Back to bathroom remodel contractors
Brady Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to May 2026
- Last 24 months
- 11 permits filed
165 permits since 2000: 157 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
86 bathroom remodel permits: 86 completed. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2026 | Completed final sign-off Aug 2026 | 101 Broderick St | unit 305: kitchen (approx 60 sq ft) and bathroom (approx. 60 sq ft) remodel in kind. bathroom: remove and replace vanity cabinet and countertop, bathtub and ceramic tile surround along with flooring. kitchen: remove and replace cabinets, countertop in kind. no structural work in unit.Details
unit 305: kitchen (approx 60 sq ft) and bathroom (approx. 60 sq ft) remodel in kind. bathroom: remove and replace vanity cabinet and countertop, bathtub and ceramic tile surround along with flooring. kitchen: remove and replace cabinets, countertop in kind. no structural work in unit. | $63,000 |
| Jan 2, 2026 | Completed final sign-off Mar 2026 | 1060 Cole St | unit #8: replace kitchen cabinets in kind, change countertops, sink and faucet. no wall change, no structural. bathroom: replace ceramic tile surrounding shower stall and shower pan. new ceramic tile to be in a mortar base. install low flow toilet, replace vanity, cabinet & sink. no wall change.Details
unit #8: replace kitchen cabinets in kind, change countertops, sink and faucet. no wall change, no structural. bathroom: replace ceramic tile surrounding shower stall and shower pan. new ceramic tile to be in a mortar base. install low flow toilet, replace vanity, cabinet & sink. no wall change. | $55,000 |
| Apr 25, 2025 | Completed final sign-off Jul 2025 | 1040 Steiner St | unit #2: bathroom - replace toilet, vanity cabinet and bathtub surround. install 2 vinyl window in bathroom and kitchen, windows in light court. kitchen - replace in kind cabinets, countertop, sink. no wall change, no structural work. max u-factor .30. add fan in bathroom.Details
unit #2: bathroom - replace toilet, vanity cabinet and bathtub surround. install 2 vinyl window in bathroom and kitchen, windows in light court. kitchen - replace in kind cabinets, countertop, sink. no wall change, no structural work. max u-factor .30. add fan in bathroom. | $64,000 |
| Apr 25, 2025 | Completed final sign-off May 2025 | 1040 Steiner St | unit #10: revision to pa# 202503031386 replace bathroom and kitchen window w/ double hung vinyl. both windows in light court and not visible from street. max u-factor 0.3Details
unit #10: revision to pa# 202503031386 replace bathroom and kitchen window w/ double hung vinyl. both windows in light court and not visible from street. max u-factor 0.3 | $3,200 |
| Mar 12, 2025 | Completed final sign-off Jun 2025 | 12 Leona Tr | bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet. new ceramic tile to be in mortar base. kitchen: replace cabinets in kind, change countertop, sink and faucet. replace 5 wood single pane glass windows to 5 vinly double hung windowsDetails
bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet. new ceramic tile to be in mortar base. kitchen: replace cabinets in kind, change countertop, sink and faucet. replace 5 wood single pane glass windows to 5 vinly double hung windows | $70,000 |
| Mar 3, 2025 | Completed final sign-off May 2025 | 1040 Steiner St | unit #10: bathroom: replace toilet, vainity, cabinet and bath tub surround kitchen: replace in kind cabinets, countertop, sink no wall change no structural workDetails
unit #10: bathroom: replace toilet, vainity, cabinet and bath tub surround kitchen: replace in kind cabinets, countertop, sink no wall change no structural work | $40,000 |
| Aug 9, 2023 | Completed final sign-off Nov 2023 | 101 Broderick St | unit 306: replace kitchen & bathroom in-kind, no wall change. no exterior changes proposed.Details
unit 306: replace kitchen & bathroom in-kind, no wall change. no exterior changes proposed. | $63,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 8 Leona Tr | 1 bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet, new ceramic tile to be in a mortar base. 1 kitchen: replace cabinets in kind, change cntertop, sink, and faucet. no wall change. replace (5) wood single pane glass windows to (5) vinyl double hungDetails
