Block 3789, lot 007
625 02nd St
- City’s use
- Commercial Office
- Built
- 1905
- Stories
- 4
- Rooms
- 9 bathrooms
- Building
- 171,187 sq ft
- Lot
- 35,062 sq ft
- Zoning
- MUO
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
109 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2026 | In progress issued Aug 2026 | 625 02nd St | Brennan Strong Hold Construction Inc | 4/fl-revision 202603117364- (n) non structural partitions, doors, casework, and plumbingDetails
4/fl-revision 202603117364- (n) non structural partitions, doors, casework, and plumbing | $200,000 |
| Mar 11, 2026 | In progress issued Mar 2026 | 625 02nd St | Brennan Strong Hold Construction Inc | 4th floor: new common corridor, new idividual tenant suites & restroom renovation. demolition of (e) non structural partitions construction of non structural partitions, doors, lights fixtures & plumbing.Details
4th floor: new common corridor, new idividual tenant suites & restroom renovation. demolition of (e) non structural partitions construction of non structural partitions, doors, lights fixtures & plumbing. | $446,250 |
| Jan 8, 2026 | In progress issued Mar 2026 | 625 02nd St | Brennan Strong Hold Construction Inc | revision to permit #202509034442, tenant improvement, entry door reconfiguration, conference room addition, finishes, electrical/plumbing is design buildDetails
revision to permit #202509034442, tenant improvement, entry door reconfiguration, conference room addition, finishes, electrical/plumbing is design build | $400,000 |
| Sep 3, 2025 | In progress issued Oct 2025 | 625 02nd St | 1 &2 /floor- ti to include divide (e) large suite into 2 by adding a partition. (n) egress doors and corridor partition.Details
1 &2 /floor- ti to include divide (e) large suite into 2 by adding a partition. (n) egress doors and corridor partition. | $75,000 | |
| Jan 7, 2025 | Completed final sign-off Jan 2025 | 625 02nd St | Bilcor Inc | deprogram & remove 2 smoke detectors, 2 control relay. revision to 202409301955. arch ref t.i. 202406215032 (275 brannan), arch ref t.i. 20240725764 ( 625 2nd st). complete seperate a fa system fa ref 202202017074. share plans w/202501077852 (275 brannan)Details
deprogram & remove 2 smoke detectors, 2 control relay. revision to 202409301955. arch ref t.i. 202406215032 (275 brannan), arch ref t.i. 20240725764 ( 625 2nd st). complete seperate a fa system fa ref 202202017074. share plans w/202501077852 (275 brannan) | $2,664 |
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 625 02nd St | Bilcor Inc | deprogram & remove (2) smoke detector, (2) control relay. ref arch 202406215032 (275 brannan st) & 202407257264 (625 2nd st). complete seperate two fire alarm systems. one system per each building address with no connection between them fa ref : 2022-0201-7074Details
deprogram & remove (2) smoke detector, (2) control relay. ref arch 202406215032 (275 brannan st) & 202407257264 (625 2nd st). complete seperate two fire alarm systems. one system per each building address with no connection between them fa ref : 2022-0201-7074 | $2,664 |
| Sep 18, 2024 | Completed final sign-off Dec 2024 | 625 02nd St | Sc Builders, Inc | 3rd fl revision to pa 2024-0725-7264 redoing the communication opening.Details
3rd fl revision to pa 2024-0725-7264 redoing the communication opening. | |
| Jul 25, 2024 | Completed final sign-off Dec 2024 | 625 02nd St | Sc Builders, Inc | sharing plans with 2024-0621-5032 to include infilling the opening permitted by p/a 2017-0328-2516 and 2017-0328-2517.Details
sharing plans with 2024-0621-5032 to include infilling the opening permitted by p/a 2017-0328-2516 and 2017-0328-2517. | |
| May 28, 2024 | Completed final sign-off Nov 2024 | 625 02nd St | Source Planning And Construction Inc | provide new lighting and branch circuiting to existing panel. provide ca title 24 compiance formsDetails
provide new lighting and branch circuiting to existing panel. provide ca title 24 compiance forms | $243,750 |
| Mar 7, 2024 | Completed final sign-off Nov 2024 | 625 02nd St | Source Planning And Construction Inc | 4th floor -office ti- limited demo of non-structural partitions & associated power/data, ceiling items & finishes throughout. space is currently unoccupied. no exterior building, site, landscape, use or parking changes are proposed. fire sprinkler modification. permit #202403067182Details
4th floor -office ti- limited demo of non-structural partitions & associated power/data, ceiling items & finishes throughout. space is currently unoccupied. no exterior building, site, landscape, use or parking changes are proposed. fire sprinkler modification. permit #202403067182 | $527,939 |
| Mar 6, 2024 | Completed final sign-off Jun 2024 | 625 02nd St | Pioneer Fire Inc. | fire only to remove (66) sprinkler headsDetails
fire only to remove (66) sprinkler heads | $2,190 |
| Apr 28, 2023 | Completed final sign-off Jul 2023 | 625 02nd St | Bilcor Inc | fire alarm: install 1 wall mount strobe, 3 wall mount horn strobes, 1 smoke detector, 2 duct c2 control relaysDetails
