Block 1082, lot 003
1327 Lyon St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 22
- Rooms
- 22 bathrooms
- Building
- 17,012 sq ft
- Lot
- 16,404 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
36 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Nov 2025 | 1327 Lyon St | Brady Construction | front structure: remove and replace replace deteriorated wood members in-kind at courtyard stairways. less than 50%. not visible from street.Details
front structure: remove and replace replace deteriorated wood members in-kind at courtyard stairways. less than 50%. not visible from street. | $3,900 |
| Sep 12, 2025 | Completed final sign-off Nov 2025 | 2 Leona Tr | Brady Construction | rear structure: 2-28 leona terrace; remove and replace deteriroated wood members in-kind @ rear decks and stairway. less than 50%.Details
rear structure: 2-28 leona terrace; remove and replace deteriroated wood members in-kind @ rear decks and stairway. less than 50%. | $5,700 |
| Mar 12, 2025 | Completed final sign-off Jun 2025 | 12 Leona Tr | Brady Construction | bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet. new ceramic tile to be in mortar base. kitchen: replace cabinets in kind, change countertop, sink and faucet. replace 5 wood single pane glass windows to 5 vinly double hung windowsDetails
bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet. new ceramic tile to be in mortar base. kitchen: replace cabinets in kind, change countertop, sink and faucet. replace 5 wood single pane glass windows to 5 vinly double hung windows | $70,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 8 Leona Tr | Brady Construction | 1 bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet, new ceramic tile to be in a mortar base. 1 kitchen: replace cabinets in kind, change cntertop, sink, and faucet. no wall change. replace (5) wood single pane glass windows to (5) vinyl double hungDetails
1 bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet, new ceramic tile to be in a mortar base. 1 kitchen: replace cabinets in kind, change cntertop, sink, and faucet. no wall change. replace (5) wood single pane glass windows to (5) vinyl double hung | $38,000 |
| Feb 11, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Leona Tr | new metal entry gate under existing archway opening entering leona tr alleyway. no obstruction to public right of wayDetails
new metal entry gate under existing archway opening entering leona tr alleyway. no obstruction to public right of way | $6,000 | |
| Nov 21, 2020 | Completed final sign-off Nov 2021 | 1327 Lyon St | unit #28 lt: add 2nd bathroom & replace fixtures in (e) bathroom includes installation of sink, shower, gfci outlets & low flow toilet. new ceremic tile installed in marter base. relocate kitchen , new cabinetry, install sink, gas stove, countertop, minor wall changes. no structural changes.Details
unit #28 lt: add 2nd bathroom & replace fixtures in (e) bathroom includes installation of sink, shower, gfci outlets & low flow toilet. new ceremic tile installed in marter base. relocate kitchen , new cabinetry, install sink, gas stove, countertop, minor wall changes. no structural changes. | $32,000 | |
| Oct 26, 2020 | Completed final sign-off Apr 2021 | 1327 Lyon St | Brady Construction | unit a: no wall change replace bathroom in kind, kitchen: replace counterstop, sink, faucet and flooringDetails
unit a: no wall change replace bathroom in kind, kitchen: replace counterstop, sink, faucet and flooring | $21,000 |
| Jun 30, 2020 | Never finaled issued Jul 2020, no final | 1327 Lyon St | street spaceDetails
street space | ||
| Jun 22, 2020 | Completed final sign-off Feb 2021 | 1333 Lyon St | unit 1 & 2 the same: kitchen remodel. replace cabinets in kind, change countertop, sink and faucet, install gfci outlets. bathroom: replace bathroom fixtures and ceramic tile surround, install low flow toilet and gfci outlets, new ceramic tile to be in mortar base. all remodel in-kind.Details
unit 1 & 2 the same: kitchen remodel. replace cabinets in kind, change countertop, sink and faucet, install gfci outlets. bathroom: replace bathroom fixtures and ceramic tile surround, install low flow toilet and gfci outlets, new ceramic tile to be in mortar base. all remodel in-kind. | $64,000 | |
| Mar 10, 2020 | Never finaled issued Mar 2020, no final | 1327 Lyon St | street spaceDetails
street space | ||
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 1327 Lyon St | Nabi Construction & Engineering Inc | street spaceDetails
street space | |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 1327 Lyon St | streetspaceDetails
streetspace | ||
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 1333 Lyon St | street spaceDetails
street space | ||
| Aug 26, 2019 | Never finaled issued Aug 2019, no final | 1327 Lyon St | street spaceDetails
street space | ||
| May 13, 2019 | Never finaled issued May 2019, no final | 20 Leona Tr | street spaceDetails
street space | ||
| Mar 12, 2019 | Never finaled issued Mar 2019, no final | 1327 Lyon St | street spaceDetails
street space | ||
