Permit GraphShortlistSan Francisco building permits since 2000

Block 1199, lot 018

422 Lyon St

City’s use
Multi-Family Residential
Built
1905
Stories
3
Units
6
Rooms
6 bathrooms
Building
5,640 sq ft
Lot
2,809 sq ft
Zoning
RH3
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

9 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 18, 2025Completed
final sign-off Sep 2025
422 Lyon StRedwood City Alarms Incsubmitting as builts for pa 2023-0511-7551. documenting (1) low frequency horn installed in a bedroom that was built after the intial drawings were approved.
Details
Permit
202504184715
Status
complete
Filed
Apr 18, 2025
Permit issued
Apr 18, 2025
Final sign-off
Sep 2, 2025
Address
422 Lyon St

submitting as builts for pa 2023-0511-7551. documenting (1) low frequency horn installed in a bedroom that was built after the intial drawings were approved.

Open the permit page

Jul 18, 2023Never finaled
issued Jul 2023, no final
422 Lyon StBrady Constructionpartial removal of e load bearing wall at basement (11 ft opening) to accomodate reloacated electrical service meters. new beam with post supported by existing reinforced concrete foundations.
Details
Permit
202307182375
Status
issued
Filed
Jul 18, 2023
Permit issued
Jul 27, 2023
Declared cost
$5,000
Address
422 Lyon St

partial removal of e load bearing wall at basement (11 ft opening) to accomodate reloacated electrical service meters. new beam with post supported by existing reinforced concrete foundations.

Open the permit page

$5,000
May 11, 2023Completed
final sign-off Nov 2023
422 Lyon StRedwood City Alarms Increplacing the fire alarm system on a one-to-one bases." voluntary installing heat detectors in the unsprinklerered area of the garage / laundry room. install low frequency horns in sleeping areas per sffd ab3.08.
Details
Permit
202305117551
Status
complete
Filed
May 11, 2023
Permit issued
May 11, 2023
Final sign-off
Nov 21, 2023
Declared cost
$37,167
Address
422 Lyon St

replacing the fire alarm system on a one-to-one bases." voluntary installing heat detectors in the unsprinklerered area of the garage / laundry room. install low frequency horns in sleeping areas per sffd ab3.08.

Open the permit page

$37,167
May 1, 2023Completed
final sign-off Aug 2023
422 Lyon StBrady Construction2/f unit 2: relocate entry door for unit 2 closer to front entry. expand media room into hallway for new alcove. no change to unit 1 or 2 exposure per the planning department's flats policy.
Details
Permit
202305016776
Status
complete
Filed
May 1, 2023
Permit issued
May 4, 2023
Final sign-off
Aug 3, 2023
Declared cost
$9,000
Address
422 Lyon St

2/f unit 2: relocate entry door for unit 2 closer to front entry. expand media room into hallway for new alcove. no change to unit 1 or 2 exposure per the planning department's flats policy.

Open the permit page

$9,000
Oct 17, 2020Completed
final sign-off Feb 2021
422 Lyon StUrban Builder General Contracting Increvision to pa 201709158388. soft story upgrade.
Details
Permit
202010176760
Status
complete
Filed
Oct 17, 2020
Permit issued
Nov 10, 2020
Final sign-off
Feb 16, 2021
Declared cost
$100,000
Address
422 Lyon St

revision to pa 201709158388. soft story upgrade.

Open the permit page

$100,000
Aug 14, 2020Never finaled
filed Aug 2020, never issued
422 Lyon Stconversion of existing basement used from storagae into 2 adu's per ordinance no 162-17.
Details
Permit
202008141756
Status
filed
Filed
Aug 14, 2020
Declared cost
$60,000
Address
422 Lyon St

conversion of existing basement used from storagae into 2 adu's per ordinance no 162-17.

Open the permit page

$60,000
Sep 15, 2017Completed
final sign-off Feb 2021
422 Lyon StUrban Builder General Contracting Incsoft story upgrades per sfbc ch 40.
Details
Permit
201709158388
Status
complete
Filed
Sep 15, 2017
Permit issued
Jul 21, 2020
Final sign-off
Feb 16, 2021
Declared cost
$100,000
Address
422 Lyon St

soft story upgrades per sfbc ch 40.

Open the permit page

$100,000
Nov 17, 2015Completed
final sign-off Feb 2016
422 Lyon StBrady Constructionunit #1: kitchen remodel: replace cabinets in-kind, change counter tops, sink and faucet. bathroom remodel: replace bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, replace vanity cabinet. no structural work.
Details
Permit
201511172771
Status
complete
Filed
Nov 17, 2015
Permit issued
Nov 17, 2015
Final sign-off
Feb 11, 2016
Declared cost
$26,000
Address
422 Lyon St

unit #1: kitchen remodel: replace cabinets in-kind, change counter tops, sink and faucet. bathroom remodel: replace bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, replace vanity cabinet. no structural work.

Open the permit page

$26,000
May 30, 2014Completed
final sign-off Aug 2014
422 Lyon StBrady Constructionin unit #2 only: replace kitchen cabinets in kind, replace counter top. in bathroom, replace vanity cabinet.
Details
Permit
201405307167
Status
complete
Filed
May 30, 2014
Permit issued
May 30, 2014
Final sign-off
Aug 4, 2014
Declared cost
$8,700
Address
422 Lyon St

in unit #2 only: replace kitchen cabinets in kind, replace counter top. in bathroom, replace vanity cabinet.

Open the permit page

$8,700

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.