1 bathroom: replace bathtub and ceramic tile surround, install low flow toilet, replace vanity cabinet, new ceramic tile to be in a mortar base. 1 kitchen: replace cabinets in kind, change cntertop, sink, and faucet. no wall change. replace (5) wood single pane glass windows to (5) vinyl double hung | $38,000 |
| Sep 1, 2022 | Completed final sign-off Dec 2022 | 101 Broderick St | apt 103: replace one kitchen & one bathroom in-kind. no structural or wall modification.Details
apt 103: replace one kitchen & one bathroom in-kind. no structural or wall modification. | $37,000 |
| Aug 5, 2021 | Completed final sign-off Dec 2021 | 1040 Steiner St | apt 1: remodel one bathroom & onr kitchen. replace in-kind. (b) vanity cabinet, creamid tile, surround of tub, toilet and flooring. (k): replae in-kind cabinets, countertop and sink. no wall change. no structural work.Details
apt 1: remodel one bathroom & onr kitchen. replace in-kind. (b) vanity cabinet, creamid tile, surround of tub, toilet and flooring. (k): replae in-kind cabinets, countertop and sink. no wall change. no structural work. | $30,000 |
| Apr 27, 2021 | Completed final sign-off Jun 2021 | 1040 Steiner St | unit# 6 - bathroom: replace in kind venity cabinet, ceramic tile surround of tub, toilet and flooring. kitchen: replace in kind cabinets, counter top and sink. no wall change or structural work in closet.Details
unit# 6 - bathroom: replace in kind venity cabinet, ceramic tile surround of tub, toilet and flooring. kitchen: replace in kind cabinets, counter top and sink. no wall change or structural work in closet. | $30,000 |
| Oct 26, 2020 | Completed final sign-off Feb 2021 | 101 Broderick St | unit 406 only: no wall change, replace kitchen and bathroom in kindDetails
unit 406 only: no wall change, replace kitchen and bathroom in kind | $32,000 |
| Oct 26, 2020 | Completed final sign-off Apr 2021 | 1327 Lyon St | unit a: no wall change replace bathroom in kind, kitchen: replace counterstop, sink, faucet and flooringDetails
unit a: no wall change replace bathroom in kind, kitchen: replace counterstop, sink, faucet and flooring | $21,000 |
| Aug 24, 2020 | Completed final sign-off Dec 2020 | 1040 Steiner St | unit 7 only - bathroom: replace in kind bathtub, vanity cabinet, toilet kitchen: replace in kind cabinets, countertop and sink, no wall change or structural work in unitDetails
unit 7 only - bathroom: replace in kind bathtub, vanity cabinet, toilet kitchen: replace in kind cabinets, countertop and sink, no wall change or structural work in unit | $30,000 |
| Jul 1, 2020 | Completed final sign-off Nov 2020 | 1018 Cortland Av | unit #1 & #3 bathroom work only: remove toilets, sinks & clawfoot tubs. install showers in place of clawfoot bathtubs. showers ceramic tiles surrounds & premade plastic shower pans. intall (n) sinks & toilets. no wall change. no structural workDetails
unit #1 & #3 bathroom work only: remove toilets, sinks & clawfoot tubs. install showers in place of clawfoot bathtubs. showers ceramic tiles surrounds & premade plastic shower pans. intall (n) sinks & toilets. no wall change. no structural work | $31,000 |
| Jul 1, 2019 | Completed final sign-off Oct 2019 | 101 Broderick St | unit # 205-bathroom(s): replace vanity cabinets and countertops.bathrub and surround to remain. remodel kitchen in kind. countertop, sink, and faucets. unit # 301: replace bathtub and surround. remodel kitchen in kind. no change to wall location. no structural work.Details
unit # 205-bathroom(s): replace vanity cabinets and countertops.bathrub and surround to remain. remodel kitchen in kind. countertop, sink, and faucets. unit # 301: replace bathtub and surround. remodel kitchen in kind. no change to wall location. no structural work. | $64,000 |
| Dec 3, 2018 | Completed final sign-off Mar 2019 | 1040 Steiner St | all work in unit # 9. bathroom: replace ceramic tile around 3 walls of bathtub, install new vanity cabinet, top and faucet. existing bathtub to remain. kitchen: replace cabinets in kind, change counter top, sink and faucet. no wall change.Details
all work in unit # 9. bathroom: replace ceramic tile around 3 walls of bathtub, install new vanity cabinet, top and faucet. existing bathtub to remain. kitchen: replace cabinets in kind, change counter top, sink and faucet. no wall change. | $34,500 |
| Sep 21, 2018 | Completed final sign-off Dec 2018 | 101 Broderick St | all work in unit 402: kitchen cabinets in-kind, change countertop, sink & faucet; bathroom: replace vanity cabinet & top, re-work toilet flange for proper clearances. no wall changeDetails