fire alarm: install 1 wall mount strobe, 3 wall mount horn strobes, 1 smoke detector, 2 duct c2 control relays | $6,600 |
| Apr 13, 2023 | Completed final sign-off Jul 2023 | 625 02nd St | Source Planning And Construction Inc | suite# 100. provided new lighting and branch circuiting to (e) panel maintained some of the (e) power and signal outlets and provided additonal power branch circuiting and raccway systems as required to new power and signal outlets, provided ca title 24 compliance forms. ref pa# 202303133545.Details
suite# 100. provided new lighting and branch circuiting to (e) panel maintained some of the (e) power and signal outlets and provided additonal power branch circuiting and raccway systems as required to new power and signal outlets, provided ca title 24 compliance forms. ref pa# 202303133545. | $135,730 |
| Apr 13, 2023 | Completed final sign-off Apr 2023 | 625 02nd St | Anderson, Rowe & Buckley, Inc. | fire sprinkler add 3 uprights for jet blue 1st fl 202303133545Details
fire sprinkler add 3 uprights for jet blue 1st fl 202303133545 | $1,500 |
| Apr 5, 2023 | Completed final sign-off Jul 2023 | 625 02nd St | Source Planning And Construction Inc | demo, relocate & add new duct work & grilles to serve new architectural layout, ref pa# 202303133545.Details
demo, relocate & add new duct work & grilles to serve new architectural layout, ref pa# 202303133545. | $32,000 |
| Mar 13, 2023 | Completed final sign-off Jul 2023 | 625 02nd St | Source Planning And Construction Inc | ground fl selective demo & construrction of non loading bearing partitions, new lights, new office doors and frames, new sink at e plumbing and new finishes. no exterior workDetails
ground fl selective demo & construrction of non loading bearing partitions, new lights, new office doors and frames, new sink at e plumbing and new finishes. no exterior work | $400,000 |
| Aug 26, 2022 | Completed final sign-off Jan 2023 | 625 02nd St | Marchetti Group | new exit door at (e) storefront and enlarge an (e) exit door at an exit stairway at 1/f. maher n/a.Details
new exit door at (e) storefront and enlarge an (e) exit door at an exit stairway at 1/f. maher n/a. | $35,000 |
| Nov 25, 2019 | Completed final sign-off Dec 2020 | 625 02nd St | Bay Cities Painters & Decorators Inc | to comply with abe ord 51-16 parking garage restripping, signage and associated barrier removal work (garage & 1st fl)Details
to comply with abe ord 51-16 parking garage restripping, signage and associated barrier removal work (garage & 1st fl) | $5,000 |
| Oct 17, 2019 | Completed final sign-off Nov 2019 | 625 02nd St | Bilcor Inc | suite 104: fire alarm: remove and replace 3 wall mount horn strobes. r/r 1 wall mount strobe. install 2 ceiling mount horn strobes. install 1 wall mount horn strobe. install 2 ceiling mount strobes. ref app 201908280002Details
suite 104: fire alarm: remove and replace 3 wall mount horn strobes. r/r 1 wall mount strobe. install 2 ceiling mount horn strobes. install 1 wall mount horn strobe. install 2 ceiling mount strobes. ref app 201908280002 | $1,980 |
| Aug 28, 2019 | Completed final sign-off Dec 2019 | 625 02nd St | Sc Builders, Inc | suite 104 - interior construction w/soft demo of non load bearing structurae. millwork in breakroom, ele power and reuse of (e) plm already in place. (no change to any hvac - hvac system will not be touched) ele permit submitted separatelyDetails
suite 104 - interior construction w/soft demo of non load bearing structurae. millwork in breakroom, ele power and reuse of (e) plm already in place. (no change to any hvac - hvac system will not be touched) ele permit submitted separately | $150,000 |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 625 02nd St | Sc Builders, Inc | (1st&2nd floor) mechanical only: 2 neco heat pumps and 3 new fan coils.Details
(1st&2nd floor) mechanical only: 2 neco heat pumps and 3 new fan coils. | $35,000 |
| May 24, 2019 | Completed final sign-off Nov 2019 | 625 02nd St | Bilcor Inc | ref pa 201904047065: install 1 ceiling mount horn-strobesDetails
ref pa 201904047065: install 1 ceiling mount horn-strobes | $600 |
| May 23, 2019 | Completed final sign-off May 2019 | 625 02nd St | Bilcor Inc | fire alarm ti - install 1 wall mount horn strobe. relocate 2 wall mount horn strobes, remove: 6 wall mount horn strobes and 1 wall mount strobeDetails
fire alarm ti - install 1 wall mount horn strobe. relocate 2 wall mount horn strobes, remove: 6 wall mount horn strobes and 1 wall mount strobe | $1,800 |
| May 2, 2019 | Never finaled issued May 2019, no final | 625 02nd St | Pacific Masonry Restorations Llc Dba Pmr | at colin p. kelly alley façade, clean with 400 psi warm water rinse with no solvents or cleaners and repoint all joints w/type n mortar. approved otc per pc 1005(e)(3). no other work.Details
at colin p. kelly alley façade, clean with 400 psi warm water rinse with no solvents or cleaners and repoint all joints w/type n mortar. approved otc per pc 1005(e)(3). no other work. | $88,650 |
