Masoud Salamat
- Listed as
- architect, engineer
- Firm
- Masoud Salamat S.E.
- On San Francisco permits
- May 2015 to Jun 2026
25 permits since 2000 (engineer on 24 permits, architect on 1 permit): 11 completed, 5 in progress, 4 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jul 2026 | 155 05th St | Peacock Construction | revision to 202509165421. clinic: revise exam, treatment, office, storage and support area, reconfigure partitions, doors, ceilings, casework, sinks plumbing fixtures, mdical equip and room functions. asc: revise or, pacu, sterile processing, utility and support areas. reconfigure partitions, doorsDetails
revision to 202509165421. clinic: revise exam, treatment, office, storage and support area, reconfigure partitions, doors, ceilings, casework, sinks plumbing fixtures, mdical equip and room functions. asc: revise or, pacu, sterile processing, utility and support areas. reconfigure partitions, doors | |
| Jun 23, 2026 | In progress issued Jun 2026 | 455 Vallejo St | Greenstar Builders Inc | unit #310 (aka 110) revision to pa #202605060808 to specify in plans, that existing walls remain the same.Details
unit #310 (aka 110) revision to pa #202605060808 to specify in plans, that existing walls remain the same. | |
| May 6, 2026 | In progress issued May 2026 | 455 Vallejo St | Greenstar Builders Inc | comply with nov 202547408. unit 310 (aka 110) removal of non bearing walls at kitchen area to improve the functionality of the space. no work in other area of unitDetails
comply with nov 202547408. unit 310 (aka 110) removal of non bearing walls at kitchen area to improve the functionality of the space. no work in other area of unit | |
| Feb 10, 2025 | In progress issued Feb 2025 | 160 Northwood Dr | R W Company | revision to pa # 2023-0615-0196 window revision and new garage doorDetails
revision to pa # 2023-0615-0196 window revision and new garage door | $500 |
| Oct 25, 2024 | In progress issued Oct 2024 | 160 Northwood Dr | R W Company | revision to pa 202407126409 update plans with new rebar schedule and engineer calcsDetails
revision to pa 202407126409 update plans with new rebar schedule and engineer calcs | |
| Dec 20, 2022 | Expired or cancelled expired Sep 2024 | 180 Yerba Buena Av | Z Construction Company Inc | garage level structural modification for apprved glass structure @ 2nd fl pa 202208050039. new pair of doors to back yard @ south facing (e) wall. re-grading @ rear yard adjacent to new door.Details
garage level structural modification for apprved glass structure @ 2nd fl pa 202208050039. new pair of doors to back yard @ south facing (e) wall. re-grading @ rear yard adjacent to new door. | $20,000 |
| Oct 14, 2022 | Completed final sign-off Aug 2024 | 72 Longview Ct | Deleon Builders Inc | backyard landscaping. adding hot tub and deck & gardners steps (deck is less than 3 ft tall)Details
backyard landscaping. adding hot tub and deck & gardners steps (deck is less than 3 ft tall) | $15,000 |
| May 14, 2021 | Completed final sign-off Aug 2024 | 72 Longview Ct | Deleon Builders Inc | modifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyardDetails
modifications/additions to lower level of house - addition of a bathroom, kitchen, sink, stove, bedroom, and a deck and stairs to access backyard | $48,000 |
| Mar 4, 2021 | Expired or cancelled cancelled Jan 2026 | 1700 Lombard St | accessibility upgrades to vacant commercial space. lower floor level to remove step. remodel (e) restroom. ada compliance.Details
accessibility upgrades to vacant commercial space. lower floor level to remove step. remodel (e) restroom. ada compliance. | $156,000 | |
| Oct 17, 2020 | Completed final sign-off Feb 2021 | 422 Lyon St | Urban Builder General Contracting Inc | revision to pa 201709158388. soft story upgrade.Details
revision to pa 201709158388. soft story upgrade. | $100,000 |
| Jan 6, 2020 | Completed final sign-off May 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | replace (e) stair from 5th floor to roof penthouse;Details
replace (e) stair from 5th floor to roof penthouse; | $20,000 |
| Oct 24, 2019 | Completed final sign-off Mar 2021 | 1376 12th Av | Daniel Larsen Builders | l, , kitchen & bath & laundry remodel and replace (e) walls w/beamsDetails
l, , kitchen & bath & laundry remodel and replace (e) walls w/beams | $40,000 |
| May 23, 2019 | Expired or cancelled withdrawn Oct 2019 | 696 Valencia St | (residential)to comply with nov #201813151. soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.Details
(residential)to comply with nov #201813151. soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. | $50,000 | |
