Daniel Epperson
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Rapt Studio
- On San Francisco permits
- Mar 2014 to Aug 2026
19 permits since 2000 (architect on 15 permits, engineer on 2 permits, authorized agent-others on 1 permit, designer on 1 permit): 15 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 27 Hotaling Pl | roof replacement over dining room, remove 2 skylights, add 1 skylight, replace ceiling light fixtures penetrating roof, replace hvac rooftop with new in same location.Details
roof replacement over dining room, remove 2 skylights, add 1 skylight, replace ceiling light fixtures penetrating roof, replace hvac rooftop with new in same location. | $100,000 | |
| Sep 12, 2024 | Completed final sign-off Feb 2026 | 2850 Filbert St | Barrett Karber Built Llc | kitchen remodel of (e) single family residence with alteration to (e) kitchen rear deck doors and windows. new structural beam for kitchen door and wall removalDetails
kitchen remodel of (e) single family residence with alteration to (e) kitchen rear deck doors and windows. new structural beam for kitchen door and wall removal | $75,000 |
| Jan 27, 2022 | Completed final sign-off Mar 2022 | 535 Pacific Av | Principal Builders Inc. | suite 300: deferred electrical & plumbing. new and relocated light fixtures and associted controles; new power and teledata. ref t.i. pa202108317494. title 24 compliance. maher n/a.Details
suite 300: deferred electrical & plumbing. new and relocated light fixtures and associted controles; new power and teledata. ref t.i. pa202108317494. title 24 compliance. maher n/a. | |
| May 20, 2021 | Completed final sign-off Jun 2022 | 215 Fremont St | Novo Construction Inc | ti upgrade core/shell restrooms on levels 2,3,4 and 8. work includes demo, upgraded framing, drywall, tile work, and toilet partitions. upgrade plumbing, electrical and mechanical components. fire sprinkler and fire alarm on deferred submittalDetails
ti upgrade core/shell restrooms on levels 2,3,4 and 8. work includes demo, upgraded framing, drywall, tile work, and toilet partitions. upgrade plumbing, electrical and mechanical components. fire sprinkler and fire alarm on deferred submittal | $1,704,445 |
| Jan 27, 2021 | Completed final sign-off Apr 2022 | 215 Fremont St | Novo Construction Inc | level 8 t.i: includeds fitness area locker rooms, restrooms and cafe, bolt kitchen/food prep with updates to lobby and corridor.Details
level 8 t.i: includeds fitness area locker rooms, restrooms and cafe, bolt kitchen/food prep with updates to lobby and corridor. | $7,000,000 |
| Jan 23, 2020 | Completed final sign-off Aug 2020 | 1455 Market St | Principal Builders Inc. | 16th, 17th & 20th floors - administrative permit for dph review of micro kitchens. no work under this kpa. related ti work pa 2019-1101-6240202019-1101-6239 & 2019-1101-6242Details
16th, 17th & 20th floors - administrative permit for dph review of micro kitchens. no work under this kpa. related ti work pa 2019-1101-6240202019-1101-6239 & 2019-1101-6242 | |
| Dec 17, 2019 | Completed final sign-off Feb 2022 | 275 Brannan St | Sc Builders, Inc | 1st & 2nd flr ti: new non-structural partitions, millwork, ceilings. mep & life safety under separate permit. interior alterations only. no change in use. no exterior work. maher naDetails
1st & 2nd flr ti: new non-structural partitions, millwork, ceilings. mep & life safety under separate permit. interior alterations only. no change in use. no exterior work. maher na | $570,000 |
| Dec 17, 2019 | Completed final sign-off Feb 2021 | 275 Brannan St | Sc Builders, Inc | demo only 1st of non-structural partitions, doors, millwork & glazing. per ab-017. maher naDetails
demo only 1st of non-structural partitions, doors, millwork & glazing. per ab-017. maher na | $200,000 |
| Oct 22, 2019 | Never finaled issued Nov 2019, no final | 2 Henry Adams St | Novo Construction Inc | interior construction at level 4 & level 5 for an interior connecting stair & skylight alterationsDetails
interior construction at level 4 & level 5 for an interior connecting stair & skylight alterations | $10,000 |