| Apr 25, 2019 | Never finaled issued May 2019, no final | 625 02nd St | Sc Builders, Inc | 1st/2nd flr - replaceing (e) lights w/all new led fixtures w/t-24 lighting controls. (no wall construction or demo, lighting only)Details
1st/2nd flr - replaceing (e) lights w/all new led fixtures w/t-24 lighting controls. (no wall construction or demo, lighting only) | $250,000 |
| Apr 4, 2019 | Never finaled issued Apr 2019, no final | 625 02nd St | Bilcor Inc | 4th fl: fire alarm t.i. install (6) ceiling horn strobes, install (4) wall horn storbes, install (2) ceiling strobes, install (2) duct detectors, install (2) control relays, t.i. 201810243992 & mep 201901230973Details
4th fl: fire alarm t.i. install (6) ceiling horn strobes, install (4) wall horn storbes, install (2) ceiling strobes, install (2) duct detectors, install (2) control relays, t.i. 201810243992 & mep 201901230973 | $9,600 |
| Mar 4, 2019 | Completed final sign-off Jun 2019 | 625 02nd St | Sc Builders, Inc | 1st & 2nd - demo only, partial floor demo. ref pa201903014140 for f/s permit. to comply with ab-017. maher n/a.Details
1st & 2nd - demo only, partial floor demo. ref pa201903014140 for f/s permit. to comply with ab-017. maher n/a. | $25,000 |
| Mar 1, 2019 | Completed final sign-off Mar 2019 | 625 02nd St | R L H Fire Protection Inc | 2nd flr. revision of fire sprinkers. relocate 4 and delete 8 sprinklers. ref ti 201903044254Details
2nd flr. revision of fire sprinkers. relocate 4 and delete 8 sprinklers. ref ti 201903044254 | $1,000 |
| Jan 30, 2019 | Completed final sign-off Apr 2019 | 625 02nd St | Cosco Fire Protection Inc. | 4th fl - add, relocate or demo sprinkler heads as needed within the area of work to accomodate the modification of walls and ceilings. ref 2018-1024-3992. offset existing main to route around new full height wallDetails
4th fl - add, relocate or demo sprinkler heads as needed within the area of work to accomodate the modification of walls and ceilings. ref 2018-1024-3992. offset existing main to route around new full height wall | $13,850 |
| Jan 23, 2019 | Completed final sign-off Nov 2019 | 625 02nd St | Acco Engineered Systems Inc. Dba Acco En | rev to pa# 201810243992; water source heat pump, new duct work, new air distributionDetails
rev to pa# 201810243992; water source heat pump, new duct work, new air distribution | $90,000 |
| Jan 17, 2019 | Expired or cancelled cancelled Jan 2026 | 625 02nd St | revision to 201810243992 document changes at e fire escapes at window infill at 5 interior locationsDetails
revision to 201810243992 document changes at e fire escapes at window infill at 5 interior locations | ||
| Jan 15, 2019 | Never finaled issued Jan 2019, no final | 625 02nd St | C B F Inc | 4th flr. new led lighting and lighting controls. 8 new duplex receptacles. ref pa 201810243992. title 24 compliance. maher n/a.Details
4th flr. new led lighting and lighting controls. 8 new duplex receptacles. ref pa 201810243992. title 24 compliance. maher n/a. | $80,000 |
| Oct 24, 2018 | Completed final sign-off Dec 2021 | 625 02nd St | Sc Builders, Inc, Cannon Constructors North Inc | 4th fl ti: selective demo (e) non-load bearing walls, lighting, etc; construct (n) partitions, ceiling, etc; mep/srpinkler will be design build under sep submittal. building is fully sprinklered.Details
4th fl ti: selective demo (e) non-load bearing walls, lighting, etc; construct (n) partitions, ceiling, etc; mep/srpinkler will be design build under sep submittal. building is fully sprinklered. | $600,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 625 02nd St | Pioneer Fire Inc. | 2nd flr - relocate 6 concealer pendents gci pa 201803093302 maher naDetails
2nd flr - relocate 6 concealer pendents gci pa 201803093302 maher na | $3,352 |
| Aug 23, 2018 | Never finaled issued Aug 2018, no final | 625 02nd St | street space onlyDetails
street space only | ||
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 625 02nd St | street space w/mtaDetails
street space w/mta | ||
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 625 02nd St | Pacific Masonry Restorations Llc Dba Pmr | exterior window maintenance on dh wood windows.Details
exterior window maintenance on dh wood windows. | $150,000 |
| Mar 9, 2018 | Completed final sign-off Apr 2019 | 625 02nd St | Marchetti Group | 1st fl: remodel existing bathroom for ada compliance. maher naDetails
1st fl: remodel existing bathroom for ada compliance. maher na | $50,000 |
| Mar 9, 2018 | Completed final sign-off Apr 2019 | 625 02nd St | Marchetti Group | 2nd fl: remodel existing bathroom for ada compliance. maher naDetails
2nd fl: remodel existing bathroom for ada compliance. maher na | $50,000 |
| Aug 29, 2017 | Never finaled issued Aug 2017, no final | 625 02nd St | Golden Gate Fire Protection Inc | fire sprinklers: add 3 upright sprinklers under new mezzanine ti# 201703282517Details
