H D Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2025
- Last 24 months
- 2 permits filed
211 permits since 2000: 167 completed, 1 in progress, 28 never finaled, 15 expired or cancelled.
Of the 28 never-finaled permits, 7 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
20 stairs permits: 18 completed, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 299 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2021 | Completed final sign-off Nov 2023 | 1746 36th Av | 1st fl: turn (e) recreation room & powder room into 2 bedrooms, 2 bathrooms, closets & 1 entertainment room with wet bar. 2nd fl: reconfigure layout with 2 bedrooms, 2 wic, 2 bathrooms, 1 powder room, kitchen, dining & living room. (n) interior staircase. eliminate light court. (n) rear deck w/stairDetails
1st fl: turn (e) recreation room & powder room into 2 bedrooms, 2 bathrooms, closets & 1 entertainment room with wet bar. 2nd fl: reconfigure layout with 2 bedrooms, 2 wic, 2 bathrooms, 1 powder room, kitchen, dining & living room. (n) interior staircase. eliminate light court. (n) rear deck w/stair | $80,000 |
| Mar 31, 2021 | Completed final sign-off Dec 2024 | 1906 Greenwich St | add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor.Details
add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor. | $280,000 |
| Feb 8, 2021 | Completed final sign-off Dec 2021 | 191 Tioga Av | rev to pa200412131318: basement-turn storage room into office.turn powder room into 3-fixtures bath.reconfig interior stairs.1/f:add 1 3-fixture full bathroom. relocate furnace water heater location./2/f: add 2 3-fixture full bathrooms. turn office into study room.Details
rev to pa200412131318: basement-turn storage room into office.turn powder room into 3-fixtures bath.reconfig interior stairs.1/f:add 1 3-fixture full bathroom. relocate furnace water heater location./2/f: add 2 3-fixture full bathrooms. turn office into study room. | $10,000 |
| Aug 7, 2020 | Completed final sign-off Jun 2023 | 3015 23rd Av | interior remodel and addition to an existing single family residence. project scope includes new walls at the lower floor plan, new staircase.Details
interior remodel and addition to an existing single family residence. project scope includes new walls at the lower floor plan, new staircase. | $450,000 |
| Mar 13, 2018 | Completed final sign-off Mar 2025 | 1616 Taylor St | (3) (n) dwelling units in (e) 11-unit building. reconfigure interior stairs. sprinklers under separate permitDetails
(3) (n) dwelling units in (e) 11-unit building. reconfigure interior stairs. sprinklers under separate permit | $500,000 |
| Oct 13, 2017 | Completed final sign-off Apr 2018 | 2879 California St | repair deck and wood stairs dryrot less than 50%. repair balcony leak in 2nd and 3rd floor. replace dryrot, siding and wood at house. like for like siding. not visible from street.Details
repair deck and wood stairs dryrot less than 50%. repair balcony leak in 2nd and 3rd floor. replace dryrot, siding and wood at house. like for like siding. not visible from street. | $18,000 |
| May 15, 2017 | Completed final sign-off Mar 2018 | 2322 40th Av | 2/f-relocate 1 bath, remodel bath, add 3 bedrms & theater, rebuild int stair. g/f- add pwdr rm,relocate kit, liv & dinrm, new foyer & sheetrock garage. ext-build n 9'-0" tall deck. replace patio door @ rear. enclose (e) stair well. add 1 new skylt. replace 2 vinyl wind in-kind add patio dr @ rearDetails
2/f-relocate 1 bath, remodel bath, add 3 bedrms & theater, rebuild int stair. g/f- add pwdr rm,relocate kit, liv & dinrm, new foyer & sheetrock garage. ext-build n 9'-0" tall deck. replace patio door @ rear. enclose (e) stair well. add 1 new skylt. replace 2 vinyl wind in-kind add patio dr @ rear | $130,000 |
| May 8, 2017 | Completed final sign-off Jun 2017 | 290 Valdez Av | repair outside the stairs leak dryrot and repair stucco wall dryrot - not visible from street. less than 50%, repair in kind.Details
repair outside the stairs leak dryrot and repair stucco wall dryrot - not visible from street. less than 50%, repair in kind. | $3,000 |
| Dec 29, 2015 | Completed final sign-off Mar 2017 | 290 Valdez Av | turn (e)storage to 1 bedrm & family rm on 1st flr,add wet bar,1 bedrm & full bath on 1st flr,relocate interior stairs,add balcony @rear,bathrm & kitchen remodel on 2nd flr,add skylite on 2nd flr.change window, u=.32Details
turn (e)storage to 1 bedrm & family rm on 1st flr,add wet bar,1 bedrm & full bath on 1st flr,relocate interior stairs,add balcony @rear,bathrm & kitchen remodel on 2nd flr,add skylite on 2nd flr.change window, u=.32 | $50,000 |
