Back to bathroom remodel contractors
H D Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2025
- Last 24 months
- 2 permits filed
211 permits since 2000: 167 completed, 1 in progress, 28 never finaled, 15 expired or cancelled.
Of the 28 never-finaled permits, 7 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
65 bathroom remodel permits: 59 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 284 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2023 | Completed final sign-off Dec 2024 | 1906 Greenwich St | revision to permit 202103317642. 1/f: reconfigure laundry and keep (e) rear door. 2/f: reconfigure half bath and closet. 3/f: reconfigure bathroom and closet, and replace windows.Details
revision to permit 202103317642. 1/f: reconfigure laundry and keep (e) rear door. 2/f: reconfigure half bath and closet. 3/f: reconfigure bathroom and closet, and replace windows. | |
| Feb 24, 2022 | Completed final sign-off Dec 2023 | 399 Winding Wy | kitchen and bath remodel, add 1 bath to 2nd fl. legalize 2 bedrooms, 1 bath on gr level and reconfigure gr fl. replace all existing windows in kindDetails
kitchen and bath remodel, add 1 bath to 2nd fl. legalize 2 bedrooms, 1 bath on gr level and reconfigure gr fl. replace all existing windows in kind | $30,000 |
| Apr 14, 2021 | Completed final sign-off Nov 2023 | 1746 36th Av | 1st fl: turn (e) recreation room & powder room into 2 bedrooms, 2 bathrooms, closets & 1 entertainment room with wet bar. 2nd fl: reconfigure layout with 2 bedrooms, 2 wic, 2 bathrooms, 1 powder room, kitchen, dining & living room. (n) interior staircase. eliminate light court. (n) rear deck w/stairDetails
1st fl: turn (e) recreation room & powder room into 2 bedrooms, 2 bathrooms, closets & 1 entertainment room with wet bar. 2nd fl: reconfigure layout with 2 bedrooms, 2 wic, 2 bathrooms, 1 powder room, kitchen, dining & living room. (n) interior staircase. eliminate light court. (n) rear deck w/stair | $80,000 |
| Apr 12, 2021 | Completed final sign-off Apr 2022 | 1616 Taylor St | unit #3: kitchen & bathroom remodel in kind.Details
unit #3: kitchen & bathroom remodel in kind. | $20,000 |
| Mar 31, 2021 | Completed final sign-off Dec 2024 | 1906 Greenwich St | add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor.Details
add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor. | $280,000 |
| Feb 8, 2021 | Completed final sign-off Dec 2021 | 191 Tioga Av | rev to pa200412131318: basement-turn storage room into office.turn powder room into 3-fixtures bath.reconfig interior stairs.1/f:add 1 3-fixture full bathroom. relocate furnace water heater location./2/f: add 2 3-fixture full bathrooms. turn office into study room.Details
rev to pa200412131318: basement-turn storage room into office.turn powder room into 3-fixtures bath.reconfig interior stairs.1/f:add 1 3-fixture full bathroom. relocate furnace water heater location./2/f: add 2 3-fixture full bathrooms. turn office into study room. | $10,000 |
| Oct 3, 2020 | Completed final sign-off Aug 2023 | 2619 24th Av | a.d.u. on 1st floor per ordinance 162-62 include living room, bedroom, game room, kitchen and one 3-fixture bathroom.Details
a.d.u. on 1st floor per ordinance 162-62 include living room, bedroom, game room, kitchen and one 3-fixture bathroom. | $30,000 |
| Sep 9, 2020 | Completed final sign-off Apr 2023 | 68 05th Av | remove fireplace chimney to roof in family rm. remodel 2nd fl unit with open kitchen. remodel bathroom, add 2 bathrooms. new lighting outlets, recondition windows. new heat pump in remodel unit 68.Details
remove fireplace chimney to roof in family rm. remodel 2nd fl unit with open kitchen. remodel bathroom, add 2 bathrooms. new lighting outlets, recondition windows. new heat pump in remodel unit 68. | $100,000 |