fire sprinklers: add 3 upright sprinklers under new mezzanine ti# 201703282517 | $1,575 |
| Jul 6, 2017 | Completed final sign-off Jul 2017 | 625 02nd St | Bilcor Inc | 3/f: f/a t.i. - install 2 smoke detectors with bases, install 2 control relay mods, 1 wall mount strobe. ref t.i. pa#201703282516Details
3/f: f/a t.i. - install 2 smoke detectors with bases, install 2 control relay mods, 1 wall mount strobe. ref t.i. pa#201703282516 | $2,500 |
| Mar 28, 2017 | Completed final sign-off Feb 2018 | 625 02nd St | Sc Builders, Inc | 3rd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref pa# 275 brannan 201703282516Details
3rd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref pa# 275 brannan 201703282516 | $10,000 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 625 02nd St | Bilcor Inc | 3rd floor: fire alarm t.i. to install 12 wall mount strobes. install 17 wall mount horn strobes. ref app#2016-1216-5223. n/a for maherDetails
3rd floor: fire alarm t.i. to install 12 wall mount strobes. install 17 wall mount horn strobes. ref app#2016-1216-5223. n/a for maher | $11,600 |
| Feb 7, 2017 | Completed final sign-off Aug 2017 | 625 02nd St | Sc Builders, Inc | 3rd floor - meps for 2016-1216-5223. n/a for maher.Details
3rd floor - meps for 2016-1216-5223. n/a for maher. | $500,000 |
| Jan 25, 2017 | Never finaled issued Jan 2017, no final | 625 02nd St | Golden Gate Fire Protection Inc | 3rd floor fire sprinklers: relocate 71 pendent sprinklers. ref pa #201612064226. n/a maher ordinanceDetails
3rd floor fire sprinklers: relocate 71 pendent sprinklers. ref pa #201612064226. n/a maher ordinance | $17,750 |
| Dec 16, 2016 | Completed final sign-off Aug 2017 | 625 02nd St | Sc Builders, Inc | 3/f: t.i.: create (n) office space,interior partitions, glazing, doors & millwork. meps, l/s, f/s etc under sep permit. n/a for maher.Details
3/f: t.i.: create (n) office space,interior partitions, glazing, doors & millwork. meps, l/s, f/s etc under sep permit. n/a for maher. | $1,500,000 |
| Dec 6, 2016 | Completed final sign-off Jan 2017 | 625 02nd St | Sc Builders, Inc | 3rd floor - demo of (e) interior office space. (ti consisting of office space, new interior partitions, glazing, doors, millwork, etc. me/el under separate permit)Details
3rd floor - demo of (e) interior office space. (ti consisting of office space, new interior partitions, glazing, doors, millwork, etc. me/el under separate permit) | $195,000 |
| Nov 19, 2015 | Completed final sign-off Feb 2016 | 625 02nd St | Bilcor Inc | 1st flr: fire alarm t.i. install 1 pull station, remove and reinstall one horn-strobe, t.i. 201509298285; maher n/aDetails
1st flr: fire alarm t.i. install 1 pull station, remove and reinstall one horn-strobe, t.i. 201509298285; maher n/a | $800 |
| Nov 19, 2015 | Completed final sign-off Jan 2016 | 625 02nd St | Bilcor Inc | 3rd flr: fire alarm tenant improvement, install 10 horn-strobes, relocate 2 horn-strobes, t.i. 201510068903; maher n/aDetails
3rd flr: fire alarm tenant improvement, install 10 horn-strobes, relocate 2 horn-strobes, t.i. 201510068903; maher n/a | $4,800 |
| Nov 18, 2015 | Never finaled issued Dec 2015, no final | 625 02nd St | Sc Builders, Inc | (3rd floor) meps for 2015-1006-8903. maher naDetails
(3rd floor) meps for 2015-1006-8903. maher na | $400,000 |
| Nov 18, 2015 | Never finaled issued Dec 2015, no final | 625 02nd St | Sc Builders, Inc | (ground floor) electrical for pa 2015-0929-8285. maher naDetails
(ground floor) electrical for pa 2015-0929-8285. maher na | $16,000 |
| Nov 16, 2015 | Completed final sign-off Dec 2015 | 625 02nd St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 11 uprights heads, add 11 uprights. total 22 heads for spec suite a on 3rd fl building permit is: 2015-1006-8903. n/a for maherDetails
fire sprinkler only. relocate 11 uprights heads, add 11 uprights. total 22 heads for spec suite a on 3rd fl building permit is: 2015-1006-8903. n/a for maher | $10,500 |
| Oct 13, 2015 | Completed final sign-off Oct 2015 | 625 02nd St | Bilcor Inc | 2nd floor: fire alarm system - install 6 wall mount horn strobes. 9 wall mount strobes. maher na erf pa 2015806496Details
2nd floor: fire alarm system - install 6 wall mount horn strobes. 9 wall mount strobes. maher na erf pa 2015806496 | $6,000 |
| Oct 6, 2015 | Completed final sign-off Feb 2016 | 625 02nd St | Sc Builders, Inc | tenant improvement: 3rd floor spec suite a, ti includes demo of nonstructural partitions and building new non-structural partitions. all new or revised mep and life safety work will be design build and submitted separately (building fully sprinklered). maher naDetails
tenant improvement: 3rd floor spec suite a, ti includes demo of nonstructural partitions and building new non-structural partitions. all new or revised mep and life safety work will be design build and submitted separately (building fully sprinklered). maher na | $796,230 |