| Jan 24, 2019 | Completed final sign-off Feb 2021 | 1327 Lyon St | Nabi Construction & Engineering Inc | seismic upgrade for soft story per sf building code, chapter 4d, 2016 cebc appendix a4Details
seismic upgrade for soft story per sf building code, chapter 4d, 2016 cebc appendix a4 | $130,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 20 Leona Tr | street spaceDetails
street space | ||
| Dec 17, 2018 | Completed final sign-off Jun 2019 | 20 Leona Tr | Nabi Construction & Engineering Inc | seismic upgade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4Details
seismic upgade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4 | $130,000 |
| Mar 19, 2018 | Never finaled filed Mar 2018, never issued | 1327 Lyon St | adding two adu's to an existing bldg per ordinance 162-16.Details
adding two adu's to an existing bldg per ordinance 162-16. | $60,000 | |
| Mar 19, 2018 | Expired or cancelled cancelled Nov 2022 | 20 Leona Tr | adding two adu's to an existing bldg per ordinance 162-16.Details
adding two adu's to an existing bldg per ordinance 162-16. | $60,000 | |
| Sep 15, 2017 | Expired or cancelled withdrawn Dec 2018 | 20 Leona Tr | soft story retrofit per sfebc ch 4dDetails
soft story retrofit per sfebc ch 4d | $100,000 | |
| Jun 5, 2017 | Completed final sign-off Aug 2017 | 10 Leona Tr | Brady Construction | unit#10 kitchen & bathroom remodel. in-kind. no wall, door or window change.Details
unit#10 kitchen & bathroom remodel. in-kind. no wall, door or window change. | $38,000 |
| Apr 6, 2017 | Never finaled issued Apr 2017, no final | 12 Leona Tr | street spaceDetails
street space | ||
| Nov 17, 2015 | Never finaled issued Nov 2015, no final | 20 Leona Tr | street spaceDetails
street space | ||
| Sep 11, 2015 | Completed final sign-off Jan 2016 | 20 Leona Tr | Brady Construction | kitchen: replace cabinets in kind, change countertop, sink and faucet. bathroom: replace bathtub and ceramic tile surround, install low flow toilet. new ceramic tile to be in mortar base. no structrual work.Details
kitchen: replace cabinets in kind, change countertop, sink and faucet. bathroom: replace bathtub and ceramic tile surround, install low flow toilet. new ceramic tile to be in mortar base. no structrual work. | $56,000 |
| Jul 17, 2014 | Completed final sign-off Sep 2014 | 16 Leona Tr | Brady Construction | 1 kitchen: replace cabinets in kind, change counter top & sink faucet. 1 bathroom: replace bath tub and ceremic tile surround, install 1 low flow toilet. new ceramic tile to be in mortor base. no structural work.Details
1 kitchen: replace cabinets in kind, change counter top & sink faucet. 1 bathroom: replace bath tub and ceremic tile surround, install 1 low flow toilet. new ceramic tile to be in mortor base. no structural work. | $18,500 |
| Feb 4, 2013 | Never finaled issued Feb 2013, no final | 1333 Lyon St | Gateway Roofing And Water Proofing Inc | reroofingDetails
reroofing | $21,000 |
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 1333 Lyon St | street spaceDetails
street space | ||
| Feb 7, 2012 | Completed final sign-off Mar 2012 | 1327 Lyon St | Brady Construction | replace dry rotted wood members of front deck in kind to comply nov#201287713, less than 50% replacement. #8 leona - replace 2 rear windows with vinyl windows. #10 leona- replace 2 rear windows with vinyl windows, u-factor 0.40 max.Details
replace dry rotted wood members of front deck in kind to comply nov#201287713, less than 50% replacement. #8 leona - replace 2 rear windows with vinyl windows. #10 leona- replace 2 rear windows with vinyl windows, u-factor 0.40 max. | $6,800 |
| Jun 3, 2010 | Completed final sign-off Aug 2010 | 14 Leona Tr | Brady Construction | to comply with nov# 200338232, 200449650, 200559275. unit on upper fl, bathrm remodel. relocate fixtures to new loc. in same rm. no wall change, new lavy sink, toilet and bathtub. ceramic tiles on bathrm walls. kitchen remodel: relocate sink, change counter top.Details
to comply with nov# 200338232, 200449650, 200559275. unit on upper fl, bathrm remodel. relocate fixtures to new loc. in same rm. no wall change, new lavy sink, toilet and bathtub. ceramic tiles on bathrm walls. kitchen remodel: relocate sink, change counter top. | $22,500 |
| Mar 20, 2003 | Never finaled issued Mar 2003, no final | 2 Leona Tr | street spaceDetails
street space | ||
| Dec 11, 2002 | Never finaled issued Dec 2002, no final | 2 Leona Tr | street spaceDetails
street space | ||
| Oct 17, 2002 | Completed final sign-off Apr 2003 | 2 Leona Tr | Espino P. Sons | repair wood deckabove grade.replace rotten framing w/ pressure treated lumber&deck w/ redwood&stairsDetails
repair wood deckabove grade.replace rotten framing w/ pressure treated lumber&deck w/ redwood&stairs | $7,800 |
| Dec 7, 2000 | Expired or cancelled expired Jun 2001 | 1327 Lyon St | street space permitDetails
street space permit | ||
| May 25, 2000 | Completed final sign-off Feb 2001 | 1327 Lyon St | Espino P. Sons | repair foundation & footings as per plansDetails
repair foundation & footings as per plans | $18,600 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.