Block 0936, lot 018H
2341 Chestnut St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 3
- Units
- 21
- Rooms
- 21 bathrooms
- Building
- 15,510 sq ft
- Lot
- 6,873 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2025 | Completed final sign-off Aug 2025 | 2341 Chestnut St | Sure, Inc. | unit #202 - (1) 90 sqft kitchen remodel. no wall moving. bring electrical in kitchen up to code. install (n) exhaust fan in the bathroom.(replace in kind)Details
unit #202 - (1) 90 sqft kitchen remodel. no wall moving. bring electrical in kitchen up to code. install (n) exhaust fan in the bathroom.(replace in kind) | $30,000 |
| Apr 9, 2025 | Completed final sign-off Aug 2025 | 2341 Chestnut St | Sure, Inc. | unit #102: (1) kitchen remodel approx 50 sf. replace cabinet. (n) countertop. update electrical in kitchen. no change to layout. (n) appliance in the unit and replace the laundry machines.Details
unit #102: (1) kitchen remodel approx 50 sf. replace cabinet. (n) countertop. update electrical in kitchen. no change to layout. (n) appliance in the unit and replace the laundry machines. | $40,000 |
| Nov 8, 2022 | Completed final sign-off May 2023 | 2341 Chestnut St | Rhapsody Painting And Environmental Svc | install cement fiber siding to west side only. adjacent to neighbors roof. over existing painted shiplap siding. enclosing the lead painted siding hazards. not facing street.Details
install cement fiber siding to west side only. adjacent to neighbors roof. over existing painted shiplap siding. enclosing the lead painted siding hazards. not facing street. | $30,000 |
| Nov 23, 2021 | Completed final sign-off Feb 2022 | 2341 Chestnut St | Sure, Inc. | unit 106: one bathroom remodel and kitchen countertop replacement. update wiring from bathroom to electric panel. install new bathroom fan.Details
unit 106: one bathroom remodel and kitchen countertop replacement. update wiring from bathroom to electric panel. install new bathroom fan. | $28,000 |
| May 21, 2021 | Completed final sign-off Sep 2021 | 2341 Chestnut St | Sure, Inc. | unit #203: kitchen & bathroom renovation in-kind. no change to structural or layout.Details
unit #203: kitchen & bathroom renovation in-kind. no change to structural or layout. | $37,000 |
| Feb 20, 2020 | Completed final sign-off Jun 2020 | 2341 Chestnut St | Sure, Inc. | unit # 302: remodel bathroom, 5'x7'Details
unit # 302: remodel bathroom, 5'x7' | $15,000 |
| Dec 19, 2019 | Never finaled issued Dec 2019, no final | 2341 Chestnut St | street space/mta meters | ||
| Nov 7, 2019 | Completed final sign-off Jan 2020 | 2341 Chestnut St | Sure, Inc. | #207: replace kitchen counter & appliances. remodeling bathroom, approx 5'x7'.Details
#207: replace kitchen counter & appliances. remodeling bathroom, approx 5'x7'. | $26,000 |
| Jul 1, 2019 | Never finaled issued Jul 2019, no final | 2341 Chestnut St | street space | ||
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 2341 Chestnut St | Sure, Inc. | kitchen and (1) bathroom remodel. no change of (e) floor planDetails
kitchen and (1) bathroom remodel. no change of (e) floor plan | $35,000 |
| Aug 13, 2018 | Completed final sign-off Sep 2018 | 2341 Chestnut St | Brady Construction | unit 105. replace 3 damged base cabinets and countertops at kitchen. replace 54 sq ft of drywall. drywall to be 5/8" type x.Details
unit 105. replace 3 damged base cabinets and countertops at kitchen. replace 54 sq ft of drywall. drywall to be 5/8" type x. | $8,000 |
| Jun 29, 2018 | Never finaled issued Jun 2018, no final | 2341 Chestnut St | Sure, Inc. | unit 105: kitchen remodel & repair, fire damage, repair in-kindDetails
unit 105: kitchen remodel & repair, fire damage, repair in-kind | $25,000 |
| Apr 20, 2018 | Completed final sign-off May 2018 | 2341 Chestnut St | San Francisco Fire Protection | add 1 remote power supply to power new horns, add 30 total horns, to comply with 1103.7.6.1 ref 201801310036, 201710030153, 201604215342 maher naDetails