all work in unit 402: kitchen cabinets in-kind, change countertop, sink & faucet; bathroom: replace vanity cabinet & top, re-work toilet flange for proper clearances. no wall change | $32,000 |
| Jan 5, 2018 | Completed final sign-off Mar 2018 | 101 Broderick St | #203: kitchen : replace cabinets in kind, change countertop,sink& faucet, bathroom: replace vanity cabinet &top of bathtub along iwth ceramic tile surround, no structural workDetails
#203: kitchen : replace cabinets in kind, change countertop,sink& faucet, bathroom: replace vanity cabinet &top of bathtub along iwth ceramic tile surround, no structural work | $32,000 |
| Oct 11, 2017 | Completed final sign-off Jan 2018 | 1101 Francisco St | unit 304 only: bathroom, replace ceramic tile on (3) walls around bathtub/bathroom floor, install new vanity cabinet, counter top, faucet; kitchen, replace cabinets in-kind, change countertop, sink, faucet; no structural workDetails
unit 304 only: bathroom, replace ceramic tile on (3) walls around bathtub/bathroom floor, install new vanity cabinet, counter top, faucet; kitchen, replace cabinets in-kind, change countertop, sink, faucet; no structural work | $38,000 |
| Sep 11, 2017 | Completed final sign-off Dec 2017 | 101 Broderick St | all work in unit #401; kitchen, replace cabinets in-kind, change countertop, sink, faucet; bathroom, replace vanity cabinet & top, bathtub with ceramic tile surround. no structural work.Details
all work in unit #401; kitchen, replace cabinets in-kind, change countertop, sink, faucet; bathroom, replace vanity cabinet & top, bathtub with ceramic tile surround. no structural work. | $32,000 |
| Jul 11, 2017 | Completed final sign-off Sep 2017 | 1101 Francisco St | unit #102 - bathroom: replace tiles around bathtub and floor; kitchen: replace cabinets & countertop, sink and faucet.Details
unit #102 - bathroom: replace tiles around bathtub and floor; kitchen: replace cabinets & countertop, sink and faucet. | $38,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 1040 Steiner St | unit 5 - bathroom -replace tile around bathtub, vanity cabiet, top & faucet. kitchen : replace cabinets, countertop, sink & faucet.Details
unit 5 - bathroom -replace tile around bathtub, vanity cabiet, top & faucet. kitchen : replace cabinets, countertop, sink & faucet. | $34,000 |
| Jun 5, 2017 | Completed final sign-off Aug 2017 | 10 Leona Tr | unit#10 kitchen & bathroom remodel. in-kind. no wall, door or window change.Details
unit#10 kitchen & bathroom remodel. in-kind. no wall, door or window change. | $38,000 |
| Jan 24, 2017 | Completed final sign-off Apr 2017 | 1472 Filbert St | unit #311 only - remove & replace kitchen cabinets in kind. install new countertop, in bathroom removes ceramic tiles on floor, vanity cabinet, install new cermaic tile floor and new vanity cabinet. no wall changes.Details
unit #311 only - remove & replace kitchen cabinets in kind. install new countertop, in bathroom removes ceramic tiles on floor, vanity cabinet, install new cermaic tile floor and new vanity cabinet. no wall changes. | $28,000 |
| Dec 12, 2016 | Completed final sign-off Mar 2017 | 101 Broderick St | unit #302 kitchen & bathroom remodel. no wall changed or structural work.Details
unit #302 kitchen & bathroom remodel. no wall changed or structural work. | $35,000 |
| Dec 12, 2016 | Completed final sign-off Feb 2017 | 530 Stockton St | unit #107 kitchen & bathroom remodel. no wall changed or structural work. n/a for maher.Details
unit #107 kitchen & bathroom remodel. no wall changed or structural work. n/a for maher. | $30,000 |
| Sep 23, 2016 | Completed final sign-off Dec 2016 | 530 Stockton St | unit #403: remove and replace kitchen cabinets in kind & replace countertop. bathroom : remove & replace ceramic tile on floor & around 3 walls of bath tub. replace vanity cabinet.no wall change, no structural work.; maher n/aDetails
unit #403: remove and replace kitchen cabinets in kind & replace countertop. bathroom : remove & replace ceramic tile on floor & around 3 walls of bath tub. replace vanity cabinet.no wall change, no structural work.; maher n/a | $25,000 |
| Sep 2, 2016 | Completed final sign-off Dec 2016 | 101 Broderick St | all work in unit 307. kitchen: replace cabinets in kind, change countertop, sink and faucet. bath: replace vanity cabinet and top. no structural work. no wall moved, removed, added or infilled. all existing layouts to remain unchanged.Details
