H D Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2025
- Last 24 months
- 2 permits filed
211 permits since 2000: 167 completed, 1 in progress, 28 never finaled, 15 expired or cancelled.
Of the 28 never-finaled permits, 7 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 211.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 27, 2025 | Completed final sign-off Mar 2025 | 1616 Taylor St | revision to permits 201803133492 and 202412136811. revise unit a and unit b layout. interior layout only. 11 (e) + (n) 3 adu'sDetails
revision to permits 201803133492 and 202412136811. revise unit a and unit b layout. interior layout only. 11 (e) + (n) 3 adu's | |
| Dec 13, 2024 | Completed final sign-off Mar 2025 | 1616 Taylor St | revision to approved bpa#201803133492 revise interior layouts.Details
revision to approved bpa#201803133492 revise interior layouts. | |
| Sep 19, 2024 | In progress issued Sep 2024 | 1416 Powell St | to revise pa# 201509157040: showing ada door to setbarck from e) 2'4" to n) 5'4" inside the building & swing outwardDetails
to revise pa# 201509157040: showing ada door to setbarck from e) 2'4" to n) 5'4" inside the building & swing outward | $5,000 |
| Sep 5, 2024 | Completed final sign-off Dec 2024 | 1209 Vicente St | unit 2- repair balcony leaks at the (back) of building and paint building . less than 50%.Details
unit 2- repair balcony leaks at the (back) of building and paint building . less than 50%. | $2,500 |
| Jul 29, 2024 | Completed final sign-off Feb 2025 | 2619 24th Av | to comply with nov# 202422926, document replacement of old rotten wood windows to double clear glass window in anodized aluminum clad wood frame; document modified stucco facade due to extensive dry rot found during construction; install 2 new one hour parapet wall to address the 2 relocate skylightDetails
to comply with nov# 202422926, document replacement of old rotten wood windows to double clear glass window in anodized aluminum clad wood frame; document modified stucco facade due to extensive dry rot found during construction; install 2 new one hour parapet wall to address the 2 relocate skylight | $3,000 |
| Mar 28, 2024 | Completed final sign-off Jun 2024 | 2339 Taraval St | administrative permit to recird 3-unit front building with address of 2339 (1st floor) 2341 (2nd floor) and 2343 (3rd floor). ref pa# 2015-0828-5547 s2 and pa# 2020-0925-4961. permit to convert commercial to adu.Details
administrative permit to recird 3-unit front building with address of 2339 (1st floor) 2341 (2nd floor) and 2343 (3rd floor). ref pa# 2015-0828-5547 s2 and pa# 2020-0925-4961. permit to convert commercial to adu. | |
| Feb 21, 2023 | Completed final sign-off Dec 2024 | 1906 Greenwich St | revision to permit 202103317642. 1/f: reconfigure laundry and keep (e) rear door. 2/f: reconfigure half bath and closet. 3/f: reconfigure bathroom and closet, and replace windows.Details
revision to permit 202103317642. 1/f: reconfigure laundry and keep (e) rear door. 2/f: reconfigure half bath and closet. 3/f: reconfigure bathroom and closet, and replace windows. | |
| Feb 17, 2023 | Completed final sign-off Jun 2023 | 3015 23rd Av | revision to pa#202008071320 to move proposed front windows to north side facade.Details
revision to pa#202008071320 to move proposed front windows to north side facade. | $3,000 |
| Apr 22, 2022 | Completed final sign-off Nov 2023 | 1746 36th Av | addition of one adu unit at the first floor per the local adu program. the project also proposes to enlarge the sliding doors in the rear bedrooms at the second floor.Details
addition of one adu unit at the first floor per the local adu program. the project also proposes to enlarge the sliding doors in the rear bedrooms at the second floor. | $80,000 |
| Mar 9, 2022 | Completed final sign-off Mar 2025 | 1616 Taylor St | addition of one adu unit at the second floor per the local adu program. 3 adus added under the issued pa#201803133492.Details
addition of one adu unit at the second floor per the local adu program. 3 adus added under the issued pa#201803133492. | $150,000 |
| Feb 24, 2022 | Completed final sign-off Dec 2023 | 399 Winding Wy | kitchen and bath remodel, add 1 bath to 2nd fl. legalize 2 bedrooms, 1 bath on gr level and reconfigure gr fl. replace all existing windows in kindDetails