add 1 remote power supply to power new horns, add 30 total horns, to comply with 1103.7.6.1 ref 201801310036, 201710030153, 201604215342 maher na | $20,000 |
| Feb 1, 2018 | Completed final sign-off Aug 2018 | 2341 Chestnut St | Rod Heisler Construction | #104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom.Details
#104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom. | $15,000 |
| Jan 31, 2018 | Completed final sign-off May 2018 | 2341 Chestnut St | San Francisco Fire Protection | like for like fire panel replacement in partly sprinklered bld. to accomodate new zones to monitor the new sprinkler service. install radio communicator near panel. install 3 sounders inside new units on grnd flr ref 201710030153 & 201604215342 maher naDetails
like for like fire panel replacement in partly sprinklered bld. to accomodate new zones to monitor the new sprinkler service. install radio communicator near panel. install 3 sounders inside new units on grnd flr ref 201710030153 & 201604215342 maher na | $3,000 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 2341 Chestnut St | street space/mta meter | ||
| Dec 13, 2017 | Completed final sign-off Jul 2025 | 2341 Chestnut St | Plumbworks Inc. /Chris Goodwin Plumbing | revision to permit 201710030153 replacing sprinklers in small garage, garbage chute, laundry room under stair, mech and storage with new sprinklers. total of 11 heads maher naDetails
revision to permit 201710030153 replacing sprinklers in small garage, garbage chute, laundry room under stair, mech and storage with new sprinklers. total of 11 heads maher na | $5,000 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 2341 Chestnut St | street space w/mta | ||
| Oct 3, 2017 | Completed final sign-off Jul 2025 | 2341 Chestnut St | Plumbworks Inc. /Chris Goodwin Plumbing | install new fire sprinkler system with 2 inch fire service off of 6 inch main on chestnut for the ground floor apartments per bldg plans 201511162762 & 201604215342/r3. install 45 heads per nfpa 13r and water service per nfpa 24.Details
install new fire sprinkler system with 2 inch fire service off of 6 inch main on chestnut for the ground floor apartments per bldg plans 201511162762 & 201604215342/r3. install 45 heads per nfpa 13r and water service per nfpa 24. | $16,600 |
| Jun 22, 2016 | Completed final sign-off Jul 2016 | 2341 Chestnut St | Rod Heisler Construction | revision to pa #201507282645, (soft story per sfbc chapter 34b,2012 iebc appendix a-4)) shear walls moved and some shear walls added and one shear wall split; maher n/aDetails
revision to pa #201507282645, (soft story per sfbc chapter 34b,2012 iebc appendix a-4)) shear walls moved and some shear walls added and one shear wall split; maher n/a | |
| Apr 21, 2016 | Completed final sign-off Aug 2018 | 2341 Chestnut St | Rod Heisler Construction | unit legalization ord 43-14. upgrade(e)g/f dwg unit #17a into legalized dwg unit.new fire rated walls, new interior partitions, new doors, new window, new kitchen, new bath, new cabinets, fixtures, appliances, new electrical, plumbing under separate permit.(maher ord-extended n/a)Details
unit legalization ord 43-14. upgrade(e)g/f dwg unit #17a into legalized dwg unit.new fire rated walls, new interior partitions, new doors, new window, new kitchen, new bath, new cabinets, fixtures, appliances, new electrical, plumbing under separate permit.(maher ord-extended n/a) | $44,000 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 2341 Chestnut St | street space | ||
| Nov 16, 2015 | Completed final sign-off Aug 2018 | 2341 Chestnut St | Rod Heisler Construction | pursuant to sf planning code section 207, the project proposes to upgrade 2 of 3 (e) ground floor units to legalized accessory dwelling units. the work includes new fire rated walls, doors, windows, along with new interior partitions, kitchens & baths. ** maher: n/a ** sprinkler deferredDetails