all work in unit 307. kitchen: replace cabinets in kind, change countertop, sink and faucet. bath: replace vanity cabinet and top. no structural work. no wall moved, removed, added or infilled. all existing layouts to remain unchanged. | $32,000 |
| Jun 23, 2016 | Completed final sign-off Nov 2016 | 101 Broderick St | apt 202: kitchen remodel: replace cabinet in-kind. change countertops, sink and faucet. bathroom: replace vanity canbiet and top. no structural work. no wall changes.Details
apt 202: kitchen remodel: replace cabinet in-kind. change countertops, sink and faucet. bathroom: replace vanity canbiet and top. no structural work. no wall changes. | $32,000 |
| May 23, 2016 | Completed final sign-off Aug 2016 | 101 Broderick St | apt 201: kitchen: replace cabinets in-kind, change countertop, sink and faucet. bathroom: replace tub, install new ceramic tile surround in the morator base around tub, replace vanity cabinet and toilet, no structural work or wall change.Details
apt 201: kitchen: replace cabinets in-kind, change countertop, sink and faucet. bathroom: replace tub, install new ceramic tile surround in the morator base around tub, replace vanity cabinet and toilet, no structural work or wall change. | $32,000 |
| Apr 19, 2016 | Completed final sign-off Jun 2016 | 530 Stockton St | unit 103. remove and replace kitchen cabinets in kind and replace countertop, bath. remove and replace ceramic tile on floor and around 3 walls of bath. replace vanity cabinet, no wall change. no structural workDetails
unit 103. remove and replace kitchen cabinets in kind and replace countertop, bath. remove and replace ceramic tile on floor and around 3 walls of bath. replace vanity cabinet, no wall change. no structural work | $25,000 |
| Mar 11, 2016 | Completed final sign-off Jun 2016 | 101 Broderick St | unit 101: kitchen - replace cabinets in-kind, change countertop, sink & faucet; bathroom - replace bathtub, install new ceramic tile surround in a mortar base around tub, replace vanity cabinet & toilet; no structural work or wall change.Details
unit 101: kitchen - replace cabinets in-kind, change countertop, sink & faucet; bathroom - replace bathtub, install new ceramic tile surround in a mortar base around tub, replace vanity cabinet & toilet; no structural work or wall change. | $32,000 |
| Feb 5, 2016 | Completed final sign-off Aug 2016 | 2843 Harrison St | no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. kitchen: (r) cabinets in-kind, change countertop, sink & faucet. bathroom: (r) bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, (r) vanity cabinet, no structural work.Details
no walls moved/removed/added/infilled; all (e) layouts to remain unchanged. kitchen: (r) cabinets in-kind, change countertop, sink & faucet. bathroom: (r) bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, (r) vanity cabinet, no structural work. | $26,000 |
| Nov 17, 2015 | Completed final sign-off Feb 2016 | 422 Lyon St | unit #1: kitchen remodel: replace cabinets in-kind, change counter tops, sink and faucet. bathroom remodel: replace bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, replace vanity cabinet. no structural work.Details
unit #1: kitchen remodel: replace cabinets in-kind, change counter tops, sink and faucet. bathroom remodel: replace bathtub, install new ceramic tile surround in a mortar base around tub, low flow toilet, replace vanity cabinet. no structural work. | $26,000 |
| Oct 1, 2015 | Completed final sign-off Dec 2015 | 530 Stockton St | #306- kitchen- remove & replace cabinets & counter top in kind. bathroom- remove & replace ceramic tile on floor & around 3 walls of bath tub, replace vanity cabinet. no structural work.Details
#306- kitchen- remove & replace cabinets & counter top in kind. bathroom- remove & replace ceramic tile on floor & around 3 walls of bath tub, replace vanity cabinet. no structural work. | $25,000 |
| Sep 11, 2015 | Completed final sign-off Jan 2016 | 20 Leona Tr | kitchen: replace cabinets in kind, change countertop, sink and faucet. bathroom: replace bathtub and ceramic tile surround, install low flow toilet. new ceramic tile to be in mortar base. no structrual work.Details
kitchen: replace cabinets in kind, change countertop, sink and faucet. bathroom: replace bathtub and ceramic tile surround, install low flow toilet. new ceramic tile to be in mortar base. no structrual work. | $56,000 |
