Block 3910, lot 001
2 Henry Adams St
- City’s use
- Commercial Retail
- Built
- 1915
- Stories
- 4
- Rooms
- 9 bathrooms
- Building
- 328,508 sq ft
- Lot
- 66,348 sq ft
- Zoning
- M2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 2 Henry Adams St | Sc Builders, Inc | 4/5/fl- ref ti 202606294074 deferred mepsDetails
4/5/fl- ref ti 202606294074 deferred meps | $1,600,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 2 Henry Adams St | Sc Builders, Inc | ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered)Details
ref pa 202606294074 - 4th & 5th fl ti includes structural anchoring of 24 phone booths and providing a new non-structural wall and door to enclose an existing room. no revision to the occupancy. no revisions to (e) meps or life safety. (bldg is fully sprinklered) | $139,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 2 Henry Adams St | Sc Builders, Inc | 4th & 5th fl - includes demo of non-struc'l partitions on 4th 5th fl in select area (n) lights, (n) carpet, paint and acoustic wall panels and refreshing existing millwork. all new or revised meps and life safety work will be deisng build and submitted separately. (bldg is fully sprinklered) pdrDetails
4th & 5th fl - includes demo of non-struc'l partitions on 4th 5th fl in select area (n) lights, (n) carpet, paint and acoustic wall panels and refreshing existing millwork. all new or revised meps and life safety work will be deisng build and submitted separately. (bldg is fully sprinklered) pdr | $454,400 |
| May 6, 2026 | In progress issued Jun 2026 | 2 Henry Adams St | Sc Builders, Inc | 4 & 5/fl-change of use and minor alterations for future tenant together computer inc. change of use from light manufactoring and wholesale sales to b-labortary use and change of use on floor 5 from wholesale sales to labortary use. minor ti to add 2 (n) windows within floor 4. no scope on floor-5.Details
4 & 5/fl-change of use and minor alterations for future tenant together computer inc. change of use from light manufactoring and wholesale sales to b-labortary use and change of use on floor 5 from wholesale sales to labortary use. minor ti to add 2 (n) windows within floor 4. no scope on floor-5. | $30,000 |
| Feb 23, 2026 | In progress issued Apr 2026 | 2 Henry Adams St | Peacock Construction | recommencement and completion of work approved under pa #2022-0331-1273.Details
recommencement and completion of work approved under pa #2022-0331-1273. | $50,000 |
| Jan 26, 2026 | Completed final sign-off Jun 2026 | 2 Henry Adams St | Giampolini & Co Dba Giampolini/Courtney | repainting and repointing. all material to match original or existing.Details
repainting and repointing. all material to match original or existing. | $150,000 |
| Dec 29, 2025 | In progress filed Dec 2025, not yet issued | 2 Henry Adams St | recommencement and completion of work approved under pa# 202203311273.Details
recommencement and completion of work approved under pa# 202203311273. | ||
| Sep 11, 2025 | Completed final sign-off Mar 2026 | 2 Henry Adams St | Metropolitan Electrical Construction | at&t modification of (e) wireless facility consisting of r/r 3 antennas, 3 rrus; remove infinity pp & rbs2206 cabinets; 9 rectifiers & 4 converters; install 1 netsure 7100 w/58v convertion pp; 11 rectifiers; 10 converters; 1 vdc bullet converter; (1) 15amp + (6) 50amp dc breakersDetails
at&t modification of (e) wireless facility consisting of r/r 3 antennas, 3 rrus; remove infinity pp & rbs2206 cabinets; 9 rectifiers & 4 converters; install 1 netsure 7100 w/58v convertion pp; 11 rectifiers; 10 converters; 1 vdc bullet converter; (1) 15amp + (6) 50amp dc breakers | $80,300 |
| Sep 10, 2024 | Completed final sign-off Oct 2024 | 2 Henry Adams St | Eco Fire Sprinklers Inc | 5 year correction , add 1 sprinkler into phone booth addedDetails
5 year correction , add 1 sprinkler into phone booth added | $4,000 |
| Mar 13, 2024 | In progress issued Mar 2025 | 2 Henry Adams St | Endeavor Wireless Construction Inc | t-mobile: remove 6 (e) antennas and install 6 new antennas. remove 6 (e) rrus and install 6 new rrus. remove 4 (e) cabinets, install 1 new cabinet and 1 new rack. install new ppc cabinet. remove all (e) batteries and install 12 new batteries in new cabinet.Details
t-mobile: remove 6 (e) antennas and install 6 new antennas. remove 6 (e) rrus and install 6 new rrus. remove 4 (e) cabinets, install 1 new cabinet and 1 new rack. install new ppc cabinet. remove all (e) batteries and install 12 new batteries in new cabinet. | $85,000 |
| Dec 26, 2023 | Completed final sign-off Jan 2025 | 2 Henry Adams St | Tilson Technology Management Inc | removing all t-mobile equipment, antenna, lines, all cabinets, ice bridge and any associated hardware.there will be no new installation of equipment and no other alterations to the building.Details
removing all t-mobile equipment, antenna, lines, all cabinets, ice bridge and any associated hardware.there will be no new installation of equipment and no other alterations to the building. | $16,280 |
| Oct 11, 2023 | In progress filed Oct 2023, not yet issued | 2 Henry Adams St | 3/f: construction of new restroom cores-in addition to mep, architectural and structural base building infrastructure upgrades throughout the bldg- new shaft construction and goes thru room from 1st flr-shafts will house outside airducts relief air duct and refrigerant piping services flr 1&2.Details
3/f: construction of new restroom cores-in addition to mep, architectural and structural base building infrastructure upgrades throughout the bldg- new shaft construction and goes thru room from 1st flr-shafts will house outside airducts relief air duct and refrigerant piping services flr 1&2. | $500,000 | |
| Mar 21, 2023 | Completed final sign-off Oct 2023 | 2 Henry Adams St | replace metal roll up door to match exisitng (same size and location)Details
replace metal roll up door to match exisitng (same size and location) | $16,000 | |
| Dec 30, 2022 | In progress issued Nov 2023 | 2 Henry Adams St | Fire Detection Unlimited | 1-3/flrs: modification of existing e3 (gaemwell/fci) fire alarm system, new speaker strobes in all existing tenant spaces only per sffd requirement.Details
1-3/flrs: modification of existing e3 (gaemwell/fci) fire alarm system, new speaker strobes in all existing tenant spaces only per sffd requirement. | $393,922 |
| Nov 18, 2022 | Completed final sign-off Dec 2023 | 2 Henry Adams St | Ravig Inc Dba Salient Global Technologi, Endeavor Wireless Construction Inc | remove an dreplace 2 raycap 3315 surge surpressors wi 3 racapsurge supr. replace rack mounted 22 60 surge sup w 3 rack mntd.2 hybrid cables w 3 12x24 hybrid cables.replace surge surge mounts w 2 new mnts. 3 antennas, cbrs 4408 b48 radio units @ antennas,4 4449 units @antenntasDetails
remove an dreplace 2 raycap 3315 surge surpressors wi 3 racapsurge supr. replace rack mounted 22 60 surge sup w 3 rack mntd.2 hybrid cables w 3 12x24 hybrid cables.replace surge surge mounts w 2 new mnts. 3 antennas, cbrs 4408 b48 radio units @ antennas,4 4449 units @antenntas | $40,000 |
| Aug 3, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Henry Adams St | Modus Rex Llc | dish install 3 new antennas, 6 new rrus, 1 new equipment platform with 1 new cabinet, 2 new batteriesDetails
dish install 3 new antennas, 6 new rrus, 1 new equipment platform with 1 new cabinet, 2 new batteries | $145,000 |
| Apr 28, 2022 | Never finaled filed Apr 2022, never issued | 2 Henry Adams St | Fire Detection Unlimited | fire as-built submittal to pa# 201912119181.Details
fire as-built submittal to pa# 201912119181. | |
| Mar 31, 2022 | Never finaled issued Apr 2022, no final | 2 Henry Adams St | 3/f: demo of entire floor, tenant partitions, walls, ceilings, mechanical and electrical lines. no new construction.Details
3/f: demo of entire floor, tenant partitions, walls, ceilings, mechanical and electrical lines. no new construction. | $50,000 | |
| Mar 10, 2022 | Completed final sign-off Oct 2022 | 2 Henry Adams St | Ericsson Inc Dba E U S Inc | at&t: remove + install 9 antennas, 3 rru's. install 6 new twin diplexers, 1 new antenna mount, rf safety signs, barriers + stripping. remove/replace 16 batteries. remove 1 5216 from rack. install 3 rectifiers, 4 new battery in (e) dcpp, 2 new seismic wall bracing. 1 6648 baseband in (e) rack.Details
at&t: remove + install 9 antennas, 3 rru's. install 6 new twin diplexers, 1 new antenna mount, rf safety signs, barriers + stripping. remove/replace 16 batteries. remove 1 5216 from rack. install 3 rectifiers, 4 new battery in (e) dcpp, 2 new seismic wall bracing. 1 6648 baseband in (e) rack. | $45,000 |
| Jan 21, 2022 | Expired or cancelled withdrawn Mar 2024 | 2 Henry Adams St | t-mobile: remove 6 extg antennas, install 3 nw antennas, install 6 new rrus, remove 4 extg cabinets, install 1 new cabinet and 1 nw 19" rack, install new 100a breaker, remove all extg batteries and install 12 new batteries.Details
t-mobile: remove 6 extg antennas, install 3 nw antennas, install 6 new rrus, remove 4 extg cabinets, install 1 new cabinet and 1 nw 19" rack, install new 100a breaker, remove all extg batteries and install 12 new batteries. | $55,000 | |