| May 23, 2019 | Expired or cancelled withdrawn Oct 2019 | 696 Valencia St | (commercial)to comply with nov #201813151. soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.Details
(commercial)to comply with nov #201813151. soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. | $50,000 | |
| May 15, 2019 | Completed final sign-off Dec 2019 | 2942 Franklin St | Sure, Inc. | demo of 2 apts - unit# 5 & 6 on 2nd level. unit 5: new bedroom, kitchen location. unit 6 new berooms & n bathroom. n kitchen location, n washer/dryers & dishwashers, n kitchen cabinets, n plumbing fixtures, n lighting at (e) j-box locations. no change to mech. no exterior, fire alarm/sprinkler work.Details
demo of 2 apts - unit# 5 & 6 on 2nd level. unit 5: new bedroom, kitchen location. unit 6 new berooms & n bathroom. n kitchen location, n washer/dryers & dishwashers, n kitchen cabinets, n plumbing fixtures, n lighting at (e) j-box locations. no change to mech. no exterior, fire alarm/sprinkler work. | $80,000 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 1635 Gough St | Grizzly Builders Inc. | renovation of 2 apartments: unit 103 on 2nd fl & 301 on 4th fl: new bedrooms, new kichen cabinets. new dishwashers, nw washers/dryers. nw lighting at extg j-box locations. no change to mechanica. no exterio work. no fire alarm or sprnklr work. no structural work.Details
renovation of 2 apartments: unit 103 on 2nd fl & 301 on 4th fl: new bedrooms, new kichen cabinets. new dishwashers, nw washers/dryers. nw lighting at extg j-box locations. no change to mechanica. no exterio work. no fire alarm or sprnklr work. no structural work. | $80,000 |
| Mar 15, 2019 | Completed final sign-off Jul 2020 | 720 Jones St | Strong Builders Construction Inc. | renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixturesDetails
renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixtures | $45,000 |
| Apr 27, 2018 | Never finaled issued Aug 2018, no final | 1033 Sanchez St | Z Construction Company Inc | structural detail changes due to site conditions. revision to app #201707252937 per 2016 soft story retrofitDetails
structural detail changes due to site conditions. revision to app #201707252937 per 2016 soft story retrofit | |
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 1033 Sanchez St | Fortitude Construction Inc. | revision to app#201707252937 for removal of 2 columns at bottom level and providing a new support beam for soft story retrofit. voluntary work not reimbursed by rent.Details
revision to app#201707252937 for removal of 2 columns at bottom level and providing a new support beam for soft story retrofit. voluntary work not reimbursed by rent. | $5,000 |
| Jul 25, 2017 | Completed final sign-off May 2022 | 1033 Sanchez St | Fortitude Construction Inc. | voluntary soft story seismic upgrade & lowering basement by 2'-6"Details
voluntary soft story seismic upgrade & lowering basement by 2'-6" | $70,000 |
| Jun 7, 2017 | Completed final sign-off Oct 2017 | 1000 Cortland Av | Urban Builder General Contracting Inc | revision to 201606109718 and 201703211981 replace e posts with concrete materialDetails
revision to 201606109718 and 201703211981 replace e posts with concrete material | $20,000 |
| Jun 10, 2016 | Completed final sign-off Oct 2017 | 1000 Cortland Av | Urban Builder General Contracting Inc | soft story retrofit per sfbc chapter 34b engineering criteria. 2012 iebc appendix a-4. (residential space).Details
soft story retrofit per sfbc chapter 34b engineering criteria. 2012 iebc appendix a-4. (residential space). | $30,000 |
| Jun 10, 2016 | Completed final sign-off Oct 2017 | 1000 Cortland Av | Urban Builder General Contracting Inc | soft story retrofit per sfbc chapter 34b engineering criteria. 2012 iebc appendix a-4. (for commercial space, same address).Details
soft story retrofit per sfbc chapter 34b engineering criteria. 2012 iebc appendix a-4. (for commercial space, same address). | $15,000 |
| Mar 29, 2016 | Never finaled issued May 2016, no final | 1061 Folsom St | interior ti to repair portion of (e) mezzanine and add another portion. ada restrooms and breakrooms added.Details
interior ti to repair portion of (e) mezzanine and add another portion. ada restrooms and breakrooms added. | $75,000 | |
| May 12, 2015 | Expired or cancelled expired Nov 2018 | 2747 19th St | interior alterations- to existing building. occupancy is to be design offices. work includes interior addition of square footage in high-bay ceiling and exterior windows. no street front exterior work is proposed. n/a ordinance.Details
interior alterations- to existing building. occupancy is to be design offices. work includes interior addition of square footage in high-bay ceiling and exterior windows. no street front exterior work is proposed. n/a ordinance. | $100,000 |