Brady Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to May 2026
- Last 24 months
- 11 permits filed
165 permits since 2000: 157 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 165.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2026 | Completed final sign-off Aug 2026 | 101 Broderick St | unit 305: kitchen (approx 60 sq ft) and bathroom (approx. 60 sq ft) remodel in kind. bathroom: remove and replace vanity cabinet and countertop, bathtub and ceramic tile surround along with flooring. kitchen: remove and replace cabinets, countertop in kind. no structural work in unit.Details
unit 305: kitchen (approx 60 sq ft) and bathroom (approx. 60 sq ft) remodel in kind. bathroom: remove and replace vanity cabinet and countertop, bathtub and ceramic tile surround along with flooring. kitchen: remove and replace cabinets, countertop in kind. no structural work in unit. | $63,000 |
| Jan 2, 2026 | Completed final sign-off Mar 2026 | 1060 Cole St | unit #8: replace kitchen cabinets in kind, change countertops, sink and faucet. no wall change, no structural. bathroom: replace ceramic tile surrounding shower stall and shower pan. new ceramic tile to be in a mortar base. install low flow toilet, replace vanity, cabinet & sink. no wall change.Details
unit #8: replace kitchen cabinets in kind, change countertops, sink and faucet. no wall change, no structural. bathroom: replace ceramic tile surrounding shower stall and shower pan. new ceramic tile to be in a mortar base. install low flow toilet, replace vanity, cabinet & sink. no wall change. | $55,000 |
| Sep 12, 2025 | Completed final sign-off Nov 2025 | 1327 Lyon St | front structure: remove and replace replace deteriorated wood members in-kind at courtyard stairways. less than 50%. not visible from street.Details
front structure: remove and replace replace deteriorated wood members in-kind at courtyard stairways. less than 50%. not visible from street. | $3,900 |
| Sep 12, 2025 | Completed final sign-off Nov 2025 | 2 Leona Tr | rear structure: 2-28 leona terrace; remove and replace deteriroated wood members in-kind @ rear decks and stairway. less than 50%.Details
rear structure: 2-28 leona terrace; remove and replace deteriroated wood members in-kind @ rear decks and stairway. less than 50%. | $5,700 |
| Apr 25, 2025 | Completed final sign-off May 2025 | 1040 Steiner St | unit #10: revision to pa# 202503031386 replace bathroom and kitchen window w/ double hung vinyl. both windows in light court and not visible from street. max u-factor 0.3Details
unit #10: revision to pa# 202503031386 replace bathroom and kitchen window w/ double hung vinyl. both windows in light court and not visible from street. max u-factor 0.3 | $3,200 |
| Apr 25, 2025 | Completed final sign-off Jul 2025 | 1040 Steiner St | unit #2: bathroom - replace toilet, vanity cabinet and bathtub surround. install 2 vinyl window in bathroom and kitchen, windows in light court. kitchen - replace in kind cabinets, countertop, sink. no wall change, no structural work. max u-factor .30. add fan in bathroom.Details
unit #2: bathroom - replace toilet, vanity cabinet and bathtub surround. install 2 vinyl window in bathroom and kitchen, windows in light court. kitchen - replace in kind cabinets, countertop, sink. no wall change, no structural work. max u-factor .30. add fan in bathroom. | $64,000 |
| Mar 12, 2025 | Completed final sign-off Jun 2025 | 12 Leona Tr | bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet. new ceramic tile to be in mortar base. kitchen: replace cabinets in kind, change countertop, sink and faucet. replace 5 wood single pane glass windows to 5 vinly double hung windowsDetails
bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet. new ceramic tile to be in mortar base. kitchen: replace cabinets in kind, change countertop, sink and faucet. replace 5 wood single pane glass windows to 5 vinly double hung windows | $70,000 |
| Mar 3, 2025 | Completed final sign-off Apr 2025 | 1040 Steiner St | unit #12: to comply with nov #202534422 repair all fire damage to unit #12 repaird all finishes electrical, plumbing, minor damage to framing, repair as neededDetails
unit #12: to comply with nov #202534422 repair all fire damage to unit #12 repaird all finishes electrical, plumbing, minor damage to framing, repair as needed | $10,500 |
| Mar 3, 2025 | Completed final sign-off May 2025 | 1040 Steiner St | unit #10: bathroom: replace toilet, vainity, cabinet and bath tub surround kitchen: replace in kind cabinets, countertop, sink no wall change no structural workDetails
unit #10: bathroom: replace toilet, vainity, cabinet and bath tub surround kitchen: replace in kind cabinets, countertop, sink no wall change no structural work | $40,000 |
| Dec 12, 2024 | Completed final sign-off Jan 2025 | 3258 Harrison St | install 2x4 blocking in garage area for plywood panel installation, plywood to be 1/2" structural 1, nailed with 10d,4" o.c at edges and 10" o.c in field. install simpson urfp brackets 4' o.c at high concrete walls. no removal of finishes.Details
install 2x4 blocking in garage area for plywood panel installation, plywood to be 1/2" structural 1, nailed with 10d,4" o.c at edges and 10" o.c in field. install simpson urfp brackets 4' o.c at high concrete walls. no removal of finishes. | $7,500 |
| Oct 11, 2024 | Completed final sign-off Jan 2025 | 3258 Harrison St | complete wood destroying pests and organisms per inspection report 987594 dated 8/15/24, remove and replace in kind dryrotted wood members in garage and various siding locations.replace in kind siding, garage studs.Details
complete wood destroying pests and organisms per inspection report 987594 dated 8/15/24, remove and replace in kind dryrotted wood members in garage and various siding locations.replace in kind siding, garage studs. | $4,090 |
| Aug 9, 2023 | Completed final sign-off Nov 2023 | 101 Broderick St | unit 306: replace kitchen & bathroom in-kind, no wall change. no exterior changes proposed.Details