| Oct 13, 2021 | Completed final sign-off Mar 2022 | 2 Henry Adams St | True North Signs & Graphic Services | 4 evacuation signs for roof deck.Details
4 evacuation signs for roof deck. | $1,400 |
| Sep 15, 2021 | Completed final sign-off Apr 2022 | 2 Henry Adams St | Eco Fire Sprinklers Inc | install 2 new pendent sprinklers for new penthouse on roof, ran from existing 5th floor system. ref. pa 201610079829.Details
install 2 new pendent sprinklers for new penthouse on roof, ran from existing 5th floor system. ref. pa 201610079829. | $7,580 |
| Jun 22, 2021 | Completed final sign-off Sep 2021 | 2 Henry Adams St | permit to memoralize planning commission authority 49,999sf of pdr to be configured to office between 4th & 5th fls. land use occupancy for fls. 1-3 and roof to remain unchanged, permit issued to finalize planning approval of land use category and enable payment of associated imapct feesDetails
permit to memoralize planning commission authority 49,999sf of pdr to be configured to office between 4th & 5th fls. land use occupancy for fls. 1-3 and roof to remain unchanged, permit issued to finalize planning approval of land use category and enable payment of associated imapct fees | ||
| May 27, 2021 | Completed final sign-off Apr 2022 | 2 Henry Adams St | C C I Commercial Construction & Improv | revision to roof and stairs lighting. ref. bpa 202010287613Details
revision to roof and stairs lighting. ref. bpa 202010287613 | $5,000 |
| May 20, 2021 | Completed final sign-off Jan 2022 | 2 Henry Adams St | Fire Detection Unlimited | modification of an existing voice alarm (evacs) fire alarm system with distributed audio: new audible and visual occupant notification devices will be provided in the penthouse and path of egress.Details
modification of an existing voice alarm (evacs) fire alarm system with distributed audio: new audible and visual occupant notification devices will be provided in the penthouse and path of egress. | $16,740 |
| Apr 1, 2021 | Completed final sign-off Jul 2021 | 2 Henry Adams St | Fire Detection Unlimited | modification to an existing evacs fire alarm system with distributed audio: new audible & visual occupant notification devices will be provided throughout the commons areas of the scope of work area as per code & shall be powered by existing remote power supplies. fdu will provide detection & con...Details
modification to an existing evacs fire alarm system with distributed audio: new audible & visual occupant notification devices will be provided throughout the commons areas of the scope of work area as per code & shall be powered by existing remote power supplies. fdu will provide detection & con... | $25,456 |
| Mar 31, 2021 | Completed final sign-off Aug 2021 | 2 Henry Adams St | True North Signs & Graphic Services | (7) evacuation signs for interior useDetails
(7) evacuation signs for interior use | $2,450 |
| Mar 24, 2021 | Completed final sign-off Jun 2021 | 2 Henry Adams St | Eco Fire Sprinklers Inc | t.i. relocate fire sprinklers per new tenant ceiling configurations & nfpa 13Details
t.i. relocate fire sprinklers per new tenant ceiling configurations & nfpa 13 | $5,000 |
| Dec 7, 2020 | Completed final sign-off May 2022 | 2 Henry Adams St | C C I Commercial Construction & Improv | title-24 for pa #2020 1005 5940 elevator lobbyDetails
title-24 for pa #2020 1005 5940 elevator lobby | $2,000 |
| Oct 28, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | C C I Commercial Construction & Improv | revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit.Details
revision to pa #2018-0913-9936: new roof deck and exit path walkway, extensin of stair #2 to roof. fire/life safety, mep, sprinkler under separate permit. | $750,000 |
| Oct 27, 2020 | Never finaled filed Oct 2020, never issued | 2 Henry Adams St | Specialized Graphics Inc | install 1 illuminated parapet sign.Details
install 1 illuminated parapet sign. | $16,800 |
| Oct 27, 2020 | Completed final sign-off Jun 2021 | 2 Henry Adams St | Eco Fire Sprinklers Inc | add one new pedent sprinkler in elevator 2 lobby @ roof level. demo existing 3/4" pipe and shaft sprinklers on floors 1-5 around elevator 3.Details
add one new pedent sprinkler in elevator 2 lobby @ roof level. demo existing 3/4" pipe and shaft sprinklers on floors 1-5 around elevator 3. | $15,000 |
| Oct 27, 2020 | Never finaled issued Jan 2021, no final | 2 Henry Adams St | Specialized Graphics Inc | install 3 illuminated blade signs.Details
install 3 illuminated blade signs. | $16,800 |
| Oct 5, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | mods to freight elevator c - 2 hr rated intumescent paint to (e) shaftwell hoistway, floor vestibules, machine rm & structr support for elevator cab (elevator & equp under separate permit). associated fire only sprinkler & alarm permit for interface (recall & saunt) as per pre-app forms on sh.g1.3 &Details
mods to freight elevator c - 2 hr rated intumescent paint to (e) shaftwell hoistway, floor vestibules, machine rm & structr support for elevator cab (elevator & equp under separate permit). associated fire only sprinkler & alarm permit for interface (recall & saunt) as per pre-app forms on sh.g1.3 & | $150,000 | |
| Oct 5, 2020 | Completed final sign-off Apr 2022 | 2 Henry Adams St | C C I Commercial Construction & Improv | revision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permiDetails
revision to approved pa 201809139936 penthouse, roofdeck & elevators. revisions are for elevator # 3 only. mods to hoistway sfaft & structr support for (n) elevator cab. (elevat cab under separate permit). mods to elevator lobbies all flrs & mach rm improvments. mep, life safety under separate permi | $85,000 |
| Sep 29, 2020 | Completed final sign-off Jan 2022 | 2 Henry Adams St | Fire Detection Unlimited | modification of (e) emergency voice alarm (evacs) fire alarm system with distributed audio. fdu will interface with 7 new horizontal exit doors on floors 1 through 3 only. ref t.i.201909030442 maher n/a.Details
modification of (e) emergency voice alarm (evacs) fire alarm system with distributed audio. fdu will interface with 7 new horizontal exit doors on floors 1 through 3 only. ref t.i.201909030442 maher n/a. | $19,800 |
| Sep 29, 2020 | Completed final sign-off Jan 2022 | 2 Henry Adams St | Fire Detection Unlimited | modification of (e) emergency voice alarm (evacs) f/a system with distributed audio: provide deprogramming and safe-off so that others can replce and modernize the (3) elevator shafts. new audible & visual occupant notification devices will be provided on roof ph as per code. 201809139936.Details
modification of (e) emergency voice alarm (evacs) f/a system with distributed audio: provide deprogramming and safe-off so that others can replce and modernize the (3) elevator shafts. new audible & visual occupant notification devices will be provided on roof ph as per code. 201809139936. | $25,460 |
| Sep 23, 2020 | Never finaled issued Feb 2021, no final | 2 Henry Adams St | Hirsch Construction Corp. | t.i.: new example toilet room, new display showroom, display fixtures, updated lighting, relocate mech w/ new underfloor distribution, ex. residential kitchen, boh & new interior storefront falling coorider. all floors, ceilings & walls to be remodeled & exterior storefront shall remain.Details
t.i.: new example toilet room, new display showroom, display fixtures, updated lighting, relocate mech w/ new underfloor distribution, ex. residential kitchen, boh & new interior storefront falling coorider. all floors, ceilings & walls to be remodeled & exterior storefront shall remain. | $875,000 |
| Sep 16, 2020 | Never finaled issued Dec 2020, no final | 2 Henry Adams St | Fire Detection Unlimited | reviision to pa 2019-1118-7495 removal of 2 hour rated pathwayDetails
reviision to pa 2019-1118-7495 removal of 2 hour rated pathway | $30,000 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 7 sets of dimension letteres on (e) canopies. maher n/a.Details
install 7 sets of dimension letteres on (e) canopies. maher n/a. | $7,000 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 3 non-illuminated single sided panel signs 24x36in, 2 henry adams, 1909 alameda, logo samsara.Details
install 3 non-illuminated single sided panel signs 24x36in, 2 henry adams, 1909 alameda, logo samsara. | $3,000 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 1 set of dimensional logo, single sided, wall mounted, 16ftx70in.Details
install 1 set of dimensional logo, single sided, wall mounted, 16ftx70in. | $1,000 |
| Jul 2, 2020 | Never finaled issued Oct 2020, no final | 2 Henry Adams St | Specialized Graphics Inc | install 17 non-illuminated double sided tenant blade signs, 24x24in, 2.5in thickness,Details
install 17 non-illuminated double sided tenant blade signs, 24x24in, 2.5in thickness, | $17,000 |
| Mar 16, 2020 | Never finaled issued Mar 2020, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Jan 22, 2020 | Completed final sign-off Mar 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | new smoke detectors, door holders and smoke curtain along (n) horizontal fire exit paths; with t-24. ref app#201909030442Details
new smoke detectors, door holders and smoke curtain along (n) horizontal fire exit paths; with t-24. ref app#201909030442 | $40,000 |