| Aug 10, 2015 | Completed final sign-off Oct 2015 | 1635 Gough St | unit #503: remove and replace kitchen cabinets in kind. install new countertop. in bathroom , remove ceramic tile around bathtub walls and floor. install new ceramic tile on bathtub walls and floor in a mortar base and new vanity cabinet. no structural work.Details
unit #503: remove and replace kitchen cabinets in kind. install new countertop. in bathroom , remove ceramic tile around bathtub walls and floor. install new ceramic tile on bathtub walls and floor in a mortar base and new vanity cabinet. no structural work. | $35,000 |
| Jul 24, 2015 | Completed final sign-off Oct 2015 | 530 Stockton St | unit #207 and #603: bathroom: remove and replace ceramic tile floor and vanity cabinet. kitchen: remove and replace cabinets in kind and countertops. unit #603: replace ceramic tiles on the 3 walls around bathtubs. no structural workDetails
unit #207 and #603: bathroom: remove and replace ceramic tile floor and vanity cabinet. kitchen: remove and replace cabinets in kind and countertops. unit #603: replace ceramic tiles on the 3 walls around bathtubs. no structural work | $56,000 |
| Jun 19, 2015 | Completed final sign-off Jul 2015 | 530 Stockton St | in bathroom only: remove ceramic tile on floors and walls, re-work plumbing, install new ceramic tile on 3 walls around bath tub and on floor. replace vanity cabinet and countertopDetails
in bathroom only: remove ceramic tile on floors and walls, re-work plumbing, install new ceramic tile on 3 walls around bath tub and on floor. replace vanity cabinet and countertop | $8,200 |
| Mar 6, 2015 | Completed final sign-off May 2015 | 1920 Pacific Av | work in unit #12 only: remove and replace deteriorated kitchen counter top and cabinets, in bathroom rmeove and replace deteriorated vanity cabinet and countertop along with ceramic tile around bathtub and floor. no structural work.Details
work in unit #12 only: remove and replace deteriorated kitchen counter top and cabinets, in bathroom rmeove and replace deteriorated vanity cabinet and countertop along with ceramic tile around bathtub and floor. no structural work. | $33,000 |
| Dec 9, 2014 | Completed final sign-off Mar 2015 | 1635 Gough St | unit 602: remove/replace kitchen cabinets in-kind & install new countertop. in front bathroom remove ceramic tile on floor & walls, & bathtub. install shower in same location, new vanity cabinets in each bath, ceramic tile on tub/shower walls. no structural work.Details
unit 602: remove/replace kitchen cabinets in-kind & install new countertop. in front bathroom remove ceramic tile on floor & walls, & bathtub. install shower in same location, new vanity cabinets in each bath, ceramic tile on tub/shower walls. no structural work. | $37,000 |
| Oct 14, 2014 | Completed final sign-off Oct 2014 | 1101 Francisco St | unit 104: in bathroom, remove ceramic tile around bath tub and floor, chnage tub/shower valve, new tile to be in a a mortar base. existing vanity cabinets to remain, install new toilet.Details
unit 104: in bathroom, remove ceramic tile around bath tub and floor, chnage tub/shower valve, new tile to be in a a mortar base. existing vanity cabinets to remain, install new toilet. | $6,200 |
| Oct 3, 2014 | Completed final sign-off Jan 2015 | 1472 Filbert St | unit 305 only. remove and replace kitchen cabinets in kind. install new countertop. bathroom remove ceramic tile around bathtub walls and floor. new vanity cabinet. new ceramic tile on bath tud walls and floor. no structural workDetails
unit 305 only. remove and replace kitchen cabinets in kind. install new countertop. bathroom remove ceramic tile around bathtub walls and floor. new vanity cabinet. new ceramic tile on bath tud walls and floor. no structural work | $25,500 |
| Aug 11, 2014 | Completed final sign-off Dec 2014 | 1635 Gough St | unit#403 remove & replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bathtub walls & floor. install new vanity cabinet, new ceramic tile on tub walls & floor. no structural work.Details
unit#403 remove & replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bathtub walls & floor. install new vanity cabinet, new ceramic tile on tub walls & floor. no structural work. | $30,000 |
| Jul 17, 2014 | Completed final sign-off Sep 2014 | 16 Leona Tr | 1 kitchen: replace cabinets in kind, change counter top & sink faucet. 1 bathroom: replace bath tub and ceremic tile surround, install 1 low flow toilet. new ceramic tile to be in mortor base. no structural work.Details
