Block 0298, lot 025
720 Jones St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 5
- Units
- 42
- Rooms
- 42 bathrooms
- Building
- 22,075 sq ft
- Lot
- 6,612 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2019 | Completed final sign-off Jun 2020 | 720 Jones St | Strong Builders Construction Inc. | unit 21 - 1 bedrm/1ba to 2bedrm/1bath. new kitchen cabinets, new dishwashers and washer/dryer. new plumbing fixtures. new lighting @ existing j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural workDetails
unit 21 - 1 bedrm/1ba to 2bedrm/1bath. new kitchen cabinets, new dishwashers and washer/dryer. new plumbing fixtures. new lighting @ existing j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural work | $65,000 |
| Mar 27, 2019 | Never finaled issued Mar 2019, no final | 720 Jones St | Halyard Inc | exploratory demo at units 1, 21, 27 for structural cost evaluation. demo not to exceed 50 sq ft at each unit. replace in kind. (e) sheetrock to be demolished. not a permanent demo, project will not violate ch 41 of the sf admin codeDetails
exploratory demo at units 1, 21, 27 for structural cost evaluation. demo not to exceed 50 sq ft at each unit. replace in kind. (e) sheetrock to be demolished. not a permanent demo, project will not violate ch 41 of the sf admin code | $2,500 |
| Mar 15, 2019 | Completed final sign-off Jul 2020 | 720 Jones St | Strong Builders Construction Inc. | renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixturesDetails
renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixtures | $45,000 |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 720 Jones St | Strong Builders Construction Inc. | apt 30: no exterior changes or moving of walls: bathroom remodel inkind (1): new tile, bathroom fan , light fixturs.Details
apt 30: no exterior changes or moving of walls: bathroom remodel inkind (1): new tile, bathroom fan , light fixturs. | $9,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 720 Jones St | Strong Builders Construction Inc. | unit #34 - renovation in apartment. new kitchen, new tiles in bathroom. no exterior changes. no change of wall , same location and replace in kind. maher n/aDetails
unit #34 - renovation in apartment. new kitchen, new tiles in bathroom. no exterior changes. no change of wall , same location and replace in kind. maher n/a | $12,000 |
| Apr 13, 2017 | Never finaled issued Jun 2017, no final | 720 Jones St | Strong Builders Construction Inc. | apt #51: renovation of #51, 5th floor: addition of 1 bedroom, laundry, renovate kitchen & bath, new lighting. maher n/aDetails
apt #51: renovation of #51, 5th floor: addition of 1 bedroom, laundry, renovate kitchen & bath, new lighting. maher n/a | $30,000 |
| Apr 6, 2017 | Never finaled issued Jun 2017, no final | 720 Jones St | Strong Builders Construction Inc. | apt #32, 3rd floor renovation - additoin of bedroom, laundry, renovation of bath, kitchen, lighting. no exterior changes. n/a maher ordinanceDetails
apt #32, 3rd floor renovation - additoin of bedroom, laundry, renovation of bath, kitchen, lighting. no exterior changes. n/a maher ordinance | $30,000 |
| Jan 12, 2016 | Completed final sign-off Feb 2016 | 720 Jones St | S & H Renovations | work in unit #31: replace fixtrues and finishes in kitchen and bath.Details
work in unit #31: replace fixtrues and finishes in kitchen and bath. | $25,000 |
| Dec 11, 2015 | Expired or cancelled withdrawn Jan 2016 | 720 Jones St | S & H Renovations | unit 31, replace finishes, fixtures, move 1 wass 30"; renovate bath & kitchen. maher naDetails
unit 31, replace finishes, fixtures, move 1 wass 30"; renovate bath & kitchen. maher na | $25,000 |
| Apr 29, 2014 | Completed final sign-off Dec 2014 | 720 Jones St | Precision Design & Drafting Inc | to comply with pnoe 12296 & bnov 201387903. removal of 4 towerstream wifi antenas & keep 1 otaro antenna.Details
to comply with pnoe 12296 & bnov 201387903. removal of 4 towerstream wifi antenas & keep 1 otaro antenna. | $500 |
| Mar 4, 2014 | Completed final sign-off Apr 2014 | 720 Jones St | D N S Construction | unit #9: remodel kitchen and bath in like and kind; compliance with ord 155-13 not rquiredDetails
unit #9: remodel kitchen and bath in like and kind; compliance with ord 155-13 not rquired | $13,000 |
| Aug 2, 2013 | Completed final sign-off Sep 2013 | 720 Jones St | Make Ready Maintenance Inc | work in unit #43: rehab living area: kitchen and bathroomDetails
work in unit #43: rehab living area: kitchen and bathroom | $22,000 |
| Apr 12, 2012 | Completed final sign-off Jul 2012 | 720 Jones St | Rayco Development Solutions Inc | #47: replacing in wall shower valve. replace and installing gfi plugs in bathroomDetails
#47: replacing in wall shower valve. replace and installing gfi plugs in bathroom | $5,000 |
| Nov 9, 2011 | Completed final sign-off Dec 2011 | 720 Jones St | Malagic Construction | replace old cabinets (kitchen), tile, bathroom tiles.Details
replace old cabinets (kitchen), tile, bathroom tiles. | $17,000 |
| Oct 20, 2006 | Expired or cancelled expired Mar 2008 | 720 Jones St | F B E And Sons General Const | kitchen & bathroom remodel ape#6 & #27. no structural work no lighting work no window.Details
kitchen & bathroom remodel ape#6 & #27. no structural work no lighting work no window. | $30,000 |
| May 11, 2005 | Completed final sign-off Nov 2005 | 720 Jones St | Frankie English Dba Doe Mabuhay Builders | replace all kitchen cabinets. replace bathroom tub faucetDetails
replace all kitchen cabinets. replace bathroom tub faucet | $15,000 |
| Aug 14, 2000 | Expired or cancelled expired Feb 2001 | 720 Jones St | Vic - 1 Construction | repair hallway throughout, wood flooring,sheetrk,patch all holes,repair garbage chute per h9602430/1Details
repair hallway throughout, wood flooring,sheetrk,patch all holes,repair garbage chute per h9602430/1 | $9,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Strong Builders Construction Inc. (6), S & H Renovations (2), D N S Construction, F B E And Sons General Const, Frankie English Dba Doe Mabuhay Builders, Halyard Inc, Make Ready Maintenance Inc, Malagic Construction, Precision Design & Drafting Inc, Rayco Development Solutions Inc, Vic - 1 Construction
- Architects
- Christopher Sullivan (2), Jacob Herczeg
- Engineers
- Masoud Salamat
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.