear facade to be re-cladded. 1.(e)interior walls will be demoished & or reconfigured. 2)(n) finishes, fixtures & appliances will be installed. 2.exterior window opening to remain, 2) exterior rear facade re-cladded w/nw windows. nfpa 13r sprinkler under separate permit. | $250,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 251 Arkansas St | Cullinane Plastering | revision to app#200905208827 /s r4. foundation work.Details
revision to app#200905208827 /s r4. foundation work. | $1,000 |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 3711 19th Av | Northern Sun Associates | tenant improvement install glass and drywall partitions. replacement of flooring. install new lights. reconstruction of double height spaceDetails
tenant improvement install glass and drywall partitions. replacement of flooring. install new lights. reconstruction of double height space | $50,000 |
| Dec 12, 2014 | Completed final sign-off Oct 2017 | 1155 Bryant St | new foundations per plan. n/a for the maher ordinance #155-13Details
new foundations per plan. n/a for the maher ordinance #155-13 | $65,000 | |
| Nov 26, 2014 | Completed final sign-off Aug 2016 | 580 Geary St | C C I Commercial Construction & Improv | selective demolition of interior walls & finishes for installation of new accessible guest rooms, replace all guestroom plumbing fixtures, finishes. a total of 8 new guestroom will be added in which 5 of the 8 will be fully accessible. clarify total # of rooms. two fire smoke dampers added.Details
selective demolition of interior walls & finishes for installation of new accessible guest rooms, replace all guestroom plumbing fixtures, finishes. a total of 8 new guestroom will be added in which 5 of the 8 will be fully accessible. clarify total # of rooms. two fire smoke dampers added. | $1,500,000 |
| Nov 26, 2014 | Completed final sign-off May 2015 | 2889 24th St | Cullinane Plastering | revision pa#2012-08-06-6608. revise roof deck tile system to pedestal system on 2nd fl.Details
revision pa#2012-08-06-6608. revise roof deck tile system to pedestal system on 2nd fl. | $5,000 |
| Nov 25, 2014 | Completed final sign-off Dec 2014 | 440 Davis St | apt 1214: replace countertop from wood to corean. replace kitchen sink. replace garbage disposal. replace faucet.Details
apt 1214: replace countertop from wood to corean. replace kitchen sink. replace garbage disposal. replace faucet. | $2,000 | |
| Nov 21, 2014 | Never finaled issued Dec 2014, no final | 1155 Bryant St | barrier removal for ada accessibility. add 2 doors at street level and alter one door to meet accessibility requirements.Details
barrier removal for ada accessibility. add 2 doors at street level and alter one door to meet accessibility requirements. | $50,000 | |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 661 Castro St | Lt Construction Inc | replace less than 50% repair dry rot. to comply complaint 201493131 items #2 and #3Details
replace less than 50% repair dry rot. to comply complaint 201493131 items #2 and #3 | $2,000 |
| Jun 20, 2014 | Never finaled issued Apr 2015, no final | 54 Commonwealth Av | Plath & Company Inc | rear horizontal extension @ 1st fl & 2nd fl; add (1)(n) dormer & enlarge (2) dormers @ roof, relocating entry stair & adding exterior stair to basement.Details
rear horizontal extension @ 1st fl & 2nd fl; add (1)(n) dormer & enlarge (2) dormers @ roof, relocating entry stair & adding exterior stair to basement. | $89,000 |
| Mar 14, 2014 | Completed final sign-off Nov 2016 | 1188 Noe St | Northpoint Builders | horizontal & vertical extension.1/fl-rear expansion convert kitchen,bedroom&office into a grt room w/kitchen,sitting&dinning areas.frt area remains as is.(n)2/fl-a stairway leads to 2 bedrooms(frt),a bathrm,laundry closet& a mstr bedrm(back) w/ bath, closet and a small back deck.Details
horizontal & vertical extension.1/fl-rear expansion convert kitchen,bedroom&office into a grt room w/kitchen,sitting&dinning areas.frt area remains as is.(n)2/fl-a stairway leads to 2 bedrooms(frt),a bathrm,laundry closet& a mstr bedrm(back) w/ bath, closet and a small back deck. | $600,000 |
| Feb 14, 2014 | Completed final sign-off Nov 2016 | 2744 Steiner St | Plath & Company Inc, Upscale Construction Inc. | dashed area only. see drawing. horizontal rear addition @ 1st & 2nd floor. 2 new dormers on south side & 1 dormer on the north side. all other work to be under a separate permit.Details
dashed area only. see drawing. horizontal rear addition @ 1st & 2nd floor. 2 new dormers on south side & 1 dormer on the north side. all other work to be under a separate permit. | $250,000 |
| Aug 14, 2007 | Expired or cancelled expired Feb 2021 | 450 Sutter St | unit #1412-demo ex. partition walls, suspended ceiling and floor finishes. all work in suite 1412 only. space to remain vacantDetails
unit #1412-demo ex. partition walls, suspended ceiling and floor finishes. all work in suite 1412 only. space to remain vacant | $12,000 | |
| Aug 14, 2007 | Completed final sign-off Nov 2007 | 440 Geary St | new cabinets, counter, equipment and lighting (replace old ones). this is (e) starbucks retail coffee shopDetails
new cabinets, counter, equipment and lighting (replace old ones). this is (e) starbucks retail coffee shop | $20,000 | |
| Feb 2, 2006 | Completed final sign-off Aug 2017 | 570 Jessie St | Transatlantic Construction Company | to erect 8 story, 47 condo unitsDetails
to erect 8 story, 47 condo units | $4,000,000 |
| Jul 6, 2005 | Never finaled issued Aug 2005, no final | 3430 Geary Bl | proposed voluntary structural reinforcement.no exterior work.Details
proposed voluntary structural reinforcement.no exterior work. | $20,000 |