unit 306: replace kitchen & bathroom in-kind, no wall change. no exterior changes proposed. | $63,000 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 422 Lyon St | partial removal of e load bearing wall at basement (11 ft opening) to accomodate reloacated electrical service meters. new beam with post supported by existing reinforced concrete foundations.Details
partial removal of e load bearing wall at basement (11 ft opening) to accomodate reloacated electrical service meters. new beam with post supported by existing reinforced concrete foundations. | $5,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1060 Cole St | units #4 and #7 only. unit# 4: replace kitchen cabinets in kind, change countertop, sink and faucet. replace tile surrounding bathtub and new ceramic tile to be in a mortar base. install low flow toilet and replace vanity cabinet. no wall change. unit# 7: replace surround of bathtub w/ ceramic tileDetails
units #4 and #7 only. unit# 4: replace kitchen cabinets in kind, change countertop, sink and faucet. replace tile surrounding bathtub and new ceramic tile to be in a mortar base. install low flow toilet and replace vanity cabinet. no wall change. unit# 7: replace surround of bathtub w/ ceramic tile | $28,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 8 Leona Tr | 1 bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet, new ceramic tile to be in a mortar base. 1 kitchen: replace cabinets in kind, change cntertop, sink, and faucet. no wall change. replace (5) wood single pane glass windows to (5) vinyl double hungDetails
1 bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet, new ceramic tile to be in a mortar base. 1 kitchen: replace cabinets in kind, change cntertop, sink, and faucet. no wall change. replace (5) wood single pane glass windows to (5) vinyl double hung | $38,000 |
| May 1, 2023 | Completed final sign-off Aug 2023 | 422 Lyon St | 2/f unit 2: relocate entry door for unit 2 closer to front entry. expand media room into hallway for new alcove. no change to unit 1 or 2 exposure per the planning department's flats policy.Details
2/f unit 2: relocate entry door for unit 2 closer to front entry. expand media room into hallway for new alcove. no change to unit 1 or 2 exposure per the planning department's flats policy. | $9,000 |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 1060 Cole St | conversion of unconditioned storage space located at rear of ground floor. to be habitable sppace for extg ground floor unit. remodel extg kitchen and bathoom. add bedroom.Details
conversion of unconditioned storage space located at rear of ground floor. to be habitable sppace for extg ground floor unit. remodel extg kitchen and bathoom. add bedroom. | $70,000 |
| Sep 1, 2022 | Completed final sign-off Dec 2022 | 101 Broderick St | apt 103: replace one kitchen & one bathroom in-kind. no structural or wall modification.Details
apt 103: replace one kitchen & one bathroom in-kind. no structural or wall modification. | $37,000 |
| Mar 4, 2022 | Completed final sign-off Jun 2022 | 1246 45th Av | repair deteriorated wood members at front exterior balcony. replace furnace and ducting. (separate plumbing and mechanical permit for furnace)Details
repair deteriorated wood members at front exterior balcony. replace furnace and ducting. (separate plumbing and mechanical permit for furnace) | $5,400 |
| Mar 4, 2022 | Expired or cancelled cancelled Jan 2026 | 1246 45th Av | replace front exterior balcony in kind. replace furnace and ducting.Details
replace front exterior balcony in kind. replace furnace and ducting. | $18,000 |
| Aug 5, 2021 | Completed final sign-off Dec 2021 | 1040 Steiner St | apt 1: remodel one bathroom & onr kitchen. replace in-kind. (b) vanity cabinet, creamid tile, surround of tub, toilet and flooring. (k): replae in-kind cabinets, countertop and sink. no wall change. no structural work.Details
apt 1: remodel one bathroom & onr kitchen. replace in-kind. (b) vanity cabinet, creamid tile, surround of tub, toilet and flooring. (k): replae in-kind cabinets, countertop and sink. no wall change. no structural work. | $30,000 |
| Apr 27, 2021 | Completed final sign-off Jun 2021 | 1040 Steiner St | unit# 6 - bathroom: replace in kind venity cabinet, ceramic tile surround of tub, toilet and flooring. kitchen: replace in kind cabinets, counter top and sink. no wall change or structural work in closet.Details
unit# 6 - bathroom: replace in kind venity cabinet, ceramic tile surround of tub, toilet and flooring. kitchen: replace in kind cabinets, counter top and sink. no wall change or structural work in closet. | $30,000 |
| Oct 26, 2020 | Completed final sign-off Feb 2021 | 101 Broderick St | unit 406 only: no wall change, replace kitchen and bathroom in kindDetails
unit 406 only: no wall change, replace kitchen and bathroom in kind | $32,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2021 | 1327 Lyon St | unit a: no wall change replace bathroom in kind, kitchen: replace counterstop, sink, faucet and flooringDetails
unit a: no wall change replace bathroom in kind, kitchen: replace counterstop, sink, faucet and flooring | $21,000 |
| Aug 24, 2020 | Completed final sign-off Dec 2020 | 1040 Steiner St | unit 7 only - bathroom: replace in kind bathtub, vanity cabinet, toilet kitchen: replace in kind cabinets, countertop and sink, no wall change or structural work in unitDetails
unit 7 only - bathroom: replace in kind bathtub, vanity cabinet, toilet kitchen: replace in kind cabinets, countertop and sink, no wall change or structural work in unit | $30,000 |
| Jul 1, 2020 | Completed final sign-off Nov 2020 | 1018 Cortland Av | unit #1 & #3 bathroom work only: remove toilets, sinks & clawfoot tubs. install showers in place of clawfoot bathtubs. showers ceramic tiles surrounds & premade plastic shower pans. intall (n) sinks & toilets. no wall change. no structural workDetails
unit #1 & #3 bathroom work only: remove toilets, sinks & clawfoot tubs. install showers in place of clawfoot bathtubs. showers ceramic tiles surrounds & premade plastic shower pans. intall (n) sinks & toilets. no wall change. no structural work | $31,000 |