1 kitchen: replace cabinets in kind, change counter top & sink faucet. 1 bathroom: replace bath tub and ceremic tile surround, install 1 low flow toilet. new ceramic tile to be in mortor base. no structural work. | $18,500 |
| May 30, 2014 | Completed final sign-off Sep 2014 | 530 Stockton St | in unit #505 only: remove and replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bath tub walls, install new ceramic tile in it's place. new tile to be set in a mortor base. replace vanity cabinets. no structural work, no wall change.Details
in unit #505 only: remove and replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bath tub walls, install new ceramic tile in it's place. new tile to be set in a mortor base. replace vanity cabinets. no structural work, no wall change. | $18,500 |
| May 30, 2014 | Completed final sign-off Aug 2014 | 422 Lyon St | in unit #2 only: replace kitchen cabinets in kind, replace counter top. in bathroom, replace vanity cabinet.Details
in unit #2 only: replace kitchen cabinets in kind, replace counter top. in bathroom, replace vanity cabinet. | $8,700 |
| Nov 22, 2013 | Completed final sign-off Mar 2014 | 1949 Page St | #1949: in bath-remove ceramic tile,bathtub & vanity replace w/new fixtures, install ceramic tile on bathtub walls, replace window in bath.in kitchen replace countertop. #1953: in bath replace vanity cabinet,install new window.in kitchn replace sink cabinet,4 other cabinets in kind,change range hoodDetails
#1949: in bath-remove ceramic tile,bathtub & vanity replace w/new fixtures, install ceramic tile on bathtub walls, replace window in bath.in kitchen replace countertop. #1953: in bath replace vanity cabinet,install new window.in kitchn replace sink cabinet,4 other cabinets in kind,change range hood | $47,000 |
| Nov 22, 2013 | Completed final sign-off Jan 2014 | 1667 Green St | unit #202 only: replace ktichen cabinets & countertop in kind. replace bathroom vanity cabinet & counter, replace ceramic tile around bathtub walls & replace bath/shower valve.Details
unit #202 only: replace ktichen cabinets & countertop in kind. replace bathroom vanity cabinet & counter, replace ceramic tile around bathtub walls & replace bath/shower valve. | $30,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2013 | 1635 Gough St | unit #501: in bathroom only, remove reramic tile around bathtub & replace tub/shower valve. install type x 5/8" drywall & ceramic tile in a mortar base. replace vanity cabinet & faucet.Details
unit #501: in bathroom only, remove reramic tile around bathtub & replace tub/shower valve. install type x 5/8" drywall & ceramic tile in a mortar base. replace vanity cabinet & faucet. | $5,500 |
| Aug 12, 2013 | Completed final sign-off Oct 2013 | 1935 Franklin St | in unit 207 only: in kitchen remove and replace deteriorated counter top and cabinets, opened walls to be covered with 5/8" type x drywall. in bathroom only change ceraminc tile around bath tub and floor, toilet and vanity cabinet, wall openings to be covered with 5/8" type x purple drywall.Details
in unit 207 only: in kitchen remove and replace deteriorated counter top and cabinets, opened walls to be covered with 5/8" type x drywall. in bathroom only change ceraminc tile around bath tub and floor, toilet and vanity cabinet, wall openings to be covered with 5/8" type x purple drywall. | $18,275 |
| Mar 22, 2013 | Completed final sign-off Apr 2013 | 1101 Francisco St | #302: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and tile in a mortar base. replace in kind or better.Details
#302: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and tile in a mortar base. replace in kind or better. | $6,200 |
| Mar 22, 2013 | Completed final sign-off Apr 2013 | 1635 Gough St | #604: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet and faucet. replace in kind or better.Details
#604: in bathroom remove ceremic tile around bathtub and replace tub/shower valve, install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet and faucet. replace in kind or better. | $6,200 |
| Nov 9, 2012 | Completed final sign-off Mar 2013 | 1329 Grove St | #1329 only: replace kitchen cabinets in kind, add gfi plugs at counter top area, no light changes in kitchen. replace in kind bath tub, vanity cabinet & ceramic tile around bath tub along with vinyl flooring @ rear bathroom. no structural work. v.i.f. exhaust fan is required in bathroom remodel.Details