| Jan 17, 2020 | Completed final sign-off Sep 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | includes (n) main gas line anchorage to exterior brick masonary facade from ground to roof. anchors to attach at mortar joints only.Details
includes (n) main gas line anchorage to exterior brick masonary facade from ground to roof. anchors to attach at mortar joints only. | $3,000 |
| Jan 6, 2020 | Never finaled issued Jan 2020, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Jan 6, 2020 | Completed final sign-off May 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | replace (e) stair from 5th floor to roof penthouse;Details
replace (e) stair from 5th floor to roof penthouse; | $20,000 |
| Dec 26, 2019 | Expired or cancelled cancelled Jan 2026 | 2 Henry Adams St | renovation of extg floors ground through roof, include new floor openings and rated shaft enclosure. no rooftop equipment.Details
renovation of extg floors ground through roof, include new floor openings and rated shaft enclosure. no rooftop equipment. | $70,000 | |
| Dec 11, 2019 | Never finaled issued Feb 2020, no final | 2 Henry Adams St | Fire Detection Unlimited | modification of an (e) emergency voice alarm (evacs) fire alarm system with distributed audio: relocation of (e) & new a/v occupant notification devices will be provided througout the common areas of the 4th & 5th floors only as per code, new remote power supplies, amplifiers, battery. add 99dd, 8sdDetails
modification of an (e) emergency voice alarm (evacs) fire alarm system with distributed audio: relocation of (e) & new a/v occupant notification devices will be provided througout the common areas of the 4th & 5th floors only as per code, new remote power supplies, amplifiers, battery. add 99dd, 8sd | $95,000 |
| Nov 20, 2019 | Never finaled issued Nov 2019, no final | 1990 Alameda St | add 1990 alameda st to 3910/001. ref 201909111373 & 201909111376.Details
add 1990 alameda st to 3910/001. ref 201909111373 & 201909111376. | ||
| Nov 19, 2019 | Completed final sign-off Mar 2020 | 2 Henry Adams St | Eco Fire Sprinklers Inc | 4th & 5th floor: demo existing sprinklers. relocate 189 sprinklers in office ti improvementsDetails
4th & 5th floor: demo existing sprinklers. relocate 189 sprinklers in office ti improvements | $80,000 |
| Nov 18, 2019 | Completed final sign-off Jan 2022 | 2 Henry Adams St | Fire Detection Unlimited, C C I Commercial Construction & Improv | install (n) emergency voice alarm (evacs) fire alarm sys w/ distributed audio. provide modedernization of (2) passenger elevators & (1) freight elevator. (n) audible & visual occupant notification devices will be provided throuhout common core areas of the 1st & 3rd fl onlyDetails
install (n) emergency voice alarm (evacs) fire alarm sys w/ distributed audio. provide modedernization of (2) passenger elevators & (1) freight elevator. (n) audible & visual occupant notification devices will be provided throuhout common core areas of the 1st & 3rd fl only | $186,900 |
| Nov 18, 2019 | Completed final sign-off Dec 2021 | 2 Henry Adams St | Fire Detection Unlimited, C C I Commercial Construction & Improv | modify emergency alarm (evacs) fire alarm sys w/ distributed audio. provide (n) audible & visual devices in common area of sow area only per code & powered by (e) remote power supplies w/ battery backup & activated thru (e) facu. all (e) to remainDetails
modify emergency alarm (evacs) fire alarm sys w/ distributed audio. provide (n) audible & visual devices in common area of sow area only per code & powered by (e) remote power supplies w/ battery backup & activated thru (e) facu. all (e) to remain | $18,740 |
| Nov 18, 2019 | Completed final sign-off Mar 2020 | 2 Henry Adams St | Fire Detection Unlimited, C C I Commercial Construction & Improv | modify emergency voice alarm (evacs) fire alarm sys w/ distributed audio. provide (n) audible & visual devices in common area in sow area on 4th & 5th fl. (e) panels & power supplies will remainDetails
modify emergency voice alarm (evacs) fire alarm sys w/ distributed audio. provide (n) audible & visual devices in common area in sow area on 4th & 5th fl. (e) panels & power supplies will remain | $15,910 |
| Nov 18, 2019 | Completed final sign-off Jan 2022 | 2 Henry Adams St | Fire Detection Unlimited, C C I Commercial Construction & Improv | install (n) emergency comm sys (1)(n)2-way communications base station (13)(n) call stations @ all elevator landings above & below level of egress. (1)(n) supervised power supply (13)(n) photo-luminescent wall sign. (1)upgs monitor for monitoringDetails
install (n) emergency comm sys (1)(n)2-way communications base station (13)(n) call stations @ all elevator landings above & below level of egress. (1)(n) supervised power supply (13)(n) photo-luminescent wall sign. (1)upgs monitor for monitoring | $57,466 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Oct 31, 2019 | Completed final sign-off May 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | replacement of elevator pit at e elevator 2. elevator to accommodate new machineryDetails
replacement of elevator pit at e elevator 2. elevator to accommodate new machinery | $25,000 |
| Oct 22, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | Novo Construction Inc | interior construction at level 4 & level 5 for an interior connecting stair & skylight alterationsDetails
interior construction at level 4 & level 5 for an interior connecting stair & skylight alterations | $10,000 |
| Oct 18, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | Novo Construction Inc | level 4 - deferred mep submittal for pa 2019-0911-1373Details
level 4 - deferred mep submittal for pa 2019-0911-1373 | $5,000 |
| Oct 18, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | Novo Construction Inc | level 5 - deferred mep submittal for pa 2019-0911-1376Details
level 5 - deferred mep submittal for pa 2019-0911-1376 | $5,000 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Oct 8, 2019 | Completed final sign-off May 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | 2m/f: guardrail permit. revision to #201902062284Details
2m/f: guardrail permit. revision to #201902062284 | $20,000 |
| Oct 7, 2019 | Never finaled issued Dec 2019, no final | 2 Henry Adams St | Novo Construction Inc | l5 - 5th fl "a bay" interior construction, new non load bearing partitions, glazing, doors, millwork, lighting, mep.Details
l5 - 5th fl "a bay" interior construction, new non load bearing partitions, glazing, doors, millwork, lighting, mep. | $1,610,000 |
| Sep 11, 2019 | Never finaled issued Oct 2019, no final | 2 Henry Adams St | Novo Construction Inc | 5th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal.Details
5th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal. | $150,244 |
| Sep 11, 2019 | Never finaled issued Oct 2019, no final | 2 Henry Adams St | Novo Construction Inc | 4th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal.maher n/a.Details
4th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal.maher n/a. | $150,244 |
| Sep 4, 2019 | Completed final sign-off Aug 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | ref 201904157934 mech & ele work onlyDetails
ref 201904157934 mech & ele work only | |
| Sep 4, 2019 | Completed final sign-off Sep 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | revision to app#201902062284, structural work only: replacement and relocation of extg wood beam to steam beam, connection detail included. n/a for maherDetails
revision to app#201902062284, structural work only: replacement and relocation of extg wood beam to steam beam, connection detail included. n/a for maher | $20,000 |
| Sep 3, 2019 | Completed final sign-off Feb 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | renovation of (e) tenant space floor 1,2,3. retrofit of (e) opening along column line 18 per fine separation requirement. maher naDetails
renovation of (e) tenant space floor 1,2,3. retrofit of (e) opening along column line 18 per fine separation requirement. maher na | $50,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2020 | 2 Henry Adams St | True North Signs & Graphic Services | 3 evacuation signsDetails
3 evacuation signs | $1,050 |
| Jul 19, 2019 | Never finaled issued Jul 2019, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Jul 18, 2019 | Completed final sign-off May 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | partial mezzanine framing plan ref 201902062284Details
partial mezzanine framing plan ref 201902062284 | $1,000 |
| Jul 11, 2019 | Never finaled issued Jul 2019, no final | 2 Henry Adams St | Eco Fire Sprinklers Inc | ref pa# 201902062284; to relocate a total of 12 heads on the lobby fl. to add a total of 16 new heads on the lobby fl.Details
ref pa# 201902062284; to relocate a total of 12 heads on the lobby fl. to add a total of 16 new heads on the lobby fl. | $8,000 |
| Jun 28, 2019 | Completed final sign-off Apr 2022 | 2 Henry Adams St | Eco Fire Sprinklers Inc | 4th & 5th - relocate a total of 7 heads, add 2 new. ref pa 2019-0415-7934 and 2019-0211-2616Details
4th & 5th - relocate a total of 7 heads, add 2 new. ref pa 2019-0415-7934 and 2019-0211-2616 | $25,000 |