| Sep 29, 2015 | Completed final sign-off Feb 2016 | 625 02nd St | Sc Builders, Inc | 1st flr: lobby improvement includes demo of non-structural soffits & ceiling and construction of (n) finishes. all (n) or revised, hvac, elec, plumbing & life safety,work will be design built & submitted separately (bldg is fully sprinklered); maher n/aDetails
1st flr: lobby improvement includes demo of non-structural soffits & ceiling and construction of (n) finishes. all (n) or revised, hvac, elec, plumbing & life safety,work will be design built & submitted separately (bldg is fully sprinklered); maher n/a | $480,000 |
| Sep 16, 2015 | Never finaled issued Sep 2015, no final | 625 02nd St | R L H Fire Protection Inc | fire sprinkler permit, relocate 3, add 10 and delete 2 pendent sprinklers on 1st & 2nd floors. t.i. pa#201508063496. n/a ordinance #155-13Details
fire sprinkler permit, relocate 3, add 10 and delete 2 pendent sprinklers on 1st & 2nd floors. t.i. pa#201508063496. n/a ordinance #155-13 | $1,600 |
| Sep 3, 2015 | Completed final sign-off Apr 2016 | 625 02nd St | Rossi Builders Inc. | 2nd floor - title 24 lighting, electrical per t.i. # 2015.0806.3496. n/a maher ordinanceDetails
2nd floor - title 24 lighting, electrical per t.i. # 2015.0806.3496. n/a maher ordinance | $200,000 |
| Aug 6, 2015 | Completed final sign-off Jun 2016 | 625 02nd St | Rossi Builders Inc. | 1/f & 2/f- t.i. includes demo of non structural partition & build (n) non structural partitions. (n) interconnecting stair down to ground floor, all new or revised mep. & life safety, sprinklers under seperate permit. n/a ordinance #155-13Details
1/f & 2/f- t.i. includes demo of non structural partition & build (n) non structural partitions. (n) interconnecting stair down to ground floor, all new or revised mep. & life safety, sprinklers under seperate permit. n/a ordinance #155-13 | $744,527 |
| Aug 4, 2015 | Never finaled filed Aug 2015, never issued | 625 02nd St | 3rd and 4th fl demo and remove existing interconnecting stair structure and infill the floor at openingDetails
3rd and 4th fl demo and remove existing interconnecting stair structure and infill the floor at opening | $40,000 | |
| Aug 4, 2015 | Completed final sign-off Nov 2015 | 625 02nd St | Field Construction Inc. | 3rd and 4th fl demo and removal existing interconnecting stair structure and infill the floor at openingDetails
3rd and 4th fl demo and removal existing interconnecting stair structure and infill the floor at opening | $40,000 |
| Mar 24, 2015 | Completed final sign-off May 2015 | 625 02nd St | Bilcor Inc | basement to 4th flr: install 10 montior modules. ref pa # 2015 0217 8413 maher not req'dDetails
basement to 4th flr: install 10 montior modules. ref pa # 2015 0217 8413 maher not req'd | $4,000 |
| Feb 17, 2015 | Never finaled issued Feb 2015, no final | 625 02nd St | Pioneer Fire Inc. | basement - 4th floors: voluntarily isolate each of the existing floors of the existing fire sprinkler system with new control valve assemblies. n/a maher ordinanceDetails
basement - 4th floors: voluntarily isolate each of the existing floors of the existing fire sprinkler system with new control valve assemblies. n/a maher ordinance | $55,840 |
| Jan 12, 2015 | Completed final sign-off Jan 2015 | 625 02nd St | Bilcor Inc | 4th floor - fire alarm tenant improvement. install 1 control relay module, 1 smoke detector with base and relocate 1 horn strobe. maher n/a.Details
4th floor - fire alarm tenant improvement. install 1 control relay module, 1 smoke detector with base and relocate 1 horn strobe. maher n/a. | $1,200 |
| Nov 13, 2014 | Completed final sign-off Feb 2015 | 625 02nd St | Cannon Constructors North Inc | 4th flr: t.i. demo of a portion (non-structural) leaving the ceiling grid as is. demo door and infilling the wall creating one room. maher n/a. a non ab-060 room (ign room)Details
4th flr: t.i. demo of a portion (non-structural) leaving the ceiling grid as is. demo door and infilling the wall creating one room. maher n/a. a non ab-060 room (ign room) | $16,217 |
| Oct 16, 2014 | Completed final sign-off Jun 2015 | 625 02nd St | Rossi Builders Inc. | 3rd floor (vacant) - demolision of non structural partition per ab-017. building is fully sprinkler. n/a maher ordinance #155-13Details
3rd floor (vacant) - demolision of non structural partition per ab-017. building is fully sprinkler. n/a maher ordinance #155-13 | $8,000 |
| Oct 2, 2014 | Completed final sign-off Dec 2014 | 625 02nd St | Bilcor Inc | roof: install 1 smoke detector, to release door lock upon activation. n/a for the maher ordinance #155-13Details
roof: install 1 smoke detector, to release door lock upon activation. n/a for the maher ordinance #155-13 | $400 |
| Feb 7, 2014 | Completed final sign-off Apr 2014 | 625 02nd St | Bilcor Inc | 4th floor and roof:install 4 heat detectors and install 1 control relay. n/a for the maher ordinance #155-13Details
4th floor and roof:install 4 heat detectors and install 1 control relay. n/a for the maher ordinance #155-13 | $2,000 |