#1329 only: replace kitchen cabinets in kind, add gfi plugs at counter top area, no light changes in kitchen. replace in kind bath tub, vanity cabinet & ceramic tile around bath tub along with vinyl flooring @ rear bathroom. no structural work. v.i.f. exhaust fan is required in bathroom remodel. | $19,500 |
| Sep 18, 2012 | Completed final sign-off Dec 2012 | 1935 Franklin St | in unit #205 only: in kitchen, remove and replace deteriorated counter top and cabinets, close open walls with type x 5/8" rock. in bathroom: replace ceramic tile around bathtub walls and floor, replace deteriorated vianity cabinet, close open walls with 5/8" type x sheetrock. new ceramic tileDetails
in unit #205 only: in kitchen, remove and replace deteriorated counter top and cabinets, close open walls with type x 5/8" rock. in bathroom: replace ceramic tile around bathtub walls and floor, replace deteriorated vianity cabinet, close open walls with 5/8" type x sheetrock. new ceramic tile | $31,400 |
| May 2, 2012 | Completed final sign-off Jun 2012 | 1472 Filbert St | work in unit 510 only: in bathroom, remove ceramic tile around bath tub walls, install tub/shower pressure balance valve, type x 5/8' purple drywall around batht tub walls, ceramic tile to finish tub walls in a mortar base, no new lighting replace vanity cabinet & top. in kitchen: repl formicaDetails
work in unit 510 only: in bathroom, remove ceramic tile around bath tub walls, install tub/shower pressure balance valve, type x 5/8' purple drywall around batht tub walls, ceramic tile to finish tub walls in a mortar base, no new lighting replace vanity cabinet & top. in kitchen: repl formica | $5,200 |
| Mar 30, 2012 | Completed final sign-off May 2012 | 1472 Filbert St | work in unit #308 only: in bathroom remove ceramic tile around bath tub, walls and floor,install tub/shower pressure balance valve, type x 5/8" purple drywall arnd bath tub walls, new vanity cabinet & top, ceramic tile in a mortar base on tub walls and floor no new lighting in kitchen: repl counterDetails
work in unit #308 only: in bathroom remove ceramic tile around bath tub, walls and floor,install tub/shower pressure balance valve, type x 5/8" purple drywall arnd bath tub walls, new vanity cabinet & top, ceramic tile in a mortar base on tub walls and floor no new lighting in kitchen: repl counter | $6,500 |
| Feb 16, 2012 | Completed final sign-off Mar 2012 | 1635 Gough St | unit #204, bathroom remove ceramic tile around bathtub and replace tub/shower valve. install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet.Details
unit #204, bathroom remove ceramic tile around bathtub and replace tub/shower valve. install 5/8" type x drywall and ceramic tile in a mortar base. replace vanity cabinet. | $6,200 |
| Jan 10, 2012 | Completed final sign-off Mar 2012 | 530 Stockton St | in unit #604 only: remove and replace kitchen cabinets in kind. install new counter tops. install 5/8" type x drywall where walls opened. in bathroom: remove and replace ceramic tile around bath tub walls along with vanity cabinet. tile to be set in mortar bed. no structural work.Details
in unit #604 only: remove and replace kitchen cabinets in kind. install new counter tops. install 5/8" type x drywall where walls opened. in bathroom: remove and replace ceramic tile around bath tub walls along with vanity cabinet. tile to be set in mortar bed. no structural work. | $23,400 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 1472 Filbert St | #401- in bathroom, remove ceramic tile at tub walls and floor, install pressure balance valve @ tub, install type x 5/8" purple dry wall and ceramic tile in a mortar base, replace vanity cabinet & sink, toilet & med. cabinet. in kitchen, replace kitchen cabinets in kind along with counter top,Details
#401- in bathroom, remove ceramic tile at tub walls and floor, install pressure balance valve @ tub, install type x 5/8" purple dry wall and ceramic tile in a mortar base, replace vanity cabinet & sink, toilet & med. cabinet. in kitchen, replace kitchen cabinets in kind along with counter top, | $17,500 |
| May 16, 2011 | Completed final sign-off Jun 2011 | 1635 Gough St | in unit 502 only: in kitchen remove & replace deteriorated countertop, sink base and adjacent base cabinet. all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base.Details