| May 28, 2019 | Never finaled issued Jun 2019, no final | 2 Henry Adams St | C C I Commercial Construction & Improv | gr fl showroom renovation including new partitons, elec, plumbing, interior storefrontDetails
gr fl showroom renovation including new partitons, elec, plumbing, interior storefront | $500,000 |
| May 24, 2019 | Completed final sign-off Dec 2020 | 2 Henry Adams St | Bigham Taylor Roofing Co | partial tear-off. install 1/4" dens deck and attach 60 mil sarnafil s327 reflective gray roofing system.Details
partial tear-off. install 1/4" dens deck and attach 60 mil sarnafil s327 reflective gray roofing system. | $675,000 |
| Apr 22, 2019 | Never finaled issued May 2021, no final | 2 Henry Adams St | C C I Commercial Construction & Improv | exterior facade improvement & minor interior work include facade repair, window & doors. restoration & aesthetic improvements. new metal awnings. demo of portion of 1 bay @ (e) ground flr facade & demo of portion of same bay interior floor framing & incl structural framing for new flr. mep seperate.Details
exterior facade improvement & minor interior work include facade repair, window & doors. restoration & aesthetic improvements. new metal awnings. demo of portion of 1 bay @ (e) ground flr facade & demo of portion of same bay interior floor framing & incl structural framing for new flr. mep seperate. | $350,000 |
| Apr 15, 2019 | Completed final sign-off Aug 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | new 4th and 5th fl. bike storage rooms and ada restroom storage lockers and showers in restrooms, mep, and life safery/fire alarm under sep permitDetails
new 4th and 5th fl. bike storage rooms and ada restroom storage lockers and showers in restrooms, mep, and life safery/fire alarm under sep permit | $75,000 |
| Feb 11, 2019 | Completed final sign-off Aug 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | construction of new south restroom core on floors 4 and 5. remodel north restroom core on floors 4 and 5. permit submitted under ab-017, unoccupied space. fire/life safety under sep permitDetails
construction of new south restroom core on floors 4 and 5. remodel north restroom core on floors 4 and 5. permit submitted under ab-017, unoccupied space. fire/life safety under sep permit | $200,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window.Details
renovation of tenant space (floors 1 & 2m) and lobby. includes the expansion of the existing level 1 toilet core, adding two designated ada, unisex toilet rooms. relocate stairs. no exteriors work. no refacing frams, mulions or glazing at window. | $650,000 |
| Dec 27, 2018 | Completed final sign-off Jan 2020 | 2 Henry Adams St | Ericsson Inc Dba E U S Inc | att modification: r&r 5 (e) antennas w/ 5 (n) antennas; install 1 (n) antenna; remove 3 (e) rrvs' install 9 (n) rrv's & other small equip, no change to batteries.Details
att modification: r&r 5 (e) antennas w/ 5 (n) antennas; install 1 (n) antenna; remove 3 (e) rrvs' install 9 (n) rrv's & other small equip, no change to batteries. | $35,000 |
| Dec 12, 2018 | Expired or cancelled cancelled Nov 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | interior tenant improvement of partial 5th floor including partitions, millwork and finishes. m.e.p and life safety under separate permit.Details
interior tenant improvement of partial 5th floor including partitions, millwork and finishes. m.e.p and life safety under separate permit. | $1,500,000 |
| Dec 11, 2018 | Completed final sign-off Feb 2019 | 2 Henry Adams St | C C I Commercial Construction & Improv | ti for sute 160 - new furniture showroom. existing hvac and lighting to remain. new breakroomDetails
ti for sute 160 - new furniture showroom. existing hvac and lighting to remain. new breakroom | $95,000 |
| Nov 13, 2018 | Expired or cancelled cancelled Jul 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | fit out of 4th fl. space with speculative suite walls, millwork, mechanical and elec systems. n/a for maher.Details
fit out of 4th fl. space with speculative suite walls, millwork, mechanical and elec systems. n/a for maher. | $1,500,000 |
| Sep 13, 2018 | Completed final sign-off Apr 2022 | 2 Henry Adams St | C C I Commercial Construction & Improv | elevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairsDetails
elevator retrofit demo of (e) elevator system & shaft, new elevator. new elevator lobby. new roof, new walkway pad. curbs, new roof deck. new penthouse interior stairs | $1,200,000 |
| Jul 10, 2018 | Completed final sign-off Mar 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | new ground floor switchgear room rated doors and electrical equipment. fire/life safety inder separate permit. ref app#201806152036 for other electrical work.Details
new ground floor switchgear room rated doors and electrical equipment. fire/life safety inder separate permit. ref app#201806152036 for other electrical work. | $20,000 |
| Jun 29, 2018 | Completed final sign-off Jul 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | demo of interior finishes, casework, ceiling assembly and light fixtures and non load bearing partitions only. submitted under ab-107 for unoccupied spaces. tenant improvement and life safety/sprinklers under sep permit maher naDetails
demo of interior finishes, casework, ceiling assembly and light fixtures and non load bearing partitions only. submitted under ab-107 for unoccupied spaces. tenant improvement and life safety/sprinklers under sep permit maher na | $150,000 |
| Jun 15, 2018 | Completed final sign-off Mar 2021 | 2 Henry Adams St | C C I Commercial Construction & Improv | construction of electrical risers from ground fl to central building core electrical & telecomrooms on 4th & 5th fls; new mechanical rooftop units and duct shafts connecting to 4th & 5th fl. mep included. this permit is submitted under ab-017 unoccupied space. conduit through 1,2,3rd floorDetails
construction of electrical risers from ground fl to central building core electrical & telecomrooms on 4th & 5th fls; new mechanical rooftop units and duct shafts connecting to 4th & 5th fl. mep included. this permit is submitted under ab-017 unoccupied space. conduit through 1,2,3rd floor | $2,000,000 |
| Jun 15, 2018 | Expired or cancelled cancelled Nov 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | construction of new south restroom core on 4th and 5th floors. remodel north restroom core on 4th & 5th floor. mepk included. this permit is submitted under ab-017 unoccupied space. n/a for maherDetails
construction of new south restroom core on 4th and 5th floors. remodel north restroom core on 4th & 5th floor. mepk included. this permit is submitted under ab-017 unoccupied space. n/a for maher | $200,000 |
| Jun 1, 2018 | Completed final sign-off Dec 2018 | 2 Henry Adams St | C C I Commercial Construction & Improv | 1st & 2nd fl: interior renovation - new partitions, walls, plywood finishes, floor finishes, base electrical outlet, sandblasting-wood beams only. fully sprinklered. maher naDetails
1st & 2nd fl: interior renovation - new partitions, walls, plywood finishes, floor finishes, base electrical outlet, sandblasting-wood beams only. fully sprinklered. maher na | $150,000 |
| Mar 30, 2018 | Completed final sign-off Jul 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | ground and second floor: demolition only under ab-017, unoccupied area. scope includes non-load bearing partitions, floors & framing, finishes, electrical and plumbing & millwork. mep & fire/life safety under sep permit. maher naDetails
ground and second floor: demolition only under ab-017, unoccupied area. scope includes non-load bearing partitions, floors & framing, finishes, electrical and plumbing & millwork. mep & fire/life safety under sep permit. maher na | $45,000 |
| Oct 13, 2017 | Completed final sign-off Aug 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | demolition only of convenience staircase connecting 2nd and 3rd floors and infill remaining fenestration. n/a for maherDetails
demolition only of convenience staircase connecting 2nd and 3rd floors and infill remaining fenestration. n/a for maher | $8,500 |
| Jul 25, 2017 | Completed final sign-off Aug 2017 | 2 Henry Adams St | Eco Fire Sprinklers Inc | install 3 new sprinklers relocate 1 in area of work for ti. ref pa 2017-0504-5686Details
install 3 new sprinklers relocate 1 in area of work for ti. ref pa 2017-0504-5686 | $2,000 |
| Jun 21, 2017 | Expired or cancelled withdrawn Jan 2022 | 2 Henry Adams St | modification to an extg t-mobile wireless telecommunication facility. scope of work consisted of replacing pbc-6500 with a pbc-6200 cabinet. adding 6 new antennas on new masts. install 1 frp screen box. install 6 new rrus next to antennas. lower extg gps antenna.Details
modification to an extg t-mobile wireless telecommunication facility. scope of work consisted of replacing pbc-6500 with a pbc-6200 cabinet. adding 6 new antennas on new masts. install 1 frp screen box. install 6 new rrus next to antennas. lower extg gps antenna. | $25,000 | |