| Jul 1, 2019 | Completed final sign-off Oct 2019 | 101 Broderick St | unit # 205-bathroom(s): replace vanity cabinets and countertops.bathrub and surround to remain. remodel kitchen in kind. countertop, sink, and faucets. unit # 301: replace bathtub and surround. remodel kitchen in kind. no change to wall location. no structural work.Details
unit # 205-bathroom(s): replace vanity cabinets and countertops.bathrub and surround to remain. remodel kitchen in kind. countertop, sink, and faucets. unit # 301: replace bathtub and surround. remodel kitchen in kind. no change to wall location. no structural work. | $64,000 |
| Dec 3, 2018 | Completed final sign-off Mar 2019 | 1040 Steiner St | all work in unit # 9. bathroom: replace ceramic tile around 3 walls of bathtub, install new vanity cabinet, top and faucet. existing bathtub to remain. kitchen: replace cabinets in kind, change counter top, sink and faucet. no wall change.Details
all work in unit # 9. bathroom: replace ceramic tile around 3 walls of bathtub, install new vanity cabinet, top and faucet. existing bathtub to remain. kitchen: replace cabinets in kind, change counter top, sink and faucet. no wall change. | $34,500 |
| Sep 21, 2018 | Completed final sign-off Dec 2018 | 101 Broderick St | all work in unit 402: kitchen cabinets in-kind, change countertop, sink & faucet; bathroom: replace vanity cabinet & top, re-work toilet flange for proper clearances. no wall changeDetails
all work in unit 402: kitchen cabinets in-kind, change countertop, sink & faucet; bathroom: replace vanity cabinet & top, re-work toilet flange for proper clearances. no wall change | $32,000 |
| Aug 13, 2018 | Completed final sign-off Sep 2018 | 2341 Chestnut St | unit 105. replace 3 damged base cabinets and countertops at kitchen. replace 54 sq ft of drywall. drywall to be 5/8" type x.Details
unit 105. replace 3 damged base cabinets and countertops at kitchen. replace 54 sq ft of drywall. drywall to be 5/8" type x. | $8,000 |
| Jan 5, 2018 | Completed final sign-off Mar 2018 | 101 Broderick St | #203: kitchen : replace cabinets in kind, change countertop,sink& faucet, bathroom: replace vanity cabinet &top of bathtub along iwth ceramic tile surround, no structural workDetails
#203: kitchen : replace cabinets in kind, change countertop,sink& faucet, bathroom: replace vanity cabinet &top of bathtub along iwth ceramic tile surround, no structural work | $32,000 |
| Oct 11, 2017 | Completed final sign-off Jan 2018 | 1101 Francisco St | unit 304 only: bathroom, replace ceramic tile on (3) walls around bathtub/bathroom floor, install new vanity cabinet, counter top, faucet; kitchen, replace cabinets in-kind, change countertop, sink, faucet; no structural workDetails
unit 304 only: bathroom, replace ceramic tile on (3) walls around bathtub/bathroom floor, install new vanity cabinet, counter top, faucet; kitchen, replace cabinets in-kind, change countertop, sink, faucet; no structural work | $38,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2017 | 101 Broderick St | all work in unit #401; kitchen, replace cabinets in-kind, change countertop, sink, faucet; bathroom, replace vanity cabinet & top, bathtub with ceramic tile surround. no structural work.Details
all work in unit #401; kitchen, replace cabinets in-kind, change countertop, sink, faucet; bathroom, replace vanity cabinet & top, bathtub with ceramic tile surround. no structural work. | $32,000 |
| Jul 11, 2017 | Completed final sign-off Sep 2017 | 1101 Francisco St | unit #102 - bathroom: replace tiles around bathtub and floor; kitchen: replace cabinets & countertop, sink and faucet.Details
unit #102 - bathroom: replace tiles around bathtub and floor; kitchen: replace cabinets & countertop, sink and faucet. | $38,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 1040 Steiner St | unit 5 - bathroom -replace tile around bathtub, vanity cabiet, top & faucet. kitchen : replace cabinets, countertop, sink & faucet.Details
unit 5 - bathroom -replace tile around bathtub, vanity cabiet, top & faucet. kitchen : replace cabinets, countertop, sink & faucet. | $34,000 |
| Jun 5, 2017 | Completed final sign-off Aug 2017 | 10 Leona Tr | unit#10 kitchen & bathroom remodel. in-kind. no wall, door or window change.Details
unit#10 kitchen & bathroom remodel. in-kind. no wall, door or window change. | $38,000 |
| Jan 24, 2017 | Completed final sign-off Apr 2017 | 1472 Filbert St | unit #311 only - remove & replace kitchen cabinets in kind. install new countertop, in bathroom removes ceramic tiles on floor, vanity cabinet, install new cermaic tile floor and new vanity cabinet. no wall changes.Details
unit #311 only - remove & replace kitchen cabinets in kind. install new countertop, in bathroom removes ceramic tiles on floor, vanity cabinet, install new cermaic tile floor and new vanity cabinet. no wall changes. | $28,000 |
| Dec 12, 2016 | Completed final sign-off Feb 2017 | 530 Stockton St | unit #107 kitchen & bathroom remodel. no wall changed or structural work. n/a for maher.Details
unit #107 kitchen & bathroom remodel. no wall changed or structural work. n/a for maher. | $30,000 |
| Dec 12, 2016 | Completed final sign-off Mar 2017 | 101 Broderick St | unit #302 kitchen & bathroom remodel. no wall changed or structural work.Details
unit #302 kitchen & bathroom remodel. no wall changed or structural work. | $35,000 |
| Sep 23, 2016 | Completed final sign-off Dec 2016 | 530 Stockton St | unit #403: remove and replace kitchen cabinets in kind & replace countertop. bathroom : remove & replace ceramic tile on floor & around 3 walls of bath tub. replace vanity cabinet.no wall change, no structural work.; maher n/aDetails
unit #403: remove and replace kitchen cabinets in kind & replace countertop. bathroom : remove & replace ceramic tile on floor & around 3 walls of bath tub. replace vanity cabinet.no wall change, no structural work.; maher n/a | $25,000 |