| Jan 21, 2014 | Completed final sign-off Jan 2014 | 625 02nd St | Golden Gate Fire Protection Inc | relocate 2 upright sprinkler on the ground floor, add 1 upright sprinkler. t.i. pa#201312275106. compliance with ordinance #155-13 not required.Details
relocate 2 upright sprinkler on the ground floor, add 1 upright sprinkler. t.i. pa#201312275106. compliance with ordinance #155-13 not required. | $1,545 |
| Dec 27, 2013 | Completed final sign-off Apr 2014 | 625 02nd St | Rossi Builders Inc. | ground floor: t.i. includes the demo of non structural partitions and bldg nonew non-structual partitions. all new or revised. hvac electrical, plmg, and life safety work will be design build and submitted seperatly.Details
ground floor: t.i. includes the demo of non structural partitions and bldg nonew non-structual partitions. all new or revised. hvac electrical, plmg, and life safety work will be design build and submitted seperatly. | $240,000 |
| Jun 17, 2013 | Completed final sign-off Jan 2014 | 625 02nd St | Cannon Constructors North Inc | 2nd floor suite 2000 - non-structural tenant improvement, close opening in demising betwee n suite 2000 & 2100, divide 1 room, add door, relocate 3 light fixtures (10% of total), add power & data outlets in suite 2000.Details
2nd floor suite 2000 - non-structural tenant improvement, close opening in demising betwee n suite 2000 & 2100, divide 1 room, add door, relocate 3 light fixtures (10% of total), add power & data outlets in suite 2000. | $15,000 |
| Apr 9, 2013 | Completed final sign-off May 2013 | 625 02nd St | Cannon Constructors North Inc | 3rd floor - non-structural tenant improvement temporary enclosure of internal stair. sprinkler plan will be submitted separately as needed.Details
3rd floor - non-structural tenant improvement temporary enclosure of internal stair. sprinkler plan will be submitted separately as needed. | $14,280 |
| Feb 14, 2012 | Never finaled issued Feb 2012, no final | 625 02nd St | street space permit.Details
street space permit. | ||
| Sep 26, 2011 | Expired or cancelled expired Dec 2013 | 625 02nd St | A M Rocca Inc. | office t.i. ; build out (n) non-bearing partitions; mep under separate permitsDetails
office t.i. ; build out (n) non-bearing partitions; mep under separate permits | $6,000 |
| May 20, 2011 | Completed final sign-off Jul 2011 | 625 02nd St | Red Hawk Fire & Security Ca Llc | 1st floor - modifications fire alarm system, add 7 horn/strobes.Details
1st floor - modifications fire alarm system, add 7 horn/strobes. | $10,000 |
| Apr 26, 2011 | Completed final sign-off May 2011 | 625 02nd St | Pioneer Fire Inc. | ground floor relocate one sprinkler, add one sprinkelr.Details
ground floor relocate one sprinkler, add one sprinkelr. | $1,000 |
| Mar 23, 2011 | Completed final sign-off Aug 2011 | 625 02nd St | Cannon Constructors North Inc | 1st floor /ground floor ti includes demolition of non structural partions and building new non structural partitions.(all new or revised hvac, electrical, plumbing, life safty and/or sprinklers work will be designed build and submitted for permit seperatly if determined as required) fully sprinklerDetails
1st floor /ground floor ti includes demolition of non structural partions and building new non structural partitions.(all new or revised hvac, electrical, plumbing, life safty and/or sprinklers work will be designed build and submitted for permit seperatly if determined as required) fully sprinkler | $87,473 |
| Feb 28, 2011 | Completed final sign-off Apr 2011 | 625 02nd St | Cannon Constructors North Inc | revision to pa# 201.12.10.6470, no life safety work will be required for the project. this was requested by the field inspectorDetails
revision to pa# 201.12.10.6470, no life safety work will be required for the project. this was requested by the field inspector | |
| Dec 10, 2010 | Completed final sign-off May 2011 | 625 02nd St | Cannon Constructors North Inc | (1st floor) t.i. includes demolition of non-structural partitions build back non-structural partitions. all new or revised. hvac, electrical, plumbing, and life safety will be design build and submitted separately (fully sprinklered building)Details
(1st floor) t.i. includes demolition of non-structural partitions build back non-structural partitions. all new or revised. hvac, electrical, plumbing, and life safety will be design build and submitted separately (fully sprinklered building) | $40,000 |
| Nov 5, 2010 | Completed final sign-off Dec 2010 | 625 02nd St | Cannon Constructors North Inc | partial office ti of suites 100 and 104 on the 1st fl. new interior egress doors, partitions, pantry and copy area, and new demising wall. no exterior workDetails
partial office ti of suites 100 and 104 on the 1st fl. new interior egress doors, partitions, pantry and copy area, and new demising wall. no exterior work | $27,000 |
| Aug 26, 2010 | Expired or cancelled cancelled Jun 2014 | 625 02nd St | Neon Works Creations | to erect non electrical aluminum sign at entrance way.Details