| May 15, 2017 | Completed final sign-off Mar 2018 | 2322 40th Av | 2/f-relocate 1 bath, remodel bath, add 3 bedrms & theater, rebuild int stair. g/f- add pwdr rm,relocate kit, liv & dinrm, new foyer & sheetrock garage. ext-build n 9'-0" tall deck. replace patio door @ rear. enclose (e) stair well. add 1 new skylt. replace 2 vinyl wind in-kind add patio dr @ rearDetails
2/f-relocate 1 bath, remodel bath, add 3 bedrms & theater, rebuild int stair. g/f- add pwdr rm,relocate kit, liv & dinrm, new foyer & sheetrock garage. ext-build n 9'-0" tall deck. replace patio door @ rear. enclose (e) stair well. add 1 new skylt. replace 2 vinyl wind in-kind add patio dr @ rear | $130,000 |
| Jan 3, 2017 | Completed final sign-off Nov 2017 | 2619 24th Av | remodel (e) 2 bathrooms, (3) bedrooms & 1 (e) kitchen, living room and dining room on 1st floor; remove and recycle molding casing and trims, remove and recycle interior door and plumbing fixtures and kitchen appliances.Details
remodel (e) 2 bathrooms, (3) bedrooms & 1 (e) kitchen, living room and dining room on 1st floor; remove and recycle molding casing and trims, remove and recycle interior door and plumbing fixtures and kitchen appliances. | $28,000 |
| Apr 28, 2016 | Completed final sign-off Feb 2019 | 470 11th Av | legalize unit on 1st floor w/ 2 bedrooms, 1 kitchen & 1 full bathroom. fire sprinkler under seperate permit.Details
legalize unit on 1st floor w/ 2 bedrooms, 1 kitchen & 1 full bathroom. fire sprinkler under seperate permit. | $10,000 |
| Dec 29, 2015 | Completed final sign-off Mar 2017 | 290 Valdez Av | turn (e)storage to 1 bedrm & family rm on 1st flr,add wet bar,1 bedrm & full bath on 1st flr,relocate interior stairs,add balcony @rear,bathrm & kitchen remodel on 2nd flr,add skylite on 2nd flr.change window, u=.32Details
turn (e)storage to 1 bedrm & family rm on 1st flr,add wet bar,1 bedrm & full bath on 1st flr,relocate interior stairs,add balcony @rear,bathrm & kitchen remodel on 2nd flr,add skylite on 2nd flr.change window, u=.32 | $50,000 |
| Dec 18, 2015 | Completed final sign-off Oct 2016 | 263 Ralston St | remodel (e) bathrooms, (e) bedrooms, (e) kitchen, (e0 living room, (e) dining room and stairway. exploratory demolition only.Details
remodel (e) bathrooms, (e) bedrooms, (e) kitchen, (e0 living room, (e) dining room and stairway. exploratory demolition only. | $8,000 |
| Sep 14, 2015 | Completed final sign-off Nov 2016 | 217 Holloway Av | remodel kitchen bathroom, and repair dry-rot.Details
remodel kitchen bathroom, and repair dry-rot. | $5,000 |
| Sep 1, 2015 | Completed final sign-off Mar 2017 | 290 Valdez Av | 1) remodel in unit, interior walls, trims, remove and repolce interior doors and plumbing fixtures, kitchen appliances & bathrooms. 2) repair dryrot and stucco.Details
1) remodel in unit, interior walls, trims, remove and repolce interior doors and plumbing fixtures, kitchen appliances & bathrooms. 2) repair dryrot and stucco. | $30,000 |
| Aug 10, 2015 | Completed final sign-off Jan 2020 | 571 18th Av | 1) kitchen remodel & bathroom remodel on 1st floor level. 2) interior remodel on 2nd & 3rd floor level. interior remodel within inside dwelling units only per plan. stucco repair only.Details
1) kitchen remodel & bathroom remodel on 1st floor level. 2) interior remodel on 2nd & 3rd floor level. interior remodel within inside dwelling units only per plan. stucco repair only. | $60,000 |
| Apr 9, 2015 | Completed final sign-off Jan 2020 | 571 18th Av | remodel (e) 4 bathrooms, (e) 4 bedrooms, (e) kitchen. living room and dining room in first floor and second floor. repair dry rot at lightwell. in-kind repair.Details
remodel (e) 4 bathrooms, (e) 4 bedrooms, (e) kitchen. living room and dining room in first floor and second floor. repair dry rot at lightwell. in-kind repair. | $68,000 |
| Mar 17, 2015 | Completed final sign-off Sep 2015 | 470 11th Av | remodel 4 bathrooms, 6 bedrooms, 2 kitchens & 2 living rooms & 2 dining rooms in first floor & 2nd fl. electrical & plumbing upgrades. replacing all sheetrock with 5/8" type x gympsum wall board. no changes to layout, no walls moved, removed or added.Details