| May 4, 2017 | Completed final sign-off Oct 2017 | 2 Henry Adams St | C C I Commercial Construction & Improv | 2nd floor - create a new exit stairway access and vestibule on the 2nd floor structural included. rated walls some lighting, signage. no plumbing disabled access compliance under pa 2016-1007-9829 per ab-056. n/a maher ordinanceDetails
2nd floor - create a new exit stairway access and vestibule on the 2nd floor structural included. rated walls some lighting, signage. no plumbing disabled access compliance under pa 2016-1007-9829 per ab-056. n/a maher ordinance | $45,000 |
| Apr 26, 2017 | Completed final sign-off Jul 2017 | 2 Henry Adams St | Electric Tech Construction Inc | att mobility r and r 1 e antenna with 1 new antenna secor a, 3 e , rrus with 3 n rrus, relocate 1 e antenna to new standoff mount, install 1 new a2 module, 6 new rrus, remove e cabinet, paint all antennas to match buildingDetails
att mobility r and r 1 e antenna with 1 new antenna secor a, 3 e , rrus with 3 n rrus, relocate 1 e antenna to new standoff mount, install 1 new a2 module, 6 new rrus, remove e cabinet, paint all antennas to match building | $30,000 |
| Mar 15, 2017 | Completed final sign-off Aug 2020 | 2 Henry Adams St | C C I Commercial Construction & Improv | demo only including extg non load bearing partitions, doors, lighting, finish flooring. no structural work involved. disabled access work related to this construction is being done under app#201610079829. n/a for maher.Details
demo only including extg non load bearing partitions, doors, lighting, finish flooring. no structural work involved. disabled access work related to this construction is being done under app#201610079829. n/a for maher. | $500,000 |
| Oct 7, 2016 | Completed final sign-off Aug 2017 | 2 Henry Adams St | comply with disabled access required under permit# 2016/10/07/9829. ab-56 path of traval verification. ** maher: n//a **Details
comply with disabled access required under permit# 2016/10/07/9829. ab-56 path of traval verification. ** maher: n//a ** | ||
| Sep 16, 2016 | Never finaled issued Nov 2016, no final | 2 Henry Adams St | C C I Commercial Construction & Improv | 3rd floor - demolition only including non-load bearing partitions, doors, lighting, finish flooring. no structural work. this is a vacant unoccupied space filed under ab-17. no rated construction is to be altered with this demo; maher n/aDetails
3rd floor - demolition only including non-load bearing partitions, doors, lighting, finish flooring. no structural work. this is a vacant unoccupied space filed under ab-17. no rated construction is to be altered with this demo; maher n/a | $25,000 |
| Jul 22, 2016 | Expired or cancelled cancelled Jan 2026 | 2 Henry Adams St | construction of 2 hour rated corridor to connect egress stair #2 amd enclose intercommunicating stair at 2nd flr w/rated construction. maher naDetails
construction of 2 hour rated corridor to connect egress stair #2 amd enclose intercommunicating stair at 2nd flr w/rated construction. maher na | $75,000 | |
| Apr 11, 2016 | Never finaled filed Apr 2016, never issued | 2 Henry Adams St | suite 110 install title 24 controls and program. ref 201601278081Details
suite 110 install title 24 controls and program. ref 201601278081 | ||
| Apr 11, 2016 | Completed final sign-off May 2016 | 2 Henry Adams St | Athena Electrical Construction Co | suite 110 install title 24 controls and program ref 201601278081Details
suite 110 install title 24 controls and program ref 201601278081 | $3,000 |
| Mar 9, 2016 | Completed final sign-off Feb 2017 | 2 Henry Adams St | Electric Tech Construction Inc | relocate sectors a/b to rooftop with ancillary equip, r/r 6 e antennas with 6 new antenns, install 2 new antennas for sector b/c, 3 new rru-32, 3 n rrus-11 w/a-2, relocate 5 e rrus-11, r/r 3 e dc2 w/3 n dc6,12 runs coax,new dus41,new xmv, r/r/4e dtmas w/2 new dtmas,r/r cable tray away from fire escDetails
relocate sectors a/b to rooftop with ancillary equip, r/r 6 e antennas with 6 new antenns, install 2 new antennas for sector b/c, 3 new rru-32, 3 n rrus-11 w/a-2, relocate 5 e rrus-11, r/r 3 e dc2 w/3 n dc6,12 runs coax,new dus41,new xmv, r/r/4e dtmas w/2 new dtmas,r/r cable tray away from fire esc | $45,000 |
| Feb 19, 2016 | Completed final sign-off Aug 2017 | 2 Henry Adams St | Eco Fire Sprinklers Inc | 1st floor suite 110 - install 4 new pendent sprinklers & 2 new upright sprinklers. relocate 4 upright sprinkelrs in area of work for tenant improvement. no bracing to be update. rer pa #201601278081. n/a maher ordinanceDetails
1st floor suite 110 - install 4 new pendent sprinklers & 2 new upright sprinklers. relocate 4 upright sprinkelrs in area of work for tenant improvement. no bracing to be update. rer pa #201601278081. n/a maher ordinance | $4,000 |
| Jan 27, 2016 | Completed final sign-off May 2016 | 2 Henry Adams St | C C I Commercial Construction & Improv | #110- 1st floor: tenant imporvement for suite#110. install partition walls and kitchenette for office electrical and lighting as necessary. maher naDetails
#110- 1st floor: tenant imporvement for suite#110. install partition walls and kitchenette for office electrical and lighting as necessary. maher na | $50,000 |
| Dec 21, 2015 | Completed final sign-off Jun 2016 | 2 Henry Adams St | Athena Electrical Construction Co | suite #152 - replace all lighting with title 24 compatible lighting & controls. n/a maher ordinanceDetails
suite #152 - replace all lighting with title 24 compatible lighting & controls. n/a maher ordinance | $3,000 |
| Dec 1, 2015 | Completed final sign-off Jan 2016 | 2 Henry Adams St | Eco Fire Sprinklers Inc | install 3 new pendent sprinklers, relocate 2, install 2 new upright, relocate 2 upright sprinklers in area of work for ti. no main piping in scope. no bracing updatedDetails
install 3 new pendent sprinklers, relocate 2, install 2 new upright, relocate 2 upright sprinklers in area of work for ti. no main piping in scope. no bracing updated | $4,500 |
| Oct 7, 2015 | Completed final sign-off Mar 2016 | 2 Henry Adams St | C C I Commercial Construction & Improv | 2nd floor minor ti including partitions, doors and and finishes with minor mechanical/electrical. mep and life safety/sprinkler under separate permit. maher naDetails
2nd floor minor ti including partitions, doors and and finishes with minor mechanical/electrical. mep and life safety/sprinkler under separate permit. maher na | $150,000 |
| Jul 7, 2015 | Completed final sign-off Nov 2015 | 2 Henry Adams St | Eco Fire Sprinklers Inc | sprinkler work - upgrade seismic bracing in 4 story bldg. n/a maher ordinanceDetails
sprinkler work - upgrade seismic bracing in 4 story bldg. n/a maher ordinance | $20,000 |
| Jul 6, 2015 | Never finaled issued Jul 2015, no final | 2 Henry Adams St | C C I Commercial Construction & Improv | tenant improvement for suite #100. install non-load bearing partition walls for showroom for display of tiles. (country floors)Details
tenant improvement for suite #100. install non-load bearing partition walls for showroom for display of tiles. (country floors) | $50,000 |
| Jun 11, 2015 | Expired or cancelled cancelled Sep 2017 | 2 Henry Adams St | t-mobile wireless proposes to modify an (e) wireless communicaiton site. the scope will include: install (3) new antennas, install 3 new rrus, new frp screen wall at sector (b), lower (e) t-mobile gps antenna & utilize (e) space hgs fiber. n/a maher ordinanceDetails
t-mobile wireless proposes to modify an (e) wireless communicaiton site. the scope will include: install (3) new antennas, install 3 new rrus, new frp screen wall at sector (b), lower (e) t-mobile gps antenna & utilize (e) space hgs fiber. n/a maher ordinance | $20,000 | |
| Nov 10, 2014 | Completed final sign-off Oct 2015 | 2 Henry Adams St | Quality Telecom Consultants | remove 9 antennas & replace with 10 antennas. install : 2 diplexers, 2 new ports, 4 surge protectors, 8 remote radio units, 4 additional cables, 1 new cabinet, and replace (e) cable tray. batteries over 50 gal.Details
remove 9 antennas & replace with 10 antennas. install : 2 diplexers, 2 new ports, 4 surge protectors, 8 remote radio units, 4 additional cables, 1 new cabinet, and replace (e) cable tray. batteries over 50 gal. | $10,000 |
| Mar 28, 2014 | Expired or cancelled cancelled Mar 2022 | 2 Henry Adams St | Quality Telecom Consultants | remove & replace 3(e)panel antennas w/3 new panel antenna. install 3 diplexers at equip shelter. paint new rf caution stripping on (e) rooftop & install new rf warning signs. add bracing to all new antennas.verizon wireless. maher ordinance not applicable,no disturbance of at least 50 cu yd of soil.Details
remove & replace 3(e)panel antennas w/3 new panel antenna. install 3 diplexers at equip shelter. paint new rf caution stripping on (e) rooftop & install new rf warning signs. add bracing to all new antennas.verizon wireless. maher ordinance not applicable,no disturbance of at least 50 cu yd of soil. | $10,000 |
| Jan 28, 2014 | Completed final sign-off Mar 2015 | 2 Henry Adams St | Overland Contracting Inc | to obtain final inspection for work approved under pa# 201201273043. all work is complete.Details
to obtain final inspection for work approved under pa# 201201273043. all work is complete. | |