kitchen and bath remodel, add 1 bath to 2nd fl. legalize 2 bedrooms, 1 bath on gr level and reconfigure gr fl. replace all existing windows in kind | $30,000 |
| Apr 14, 2021 | Completed final sign-off Nov 2023 | 1746 36th Av | 1st fl: turn (e) recreation room & powder room into 2 bedrooms, 2 bathrooms, closets & 1 entertainment room with wet bar. 2nd fl: reconfigure layout with 2 bedrooms, 2 wic, 2 bathrooms, 1 powder room, kitchen, dining & living room. (n) interior staircase. eliminate light court. (n) rear deck w/stairDetails
1st fl: turn (e) recreation room & powder room into 2 bedrooms, 2 bathrooms, closets & 1 entertainment room with wet bar. 2nd fl: reconfigure layout with 2 bedrooms, 2 wic, 2 bathrooms, 1 powder room, kitchen, dining & living room. (n) interior staircase. eliminate light court. (n) rear deck w/stair | $80,000 |
| Apr 12, 2021 | Completed final sign-off Apr 2022 | 1616 Taylor St | unit #3: kitchen & bathroom remodel in kind.Details
unit #3: kitchen & bathroom remodel in kind. | $20,000 |
| Mar 31, 2021 | Completed final sign-off Dec 2024 | 1906 Greenwich St | add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor.Details
add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor. | $280,000 |
| Feb 8, 2021 | Completed final sign-off Dec 2021 | 191 Tioga Av | rev to pa200412131318: basement-turn storage room into office.turn powder room into 3-fixtures bath.reconfig interior stairs.1/f:add 1 3-fixture full bathroom. relocate furnace water heater location./2/f: add 2 3-fixture full bathrooms. turn office into study room.Details
rev to pa200412131318: basement-turn storage room into office.turn powder room into 3-fixtures bath.reconfig interior stairs.1/f:add 1 3-fixture full bathroom. relocate furnace water heater location./2/f: add 2 3-fixture full bathrooms. turn office into study room. | $10,000 |
| Oct 3, 2020 | Completed final sign-off Aug 2023 | 2619 24th Av | a.d.u. on 1st floor per ordinance 162-62 include living room, bedroom, game room, kitchen and one 3-fixture bathroom.Details
a.d.u. on 1st floor per ordinance 162-62 include living room, bedroom, game room, kitchen and one 3-fixture bathroom. | $30,000 |
| Sep 25, 2020 | Completed final sign-off Jun 2024 | 2339 Taraval St | revision to approved permit application #2015-0828-5547 for front building. convert ground floor commercial to accessory dwelling unit per ordinance no. 116-19. no structural work.Details
revision to approved permit application #2015-0828-5547 for front building. convert ground floor commercial to accessory dwelling unit per ordinance no. 116-19. no structural work. | $15,000 |
| Sep 24, 2020 | Never finaled issued Jun 2021, no final | 1416 Powell St | revision to pa 201509157040. revised shear wall at grid line e.Details
revision to pa 201509157040. revised shear wall at grid line e. | $2,000 |
| Sep 9, 2020 | Completed final sign-off Apr 2023 | 68 05th Av | remove fireplace chimney to roof in family rm. remodel 2nd fl unit with open kitchen. remodel bathroom, add 2 bathrooms. new lighting outlets, recondition windows. new heat pump in remodel unit 68.Details
remove fireplace chimney to roof in family rm. remodel 2nd fl unit with open kitchen. remodel bathroom, add 2 bathrooms. new lighting outlets, recondition windows. new heat pump in remodel unit 68. | $100,000 |
| Sep 9, 2020 | Completed final sign-off Apr 2023 | 68 05th Av | reconfigure front entries to be 68 & 70 5th ave. create enlarged entry arch. two new entry doors w/transom. raise sill and replace three front wood windows to lower unit 70. new footing + framing. replace railing and shingles in kind as required.Details
reconfigure front entries to be 68 & 70 5th ave. create enlarged entry arch. two new entry doors w/transom. raise sill and replace three front wood windows to lower unit 70. new footing + framing. replace railing and shingles in kind as required. | $20,000 |
| Aug 7, 2020 | Completed final sign-off Jun 2023 | 3015 23rd Av | interior remodel and addition to an existing single family residence. project scope includes new walls at the lower floor plan, new staircase.Details
interior remodel and addition to an existing single family residence. project scope includes new walls at the lower floor plan, new staircase. | $450,000 |