| Sep 2, 2016 | Completed final sign-off Dec 2016 | 101 Broderick St | all work in unit 307. kitchen: replace cabinets in kind, change countertop, sink and faucet. bath: replace vanity cabinet and top. no structural work. no wall moved, removed, added or infilled. all existing layouts to remain unchanged.Details
all work in unit 307. kitchen: replace cabinets in kind, change countertop, sink and faucet. bath: replace vanity cabinet and top. no structural work. no wall moved, removed, added or infilled. all existing layouts to remain unchanged. | $32,000 |
| Sep 2, 2016 | Completed final sign-off Dec 2016 | 1938 Jefferson St | replace kitchen cabinets, countertop and faucet, rplace vinyl flooring. in pantry washer dyer hookups. rework existingDetails
replace kitchen cabinets, countertop and faucet, rplace vinyl flooring. in pantry washer dyer hookups. rework existing | $30,000 |
| Aug 16, 2016 | Completed final sign-off Nov 2016 | 101 Broderick St | replace deteriorated siding at broderick street side, replace siding in kind.Details
replace deteriorated siding at broderick street side, replace siding in kind. | $23,000 |
| Jun 23, 2016 | Completed final sign-off Nov 2016 | 101 Broderick St | apt 202: kitchen remodel: replace cabinet in-kind. change countertops, sink and faucet. bathroom: replace vanity canbiet and top. no structural work. no wall changes.Details
apt 202: kitchen remodel: replace cabinet in-kind. change countertops, sink and faucet. bathroom: replace vanity canbiet and top. no structural work. no wall changes. | $32,000 |
| May 23, 2016 | Completed final sign-off Aug 2016 | 101 Broderick St | apt 201: kitchen: replace cabinets in-kind, change countertop, sink and faucet. bathroom: replace tub, install new ceramic tile surround in the morator base around tub, replace vanity cabinet and toilet, no structural work or wall change.Details
apt 201: kitchen: replace cabinets in-kind, change countertop, sink and faucet. bathroom: replace tub, install new ceramic tile surround in the morator base around tub, replace vanity cabinet and toilet, no structural work or wall change. | $32,000 |
| Apr 19, 2016 | Completed final sign-off Jun 2016 | 530 Stockton St | unit 103. remove and replace kitchen cabinets in kind and replace countertop, bath. remove and replace ceramic tile on floor and around 3 walls of bath. replace vanity cabinet, no wall change. no structural workDetails
unit 103. remove and replace kitchen cabinets in kind and replace countertop, bath. remove and replace ceramic tile on floor and around 3 walls of bath. replace vanity cabinet, no wall change. no structural work | $25,000 |
| Mar 11, 2016 | Completed final sign-off Sep 2016 | 2843 Harrison St | inkind repair of stucco on left bottom portion of front facade to replace damaged stucco and wood membersDetails
inkind repair of stucco on left bottom portion of front facade to replace damaged stucco and wood members | $19,000 |
| Mar 11, 2016 | Completed final sign-off Jun 2016 | 101 Broderick St | unit 101: kitchen - replace cabinets in-kind, change countertop, sink & faucet; bathroom - replace bathtub, install new ceramic tile surround in a mortar base around tub, replace vanity cabinet & toilet; no structural work or wall change.Details
unit 101: kitchen - replace cabinets in-kind, change countertop, sink & faucet; bathroom - replace bathtub, install new ceramic tile surround in a mortar base around tub, replace vanity cabinet & toilet; no structural work or wall change. | $32,000 |
| Feb 5, 2016 | Completed final sign-off Aug 2016 | 2843 Harrison St | no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. kitchen: (r) cabinets in-kind, change countertop, sink & faucet. bathroom: (r) bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, (r) vanity cabinet, no structural work.Details
no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. kitchen: (r) cabinets in-kind, change countertop, sink & faucet. bathroom: (r) bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, (r) vanity cabinet, no structural work. | $26,000 |
| Feb 5, 2016 | Completed final sign-off Mar 2016 | 1525 Cortland Av | revision to permit 201505206758; change from concrete retaining wall to wood w/conc. piers. revise original permit scope to "building strengthening" from "seismic repair". compliance with maher ordinance no 155-13 not required.Details
revision to permit 201505206758; change from concrete retaining wall to wood w/conc. piers. revise original permit scope to "building strengthening" from "seismic repair". compliance with maher ordinance no 155-13 not required. | |
| Nov 17, 2015 | Completed final sign-off Feb 2016 | 422 Lyon St | unit #1: kitchen remodel: replace cabinets in-kind, change counter tops, sink and faucet. bathroom remodel: replace bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, replace vanity cabinet. no structural work.Details
unit #1: kitchen remodel: replace cabinets in-kind, change counter tops, sink and faucet. bathroom remodel: replace bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, replace vanity cabinet. no structural work. | $26,000 |
| Oct 1, 2015 | Completed final sign-off Dec 2015 | 530 Stockton St | #306- kitchen- remove & replace cabinets & counter top in kind. bathroom- remove & replace ceramic tile on floor & around 3 walls of bath tub, replace vanity cabinet. no structural work.Details
#306- kitchen- remove & replace cabinets & counter top in kind. bathroom- remove & replace ceramic tile on floor & around 3 walls of bath tub, replace vanity cabinet. no structural work. | $25,000 |
| Sep 11, 2015 | Completed final sign-off Jan 2016 | 20 Leona Tr | kitchen: replace cabinets in kind, change countertop, sink and faucet. bathroom: replace bathtub and ceramic tile surround, install low flow toilet. new ceramic tile to be in mortar base. no structrual work.Details
kitchen: replace cabinets in kind, change countertop, sink and faucet. bathroom: replace bathtub and ceramic tile surround, install low flow toilet. new ceramic tile to be in mortar base. no structrual work. | $56,000 |
| Sep 10, 2015 | Completed final sign-off Nov 2015 | 1060 Cole St | repair deteriorated wood trim on exterior of building.Details