| Jan 13, 2014 | Completed final sign-off Dec 2014 | 2 Henry Adams St | Electric Tech Construction Inc | a modification to an existing unmanned at&t telecommunication facility consisting of adding 3 new rru's, 3 new surge suppressors, a new splice box and new innerduct for fiber and dc power, also 2 new h-frames. compliance ordinance no. 155-13 not required.Details
a modification to an existing unmanned at&t telecommunication facility consisting of adding 3 new rru's, 3 new surge suppressors, a new splice box and new innerduct for fiber and dc power, also 2 new h-frames. compliance ordinance no. 155-13 not required. | $6,000 |
| Oct 25, 2013 | Completed final sign-off Dec 2013 | 2 Henry Adams St | Cci Com'l Constr & Improv**See 985808*** | switch doors and window positions as well as remove and relocate extg window in west room. all work to take place on second floor.Details
switch doors and window positions as well as remove and relocate extg window in west room. all work to take place on second floor. | $5,000 |
| Oct 7, 2013 | Never finaled issued Oct 2013, no final | 2 Henry Adams St | Cci Com'l Constr & Improv**See 985808*** | to obtain title -24. ref app#201306210218Details
to obtain title -24. ref app#201306210218 | $1,000 |
| Sep 23, 2013 | Completed final sign-off Jan 2016 | 2 Henry Adams St | Cisco Fire Sprinklers, Inc. | relocate 50 existing heads and add 4 new heads to match existing. relocate existing fire sprinkler branch lines to accomodate new head locations. install 5 new pendents for new ceilings. (201308214894)Details
relocate 50 existing heads and add 4 new heads to match existing. relocate existing fire sprinkler branch lines to accomodate new head locations. install 5 new pendents for new ceilings. (201308214894) | $5,000 |
| Aug 21, 2013 | Never finaled issued Oct 2013, no final | 2 Henry Adams St | K Brackett Construction | work in unit 160: build 92 linear feet of interior non-load bearing walls between columns (8' tall) steel studs to be used . these walls will divide different rooms(non partition walls).Details
work in unit 160: build 92 linear feet of interior non-load bearing walls between columns (8' tall) steel studs to be used . these walls will divide different rooms(non partition walls). | $2,300 |
| Jun 21, 2013 | Completed final sign-off Nov 2013 | 2 Henry Adams St | t.i. for show place suite #250-295, new patition wall, some structural work for framing(hanger) some cabinet work display. sprinkler and fire alarm revisionsa u nder separated applicationsDetails
t.i. for show place suite #250-295, new patition wall, some structural work for framing(hanger) some cabinet work display. sprinkler and fire alarm revisionsa u nder separated applications | $250,000 | |
| May 28, 2013 | Completed final sign-off Jan 2016 | 2 Henry Adams St | Peninsula Fire Protection Inc | install (4) fire sprinkler heads for new tenant improvements suite 406Details
install (4) fire sprinkler heads for new tenant improvements suite 406 | $2,500 |
| Mar 14, 2013 | Completed final sign-off May 2013 | 2 Henry Adams St | Leung's Construction Corp. | space 406:show room tenant improvement - remove existing ponywall, replace missing tile, construct wall to create storage/office area, furr out one wall and build out a soffit to support motorized window treatment displays.no structural work will be done.no changes to elec.,ltg or mech.Details
space 406:show room tenant improvement - remove existing ponywall, replace missing tile, construct wall to create storage/office area, furr out one wall and build out a soffit to support motorized window treatment displays.no structural work will be done.no changes to elec.,ltg or mech. | $12,000 |
| Feb 19, 2013 | Completed final sign-off Oct 2013 | 2 Henry Adams St | Cci Com'l Constr & Improv**See 985808*** | demolition non structual. reopen an reinforce previously in filled wall opening . see structural drawing. t.i. under seperate permit.Details
demolition non structual. reopen an reinforce previously in filled wall opening . see structural drawing. t.i. under seperate permit. | $5,000 |
| Jul 25, 2012 | Completed final sign-off Sep 2012 | 2 Henry Adams St | Cci Com'l Constr & Improv**See 985808*** | construction new tile display walls for extg showroom. if required, sprinkler under separate permit.Details
construction new tile display walls for extg showroom. if required, sprinkler under separate permit. | $40,000 |
| Jun 20, 2012 | Expired or cancelled withdrawn Dec 2013 | 2 Henry Adams St | a modification to an (e) telecom facility consisting of removing & replacing (3) antennas painted to match (e) bldg, adding (3) (n) dtma, & (n) rets, also adding (6) (n) runs of coax cable in (e) cable tray and a (n) 3206 rbs cabinet.Details
a modification to an (e) telecom facility consisting of removing & replacing (3) antennas painted to match (e) bldg, adding (3) (n) dtma, & (n) rets, also adding (6) (n) runs of coax cable in (e) cable tray and a (n) 3206 rbs cabinet. | $45,000 | |
| May 30, 2012 | Never finaled issued May 2012, no final | 2 Henry Adams St | Cisco Fire Sprinklers, Inc. | relocate 9 sprinklers to cover new wall layout for tenant improvement.Details
relocate 9 sprinklers to cover new wall layout for tenant improvement. | $5,000 |
| Apr 17, 2012 | Completed final sign-off Sep 2012 | 2 Henry Adams St | suite #155-new non bearing partition walls to create storage room, carpet racks. new employee recreation room. m.e.p under seperate permitDetails
suite #155-new non bearing partition walls to create storage room, carpet racks. new employee recreation room. m.e.p under seperate permit | $250,000 | |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 2 Henry Adams St | Cci Com'l Constr & Improv**See 985808*** | demo work to include e tbar grid and tiles in low ceiling area, removal of new drywall partitions, removal of all e carpet flooring and demo of e corridor wall for new roll up doorDetails
demo work to include e tbar grid and tiles in low ceiling area, removal of new drywall partitions, removal of all e carpet flooring and demo of e corridor wall for new roll up door | $18,000 |
| Feb 16, 2012 | Never finaled issued Feb 2012, no final | 2 Henry Adams St | Fluoresco Lighting & Sign | to obtain final inspection for work approved under pa #200706042905. all work is complete.Details
to obtain final inspection for work approved under pa #200706042905. all work is complete. | |
| Feb 9, 2012 | Completed final sign-off Feb 2012 | 2 Henry Adams St | L.D. Strobel Co Ltd | to obtain final inspection for work approved under pa#200502024552 all work has been completed.Details
to obtain final inspection for work approved under pa#200502024552 all work has been completed. | |
| Jan 27, 2012 | Never finaled issued Mar 2012, no final | 2 Henry Adams St | Overland Contracting Inc | sprint wireless facility modification: swap (6) extg panel antennas w/ (6) new mounted to exist strue on roof. replace (3) existg equipment cabinets w/ (2) new inside existg equipment rm. run coaxial from antennas to equipment.Details
sprint wireless facility modification: swap (6) extg panel antennas w/ (6) new mounted to exist strue on roof. replace (3) existg equipment cabinets w/ (2) new inside existg equipment rm. run coaxial from antennas to equipment. | $45,000 |
| Sep 15, 2011 | Completed final sign-off May 2012 | 2 Henry Adams St | Cci Com'l Constr & Improv**See 985808*** | #125 interior remodelling of (e) showroom which includes: demo of non-load bearing walls & load bearing walls, removal of cabinets & relcoation, removal of wall racks - new load bearing walls & non-load bearing walls, new electrical - title 24, cosmetic work.Details
#125 interior remodelling of (e) showroom which includes: demo of non-load bearing walls & load bearing walls, removal of cabinets & relcoation, removal of wall racks - new load bearing walls & non-load bearing walls, new electrical - title 24, cosmetic work. | $260,000 |
| Jul 29, 2011 | Completed final sign-off Aug 2011 | 2 Henry Adams St | Cisco Fire Sprinklers, Inc. | adding 4-head head because of a relocate of a wall changed to a frameless glass. add two heads on both side of window.Details
adding 4-head head because of a relocate of a wall changed to a frameless glass. add two heads on both side of window. | $2,000 |
| Jul 21, 2011 | Never finaled issued Feb 2013, no final | 2 Henry Adams St | L.D. Strobel Co Ltd | (e) verizon cell facility to be upgraded with the addition of 9 new antennas, 18 additional runs of coax, larger dog house, and upgrade existing cabinets in equipment room, and 2 additonal gps antennas.Details
(e) verizon cell facility to be upgraded with the addition of 9 new antennas, 18 additional runs of coax, larger dog house, and upgrade existing cabinets in equipment room, and 2 additonal gps antennas. | $40,000 |
| Jun 30, 2011 | Completed final sign-off Aug 2011 | 2 Henry Adams St | Cci Com'l Constr & Improv**See 985808*** | (n) interior non-load bearing partitions. install (n) glass in corridor/dry wall paint. sprinkler under separate permit.Details
(n) interior non-load bearing partitions. install (n) glass in corridor/dry wall paint. sprinkler under separate permit. | $25,000 |