| Dec 2, 2019 | Completed final sign-off Jan 2020 | 571 18th Av | revision to bpa# 2016-1025-1093. remove nfpa fire sprinker requirement on the approved pan sheet a1.0 per dbi information sheet no. fs-03, dated july 20, 2015, and sec. of 2016 sfbc. proposed building had no change on exterior dimensions from (e) bldg.Details
revision to bpa# 2016-1025-1093. remove nfpa fire sprinker requirement on the approved pan sheet a1.0 per dbi information sheet no. fs-03, dated july 20, 2015, and sec. of 2016 sfbc. proposed building had no change on exterior dimensions from (e) bldg. | |
| Sep 4, 2019 | Completed final sign-off Mar 2022 | 1209 Vicente St | unit 3: repair dry rot and leak at roof. deck and lightwell. (non street facing) repair in kindDetails
unit 3: repair dry rot and leak at roof. deck and lightwell. (non street facing) repair in kind | $2,000 |
| Jul 30, 2019 | Completed final sign-off Jan 2024 | 2337 Taraval St | rear building. interior remodel on 2nd & 3rd floors. add 43 sq. ft. on 2nd floor. first floor legalization under separate pa# 2019/07/30/7285.Details
rear building. interior remodel on 2nd & 3rd floors. add 43 sq. ft. on 2nd floor. first floor legalization under separate pa# 2019/07/30/7285. | $23,300 |
| Jul 15, 2019 | Completed final sign-off Apr 2023 | 70 05th Av | strl modification to add parking. enclose open artea below 2nd flr sunroom as new lv rm. remove 7o 5th ave kit wall to din/liv rm. upgrade bathrm 70a 5th ave and remodel unit. new lighting upgrade ele service & seperate meters. radiant flr. replace windowsDetails
strl modification to add parking. enclose open artea below 2nd flr sunroom as new lv rm. remove 7o 5th ave kit wall to din/liv rm. upgrade bathrm 70a 5th ave and remodel unit. new lighting upgrade ele service & seperate meters. radiant flr. replace windows | $155,000 |
| Apr 29, 2019 | Completed final sign-off Jun 2019 | 1213 Vicente St | repair drywall in office rooms and pint. replace air conditioner and ventilation duct. under a separate permit.Details
repair drywall in office rooms and pint. replace air conditioner and ventilation duct. under a separate permit. | $8,000 |
| Dec 5, 2018 | Never finaled issued Dec 2018, no final | 701 Taraval St | street spaceDetails
street space | |
| Oct 3, 2018 | Completed final sign-off Jan 2019 | 50 27th Av | revise approved bldg 201301077317 to utilize poured concrete instead of shotcrete, and to revise steel beam to wood. remove special inspection of 5a and #12. add special inspection #1. strucural only. no change to floor plans, elevations, mechDetails
revise approved bldg 201301077317 to utilize poured concrete instead of shotcrete, and to revise steel beam to wood. remove special inspection of 5a and #12. add special inspection #1. strucural only. no change to floor plans, elevations, mech | |
| Jun 7, 2018 | Never finaled issued Jul 2018, no final | 701 Taraval St | revise approved plan for new soil report app 201406067695Details
revise approved plan for new soil report app 201406067695 | |
| Apr 25, 2018 | Completed final sign-off May 2020 | 4200 Mission St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201804186708Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201804186708 | $1,000 |
| Apr 18, 2018 | Completed final sign-off May 2020 | 4200 Mission St | residential - soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4. commercial soft story under pa 201804257419Details
residential - soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4. commercial soft story under pa 201804257419 | $20,000 |
| Apr 16, 2018 | Completed final sign-off Apr 2018 | 2877 California St | to obtain final inspection for work approved under pa # 201611042054. all work is complete.Details
to obtain final inspection for work approved under pa # 201611042054. all work is complete. | |
| Mar 13, 2018 | Completed final sign-off Mar 2025 | 1616 Taylor St | (3) (n) dwelling units in (e) 11-unit building. reconfigure interior stairs. sprinklers under separate permitDetails
(3) (n) dwelling units in (e) 11-unit building. reconfigure interior stairs. sprinklers under separate permit | $500,000 |
| Oct 13, 2017 | Completed final sign-off Apr 2018 | 2879 California St | repair deck and wood stairs dryrot less than 50%. repair balcony leak in 2nd and 3rd floor. replace dryrot, siding and wood at house. like for like siding. not visible from street.Details