remodel 4 bathrooms, 6 bedrooms, 2 kitchens & 2 living rooms & 2 dining rooms in first floor & 2nd fl. electrical & plumbing upgrades. replacing all sheetrock with 5/8" type x gympsum wall board. no changes to layout, no walls moved, removed or added. | $125,000 |
| Feb 17, 2015 | Never finaled issued Feb 2015, no final | 436 Carl St | remodel (e) 2 bathrooms and (e) kitchen cabinets, change hardwood floors, unit #436.Details
remodel (e) 2 bathrooms and (e) kitchen cabinets, change hardwood floors, unit #436. | $13,000 |
| Feb 17, 2015 | Completed final sign-off Apr 2015 | 1446 Leavenworth St | to comply with nov #201524561 repair drainage pipes at extension. repair dryrot at bathroom. paint exterior.Details
to comply with nov #201524561 repair drainage pipes at extension. repair dryrot at bathroom. paint exterior. | $12,000 |
| Jan 14, 2015 | Completed final sign-off Apr 2016 | 238 Wilde Av | add bedroom, family room and 2-1/2/bathrooms per plan. to comply with complaint #201517151Details
add bedroom, family room and 2-1/2/bathrooms per plan. to comply with complaint #201517151 | $35,000 |
| Jul 23, 2014 | Completed final sign-off Feb 2015 | 831 32nd Av | add 1 bedroom, 1 bath, 1 great room on the 1st fl per plan.Details
add 1 bedroom, 1 bath, 1 great room on the 1st fl per plan. | $50,000 |
| Jun 25, 2014 | Completed final sign-off Feb 2015 | 831 32nd Av | remodel extg 2 bathrooms, extg 3 bedrooms and kitchen, living room and dining room.Details
remodel extg 2 bathrooms, extg 3 bedrooms and kitchen, living room and dining room. | $35,000 |
| Jun 9, 2014 | Completed final sign-off Apr 2019 | 1213 Vicente St | remodel one bathroom on mezzanine per planDetails
remodel one bathroom on mezzanine per plan | $5,000 |
| Jun 5, 2014 | Completed final sign-off Jun 2015 | 3125 Folsom St | add two bedrooms, three half baths, laundry and great room on 1st floor per plan.Details
add two bedrooms, three half baths, laundry and great room on 1st floor per plan. | $50,000 |
| Mar 17, 2014 | Completed final sign-off Nov 2014 | 3125 Folsom St | remodel (e) bathroom and (e) kitchen and water station, and laundry on 1/f, & 2/f, and 3/f; to comply with cec150(k) 8 & 10Details
remodel (e) bathroom and (e) kitchen and water station, and laundry on 1/f, & 2/f, and 3/f; to comply with cec150(k) 8 & 10 | $25,000 |
| Nov 22, 2013 | Completed final sign-off Mar 2014 | 186 Sagamore St | legalize one bedroom, two bathrooms, great room and laundry room on 1st flr to comply with complaint 201336351Details
legalize one bedroom, two bathrooms, great room and laundry room on 1st flr to comply with complaint 201336351 | $48,000 |
| Sep 12, 2013 | Completed final sign-off Jan 2018 | 618 17th Av | rear horizontal & vertical addition, additional unit, addition bathrooms & bedrooms.Details
rear horizontal & vertical addition, additional unit, addition bathrooms & bedrooms. | $10,000 |
| Sep 12, 2013 | Completed final sign-off May 2014 | 1537 Ulloa St | 1)add 2 bedrooms, 2 bathrooms, laundry room, mud room, office on 1st floor per plan. 2)add deck at rear on 2nd floor per plan.Details
1)add 2 bedrooms, 2 bathrooms, laundry room, mud room, office on 1st floor per plan. 2)add deck at rear on 2nd floor per plan. | $50,000 |
| Sep 5, 2013 | Never finaled issued Sep 2013, no final | 1655 10th Av | add 1 bedroom & 1 bathroom on 1st floor per plan (garage level). additional space belongs to 2nd floor unit.Details
add 1 bedroom & 1 bathroom on 1st floor per plan (garage level). additional space belongs to 2nd floor unit. | $48,000 |
| Aug 8, 2013 | Completed final sign-off Mar 2014 | 2762 40th Av | add one bedroom, storage and power room on 2nd floor per plan. add two bedrooms, home office, launry room & three bathrooms on 1st floor per plan. repair deck at rear (less than 50%).Details
