Block 0147, lot 014
1422 Powell St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 8
- Rooms
- 10 bathrooms
- Building
- 9,950 sq ft
- Lot
- 3,600 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 1422 Powell St | interior remodel in the 2nd floor on existing unit.Details
interior remodel in the 2nd floor on existing unit. | $40,000 | |
| Mar 20, 2026 | In progress issued Mar 2026 | 1416 Powell St | Sincere Construction Company Inc | revision to pa# 201509157040: revise layout of accessible doors. install power door in the front door. ref 202409191213Details
revision to pa# 201509157040: revise layout of accessible doors. install power door in the front door. ref 202409191213 | $8,000 |
| Dec 23, 2024 | Completed final sign-off Jan 2025 | 1422 Powell St | Crime Watch Security Sys Llc | upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1 | $30,900 |
| Sep 19, 2024 | In progress issued Sep 2024 | 1416 Powell St | H D Construction Company | to revise pa# 201509157040: showing ada door to setbarck from e) 2'4" to n) 5'4" inside the building & swing outwardDetails
to revise pa# 201509157040: showing ada door to setbarck from e) 2'4" to n) 5'4" inside the building & swing outward | $5,000 |
| May 11, 2022 | Completed final sign-off Jul 2022 | 1422 Powell St | Alex He General Construction | unit 3: one partial bathroom remodel: new prefabricated shower pan and shower door. new stone in shower enclosure. replace old dry rotted wood studs on on sidee of a wall.Details
unit 3: one partial bathroom remodel: new prefabricated shower pan and shower door. new stone in shower enclosure. replace old dry rotted wood studs on on sidee of a wall. | $6,000 |
| May 9, 2022 | Expired or cancelled cancelled Jan 2026 | 1422 Powell St | Parkson Construction Company | install drywall in bathroomDetails
install drywall in bathroom | $8,000 |
| Mar 17, 2021 | Expired or cancelled cancelled Jan 2026 | 1422 Powell St | Ryz Construction Inc | unit #8: interior remodel of kitchen, bathroom, add a bathroom. on 2nd fl.Details
unit #8: interior remodel of kitchen, bathroom, add a bathroom. on 2nd fl. | $58,000 |
| Sep 24, 2020 | Never finaled issued Jun 2021, no final | 1416 Powell St | H D Construction Company | revision to pa 201509157040. revised shear wall at grid line e.Details
revision to pa 201509157040. revised shear wall at grid line e. | $2,000 |
| Sep 15, 2015 | Never finaled issued May 2020, no final | 1416 Powell St | soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. seismic retrofit. ada upgrade @ the entry on ground floor only. ** maher: compliance with ordinance no# 155-13 not required **Details
soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. seismic retrofit. ada upgrade @ the entry on ground floor only. ** maher: compliance with ordinance no# 155-13 not required ** | $100,000 | |
| May 5, 2015 | Completed final sign-off May 2015 | 1416 Powell St | 328 Construction | per nov 201539331; repair damaged by fire about 200 sq.ft. on external wall @ rear of building.Details
per nov 201539331; repair damaged by fire about 200 sq.ft. on external wall @ rear of building. | $5,000 |
| Jul 25, 2012 | Never finaled issued Jul 2012, no final | 1416 Powell St | Star Plumbing & Fire Const Co. | upgrade fire suppression system to ul 300.Details
upgrade fire suppression system to ul 300. | $5,000 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 1416 Powell St | Star Plumbing & Fire Const Co. | 1. replace existing hood canopy with new stainless hood canopy. 2. install (1) new hand sink, replacement existing 3 compartment sink.Details
1. replace existing hood canopy with new stainless hood canopy. 2. install (1) new hand sink, replacement existing 3 compartment sink. | $10,000 |
| Apr 30, 2012 | Never finaled issued Apr 2012, no final | 1416 Powell St | street spaceDetails
street space | ||
| Oct 25, 2010 | Never finaled issued Oct 2010, no final | 1416 Powell St | street spaceDetails
street space | ||
| Jun 12, 2006 | Completed final sign-off Sep 2010 | 1416 Powell St | renew app #200405184147 for final inspectionDetails
renew app #200405184147 for final inspection | ||
| May 18, 2004 | Completed final sign-off Sep 2010 | 1416 Powell St | Home C Construction Inc | barrier removal & accessible upgrade on both bathrooms & entrancesDetails
barrier removal & accessible upgrade on both bathrooms & entrances | $40,000 |
| Feb 12, 2002 | Expired or cancelled expired Jun 2002 | 1416 Powell St | street space/sidewalk repairDetails
street space/sidewalk repair | ||
| Oct 16, 2001 | Expired or cancelled expired Feb 2002 | 1416 Powell St | sidewalk repairDetails
sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.