| Apr 14, 2011 | Completed final sign-off Jun 2011 | 2 Henry Adams St | Bullard's Heating & Air Inc. | 1st floor-install 1 9ft type 2 exhaust hood & 2 exhaust fans & related duct workDetails
1st floor-install 1 9ft type 2 exhaust hood & 2 exhaust fans & related duct work | $10,000 |
| Dec 1, 2010 | Expired or cancelled withdrawn Jul 2016 | 2 Henry Adams St | a modification to an (e) unmanned telecommunication facility consisting of adding 3 new lte antennas, a new 6601 rbs cabinet to an (e) 19" equipment rack, 6 new rru's, 3 new surge suppressors, a new splice box, a new gps antenna, & new inner ducts.Details
a modification to an (e) unmanned telecommunication facility consisting of adding 3 new lte antennas, a new 6601 rbs cabinet to an (e) 19" equipment rack, 6 new rru's, 3 new surge suppressors, a new splice box, a new gps antenna, & new inner ducts. | $41,000 | |
| Nov 9, 2010 | Never finaled issued Nov 2010, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Oct 25, 2010 | Completed final sign-off Dec 2010 | 2 Henry Adams St | Ad Art Inc. | the owner of the south facing wall sign and west facing wall sign will remove these signs to comply with nov#10788. note: also to include an additional south facing wall sign for 3 total.Details
the owner of the south facing wall sign and west facing wall sign will remove these signs to comply with nov#10788. note: also to include an additional south facing wall sign for 3 total. | $5,000 |
| Mar 23, 2010 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | Broken Arrow Communications Inc | modification to an (e) unmanned telecommunications facility consisting of removing & replacing (3) antennas painted to match (e) bldg, add (n) otma, & (n) ret's (remote electronic tilts), add (6) (n) runs of coax cable in (e) cable tray & (n) 3206 rbs cabinet.Details
modification to an (e) unmanned telecommunications facility consisting of removing & replacing (3) antennas painted to match (e) bldg, add (n) otma, & (n) ret's (remote electronic tilts), add (6) (n) runs of coax cable in (e) cable tray & (n) 3206 rbs cabinet. | $25,000 |
| Oct 30, 2009 | Completed final sign-off Jan 2010 | 2 Henry Adams St | 4th floor-tenant improvements-selective demolition, construct new corridor, new finishes for corridor. mechanical, electrical under seperate permitDetails
4th floor-tenant improvements-selective demolition, construct new corridor, new finishes for corridor. mechanical, electrical under seperate permit | $49,000 | |
| Jun 17, 2009 | Completed final sign-off Nov 2009 | 2 Henry Adams St | Park Place Contractors, N S A Wireless Inc | swap like for like cingular antennas (3 total)Details
swap like for like cingular antennas (3 total) | $2,250 |
| May 5, 2009 | Completed final sign-off Oct 2010 | 2 Henry Adams St | Metropolitan Electrical Construction | modification to e unmanned telecommunication facility consisting of adding 6 new runs of coax cable. also adding n retes (remote electronic tilts) to e antennas. ret powered by low voltage signaled through e coax cableDetails
modification to e unmanned telecommunication facility consisting of adding 6 new runs of coax cable. also adding n retes (remote electronic tilts) to e antennas. ret powered by low voltage signaled through e coax cable | $5,000 |
| Jan 23, 2009 | Expired or cancelled withdrawn Jul 2016 | 2 Henry Adams St | cellular antenna replacement: att wireless . install 6 new coaxial cables within existing vertical chase, existing rooftop cable guides and 6 total ret units. connected to the base of 3 of 6 existing antennas. no visual impact to existing buildingDetails
cellular antenna replacement: att wireless . install 6 new coaxial cables within existing vertical chase, existing rooftop cable guides and 6 total ret units. connected to the base of 3 of 6 existing antennas. no visual impact to existing building | $5,000 | |
| Aug 1, 2008 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | Sure Fire Protection | suite: 135: ground floor-revision to pa# 2008-0721-7093-relocate (e) branh line into soffit-add 7 new uprights into soffit, concealed space. revision to pa# 2008-0721-7093Details
suite: 135: ground floor-revision to pa# 2008-0721-7093-relocate (e) branh line into soffit-add 7 new uprights into soffit, concealed space. revision to pa# 2008-0721-7093 | $3,500 |
| Jul 21, 2008 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | Sure Fire Protection | g/f #135: add 6 new pendents at window and entry. add 7 new pendents for new battons. replace e uprights (21 total) to 8 k factorDetails
g/f #135: add 6 new pendents at window and entry. add 7 new pendents for new battons. replace e uprights (21 total) to 8 k factor | $8,000 |
| Jul 15, 2008 | Completed final sign-off Sep 2008 | 2 Henry Adams St | ti for fabric showroom on the ground floor. construct new nonbearing partition walls and soffits. ref pa#200610104596.Details
ti for fabric showroom on the ground floor. construct new nonbearing partition walls and soffits. ref pa#200610104596. | $30,000 | |
| Mar 6, 2008 | Completed final sign-off Mar 2008 | 2 Henry Adams St | Fluoresco Lighting & Sign | renew pa# 2007/07/27/7940 & pa# 2007/06/04/2905 for final inspection only.Details
renew pa# 2007/07/27/7940 & pa# 2007/06/04/2905 for final inspection only. | |
| Dec 14, 2007 | Completed final sign-off Apr 2008 | 2 Henry Adams St | relocate (e) tenant space entry doors, close (e) tenant windows to common area. no lighting, electrical or plumbing workDetails
relocate (e) tenant space entry doors, close (e) tenant windows to common area. no lighting, electrical or plumbing work | $7,500 | |
| Jul 27, 2007 | Never finaled issued Jul 2007, no final | 2 Henry Adams St | Fluoresco Lighting & Sign | to erect electrical signDetails
to erect electrical sign | |
| Jul 11, 2007 | Completed final sign-off Aug 2007 | 2 Henry Adams St | Sure Fire Protection | #291- due to addition of new walls and new ceiling. relocate 4 existing upright heads and add 2 new pendent sprinklers.Details
#291- due to addition of new walls and new ceiling. relocate 4 existing upright heads and add 2 new pendent sprinklers. | $2,500 |
| Jun 26, 2007 | Completed final sign-off Aug 2007 | 2 Henry Adams St | demo partition walls at showroom at second floor.new closet new office. wrap wood columns.Details
demo partition walls at showroom at second floor.new closet new office. wrap wood columns. | $25,000 | |
| Jun 4, 2007 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | Fluoresco Lighting & Sign | to erect non electrical sign permitDetails
to erect non electrical sign permit | |
| Dec 7, 2006 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | Sure Fire Protection | add 10 heads, relocate 2 pendents. relocate 3 uprights, delete 1 upDetails
add 10 heads, relocate 2 pendents. relocate 3 uprights, delete 1 up | $4,454 |
| Nov 17, 2006 | Expired or cancelled expired Apr 2009 | 2 Henry Adams St | work includes removal of (e) partitions and finishes. new tenant partitions, demising wall, doors and windows will be constructed. existing lighting and electrical systems will be retained with minor modifications as required by new partitions. existing hvac to remain. building is fully sprinklered.Details
work includes removal of (e) partitions and finishes. new tenant partitions, demising wall, doors and windows will be constructed. existing lighting and electrical systems will be retained with minor modifications as required by new partitions. existing hvac to remain. building is fully sprinklered. | $35,000 | |
| Nov 13, 2006 | Completed final sign-off Dec 2006 | 2 Henry Adams St | Ad Art Inc. | renew pa# 2004/01/15/4188 for final inspection.Details
renew pa# 2004/01/15/4188 for final inspection. | |
| Oct 13, 2006 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | title 24 energy calc's-lighting. work only under the permit. architectural work approved under building permit # 200610104596.Details
title 24 energy calc's-lighting. work only under the permit. architectural work approved under building permit # 200610104596. | $5,000 | |
| Oct 10, 2006 | Expired or cancelled expired Jan 2008 | 2 Henry Adams St | demo (e) 1 hour wall. construct new 1 hour rated wall with 20 min door. lighting under seperate permit.Details
demo (e) 1 hour wall. construct new 1 hour rated wall with 20 min door. lighting under seperate permit. | $70,000 | |
| Aug 1, 2006 | Never finaled issued Aug 2006, no final | 2 Henry Adams St | street spaceDetails
street space | ||
| Feb 17, 2006 | Completed final sign-off Aug 2006 | 2 Henry Adams St | removal of windows,doors,demo of 1 hr.corridor wall,relocate existing cabinet,install 2 entry vertibule,new wire glass windows,entry tile,interior non-bearing partitions,patch wall and paint.Details
removal of windows,doors,demo of 1 hr.corridor wall,relocate existing cabinet,install 2 entry vertibule,new wire glass windows,entry tile,interior non-bearing partitions,patch wall and paint. | $45,000 | |
| Jan 30, 2006 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | L.D. Strobel Co Ltd | renew appl#200502024552 for final inspectionDetails
renew appl#200502024552 for final inspection | |
| Dec 1, 2005 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | Sure Fire Protection | add 18 window sprinklersDetails