repair deteriorated wood trim on exterior of building. | $12,000 |
| Aug 10, 2015 | Completed final sign-off Oct 2015 | 1635 Gough St | unit #503: remove and replace kitchen cabinets in kind. install new countertop. in bathroom , remove ceramic tile around bathtub walls and floor. install new ceramic tile on bathtub walls and floor in a mortar base and new vanity cabinet. no structural work.Details
unit #503: remove and replace kitchen cabinets in kind. install new countertop. in bathroom , remove ceramic tile around bathtub walls and floor. install new ceramic tile on bathtub walls and floor in a mortar base and new vanity cabinet. no structural work. | $35,000 |
| Jul 24, 2015 | Completed final sign-off Aug 2015 | 1940 Jefferson St | replace 12 feet of deteriorated window sill in-kind at front of building. remove and replace 4 deteriorated joists on rear exterior deck with pressure-treated limber.Details
replace 12 feet of deteriorated window sill in-kind at front of building. remove and replace 4 deteriorated joists on rear exterior deck with pressure-treated limber. | $6,500 |
| Jul 24, 2015 | Completed final sign-off Oct 2015 | 530 Stockton St | unit #207 and #603: bathroom: remove and replace ceramic tile floor and vanity cabinet. kitchen: remove and replace cabinets in kind and countertops. unit #603: replace ceramic tiles on the 3 walls around bathtubs. no structural workDetails
unit #207 and #603: bathroom: remove and replace ceramic tile floor and vanity cabinet. kitchen: remove and replace cabinets in kind and countertops. unit #603: replace ceramic tiles on the 3 walls around bathtubs. no structural work | $56,000 |
| Jun 19, 2015 | Completed final sign-off Jul 2015 | 530 Stockton St | in bathroom only: remove ceramic tile on floors and walls, re-work plumbing, install new ceramic tile on 3 walls around bath tub and on floor. replace vanity cabinet and countertopDetails
in bathroom only: remove ceramic tile on floors and walls, re-work plumbing, install new ceramic tile on 3 walls around bath tub and on floor. replace vanity cabinet and countertop | $8,200 |
| May 20, 2015 | Never finaled issued May 2015, no final | 1525 Cortland Av | voulntary seismic repair and improvement: repair & replacement of (e) steel seismic braces. addition of new steel x-braces. replace mo (e) site retaining wall w/new concrete retaining wall in the same location. maher na (no change to industrial use)Details
voulntary seismic repair and improvement: repair & replacement of (e) steel seismic braces. addition of new steel x-braces. replace mo (e) site retaining wall w/new concrete retaining wall in the same location. maher na (no change to industrial use) | $44,000 |
| Mar 6, 2015 | Completed final sign-off May 2015 | 1920 Pacific Av | work in unit #12 only: remove and replace deteriorated kitchen counter top and cabinets, in bathroom rmeove and replace deteriorated vanity cabinet and countertop along with ceramic tile around bathtub and floor. no structural work.Details
work in unit #12 only: remove and replace deteriorated kitchen counter top and cabinets, in bathroom rmeove and replace deteriorated vanity cabinet and countertop along with ceramic tile around bathtub and floor. no structural work. | $33,000 |
| Jan 23, 2015 | Completed final sign-off Apr 2015 | 1935 Franklin St | new laundry facilities and bicycle storage on ground floor. n/a ordinance #155-13Details
new laundry facilities and bicycle storage on ground floor. n/a ordinance #155-13 | $47,000 |
| Jan 21, 2015 | Completed final sign-off Feb 2015 | 905 Cortland Av | install 5/8 " all thread with epoxy into concrete foundation. bolts to be 4 feet apart, 12" away from corners & mudsill seams. intall plywood panels on front & rear transverse wall. plywood to be 1/2 " structural 5 ply with 10d nails 4" o.c. on edges, 12" o.c. in field. voluntary structural upgDetails
install 5/8 " all thread with epoxy into concrete foundation. bolts to be 4 feet apart, 12" away from corners & mudsill seams. intall plywood panels on front & rear transverse wall. plywood to be 1/2 " structural 5 ply with 10d nails 4" o.c. on edges, 12" o.c. in field. voluntary structural upg | $5,200 |
| Dec 9, 2014 | Completed final sign-off Mar 2015 | 1635 Gough St | unit 602: remove/replace kitchen cabinets in-kind & install new countertop. in front bathroom remove ceramic tile on floor & walls, & bathtub. install shower in same location, new vanity cabinets in each bath, ceramic tile on tub/shower walls. no structural work.Details
unit 602: remove/replace kitchen cabinets in-kind & install new countertop. in front bathroom remove ceramic tile on floor & walls, & bathtub. install shower in same location, new vanity cabinets in each bath, ceramic tile on tub/shower walls. no structural work. | $37,000 |
| Oct 27, 2014 | Completed final sign-off Dec 2014 | 101 Broderick St | replace deteriorated siding at southwest corner of building facing street. replace siding in kind. no structural work.Details
replace deteriorated siding at southwest corner of building facing street. replace siding in kind. no structural work. | $21,000 |
| Oct 14, 2014 | Completed final sign-off Oct 2014 | 1101 Francisco St | unit 104: in bathroom, remove ceramic tile around bath tub and floor, chnage tub/shower valve, new tile to be in a a mortar base. existing vanity cabinets to remain, install new toilet.Details
unit 104: in bathroom, remove ceramic tile around bath tub and floor, chnage tub/shower valve, new tile to be in a a mortar base. existing vanity cabinets to remain, install new toilet. | $6,200 |
| Oct 3, 2014 | Completed final sign-off Oct 2014 | 905 Cortland Av | add to scope of work 201409247130. replace 4 deteriorated wood members at lower entrance. also at rear of building, replace 100 sq ft more of siding that was deteriorated. in kindDetails
add to scope of work 201409247130. replace 4 deteriorated wood members at lower entrance. also at rear of building, replace 100 sq ft more of siding that was deteriorated. in kind | $2,200 |