add one bedroom, storage and power room on 2nd floor per plan. add two bedrooms, home office, launry room & three bathrooms on 1st floor per plan. repair deck at rear (less than 50%). | $58,000 |
| Jul 11, 2013 | Completed final sign-off Nov 2018 | 1767 08th Av | to comply w/complaint #201390431, 201390671, 201308182, 201310871 - add one bedroom, one bathroom & family room on ground floor per plan. (repair fire damaged on 2nd & 3rd floor under pa #2013.06.14.9628Details
to comply w/complaint #201390431, 201390671, 201308182, 201310871 - add one bedroom, one bathroom & family room on ground floor per plan. (repair fire damaged on 2nd & 3rd floor under pa #2013.06.14.9628 | $48,000 |
| May 6, 2013 | Never finaled issued May 2013, no final | 1707 35th Av | add 1 bathroom on 2nd floor per plan & remodel (e) bathroom & kitchen on 2nd floorDetails
add 1 bathroom on 2nd floor per plan & remodel (e) bathroom & kitchen on 2nd floor | $20,000 |
| Apr 5, 2013 | Completed final sign-off Apr 2014 | 558 20th Av | add two bathrooms, laundry room, utility room & mudroom on 1st floor per plan. add two bathrooms and one bedroom on 2nd floor per plan.Details
add two bathrooms, laundry room, utility room & mudroom on 1st floor per plan. add two bathrooms and one bedroom on 2nd floor per plan. | $48,000 |
| Feb 19, 2013 | Completed final sign-off Aug 2013 | 1707 35th Av | add 1 bedroom, 1 bath, 1 utility and 1 entertainment room on 1st floor per planDetails
add 1 bedroom, 1 bath, 1 utility and 1 entertainment room on 1st floor per plan | $40,000 |
| Sep 14, 2012 | Completed final sign-off Jul 2013 | 1150 Cabrillo St | repair (e) bathroom on 2/f, 2 (e) restrooms 1/f, 2 (e) restrooms on basement, repair work only. repair (e) kitchen at garage floor, replace detected drain and rotte wood on back stair, replace (e) exterior stucco.Details
repair (e) bathroom on 2/f, 2 (e) restrooms 1/f, 2 (e) restrooms on basement, repair work only. repair (e) kitchen at garage floor, replace detected drain and rotte wood on back stair, replace (e) exterior stucco. | $8,000 |
| Jan 6, 2012 | Completed final sign-off Jan 2013 | 2963 23rd Av | remodel (e) bathroom on 1/f, 2/f, 3/f, replace defected drain and rotted wood on roofing deck, replace (e) 5 windows, replace (e) balcony french door in front.Details
remodel (e) bathroom on 1/f, 2/f, 3/f, replace defected drain and rotted wood on roofing deck, replace (e) 5 windows, replace (e) balcony french door in front. | $12,000 |
| Nov 8, 2011 | Completed final sign-off Jan 2013 | 385 21st Av | new restaurant use. new communication openings with adjacent restaurant @ 5700 geary per ab-010. modify front facade for egress requirements. new kitchen & hvac equipment. new bathrooms to comply with accessibility requirements.Details
new restaurant use. new communication openings with adjacent restaurant @ 5700 geary per ab-010. modify front facade for egress requirements. new kitchen & hvac equipment. new bathrooms to comply with accessibility requirements. | $200,000 |
| Jun 30, 2011 | Completed final sign-off Jan 2013 | 5700 Geary Bl | interior remodel of (e) restaurant-new kitchen equipment & bathroom remodel, infill ground floor area at ground floor entry. new 2nd exit in dining area. (e) mechanical/hvac to remain. rebuilt mezzanine & stair.Details
interior remodel of (e) restaurant-new kitchen equipment & bathroom remodel, infill ground floor area at ground floor entry. new 2nd exit in dining area. (e) mechanical/hvac to remain. rebuilt mezzanine & stair. | $150,000 |
| Jun 22, 2010 | Completed final sign-off Dec 2010 | 160 Aptos Av | remodel current kitchen and bathroom; kitchen: replace counter and cabinets; bathroom: replace plumbing fixtures and retile floors. no structural work. no. new lighting.Details
remodel current kitchen and bathroom; kitchen: replace counter and cabinets; bathroom: replace plumbing fixtures and retile floors. no structural work. no. new lighting. | $9,000 |