repair deck and wood stairs dryrot less than 50%. repair balcony leak in 2nd and 3rd floor. replace dryrot, siding and wood at house. like for like siding. not visible from street. | $18,000 |
| Aug 24, 2017 | Completed final sign-off Dec 2017 | 618 17th Av | revision to pa #201309126618 - to eliminate 3 property line windows & finalize the other 5 property line windows. details no change, shall follow previous approved pa #201309126618.Details
revision to pa #201309126618 - to eliminate 3 property line windows & finalize the other 5 property line windows. details no change, shall follow previous approved pa #201309126618. | |
| Jun 22, 2017 | Completed final sign-off Nov 2017 | 2619 24th Av | relocate interior doors on 1st floor per plan, push (e) garage door towards the st by 1 ft to create legal parking space for compact car only o n 1st floor; replace window with full light door to create lightwell access on 1st fl per planDetails
relocate interior doors on 1st floor per plan, push (e) garage door towards the st by 1 ft to create legal parking space for compact car only o n 1st floor; replace window with full light door to create lightwell access on 1st fl per plan | $3,000 |
| May 15, 2017 | Completed final sign-off Mar 2018 | 2322 40th Av | 2/f-relocate 1 bath, remodel bath, add 3 bedrms & theater, rebuild int stair. g/f- add pwdr rm,relocate kit, liv & dinrm, new foyer & sheetrock garage. ext-build n 9'-0" tall deck. replace patio door @ rear. enclose (e) stair well. add 1 new skylt. replace 2 vinyl wind in-kind add patio dr @ rearDetails
2/f-relocate 1 bath, remodel bath, add 3 bedrms & theater, rebuild int stair. g/f- add pwdr rm,relocate kit, liv & dinrm, new foyer & sheetrock garage. ext-build n 9'-0" tall deck. replace patio door @ rear. enclose (e) stair well. add 1 new skylt. replace 2 vinyl wind in-kind add patio dr @ rear | $130,000 |
| May 12, 2017 | Completed final sign-off Jun 2017 | 1213 Vicente St | add ventilation exhaust fan to office on mezzanine per plan.Details
add ventilation exhaust fan to office on mezzanine per plan. | $5,000 |
| May 8, 2017 | Completed final sign-off Jun 2017 | 290 Valdez Av | repair outside the stairs leak dryrot and repair stucco wall dryrot - not visible from street. less than 50%, repair in kind.Details
repair outside the stairs leak dryrot and repair stucco wall dryrot - not visible from street. less than 50%, repair in kind. | $3,000 |
| Mar 21, 2017 | Completed final sign-off Nov 2017 | 2619 24th Av | enlarge parking space on 1st floor to comply complaint #201767806. under cantilever w/in (e) bldg envelope. recessed garage to be maintained.Details
enlarge parking space on 1st floor to comply complaint #201767806. under cantilever w/in (e) bldg envelope. recessed garage to be maintained. | $10,000 |
| Feb 7, 2017 | Completed final sign-off Nov 2017 | 2619 24th Av | reinforce (e) foundation along southerly side foundtaionDetails
reinforce (e) foundation along southerly side foundtaion | $10,000 |
| Jan 19, 2017 | Completed final sign-off Jan 2018 | 301 18th Av | soft story retrofit: comply with san francisco wood frame seismic retrofit program (soft story), sfbc hapter 34b, per 2012 iebc, appendix a-4.Details
soft story retrofit: comply with san francisco wood frame seismic retrofit program (soft story), sfbc hapter 34b, per 2012 iebc, appendix a-4. | $50,000 |
| Jan 3, 2017 | Completed final sign-off Nov 2017 | 2619 24th Av | remodel (e) 2 bathrooms, (3) bedrooms & 1 (e) kitchen, living room and dining room on 1st floor; remove and recycle molding casing and trims, remove and recycle interior door and plumbing fixtures and kitchen appliances.Details
remodel (e) 2 bathrooms, (3) bedrooms & 1 (e) kitchen, living room and dining room on 1st floor; remove and recycle molding casing and trims, remove and recycle interior door and plumbing fixtures and kitchen appliances. | $28,000 |
| Nov 16, 2016 | Never finaled issued Nov 2016, no final | 2648 26th Av | repair roof leak dryrot, repair stucco wal dryrot, repair balcony leak in south side & in front of house, repair window moulding & column in front of house. repair work onlyDetails
repair roof leak dryrot, repair stucco wal dryrot, repair balcony leak in south side & in front of house, repair window moulding & column in front of house. repair work only | $5,000 |