| Oct 3, 2014 | Completed final sign-off Jan 2015 | 1472 Filbert St | unit 305 only. remove and replace kitchen cabinets in kind. install new countertop. bathroom remove ceramic tile around bathtub walls and floor. new vanity cabinet. new ceramic tile on bath tud walls and floor. no structural workDetails
unit 305 only. remove and replace kitchen cabinets in kind. install new countertop. bathroom remove ceramic tile around bathtub walls and floor. new vanity cabinet. new ceramic tile on bath tud walls and floor. no structural work | $25,500 |
| Sep 24, 2014 | Completed final sign-off Oct 2014 | 905 Cortland Av | approx 25 sq.ft. work at rear of building only, remove vinly siding and repair deteriorated wood siding in small sections, replace gutter, repl one door jamb and door, repl 2 posts & one joist,paint new of bldg, repair in kind.Details
approx 25 sq.ft. work at rear of building only, remove vinly siding and repair deteriorated wood siding in small sections, replace gutter, repl one door jamb and door, repl 2 posts & one joist,paint new of bldg, repair in kind. | $7,500 |
| Aug 11, 2014 | Completed final sign-off Dec 2014 | 1635 Gough St | unit#403 remove & replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bathtub walls & floor. install new vanity cabinet, new ceramic tile on tub walls & floor. no structural work.Details
unit#403 remove & replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bathtub walls & floor. install new vanity cabinet, new ceramic tile on tub walls & floor. no structural work. | $30,000 |
| Jul 17, 2014 | Completed final sign-off Sep 2014 | 16 Leona Tr | 1 kitchen: replace cabinets in kind, change counter top & sink faucet. 1 bathroom: replace bath tub and ceremic tile surround, install 1 low flow toilet. new ceramic tile to be in mortor base. no structural work.Details
1 kitchen: replace cabinets in kind, change counter top & sink faucet. 1 bathroom: replace bath tub and ceremic tile surround, install 1 low flow toilet. new ceramic tile to be in mortor base. no structural work. | $18,500 |
| May 30, 2014 | Completed final sign-off Sep 2014 | 530 Stockton St | in unit #505 only: remove and replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bath tub walls, install new ceramic tile in it's place. new tile to be set in a mortor base. replace vanity cabinets. no structural work, no wall change.Details
in unit #505 only: remove and replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bath tub walls, install new ceramic tile in it's place. new tile to be set in a mortor base. replace vanity cabinets. no structural work, no wall change. | $18,500 |
| May 30, 2014 | Completed final sign-off Aug 2014 | 422 Lyon St | in unit #2 only: replace kitchen cabinets in kind, replace counter top. in bathroom, replace vanity cabinet.Details
in unit #2 only: replace kitchen cabinets in kind, replace counter top. in bathroom, replace vanity cabinet. | $8,700 |
| Apr 18, 2014 | Completed final sign-off Jul 2014 | 2341 Chestnut St | in unit # 304: remove and replace kitchen cabinets and countertop. no structural work. in bathrom remove ceramic tile around bathtub and floor. replace tub/shower valve. install purple 5/8" type x dry wall around tub walls, 3 wall 5' high. install ceramic tile in a mortar base on tub walls andDetails
in unit # 304: remove and replace kitchen cabinets and countertop. no structural work. in bathrom remove ceramic tile around bathtub and floor. replace tub/shower valve. install purple 5/8" type x dry wall around tub walls, 3 wall 5' high. install ceramic tile in a mortar base on tub walls and | $19,300 |
| Nov 22, 2013 | Completed final sign-off Mar 2014 | 1949 Page St | #1949: in bath-remove ceramic tile,bathtub & vanity replace w/new fixtures, install ceramic tile on bathtub walls, replace window in bath.in kitchen replace countertop. #1953: in bath replace vanity cabinet,install new window.in kitchn replace sink cabinet,4 other cabinets in kind,change range hoodDetails
#1949: in bath-remove ceramic tile,bathtub & vanity replace w/new fixtures, install ceramic tile on bathtub walls, replace window in bath.in kitchen replace countertop. #1953: in bath replace vanity cabinet,install new window.in kitchn replace sink cabinet,4 other cabinets in kind,change range hood | $47,000 |
| Nov 22, 2013 | Completed final sign-off Jan 2014 | 1667 Green St | unit #202 only: replace ktichen cabinets & countertop in kind. replace bathroom vanity cabinet & counter, replace ceramic tile around bathtub walls & replace bath/shower valve.Details
unit #202 only: replace ktichen cabinets & countertop in kind. replace bathroom vanity cabinet & counter, replace ceramic tile around bathtub walls & replace bath/shower valve. | $30,000 |
| Nov 15, 2013 | Completed final sign-off Jan 2014 | 530 Stockton St | unit #307 only: remove/replace kitchen cabinets in kind,install new countertop,5/8" type x drywall where walls are opened in kitchen area. in bathrm remove ceramic tile around bathtub & replace tub/shower valve. install type x 5/8 drywall,ceramic tile in a mortar base. replace vanity cabinet,faucetDetails
unit #307 only: remove/replace kitchen cabinets in kind,install new countertop,5/8" type x drywall where walls are opened in kitchen area. in bathrm remove ceramic tile around bathtub & replace tub/shower valve. install type x 5/8 drywall,ceramic tile in a mortar base. replace vanity cabinet,faucet | $24,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2013 | 1635 Gough St | unit #501: in bathroom only, remove reramic tile around bathtub & replace tub/shower valve. install type x 5/8" drywall & ceramic tile in a mortar base. replace vanity cabinet & faucet.Details
unit #501: in bathroom only, remove reramic tile around bathtub & replace tub/shower valve. install type x 5/8" drywall & ceramic tile in a mortar base. replace vanity cabinet & faucet. | $5,500 |
| Sep 11, 2013 | Completed final sign-off Nov 2013 | 530 Stockton St | work in unit #404 only: remove and replace kitchen cabinets in-kind. install new countertop. install 5/8" type x drywall where walls are opened at kitchen area. no structural work, no new wall & no existing wall relocation. kitchen remodel shall comply with cec 150(k)8.Details