pursuant to sf planning code section 207, the project proposes to upgrade 2 of 3 (e) ground floor units to legalized accessory dwelling units. the work includes new fire rated walls, doors, windows, along with new interior partitions, kitchens & baths. ** maher: n/a ** sprinkler deferred | $45,000 |
| Jul 28, 2015 | Completed final sign-off Jul 2016 | 2341 Chestnut St | Rod Heisler Construction | soft story retrofit per sfbc chapter 34b, fema on 1st level per plans & repair of finishes. n/a maher ordinanceDetails
soft story retrofit per sfbc chapter 34b, fema on 1st level per plans & repair of finishes. n/a maher ordinance | $60,000 |
| Apr 24, 2014 | Never finaled issued Apr 2014, no final | 2341 Chestnut St | mta only. | ||
| Apr 18, 2014 | Completed final sign-off Jul 2014 | 2341 Chestnut St | Brady Construction | in unit # 304: remove and replace kitchen cabinets and countertop. no structural work. in bathrom remove ceramic tile around bathtub and floor. replace tub/shower valve. install purple 5/8" type x dry wall around tub walls, 3 wall 5' high. install ceramic tile in a mortar base on tub walls andDetails
in unit # 304: remove and replace kitchen cabinets and countertop. no structural work. in bathrom remove ceramic tile around bathtub and floor. replace tub/shower valve. install purple 5/8" type x dry wall around tub walls, 3 wall 5' high. install ceramic tile in a mortar base on tub walls and | $19,300 |
| Mar 17, 2008 | Completed final sign-off May 2008 | 2341 Chestnut St | Brady Construction | unit 201 - kitchen remodel.no structural. remove & replace sink and countertop. 50% of wattage of lighting to be fluorescent.Details
unit 201 - kitchen remodel.no structural. remove & replace sink and countertop. 50% of wattage of lighting to be fluorescent. | $8,100 |
| Dec 5, 2006 | Completed final sign-off Dec 2006 | 2341 Chestnut St | Brady Construction | repair and maintenance to facade at front of building. horizontal wood molding deteriorated. approx 20 lineal feet. replace in kind. no structural work. less than 10% of facadeDetails
repair and maintenance to facade at front of building. horizontal wood molding deteriorated. approx 20 lineal feet. replace in kind. no structural work. less than 10% of facade | $2,500 |
| Sep 28, 2006 | Completed final sign-off Oct 2006 | 2341 Chestnut St | Brady Construction | repair and maintence to exterior wood stairway. less than 50% replacement install metal connectors to strengthen and reinforce stairway.Details
repair and maintence to exterior wood stairway. less than 50% replacement install metal connectors to strengthen and reinforce stairway. | $3,100 |
| Sep 12, 2006 | Completed final sign-off Nov 2006 | 2341 Chestnut St | Anderson Roofing & Sheet Metal | reroofingDetails
reroofing | $43,250 |
| Jun 20, 2003 | Expired or cancelled expired Mar 2005 | 2341 Chestnut St | D C S Construction Services Inc | the scope of work has increased by $25,000 in apt 101,105 &107 reference#996628Details
the scope of work has increased by $25,000 in apt 101,105 &107 reference#996628 | $25,000 |
| Jun 10, 2003 | Expired or cancelled expired Mar 2005 | 2341 Chestnut St | D C S Construction Services Inc | remove lath & plaster apt#101,105,107 in kitchen & bath area. insulate & install 5/8" drywall & painDetails
remove lath & plaster apt#101,105,107 in kitchen & bath area. insulate & install 5/8" drywall & pain | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sure, Inc. (8), Brady Construction (5), Rod Heisler Construction (5), D C S Construction Services Inc (2), Plumbworks Inc. /Chris Goodwin Plumbing (2), San Francisco Fire Protection (2), Anderson Roofing & Sheet Metal, Rhapsody Painting And Environmental Svc
- Architects
- Brian Milford (2)
- Authorized agents
- Siu Man (2)