to erect non electrical aluminum sign at entrance way. | $1,500 |
| Feb 12, 2010 | Completed final sign-off Aug 2010 | 625 02nd St | Bay City Mechanical Inc | revise (e) duct work & air distributor & add 6 ac systems, floors 2, 3, 4. arch pa# 2009/10/20/9332.Details
revise (e) duct work & air distributor & add 6 ac systems, floors 2, 3, 4. arch pa# 2009/10/20/9332. | $120,000 |
| Jan 13, 2010 | Completed final sign-off Aug 2010 | 625 02nd St | Cannon Constructors North Inc | reference pa# 2009-1020-9332-for documentation of type of construction was (2b) but it's actually (3a).Details
reference pa# 2009-1020-9332-for documentation of type of construction was (2b) but it's actually (3a). | |
| Dec 11, 2009 | Completed final sign-off Aug 2010 | 625 02nd St | Cannon Constructors North Inc | electrical for tenent improvement on 2nd, 3rd and 4th floors. architectural permit under pa# 2009.10.20.9332Details
electrical for tenent improvement on 2nd, 3rd and 4th floors. architectural permit under pa# 2009.10.20.9332 | $175,000 |
| Dec 2, 2009 | Never finaled issued Dec 2009, no final | 625 02nd St | R L H Fire Protection Inc | 4th floor t.i. on existing fire sprinkler system. relcoate 10 & add 2 heads. total of 12 headsDetails
4th floor t.i. on existing fire sprinkler system. relcoate 10 & add 2 heads. total of 12 heads | $2,400 |
| Dec 2, 2009 | Never finaled issued Dec 2009, no final | 625 02nd St | R L H Fire Protection Inc | 3rd floor-t.i upgrade on the (e) fire sprinkler system, for fox interactive. relocate 25 heads, add 26 heads, total 51 headsDetails
3rd floor-t.i upgrade on the (e) fire sprinkler system, for fox interactive. relocate 25 heads, add 26 heads, total 51 heads | $10,200 |
| Dec 2, 2009 | Never finaled issued Dec 2009, no final | 625 02nd St | R L H Fire Protection Inc | 2nd floor t.i. on existing fire sprinkler system. relcoate 19 & add 29 heads. total of 48 headsDetails
2nd floor t.i. on existing fire sprinkler system. relcoate 19 & add 29 heads. total of 48 heads | $9,600 |
| Nov 24, 2009 | Completed final sign-off Aug 2010 | 625 02nd St | Diversified Fire Products | fire alarm ti for interactive floors 2,3,4. add 20 horn/strobes. 7 strobesDetails
fire alarm ti for interactive floors 2,3,4. add 20 horn/strobes. 7 strobes | $13,000 |
| Oct 20, 2009 | Completed final sign-off Aug 2010 | 625 02nd St | Cannon Constructors North Inc | 2nd, 3rd & 4th floors. tenant improvement. demo of non-structural partitions and build new non-structural partitions, work stations;ceilings. all new or revised hvac, electrical, plumbing and life safety work under separate permit. building fully sprinklered.Details
2nd, 3rd & 4th floors. tenant improvement. demo of non-structural partitions and build new non-structural partitions, work stations;ceilings. all new or revised hvac, electrical, plumbing and life safety work under separate permit. building fully sprinklered. | $650,000 |
| Oct 8, 2009 | Completed final sign-off Nov 2009 | 625 02nd St | Cannon Constructors North Inc | 4th floor tenant improvement one new non-structural partitions, door & sidelight. all new or revised hvac & electrical. work will be design build & submitted for permit separately. buildign is fully sprinklered.Details
4th floor tenant improvement one new non-structural partitions, door & sidelight. all new or revised hvac & electrical. work will be design build & submitted for permit separately. buildign is fully sprinklered. | $6,500 |
| Jun 24, 2008 | Completed final sign-off Dec 2008 | 625 02nd St | Howard S. Wright Constructors Lp | 1st floor- demo 2 doors & addition of 3 doors. 2nd floor, demo of 2 walls, addition of millwork & flooring. upgrade drinking fountain.Details
1st floor- demo 2 doors & addition of 3 doors. 2nd floor, demo of 2 walls, addition of millwork & flooring. upgrade drinking fountain. | $20,000 |
| Apr 4, 2008 | Completed final sign-off Apr 2008 | 625 02nd St | R L H Fire Protection Inc | as built to pa# 2008/02/26/5554. 36 pendants added to offices. 36 total.Details
as built to pa# 2008/02/26/5554. 36 pendants added to offices. 36 total. | $1,000 |
| Mar 4, 2008 | Completed final sign-off Apr 2008 | 625 02nd St | Cannon Constructors North Inc | ref. pa# 2008/01/10/2245. t-24 for hvac and lighting for new offices ti on the 4th floor. ti for fire alarm to relocate audio/visual notification appliances and tie to an ex. auxilary power supply.Details
ref. pa# 2008/01/10/2245. t-24 for hvac and lighting for new offices ti on the 4th floor. ti for fire alarm to relocate audio/visual notification appliances and tie to an ex. auxilary power supply. | $115,000 |
| Feb 26, 2008 | Completed final sign-off Apr 2008 | 625 02nd St | R L H Fire Protection Inc | 4th floor-t/i upgrade on the (e) fire sprinkler system for fox interactive on the 4th floor. relocate 34 heads, add 2 pendents-total 36 headsDetails
4th floor-t/i upgrade on the (e) fire sprinkler system for fox interactive on the 4th floor. relocate 34 heads, add 2 pendents-total 36 heads | $7,200 |