work in unit #404 only: remove and replace kitchen cabinets in-kind. install new countertop. install 5/8" type x drywall where walls are opened at kitchen area. no structural work, no new wall & no existing wall relocation. kitchen remodel shall comply with cec 150(k)8. | $18,500 |
| Aug 12, 2013 | Completed final sign-off Oct 2013 | 1935 Franklin St | in unit 207 only: in kitchen remove and replace deteriorated counter top and cabinets, opened walls to be covered with 5/8" type x drywall. in bathroom only change ceraminc tile around bath tub and floor, toilet and vanity cabinet, wall openings to be covered with 5/8" type x purple drywall.Details
in unit 207 only: in kitchen remove and replace deteriorated counter top and cabinets, opened walls to be covered with 5/8" type x drywall. in bathroom only change ceraminc tile around bath tub and floor, toilet and vanity cabinet, wall openings to be covered with 5/8" type x purple drywall. | $18,275 |
| May 28, 2013 | Never finaled issued May 2013, no final | 2159 California St | repair deteriorated posts and rails at rear roof deck less than 50% replacement in kind.Details
repair deteriorated posts and rails at rear roof deck less than 50% replacement in kind. | $1,800 |
| Mar 22, 2013 | Completed final sign-off Apr 2013 | 1101 Francisco St | #302: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and tile in a mortar base. replace in kind or better.Details
#302: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and tile in a mortar base. replace in kind or better. | $6,200 |
| Mar 22, 2013 | Completed final sign-off Apr 2013 | 1635 Gough St | #604: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet and faucet. replace in kind or better.Details
#604: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet and faucet. replace in kind or better. | $6,200 |
| Nov 9, 2012 | Completed final sign-off Mar 2013 | 1329 Grove St | #1329 only: replace kitchen cabinets in kind, add gfi plugs at counter top area, no light changes in kitchen. replace in kind bath tub, vanity cabinet & ceramic tile around bath tub along with vinyl flooring @ rear bathroom. no structural work. v.i.f. exhaust fan is required in bathroom remodel.Details
#1329 only: replace kitchen cabinets in kind, add gfi plugs at counter top area, no light changes in kitchen. replace in kind bath tub, vanity cabinet & ceramic tile around bath tub along with vinyl flooring @ rear bathroom. no structural work. v.i.f. exhaust fan is required in bathroom remodel. | $19,500 |
| Sep 18, 2012 | Completed final sign-off Dec 2012 | 1935 Franklin St | in unit #205 only: in kitchen, remove and replace deteriorated counter top and cabinets, close open walls with type x 5/8" rock. in bathroom: replace ceramic tile around bathtub walls and floor, replace deteriorated vianity cabinet, close open walls with 5/8" type x sheetrock. new ceramic tileDetails
in unit #205 only: in kitchen, remove and replace deteriorated counter top and cabinets, close open walls with type x 5/8" rock. in bathroom: replace ceramic tile around bathtub walls and floor, replace deteriorated vianity cabinet, close open walls with 5/8" type x sheetrock. new ceramic tile | $31,400 |
| May 2, 2012 | Completed final sign-off Jun 2012 | 1472 Filbert St | work in unit 510 only: in bathroom, remove ceramic tile around bath tub walls, install tub/shower pressure balance valve, type x 5/8' purple drywall around batht tub walls, ceramic tile to finish tub walls in a mortar base, no new lighting replace vanity cabinet & top. in kitchen: repl formicaDetails
work in unit 510 only: in bathroom, remove ceramic tile around bath tub walls, install tub/shower pressure balance valve, type x 5/8' purple drywall around batht tub walls, ceramic tile to finish tub walls in a mortar base, no new lighting replace vanity cabinet & top. in kitchen: repl formica | $5,200 |
| May 2, 2012 | Completed final sign-off May 2012 | 1938 Jefferson St | replace 2 deteriorated wood stair treads at stairway in breezeway (less than 50%)Details
replace 2 deteriorated wood stair treads at stairway in breezeway (less than 50%) | $750 |
| Mar 30, 2012 | Completed final sign-off May 2012 | 1472 Filbert St | work in unit #308 only: in bathroom remove ceramic tile around bath tub, walls and floor,install tub/shower pressure balance valve, type x 5/8" purple drywall arnd bath tub walls, new vanity cabinet & top, ceramic tile in a mortar base on tub walls and floor no new lighting in kitchen: repl counterDetails
work in unit #308 only: in bathroom remove ceramic tile around bath tub, walls and floor,install tub/shower pressure balance valve, type x 5/8" purple drywall arnd bath tub walls, new vanity cabinet & top, ceramic tile in a mortar base on tub walls and floor no new lighting in kitchen: repl counter | $6,500 |
| Feb 16, 2012 | Completed final sign-off Mar 2012 | 1635 Gough St | unit #204, bathroom remove ceramic tile around bathtub and replace tub/shower valve. install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet.Details
unit #204, bathroom remove ceramic tile around bathtub and replace tub/shower valve. install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet. | $6,200 |
| Feb 7, 2012 | Completed final sign-off Mar 2012 | 1327 Lyon St | replace dry rotted wood members of front deck in kind to comply nov#201287713, less than 50% replacement. #8 leona - replace 2 rear windows with vinyl windows. #10 leona- replace 2 rear windows with vinyl windows, u-factor 0.40 max.Details
replace dry rotted wood members of front deck in kind to comply nov#201287713, less than 50% replacement. #8 leona - replace 2 rear windows with vinyl windows. #10 leona- replace 2 rear windows with vinyl windows, u-factor 0.40 max. | $6,800 |