| Nov 14, 2016 | Completed final sign-off Aug 2020 | 2511 Sacramento St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $20,000 |
| Nov 4, 2016 | Expired or cancelled expired Apr 2018 | 2877 California St | repair the roof, stucco wall, window of the back yard storage which was damaged by the removal of the dead tree at the yard. the dead tree was ordered by dpw director. no visible from streetDetails
repair the roof, stucco wall, window of the back yard storage which was damaged by the removal of the dead tree at the yard. the dead tree was ordered by dpw director. no visible from street | $2,500 |
| Oct 28, 2016 | Completed final sign-off Jun 2021 | 18 Turk Murphy Ln | erect 4 stories 6 dwelling units.type 5 building.Details
erect 4 stories 6 dwelling units.type 5 building. | $800,000 |
| Oct 25, 2016 | Completed final sign-off Jan 2020 | 571 18th Av | infill (e) lightwell @ south of property on 2nd & 3rd flr. rearrange interior layout for 571 18th ave on 1st & 2nd flr. rearrange interior layout for 573 18th ave on 3rd flr. provide sprinkler for entire building.Details
infill (e) lightwell @ south of property on 2nd & 3rd flr. rearrange interior layout for 571 18th ave on 1st & 2nd flr. rearrange interior layout for 573 18th ave on 3rd flr. provide sprinkler for entire building. | $30,000 |
| Sep 22, 2016 | Completed final sign-off Oct 2016 | 618 17th Av | pre-construction investigation of (e) plumbing, electrical and structural system for pa # 201309126618 (site permit issued). remove sheetrock for exploratory demo only. exploratory investigation of (e) foundation. remove and salvage all cabinets, plumbing and electrical fixtures for re-use.Details
pre-construction investigation of (e) plumbing, electrical and structural system for pa # 201309126618 (site permit issued). remove sheetrock for exploratory demo only. exploratory investigation of (e) foundation. remove and salvage all cabinets, plumbing and electrical fixtures for re-use. | $5,500 |
| Apr 28, 2016 | Completed final sign-off Feb 2019 | 470 11th Av | legalize unit on 1st floor w/ 2 bedrooms, 1 kitchen & 1 full bathroom. fire sprinkler under seperate permit.Details
legalize unit on 1st floor w/ 2 bedrooms, 1 kitchen & 1 full bathroom. fire sprinkler under seperate permit. | $10,000 |
| Jan 19, 2016 | Completed final sign-off Aug 2016 | 295 Monterey Bl | soft story program swismic retrofit 2012 iebc a4Details
soft story program swismic retrofit 2012 iebc a4 | $20,000 |
| Dec 29, 2015 | Completed final sign-off Jan 2020 | 571 18th Av | site verification for light well existance per plan. to comply with complaint # 201583071. in reference to bpa# 201504093201. documentation of (e) lightwell at 3rd floor level only.Details
site verification for light well existance per plan. to comply with complaint # 201583071. in reference to bpa# 201504093201. documentation of (e) lightwell at 3rd floor level only. | |
| Dec 29, 2015 | Completed final sign-off Mar 2017 | 290 Valdez Av | turn (e)storage to 1 bedrm & family rm on 1st flr,add wet bar,1 bedrm & full bath on 1st flr,relocate interior stairs,add balcony @rear,bathrm & kitchen remodel on 2nd flr,add skylite on 2nd flr.change window, u=.32Details
turn (e)storage to 1 bedrm & family rm on 1st flr,add wet bar,1 bedrm & full bath on 1st flr,relocate interior stairs,add balcony @rear,bathrm & kitchen remodel on 2nd flr,add skylite on 2nd flr.change window, u=.32 | $50,000 |
| Dec 18, 2015 | Completed final sign-off Oct 2016 | 263 Ralston St | remodel (e) bathrooms, (e) bedrooms, (e) kitchen, (e0 living room, (e) dining room and stairway. exploratory demolition only.Details
remodel (e) bathrooms, (e) bedrooms, (e) kitchen, (e0 living room, (e) dining room and stairway. exploratory demolition only. | $8,000 |
| Oct 28, 2015 | Never finaled issued Nov 2015, no final | 1424 Pacific Av | underpinning foundation along east side of property line. n/a for maherDetails
underpinning foundation along east side of property line. n/a for maher | $10,000 |
| Oct 28, 2015 | Completed final sign-off Mar 2017 | 1418 Pacific Av | underpinning foundation along west side of property line. n/a for maher. ref #2015-1028-1042Details