| Jan 10, 2008 | Completed final sign-off Apr 2008 | 625 02nd St | 4th floor-install non-structural partitions and doors etc.; all required adjustments to the (e) hvac, life safety, sprinklers, lighting under seperate permit (design built)Details
4th floor-install non-structural partitions and doors etc.; all required adjustments to the (e) hvac, life safety, sprinklers, lighting under seperate permit (design built) | $490,000 | |
| Dec 20, 2007 | Completed final sign-off Dec 2007 | 625 02nd St | 4th fl - structural drawings, infill existing opening in floor. near break room. ref. arch. p/a #2007.12.07.9929Details
4th fl - structural drawings, infill existing opening in floor. near break room. ref. arch. p/a #2007.12.07.9929 | $25,000 | |
| Dec 7, 2007 | Completed final sign-off Mar 2008 | 625 02nd St | 3rd & 4th floors - new partitions and converting (e) copy room into break room. (electrical, mechanical, life safety & sprinklers are to be design built and on separate permit). all non-strucutral.Details
3rd & 4th floors - new partitions and converting (e) copy room into break room. (electrical, mechanical, life safety & sprinklers are to be design built and on separate permit). all non-strucutral. | $62,000 | |
| Jun 1, 2006 | Expired or cancelled expired Nov 2007 | 625 02nd St | San Francisco Fire Protection | tenant improvement-relocate existing audibles, add two more and move four. scope of work on 1st floor south only.Details
tenant improvement-relocate existing audibles, add two more and move four. scope of work on 1st floor south only. | $2,000 |
| May 23, 2006 | Completed final sign-off Aug 2006 | 625 02nd St | C B F Inc | life safety system modifications @ 625 2nd street, 1st floor-4 horns/strobes & 5 strobes.Details
life safety system modifications @ 625 2nd street, 1st floor-4 horns/strobes & 5 strobes. | $5,000 |
| May 11, 2006 | Completed final sign-off Aug 2006 | 625 02nd St | Skyline Construction | relocate/blance diffuser, remove/replace heat pumps, relocate thermostatDetails
relocate/blance diffuser, remove/replace heat pumps, relocate thermostat | $10,000 |
| May 8, 2006 | Completed final sign-off Jul 2006 | 625 02nd St | provide t.i. in 1/f including interior non-bearing partition walls, doors, sidelights, mechanical, electrical & plumbing under seperate permit. no exterior, no structural work.Details
provide t.i. in 1/f including interior non-bearing partition walls, doors, sidelights, mechanical, electrical & plumbing under seperate permit. no exterior, no structural work. | $85,000 | |
| May 2, 2006 | Completed final sign-off Aug 2006 | 625 02nd St | Anderson, Rowe & Buckley, Inc. | t.i (e) spkr. syst. 4 new, 9 relocates.Details
t.i (e) spkr. syst. 4 new, 9 relocates. | $2,600 |
| Apr 14, 2006 | Completed final sign-off Aug 2006 | 625 02nd St | tenant improvement including soft demolition, new partition walls, new finishes, tel / dat signal, 1st floor. mechanical, electrical, plumbing & fire suppression system are submitted under separate permit.Details
tenant improvement including soft demolition, new partition walls, new finishes, tel / dat signal, 1st floor. mechanical, electrical, plumbing & fire suppression system are submitted under separate permit. | $108,000 | |
| May 17, 2002 | Completed final sign-off Jul 2002 | 625 02nd St | Vkk Signmakers Inc. | erect electric, single faced, non-illuminated wall signDetails
erect electric, single faced, non-illuminated wall sign | $5,000 |
| Feb 13, 2002 | Completed final sign-off Apr 2002 | 625 02nd St | Schwartz & Lindheim | relocation of 1 fire alarm device (horn/strobe) and testingDetails
relocation of 1 fire alarm device (horn/strobe) and testing | $1,800 |
| Jul 20, 2001 | Completed final sign-off Apr 2002 | 625 02nd St | demo of few non structural partitions doors and frames provide new non struct partition doors framesDetails
demo of few non structural partitions doors and frames provide new non struct partition doors frames | $45,000 | |
| Mar 19, 2001 | Expired or cancelled expired Jul 2001 | 625 02nd St | street spaceDetails
street space | ||
| Feb 7, 2001 | Expired or cancelled expired Sep 2005 | 625 02nd St | abate complaint #3771 from the dept of dcp remove an identify (address sign) sign & supporting strucDetails
abate complaint #3771 from the dept of dcp remove an identify (address sign) sign & supporting struc | $1,000 | |
| Aug 2, 2000 | Expired or cancelled expired Aug 2001 | 625 02nd St | revision to pa#200006172942 install new stair between 2nd fl & 3rd fl provide smoke doors 2-3/fDetails
revision to pa#200006172942 install new stair between 2nd fl & 3rd fl provide smoke doors 2-3/f | $76,000 | |
| Jun 17, 2000 | Expired or cancelled expired Jun 2001 | 625 02nd St | tenant improvement install wall door window el & mech under sep plan & permit 2-3/fDetails
tenant improvement install wall door window el & mech under sep plan & permit 2-3/f | $48,600 |