| Feb 22, 2010 | Completed final sign-off Mar 2010 | 3920 San Bruno Av | as-built for previous approved application #2005/1205/9465 s1/r1. ground floor remove interior stair, area, office. second floor new kitchen. third floor add 3rd bedroom, reconfigure stairs, relocate bath, skylight.Details
as-built for previous approved application #2005/1205/9465 s1/r1. ground floor remove interior stair, area, office. second floor new kitchen. third floor add 3rd bedroom, reconfigure stairs, relocate bath, skylight. | |
| Feb 22, 2010 | Completed final sign-off Mar 2010 | 3918 San Bruno Av | "as-built" for previous approved application #2005/1205/9463 s1/r1 2nd, add bedroom, window changes, relocate kitchen to 2nd floor, 3rd floor relocate bathroom, skylight. remove interior stair from ground floor to 2nd floor.Details
"as-built" for previous approved application #2005/1205/9463 s1/r1 2nd, add bedroom, window changes, relocate kitchen to 2nd floor, 3rd floor relocate bathroom, skylight. remove interior stair from ground floor to 2nd floor. | |
| Oct 27, 2009 | Completed final sign-off Oct 2009 | 1240 05th Av | convert laundry room approved under bpa# 2004/1001/5701 & finished 9/22/08 into bathroom at ground floor garage level.Details
convert laundry room approved under bpa# 2004/1001/5701 & finished 9/22/08 into bathroom at ground floor garage level. | |
| May 27, 2008 | Completed final sign-off May 2012 | 177 Inverness Dr | add one guest room, excercise gym and bathroom at basement. extension of master bedroom, ext of a (e) bedroom upstairs. addition of a (n) bathroom upstairs.Details
add one guest room, excercise gym and bathroom at basement. extension of master bedroom, ext of a (e) bedroom upstairs. addition of a (n) bathroom upstairs. | $100,000 |
| May 12, 2008 | Completed final sign-off Oct 2008 | 2453 Lawton St | remodel (e) kitchen & bathroom, add one new bathroom, convert (e) breakfast room to new home office on 2nd floor. construct family room, 2 bedrooms & 2 bathrooms on ground floor, construct a new deck at rear of bldg. approx. 19'x7'.Details
remodel (e) kitchen & bathroom, add one new bathroom, convert (e) breakfast room to new home office on 2nd floor. construct family room, 2 bedrooms & 2 bathrooms on ground floor, construct a new deck at rear of bldg. approx. 19'x7'. | $72,000 |
| Mar 25, 2008 | Completed final sign-off Jun 2008 | 3900 San Bruno Av | (1). remodel (e) kitchen, bathroom (2). repair dry rot front stair less than 50% being replaced. (3). provide exhaust in bathroom, termination 3' from property line & opening. (4). upgrade electrical in bathroom and kitchen.Details
(1). remodel (e) kitchen, bathroom (2). repair dry rot front stair less than 50% being replaced. (3). provide exhaust in bathroom, termination 3' from property line & opening. (4). upgrade electrical in bathroom and kitchen. | $80,000 |
| Feb 27, 2008 | Completed final sign-off Aug 2008 | 1244 05th Av | remodel extg kitchen, bathroom, living and din. room on 1st floor and extg bathroom and bedroom on 2nd floor of rear bldg. repair dry rot rafters of the rear bldg. (no structural) all work at rear building. minor dry rot repair at rafters. sister (n) to (e). less than 2/3 of interior wall coveringsDetails
remodel extg kitchen, bathroom, living and din. room on 1st floor and extg bathroom and bedroom on 2nd floor of rear bldg. repair dry rot rafters of the rear bldg. (no structural) all work at rear building. minor dry rot repair at rafters. sister (n) to (e). less than 2/3 of interior wall coverings | $68,000 |
| Aug 27, 2007 | Completed final sign-off Jul 2009 | 36 San Leandro Wy | interior remodel only. remodel basement level new foundation & bathroom. remodel main level kitchen & partition wall. remodel upper level (n) partition wall.Details
interior remodel only. remodel basement level new foundation & bathroom. remodel main level kitchen & partition wall. remodel upper level (n) partition wall. | $30,000 |