add 18 window sprinklers | $12,000 |
| Dec 1, 2005 | Completed final sign-off Apr 2006 | 2 Henry Adams St | Art Of Construction Inc | new non strucrtural walls 8'high, install 1/2 dry wall and flooring partition walls for showroomsDetails
new non strucrtural walls 8'high, install 1/2 dry wall and flooring partition walls for showrooms | $5,000 |
| Nov 17, 2005 | Completed final sign-off Jan 2006 | 2 Henry Adams St | new storefront with entry doors, modification of interior non bearing partitions.Details
new storefront with entry doors, modification of interior non bearing partitions. | $55,000 | |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 2 Henry Adams St | work includes selective demolition of (e) toilet room finishes and fixtures. new interior finishes,Details
work includes selective demolition of (e) toilet room finishes and fixtures. new interior finishes, | $30,000 | |
| Feb 2, 2005 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | L.D. Strobel Co Ltd | replacing center antennas on all (e) sectors-9 total.Details
replacing center antennas on all (e) sectors-9 total. | $2,500 |
| Sep 2, 2004 | Completed final sign-off Oct 2004 | 2 Henry Adams St | add sin # for concealed headDetails
add sin # for concealed head | ||
| Aug 27, 2004 | Completed final sign-off Oct 2004 | 2 Henry Adams St | 8 ws sprinkler, 2 drop sprinkler, 1 upright sprinkler in suite 140 (gr flr)Details
8 ws sprinkler, 2 drop sprinkler, 1 upright sprinkler in suite 140 (gr flr) | $5,000 | |
| Aug 11, 2004 | Completed final sign-off Dec 2004 | 2 Henry Adams St | new corridor fire rated new entry full height wall and some partition short wallDetails
new corridor fire rated new entry full height wall and some partition short wall | $50,000 | |
| Jul 13, 2004 | Completed final sign-off Oct 2004 | 2 Henry Adams St | install new glass storefront, new non-structural dry wall partitionDetails
install new glass storefront, new non-structural dry wall partition | $19,500 | |
| Jun 29, 2004 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | install new 20 min.fire doors on 2/f on (e)1 hr.rated corridor & remove (e)redundant 5'longDetails
install new 20 min.fire doors on 2/f on (e)1 hr.rated corridor & remove (e)redundant 5'long | $3,000 | |
| Jun 29, 2004 | Completed final sign-off Jul 2004 | 2 Henry Adams St | demo non bearing wall.repl new partition wall new entry entrance.no new elec light,no chg on sprinkDetails
demo non bearing wall.repl new partition wall new entry entrance.no new elec light,no chg on sprink | $35,000 | |
| Jun 21, 2004 | Expired or cancelled expired Feb 2012 | 2 Henry Adams St | re;pcate 1 (e)panel type antenna on roof,no other work proposed.per planning,install new cableDetails
re;pcate 1 (e)panel type antenna on roof,no other work proposed.per planning,install new cable | $5,000 | |
| May 26, 2004 | Completed final sign-off Aug 2004 | 2 Henry Adams St | revise appl#200403259641 add solid core wood door delet glass door,revised doorsDetails
revise appl#200403259641 add solid core wood door delet glass door,revised doors | ||
| May 14, 2004 | Completed final sign-off Aug 2004 | 2 Henry Adams St | install 85 upright head and 41 pend head and 16 window sprinkler.Details
install 85 upright head and 41 pend head and 16 window sprinkler. | $10,000 | |
| Apr 29, 2004 | Never finaled issued Apr 2004, no final | 2 Henry Adams St | California Roofing Co Inc | reroofingDetails
reroofing | $171,000 |
| Apr 13, 2004 | Completed final sign-off Oct 2004 | 2 Henry Adams St | revision to app#200403259641 & 200403259645. the plan orientation on drawing st has been rotated toDetails
revision to app#200403259641 & 200403259645. the plan orientation on drawing st has been rotated to | ||
| Mar 25, 2004 | Completed final sign-off Aug 2004 | 2 Henry Adams St | furniture and finish floor plan lighting and mechanical sprinklers separate permitDetails
furniture and finish floor plan lighting and mechanical sprinklers separate permit | $350,000 | |
| Mar 25, 2004 | Completed final sign-off Oct 2004 | 2 Henry Adams St | new opener in existing shear wall (masonry)Details
new opener in existing shear wall (masonry) | $150,000 | |
| Feb 23, 2004 | Completed final sign-off Feb 2005 | 2 Henry Adams St | remodel (e) public restrm *all interior work) @ 34d floor only) new finishes, fixtures and layoutDetails
remodel (e) public restrm *all interior work) @ 34d floor only) new finishes, fixtures and layout | $30,000 | |
| Jan 15, 2004 | Never finaled issued Jan 2004, no final | 2 Henry Adams St | Ad Art Inc. | erect:non-electric, wall, single faced, indirect (change copy)Details
erect:non-electric, wall, single faced, indirect (change copy) | |
| Jan 6, 2004 | Completed final sign-off Jun 2004 | 2 Henry Adams St | Sure Fire Protection | install 8 window sprinklers & two pendant sprinkler headsDetails
install 8 window sprinklers & two pendant sprinkler heads | $2,500 |
| Dec 11, 2003 | Completed final sign-off Jun 2004 | 2 Henry Adams St | relocate front door inside (door) & replace disply window. demo one wall non grd bearingDetails
relocate front door inside (door) & replace disply window. demo one wall non grd bearing | $10,000 | |
| Jul 1, 2003 | Completed final sign-off Jul 2003 | 2 Henry Adams St | for final inspection per app #200204164108Details
for final inspection per app #200204164108 | ||
| May 23, 2003 | Completed final sign-off Aug 2003 | 2 Henry Adams St | construct concrete pad for debris box placement,driveway to access debris boxes,(n)concrete sidewalkDetails
construct concrete pad for debris box placement,driveway to access debris boxes,(n)concrete sidewalk | $20,000 | |
| May 15, 2003 | Expired or cancelled expired Sep 2005 | 2 Henry Adams St | California Roofing Co Inc | reroofingDetails
reroofing | $180,000 |
| Oct 21, 2002 | Completed final sign-off Mar 2003 | 2 Henry Adams St | install storefront glazing assembly to create a product for display area onlyDetails
install storefront glazing assembly to create a product for display area only | $6,500 | |
| Oct 15, 2002 | Completed final sign-off Oct 2002 | 2 Henry Adams St | Pacific Tower Enterprises | feild change to approved bldg permit #200205176885r1Details
feild change to approved bldg permit #200205176885r1 | |
| Oct 9, 2002 | Completed final sign-off Jun 2003 | 2 Henry Adams St | remodel exist 4th fl restrooms, install new tile,toilet partitions & fixtures. reconfigure exist layDetails
remodel exist 4th fl restrooms, install new tile,toilet partitions & fixtures. reconfigure exist lay | $40,000 | |
| Sep 20, 2002 | Never finaled issued Sep 2002, no final | 2 Henry Adams St | Sure Fire Protection | add new line relocate 2 sprinkler heads add 2 sprinkler heads on 4/f revise app #200209136392Details
add new line relocate 2 sprinkler heads add 2 sprinkler heads on 4/f revise app #200209136392 | $600 |
| Sep 13, 2002 | Completed final sign-off Oct 2002 | 2 Henry Adams St | Sure Fire Protection | relocation of 2 sprinkler heads and addition of 2 sprinkler heads on 4th floorDetails
relocation of 2 sprinkler heads and addition of 2 sprinkler heads on 4th floor | $600 |
| Sep 5, 2002 | Completed final sign-off Oct 2002 | 2 Henry Adams St | 4/fl- new demising wall, new entry doorDetails
4/fl- new demising wall, new entry door | $20,000 | |
| Aug 26, 2002 | Completed final sign-off Nov 2002 | 2 Henry Adams St | Sure Fire Protection | relocation of sprinklers & change 3/4 pipe to 1" to meet code. 2nd flr. total 8 headsDetails
relocation of sprinklers & change 3/4 pipe to 1" to meet code. 2nd flr. total 8 heads | $2,700 |
| Aug 13, 2002 | Completed final sign-off Nov 2002 | 2 Henry Adams St | 1/fl- store front changes, interior work onlyDetails
1/fl- store front changes, interior work only | $10,000 | |
| Aug 6, 2002 | Completed final sign-off Oct 2002 | 2 Henry Adams St | 28-sinc3488 sprinkler at store front & 2-sinc355 sprinkler at store front window of showrm placeDetails
28-sinc3488 sprinkler at store front & 2-sinc355 sprinkler at store front window of showrm place | $8,000 | |
| Jul 18, 2002 | Completed final sign-off Oct 2002 | 2 Henry Adams St | installation of three panel tupe antennas and associated equipment cabinetsDetails
installation of three panel tupe antennas and associated equipment cabinets | $50,000 | |
| Jun 6, 2002 | Never finaled issued Jun 2002, no final | 2 Henry Adams St | Sure Fire Protection | rev. appl#200205096196, add to pipe schedule sprinkler system, relocate & add 82 headsDetails
rev. appl#200205096196, add to pipe schedule sprinkler system, relocate & add 82 heads | $15,240 |
| Jun 3, 2002 | Completed final sign-off Sep 2002 | 2 Henry Adams St | Bullard's Heating & Air Inc. | install 8 a/c units on bldg roof and remove 8 a/c units/access to roof via stairs on ne cornerDetails
install 8 a/c units on bldg roof and remove 8 a/c units/access to roof via stairs on ne corner | $75,000 |
| May 31, 2002 | Completed final sign-off Sep 2002 | 2 Henry Adams St | remove and replace e doors with 6x9 20 min assembly raise int partition,8' wide load bear partn,wndwDetails
remove and replace e doors with 6x9 20 min assembly raise int partition,8' wide load bear partn,wndw | $12,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.