underpinning foundation along west side of property line. n/a for maher. ref #2015-1028-1042 | $10,000 |
| Sep 14, 2015 | Completed final sign-off Nov 2016 | 217 Holloway Av | remodel kitchen bathroom, and repair dry-rot.Details
remodel kitchen bathroom, and repair dry-rot. | $5,000 |
| Sep 1, 2015 | Completed final sign-off Mar 2017 | 290 Valdez Av | 1) remodel in unit, interior walls, trims, remove and repolce interior doors and plumbing fixtures, kitchen appliances & bathrooms. 2) repair dryrot and stucco.Details
1) remodel in unit, interior walls, trims, remove and repolce interior doors and plumbing fixtures, kitchen appliances & bathrooms. 2) repair dryrot and stucco. | $30,000 |
| Aug 28, 2015 | Completed final sign-off Jun 2024 | 2337 Taraval St | erect 3 stories of 2 dwelling units, type 5 construction w/ commercial space.Details
erect 3 stories of 2 dwelling units, type 5 construction w/ commercial space. | $300,000 |
| Aug 10, 2015 | Completed final sign-off Jan 2020 | 571 18th Av | 1) kitchen remodel & bathroom remodel on 1st floor level. 2) interior remodel on 2nd & 3rd floor level. interior remodel within inside dwelling units only per plan. stucco repair only.Details
1) kitchen remodel & bathroom remodel on 1st floor level. 2) interior remodel on 2nd & 3rd floor level. interior remodel within inside dwelling units only per plan. stucco repair only. | $60,000 |
| Aug 5, 2015 | Completed final sign-off Jan 2020 | 571 18th Av | replace foundation oer plan - north side approx 39'-0". comply with complaint 205 55 031Details
replace foundation oer plan - north side approx 39'-0". comply with complaint 205 55 031 | $5,000 |
| Jun 30, 2015 | Never finaled issued Jun 2015, no final | 571 18th Av | revision to app#201506037894, revised foundation detail at 1/s1.o. scope of work: to comply with complaint #201550281. 1)soft demolition, remove and recycle moldings, casing and trims. remove and recycle interior doors and plmg fixtures and kitchen appliances. 2) foundation replace per plan.Details
revision to app#201506037894, revised foundation detail at 1/s1.o. scope of work: to comply with complaint #201550281. 1)soft demolition, remove and recycle moldings, casing and trims. remove and recycle interior doors and plmg fixtures and kitchen appliances. 2) foundation replace per plan. | |
| Jun 17, 2015 | Completed final sign-off Aug 2016 | 69 Forest Side Av | replace foundation per plan.Details
replace foundation per plan. | $30,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 571 18th Av | to comply w/ complaint# 201550281. soft demo remove and recycle mouldings, casing and trim. remove and recycle interior doors and plumbing fixtures kitchen appliances. replace foundation per plan.Details
to comply w/ complaint# 201550281. soft demo remove and recycle mouldings, casing and trim. remove and recycle interior doors and plumbing fixtures kitchen appliances. replace foundation per plan. | $8,000 |
| Jun 1, 2015 | Completed final sign-off Sep 2015 | 470 11th Av | add two bedrooms, one powder, one media/entertainment room on 1st floor per plan for unit 470 - 11th ave.Details
add two bedrooms, one powder, one media/entertainment room on 1st floor per plan for unit 470 - 11th ave. | $20,000 |
| Apr 9, 2015 | Completed final sign-off Jan 2020 | 571 18th Av | remodel (e) 4 bathrooms, (e) 4 bedrooms, (e) kitchen. living room and dining room in first floor and second floor. repair dry rot at lightwell. in-kind repair.Details
remodel (e) 4 bathrooms, (e) 4 bedrooms, (e) kitchen. living room and dining room in first floor and second floor. repair dry rot at lightwell. in-kind repair. | $68,000 |
| Mar 17, 2015 | Completed final sign-off Sep 2015 | 470 11th Av | remodel 4 bathrooms, 6 bedrooms, 2 kitchens & 2 living rooms & 2 dining rooms in first floor & 2nd fl. electrical & plumbing upgrades. replacing all sheetrock with 5/8" type x gympsum wall board. no changes to layout, no walls moved, removed or added.Details
remodel 4 bathrooms, 6 bedrooms, 2 kitchens & 2 living rooms & 2 dining rooms in first floor & 2nd fl. electrical & plumbing upgrades. replacing all sheetrock with 5/8" type x gympsum wall board. no changes to layout, no walls moved, removed or added. | $125,000 |
| Feb 17, 2015 | Never finaled issued Feb 2015, no final | 436 Carl St | remodel (e) 2 bathrooms and (e) kitchen cabinets, change hardwood floors, unit #436.Details