| Jan 10, 2012 | Completed final sign-off Mar 2012 | 530 Stockton St | in unit #604 only: remove and replace kitchen cabinets in kind. install new counter tops. install 5/8" type x drywall where walls opened. in bathroom: remove and replace ceramic tile around bath tub walls along with vanity cabinet. tile to be set in mortar bed. no structural work.Details
in unit #604 only: remove and replace kitchen cabinets in kind. install new counter tops. install 5/8" type x drywall where walls opened. in bathroom: remove and replace ceramic tile around bath tub walls along with vanity cabinet. tile to be set in mortar bed. no structural work. | $23,400 |
| Oct 12, 2011 | Completed final sign-off Nov 2011 | 101 Broderick St | remove fungus damage to wood siding at south, east exterior corner of building, repl siding in kind, no structural workDetails
remove fungus damage to wood siding at south, east exterior corner of building, repl siding in kind, no structural work | $9,700 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 1472 Filbert St | #401- in bathroom, remove ceramic tile at tub walls and floor, install pressure balance valve @ tub, install type x 5/8" purple dry wall and ceramic tile in a mortar base, replace vanity cabinet & sink, toilet & med. cabinet. in kitchen, replace kitchen cabinets in kind along with counter top,Details
#401- in bathroom, remove ceramic tile at tub walls and floor, install pressure balance valve @ tub, install type x 5/8" purple dry wall and ceramic tile in a mortar base, replace vanity cabinet & sink, toilet & med. cabinet. in kitchen, replace kitchen cabinets in kind along with counter top, | $17,500 |
| May 16, 2011 | Completed final sign-off Jun 2011 | 1635 Gough St | in unit 502 only: in kitchen remove & replace deteriorated countertop, sink base and adjacent base cabinet. all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base.Details
in unit 502 only: in kitchen remove & replace deteriorated countertop, sink base and adjacent base cabinet. all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base. | $8,700 |
| Jan 6, 2011 | Completed final sign-off Apr 2011 | 1920 Pacific Av | work in unit #7 only: remove & replace deteriorated kitchen counter top and cabinets, in bathroom, remove and repl deteriorated vanity cabinet and counter top along with ceramic tile around bath tub, install 5/8" purple, drywall around bathrub with ceramic tile in a mortar base, no structural workDetails
work in unit #7 only: remove & replace deteriorated kitchen counter top and cabinets, in bathroom, remove and repl deteriorated vanity cabinet and counter top along with ceramic tile around bath tub, install 5/8" purple, drywall around bathrub with ceramic tile in a mortar base, no structural work | $12,600 |
| Nov 30, 2010 | Completed final sign-off Apr 2011 | 1331 Grove St | for both units 1331 & 1339: replace kitchen cabinets in-kind, add gfi plugs @ countertop area. rear bathroom to have replacement in-kind of bathtubs, vanity, cabinets & ceramic tile around bathtub along w/ vinyl sheet flooring. no structural work. provide min 50% (per watt) lighting in kitchen w/Details
for both units 1331 & 1339: replace kitchen cabinets in-kind, add gfi plugs @ countertop area. rear bathroom to have replacement in-kind of bathtubs, vanity, cabinets & ceramic tile around bathtub along w/ vinyl sheet flooring. no structural work. provide min 50% (per watt) lighting in kitchen w/ | $65,000 |
| Sep 10, 2010 | Completed final sign-off Sep 2010 | 1056 Pacheco St | install 5/8"x12" all tread into foundation with epoxy bolts to be 4ft. on center & no more than 12" from concrete edge. install post & beam connectors using t & l brackets.Details
install 5/8"x12" all tread into foundation with epoxy bolts to be 4ft. on center & no more than 12" from concrete edge. install post & beam connectors using t & l brackets. | $4,500 |
| Jun 3, 2010 | Completed final sign-off Aug 2010 | 14 Leona Tr | to comply with nov# 200338232, 200449650, 200559275. unit on upper fl, bathrm remodel. relocate fixtures to new loc. in same rm. no wall change, new lavy sink, toilet and bathtub. ceramic tiles on bathrm walls. kitchen remodel: relocate sink, change counter top.Details
to comply with nov# 200338232, 200449650, 200559275. unit on upper fl, bathrm remodel. relocate fixtures to new loc. in same rm. no wall change, new lavy sink, toilet and bathtub. ceramic tiles on bathrm walls. kitchen remodel: relocate sink, change counter top. | $22,500 |
| May 24, 2010 | Completed final sign-off Aug 2010 | 1935 Franklin St | in unit#305 only: in kitchen remove & replace deteriorated countertop, sink base & adjacent base cabinet all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base. replace deteriorated vanity cabinet & sink.Details
in unit#305 only: in kitchen remove & replace deteriorated countertop, sink base & adjacent base cabinet all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base. replace deteriorated vanity cabinet & sink. | $17,500 |
| Mar 19, 2010 | Completed final sign-off May 2010 | 530 Stockton St | unit #106 only-remove & replace kitchen cabinets in kind, install new countertops, install 5/8 type x sheetrock where walls opened & some lights. no structural work. no adding & moving walls. provide high efficacy lighting per title 24 requirements.Details
unit #106 only-remove & replace kitchen cabinets in kind, install new countertops, install 5/8 type x sheetrock where walls opened & some lights. no structural work. no adding & moving walls. provide high efficacy lighting per title 24 requirements. | $22,200 |
| Feb 17, 2010 | Completed final sign-off Mar 2010 | 1472 Filbert St | unit # 411. bathroom remodel. remove ceramic tile around bath tub walls. install tub/shower pressure balance valve. install 5/8" type x drywall around bath, tub walls. install ceramic tile in a mortar base around bath tub walls. new vanity cabinet & top. no new lighting.Details
unit # 411. bathroom remodel. remove ceramic tile around bath tub walls. install tub/shower pressure balance valve. install 5/8" type x drywall around bath, tub walls. install ceramic tile in a mortar base around bath tub walls. new vanity cabinet & top. no new lighting. | $4,700 |