| May 16, 2005 | Expired or cancelled expired Jan 2007 | 3435 Broderick St | remodel kitchen , 2 baths, 1 furnace. no structural work to comply with nov 200559235.Details
remodel kitchen , 2 baths, 1 furnace. no structural work to comply with nov 200559235. | $20,000 |
| Nov 17, 2003 | Completed final sign-off Jun 2004 | 70 Yerba Buena Av | construct rooms (guest rm,exercise rm, storage rm) & relocate exist full bath at grd floor.Details
construct rooms (guest rm,exercise rm, storage rm) & relocate exist full bath at grd floor. | $15,000 |
| Oct 17, 2003 | Completed final sign-off Jun 2004 | 70 Yerba Buena Av | remodel kitchen & bathrooms at upstair. no change in walls.Details
remodel kitchen & bathrooms at upstair. no change in walls. | $20,000 |
| Aug 28, 2003 | Never finaled issued Aug 2003, no final | 2474 41st Av | remodel kitchen & bathroom at upstair.Details
remodel kitchen & bathroom at upstair. | $10,000 |
| Aug 18, 2003 | Completed final sign-off Apr 2004 | 1723 40th Av | relocate bathroom from approved app#200307310936 due to existing columDetails
relocate bathroom from approved app#200307310936 due to existing colum | |
| Aug 15, 2003 | Completed final sign-off Aug 2004 | 1718 Wawona St | alter (e) 2/f. install bathroom @ g/f. retainning wall @ front, install new 3 skylight @ roof (flat)Details
alter (e) 2/f. install bathroom @ g/f. retainning wall @ front, install new 3 skylight @ roof (flat) | $38,000 |
| Aug 1, 2003 | Completed final sign-off Apr 2004 | 119 Lawrence Av | comply with nov#200338739, remove kitchen facilities & to legalize new full bath/new guest room/newDetails
comply with nov#200338739, remove kitchen facilities & to legalize new full bath/new guest room/new | $10,000 |
| Jul 31, 2003 | Completed final sign-off Apr 2004 | 1723 40th Av | relocate existing full bath & legalize rooms at ground floorDetails
relocate existing full bath & legalize rooms at ground floor | $15,000 |
| Feb 13, 2003 | Completed final sign-off Jun 2003 | 1775 33rd Av | construct rooms (2 bedrooms 1 storage rm, 1 laundry area & half bath at ground floorDetails
construct rooms (2 bedrooms 1 storage rm, 1 laundry area & half bath at ground floor | $31,400 |
| Dec 23, 2002 | Completed final sign-off Apr 2003 | 2563 26th Av | construct room (2 bedrooms, store room, play area & half bath) at ground flrDetails
construct room (2 bedrooms, store room, play area & half bath) at ground flr | $28,000 |
| Dec 3, 2002 | Completed final sign-off May 2003 | 1864 Wawona St | construct rooms/1 bdrm/1 studyrm/1 family room/1landry area & full bath at ground floorDetails
construct rooms/1 bdrm/1 studyrm/1 family room/1landry area & full bath at ground floor | $42,000 |
| Nov 6, 2002 | Never finaled issued Nov 2002, no final | 2240 40th Av | remodel kitchen & bathroom at upstair.Details
remodel kitchen & bathroom at upstair. | $15,000 |
| May 2, 2002 | Completed final sign-off Oct 2002 | 371 Staples Av | construct rooms & half bath at gr. fl. (2 bedrm/exercise rm/storage/1/2 bath)Details
construct rooms & half bath at gr. fl. (2 bedrm/exercise rm/storage/1/2 bath) | $28,000 |
| Jan 22, 2002 | Completed final sign-off Feb 2003 | 379 Teddy Av | construct rooms (bedroom, laundry area & full bath) at ground floorDetails
construct rooms (bedroom, laundry area & full bath) at ground floor | $15,000 |
| Aug 4, 2000 | Completed final sign-off Sep 2000 | 2610 26th Av | kitchen remodel and 2 bathroomsDetails
kitchen remodel and 2 bathrooms | $12,000 |
| Jul 12, 2000 | Completed final sign-off Dec 2001 | 624 Rolph St | construct rooms (2 bedrooms,family room, 1 storage) & full bath at ground floorDetails
construct rooms (2 bedrooms,family room, 1 storage) & full bath at ground floor | $18,000 |
| May 24, 2000 | Completed final sign-off Dec 2001 | 624 Rolph St | remodel kitchen & bathroom at 2nd floorDetails
remodel kitchen & bathroom at 2nd floor | $3,000 |