| Dec 18, 2015 | Completed final sign-off Oct 2016 | 263 Ralston St | remodel (e) bathrooms, (e) bedrooms, (e) kitchen, (e0 living room, (e) dining room and stairway. exploratory demolition only.Details
remodel (e) bathrooms, (e) bedrooms, (e) kitchen, (e0 living room, (e) dining room and stairway. exploratory demolition only. | $8,000 |
| Nov 6, 2014 | Never finaled issued Nov 2014, no final | 162 Brewster St | repair spiral stair at rear at property more than 50% per plan.Details
repair spiral stair at rear at property more than 50% per plan. | $1,000 |
| Apr 16, 2014 | Expired or cancelled cancelled Jan 2026 | 238 Wilde Av | replace front stairsDetails
replace front stairs | $8,800 |
| Sep 14, 2012 | Completed final sign-off Jul 2013 | 1150 Cabrillo St | repair (e) bathroom on 2/f, 2 (e) restrooms 1/f, 2 (e) restrooms on basement, repair work only. repair (e) kitchen at garage floor, replace detected drain and rotte wood on back stair, replace (e) exterior stucco.Details
repair (e) bathroom on 2/f, 2 (e) restrooms 1/f, 2 (e) restrooms on basement, repair work only. repair (e) kitchen at garage floor, replace detected drain and rotte wood on back stair, replace (e) exterior stucco. | $8,000 |
| Jun 11, 2012 | Completed final sign-off Jan 2013 | 2963 23rd Av | replace (e) entry door. (e) roofing deck door and (e) kitchen door and bedroom sliding door. repair stucco in the front stair. repair dryrot in the front stair and kitchen stair.Details
replace (e) entry door. (e) roofing deck door and (e) kitchen door and bedroom sliding door. repair stucco in the front stair. repair dryrot in the front stair and kitchen stair. | $40,000 |
| Jun 30, 2011 | Completed final sign-off Jan 2013 | 5700 Geary Bl | interior remodel of (e) restaurant-new kitchen equipment & bathroom remodel, infill ground floor area at ground floor entry. new 2nd exit in dining area. (e) mechanical/hvac to remain. rebuilt mezzanine & stair.Details
interior remodel of (e) restaurant-new kitchen equipment & bathroom remodel, infill ground floor area at ground floor entry. new 2nd exit in dining area. (e) mechanical/hvac to remain. rebuilt mezzanine & stair. | $150,000 |
| Feb 22, 2010 | Completed final sign-off Mar 2010 | 3920 San Bruno Av | as-built for previous approved application #2005/1205/9465 s1/r1. ground floor remove interior stair, area, office. second floor new kitchen. third floor add 3rd bedroom, reconfigure stairs, relocate bath, skylight.Details
as-built for previous approved application #2005/1205/9465 s1/r1. ground floor remove interior stair, area, office. second floor new kitchen. third floor add 3rd bedroom, reconfigure stairs, relocate bath, skylight. | |
| Feb 22, 2010 | Completed final sign-off Mar 2010 | 3918 San Bruno Av | "as-built" for previous approved application #2005/1205/9463 s1/r1 2nd, add bedroom, window changes, relocate kitchen to 2nd floor, 3rd floor relocate bathroom, skylight. remove interior stair from ground floor to 2nd floor.Details
"as-built" for previous approved application #2005/1205/9463 s1/r1 2nd, add bedroom, window changes, relocate kitchen to 2nd floor, 3rd floor relocate bathroom, skylight. remove interior stair from ground floor to 2nd floor. | |
| Mar 25, 2008 | Completed final sign-off Jun 2008 | 3900 San Bruno Av | (1). remodel (e) kitchen, bathroom (2). repair dry rot front stair less than 50% being replaced. (3). provide exhaust in bathroom, termination 3' from property line & opening. (4). upgrade electrical in bathroom and kitchen.Details
(1). remodel (e) kitchen, bathroom (2). repair dry rot front stair less than 50% being replaced. (3). provide exhaust in bathroom, termination 3' from property line & opening. (4). upgrade electrical in bathroom and kitchen. | $80,000 |
| Apr 20, 2007 | Completed final sign-off Jul 2007 | 566 41st Av | repalce walkway at south p/l . repair front & back stairs less than 50%. repair dryrot less than 50% for deck @ side.Details
repalce walkway at south p/l . repair front & back stairs less than 50%. repair dryrot less than 50% for deck @ side. | $1,000 |
| Jan 25, 2005 | Completed final sign-off Apr 2008 | 1405 York St | enclose (e) outside deck and rear stair into habitable area. to comply nov#200452181.w/ref app# 200408091027.Details
enclose (e) outside deck and rear stair into habitable area. to comply nov#200452181.w/ref app# 200408091027. | $5,000 |