remodel (e) 2 bathrooms and (e) kitchen cabinets, change hardwood floors, unit #436. | $13,000 |
| Feb 17, 2015 | Completed final sign-off Apr 2015 | 1446 Leavenworth St | to comply with nov #201524561 repair drainage pipes at extension. repair dryrot at bathroom. paint exterior.Details
to comply with nov #201524561 repair drainage pipes at extension. repair dryrot at bathroom. paint exterior. | $12,000 |
| Feb 12, 2015 | Completed final sign-off Feb 2015 | 831 32nd Av | add utility/landry room on 1st fl per planDetails
add utility/landry room on 1st fl per plan | $3,500 |
| Jan 14, 2015 | Completed final sign-off Apr 2016 | 238 Wilde Av | add bedroom, family room and 2-1/2/bathrooms per plan. to comply with complaint #201517151Details
add bedroom, family room and 2-1/2/bathrooms per plan. to comply with complaint #201517151 | $35,000 |
| Jan 12, 2015 | Never finaled issued Jan 2015, no final | 1695 25th Av | repair of roof plywood & dry rot.Details
repair of roof plywood & dry rot. | $3,000 |
| Jan 8, 2015 | Completed final sign-off Jul 2015 | 531 Taraval St | convert (e) retail to dwelling unit on 1st floor per plan. sprinklers under separate permit.Details
convert (e) retail to dwelling unit on 1st floor per plan. sprinklers under separate permit. | $50,000 |
| Nov 6, 2014 | Never finaled issued Nov 2014, no final | 162 Brewster St | repair spiral stair at rear at property more than 50% per plan.Details
repair spiral stair at rear at property more than 50% per plan. | $1,000 |
| Oct 23, 2014 | Never finaled issued Nov 2014, no final | 162 Brewster St | revision to pa# 200607106046. relocate entry door per plan.Details
revision to pa# 200607106046. relocate entry door per plan. | $5,000 |
| Sep 12, 2014 | Completed final sign-off Feb 2015 | 831 32nd Av | pa# 201406259504 has been under valued, increase by $30000Details
pa# 201406259504 has been under valued, increase by $30000 | $30,000 |
| Sep 12, 2014 | Never finaled issued Sep 2014, no final | 831 32nd Av | pa# 201407231992 has been under valued, increase by $50000.Details
pa# 201407231992 has been under valued, increase by $50000. | $50,000 |
| Jul 23, 2014 | Completed final sign-off Feb 2015 | 831 32nd Av | add 1 bedroom, 1 bath, 1 great room on the 1st fl per plan.Details
add 1 bedroom, 1 bath, 1 great room on the 1st fl per plan. | $50,000 |
| Jun 25, 2014 | Completed final sign-off Feb 2015 | 831 32nd Av | remodel extg 2 bathrooms, extg 3 bedrooms and kitchen, living room and dining room.Details
remodel extg 2 bathrooms, extg 3 bedrooms and kitchen, living room and dining room. | $35,000 |
| Jun 9, 2014 | Completed final sign-off Apr 2019 | 1213 Vicente St | remodel one bathroom on mezzanine per planDetails
remodel one bathroom on mezzanine per plan | $5,000 |
| Jun 6, 2014 | Completed final sign-off Aug 2020 | 701 Taraval St | erect 4 story 3 units condo, no basement & commercial building.Details
erect 4 story 3 units condo, no basement & commercial building. | $1,200,000 |
| Jun 6, 2014 | Never finaled issued May 2017, no final | 701 Taraval St | demolish one story, type 5-b, commercial dry cleaner building.Details
demolish one story, type 5-b, commercial dry cleaner building. | $5,000 |
| Jun 5, 2014 | Completed final sign-off Jun 2015 | 3125 Folsom St | add two bedrooms, three half baths, laundry and great room on 1st floor per plan.Details
add two bedrooms, three half baths, laundry and great room on 1st floor per plan. | $50,000 |
| May 29, 2014 | Completed final sign-off Apr 2016 | 238 Wilde Av | to complete work and obtain final inspection for work approved under pa# 201109154671Details
to complete work and obtain final inspection for work approved under pa# 201109154671 | $500 |
| May 6, 2014 | Completed final sign-off Nov 2014 | 3125 Folsom St | add 2 layers of 5/8" type x gb on pl walls of bsmt, 1st & 2nd floors along the north side of the bldg including attic area.Details
add 2 layers of 5/8" type x gb on pl walls of bsmt, 1st & 2nd floors along the north side of the bldg including attic area. | $3,800 |
| May 6, 2014 | Never finaled issued May 2014, no final | 177 Inverness Dr | replace (e) 3/4 gas pipe for pg&e.Details
replace (e) 3/4 gas pipe for pg&e. | $500 |
| Apr 16, 2014 | Expired or cancelled cancelled Jan 2026 | 238 Wilde Av | replace front stairsDetails