| Sep 11, 2019 | Never finaled issued Oct 2019, no final | 2 Henry Adams St | Novo Construction Inc | 4th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal.maher n/a.Details
4th fl - interior construction of new non-load bearing partitions, glazing, doors, millwork. fire life safety and mep will be deferred submittal.maher n/a. | $150,244 |
| Jul 9, 2019 | Expired or cancelled withdrawn Aug 2019 | 1355 Market St | 9th fl: interior ti consist of partitions, glazing, doors & millwork.Details
9th fl: interior ti consist of partitions, glazing, doors & millwork. | $1,750,000 | |
| Apr 3, 2019 | Completed final sign-off Oct 2019 | 101 California St | Principal Builders Inc. | 46th floor tenant improvement: to include new non load bearing partitions. glazing doors, millwork, lighting and associated electrical mep. fire alarm/ sprinklers under separate paerit submittal.Details
46th floor tenant improvement: to include new non load bearing partitions. glazing doors, millwork, lighting and associated electrical mep. fire alarm/ sprinklers under separate paerit submittal. | $487,100 |
| Dec 16, 2016 | Completed final sign-off Aug 2017 | 625 02nd St | Sc Builders, Inc | 3/f: t.i.: create (n) office space,interior partitions, glazing, doors & millwork. meps, l/s, f/s etc under sep permit. n/a for maher.Details
3/f: t.i.: create (n) office space,interior partitions, glazing, doors & millwork. meps, l/s, f/s etc under sep permit. n/a for maher. | $1,500,000 |
| Dec 6, 2016 | Completed final sign-off Jan 2017 | 625 02nd St | Sc Builders, Inc | 3rd floor - demo of (e) interior office space. (ti consisting of office space, new interior partitions, glazing, doors, millwork, etc. me/el under separate permit)Details
3rd floor - demo of (e) interior office space. (ti consisting of office space, new interior partitions, glazing, doors, millwork, etc. me/el under separate permit) | $195,000 |
| Mar 23, 2016 | Completed final sign-off Dec 2016 | 275 Brannan St | Sc Builders, Inc | 1st,2nd,3rd fl: modificiation of e tenant office space to include selective demo, new construction of non load bearing partition. meps, life safety, sprinkler permits on sep permits. n/a ordinance #155-13Details
1st,2nd,3rd fl: modificiation of e tenant office space to include selective demo, new construction of non load bearing partition. meps, life safety, sprinkler permits on sep permits. n/a ordinance #155-13 | $1,000,000 |
| Nov 2, 2015 | Completed final sign-off Oct 2016 | 595 Market St | Source Planning And Construction Inc | revision to pa#201510139409 to clarify door #726.Details
revision to pa#201510139409 to clarify door #726. | |
| Sep 22, 2015 | Completed final sign-off Feb 2016 | 71 Stevenson St | Source Planning And Construction Inc | 13/f- revision to pa# 2015-0706-0699 architectural for detail clarification.Details
13/f- revision to pa# 2015-0706-0699 architectural for detail clarification. | |
| Sep 22, 2015 | Completed final sign-off Nov 2015 | 111 Maiden Ln | Principal Builders Inc. | 4th floor: demo - partitions, doors, millwork, ceiling and finishes. space to remain vacant under ab017 until future ti. existing lobby walls and doors to remain in place until future tiDetails
4th floor: demo - partitions, doors, millwork, ceiling and finishes. space to remain vacant under ab017 until future ti. existing lobby walls and doors to remain in place until future ti | $64,000 |
| Mar 24, 2014 | Completed final sign-off Nov 2014 | 448 Balboa St | change of use. small tenant improvement within the (e) envelop of a restaurant space. adjacent spaces of (e) bldg are restaurant spaces. selective demolition of (e) millwork, walls & flooring. (n) work consists of (n) walls, electrical, (n) equipment & ada compliant restroom.Details
change of use. small tenant improvement within the (e) envelop of a restaurant space. adjacent spaces of (e) bldg are restaurant spaces. selective demolition of (e) millwork, walls & flooring. (n) work consists of (n) walls, electrical, (n) equipment & ada compliant restroom. | $95,000 |