replace front stairs | $8,800 |
| Apr 2, 2014 | Completed final sign-off Apr 2014 | 1767 08th Av | to comply with complaint #201446030 - add new decking on (e) roof per planDetails
to comply with complaint #201446030 - add new decking on (e) roof per plan | $10,000 |
| Mar 31, 2014 | Completed final sign-off Dec 2014 | 2224 Castro St | to obtain final inspection for work approved under pa # 200508251198. all work is complete. additional dwelling unit added on pa # 200508251198.Details
to obtain final inspection for work approved under pa # 200508251198. all work is complete. additional dwelling unit added on pa # 200508251198. | |
| Mar 31, 2014 | Completed final sign-off Aug 2015 | 2224 Castro St | to obtain final inspection for work approved under pa # 200411108935. all work is complete.Details
to obtain final inspection for work approved under pa # 200411108935. all work is complete. | |
| Mar 19, 2014 | Expired or cancelled expired Mar 2022 | 2040 Mission St | to comply with nov. #201306851. remove existing gas stoves, cut off/out gas pipe. at community kitchen, provide and install electrical wiring for community kitchens.Details
to comply with nov. #201306851. remove existing gas stoves, cut off/out gas pipe. at community kitchen, provide and install electrical wiring for community kitchens. | $2,600 |
| Mar 17, 2014 | Never finaled issued Mar 2014, no final | 1209 Vicente St | complaint 201457681 - repair water darin at g/f garage; repair dryrot and leak at 2/f roof deckDetails
complaint 201457681 - repair water darin at g/f garage; repair dryrot and leak at 2/f roof deck | $1,800 |
| Mar 17, 2014 | Completed final sign-off Nov 2014 | 3125 Folsom St | remodel (e) bathroom and (e) kitchen and water station, and laundry on 1/f, & 2/f, and 3/f; to comply with cec150(k) 8 & 10Details
remodel (e) bathroom and (e) kitchen and water station, and laundry on 1/f, & 2/f, and 3/f; to comply with cec150(k) 8 & 10 | $25,000 |
| Dec 19, 2013 | Completed final sign-off Feb 2014 | 3575 Keith St | revision to bpa#201305106597. rearrange rooms. no structural works per plan.Details
revision to bpa#201305106597. rearrange rooms. no structural works per plan. | |
| Nov 22, 2013 | Completed final sign-off Mar 2014 | 186 Sagamore St | legalize one bedroom, two bathrooms, great room and laundry room on 1st flr to comply with complaint 201336351Details
legalize one bedroom, two bathrooms, great room and laundry room on 1st flr to comply with complaint 201336351 | $48,000 |
| Sep 26, 2013 | Completed final sign-off Jul 2014 | 555 46th Av | replace 3 french windows in front of building on the upper level within existing opennings, same style and same opennings, with wood aluminum clad windows. u < 0.4Details
replace 3 french windows in front of building on the upper level within existing opennings, same style and same opennings, with wood aluminum clad windows. u < 0.4 | $1,500 |
| Sep 12, 2013 | Completed final sign-off Jan 2018 | 618 17th Av | rear horizontal & vertical addition, additional unit, addition bathrooms & bedrooms.Details
rear horizontal & vertical addition, additional unit, addition bathrooms & bedrooms. | $10,000 |
| Sep 12, 2013 | Completed final sign-off May 2014 | 1537 Ulloa St | 1)add 2 bedrooms, 2 bathrooms, laundry room, mud room, office on 1st floor per plan. 2)add deck at rear on 2nd floor per plan.Details
1)add 2 bedrooms, 2 bathrooms, laundry room, mud room, office on 1st floor per plan. 2)add deck at rear on 2nd floor per plan. | $50,000 |
| Sep 5, 2013 | Never finaled issued Sep 2013, no final | 1655 10th Av | add 1 bedroom & 1 bathroom on 1st floor per plan (garage level). additional space belongs to 2nd floor unit.Details
add 1 bedroom & 1 bathroom on 1st floor per plan (garage level). additional space belongs to 2nd floor unit. | $48,000 |
| Aug 8, 2013 | Completed final sign-off Mar 2014 | 2762 40th Av | add one bedroom, storage and power room on 2nd floor per plan. add two bedrooms, home office, launry room & three bathrooms on 1st floor per plan. repair deck at rear (less than 50%).Details
add one bedroom, storage and power room on 2nd floor per plan. add two bedrooms, home office, launry room & three bathrooms on 1st floor per plan. repair deck at rear (less than 50%). | $58,000 |