in unit 502 only: in kitchen remove & replace deteriorated countertop, sink base and adjacent base cabinet. all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base. | $8,700 |
| Jan 6, 2011 | Completed final sign-off Apr 2011 | 1920 Pacific Av | work in unit #7 only: remove & replace deteriorated kitchen counter top and cabinets, in bathroom, remove and repl deteriorated vanity cabinet and counter top along with ceramic tile around bath tub, install 5/8" purple, drywall around bathrub with ceramic tile in a mortar base, no structural workDetails
work in unit #7 only: remove & replace deteriorated kitchen counter top and cabinets, in bathroom, remove and repl deteriorated vanity cabinet and counter top along with ceramic tile around bath tub, install 5/8" purple, drywall around bathrub with ceramic tile in a mortar base, no structural work | $12,600 |
| Nov 30, 2010 | Completed final sign-off Apr 2011 | 1331 Grove St | for both units 1331 & 1339: replace kitchen cabinets in-kind, add gfi plugs @ countertop area. rear bathroom to have replacement in-kind of bathtubs, vanity, cabinets & ceramic tile around bathtub along w/ vinyl sheet flooring. no structural work. provide min 50% (per watt) lighting in kitchen w/Details
for both units 1331 & 1339: replace kitchen cabinets in-kind, add gfi plugs @ countertop area. rear bathroom to have replacement in-kind of bathtubs, vanity, cabinets & ceramic tile around bathtub along w/ vinyl sheet flooring. no structural work. provide min 50% (per watt) lighting in kitchen w/ | $65,000 |
| May 24, 2010 | Completed final sign-off Aug 2010 | 1935 Franklin St | in unit#305 only: in kitchen remove & replace deteriorated countertop, sink base & adjacent base cabinet all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base. replace deteriorated vanity cabinet & sink.Details
in unit#305 only: in kitchen remove & replace deteriorated countertop, sink base & adjacent base cabinet all other kitchen cabinets to remain. in bathroom replace ceramic tile around bathtub walls & set (n) ceramic tile in a mortar base. replace deteriorated vanity cabinet & sink. | $17,500 |
| Feb 17, 2010 | Completed final sign-off Mar 2010 | 1472 Filbert St | unit # 411. bathroom remodel. remove ceramic tile around bath tub walls. install tub/shower pressure balance valve. install 5/8" type x drywall around bath, tub walls. install ceramic tile in a mortar base around bath tub walls. new vanity cabinet & top. no new lighting.Details
unit # 411. bathroom remodel. remove ceramic tile around bath tub walls. install tub/shower pressure balance valve. install 5/8" type x drywall around bath, tub walls. install ceramic tile in a mortar base around bath tub walls. new vanity cabinet & top. no new lighting. | $4,700 |
| Feb 3, 2010 | Completed final sign-off Feb 2010 | 530 Stockton St | unit#207 only: in bathroom, remove & replace ceramic tile around bathtub walls. install 5/8" type "x" drywall, (n) ceramic tile to be installed in a mortar base around bathtub.Details
unit#207 only: in bathroom, remove & replace ceramic tile around bathtub walls. install 5/8" type "x" drywall, (n) ceramic tile to be installed in a mortar base around bathtub. | $5,200 |
| Jan 22, 2010 | Completed final sign-off Feb 2010 | 1472 Filbert St | work in unit 205. in bath remove/replace ceramic tile around tub. press valve, 5/9" type x drywall, new cabinet, countertop along with faucet. no new lightingDetails
work in unit 205. in bath remove/replace ceramic tile around tub. press valve, 5/9" type x drywall, new cabinet, countertop along with faucet. no new lighting | $4,700 |
| Nov 16, 2009 | Completed final sign-off Dec 2009 | 1472 Filbert St | work in unit #105 only, i bathroom: remove ceramic tile around bathtub walls. install tub/shower pressure balance valve,install 5/8" type z drywall around bathtub walls.install cermic tile in a mortar bage around bathtub walls, remove & replace vanity cabinet &countertop along w/faucet.no new lightgDetails
work in unit #105 only, i bathroom: remove ceramic tile around bathtub walls. install tub/shower pressure balance valve,install 5/8" type z drywall around bathtub walls.install cermic tile in a mortar bage around bathtub walls, remove & replace vanity cabinet &countertop along w/faucet.no new lightg | $5,500 |
| Oct 7, 2009 | Completed final sign-off Oct 2009 | 1472 Filbert St | unit # 412. bathroom, remove & replace ceramic, tile around bathtub walls &floors. install type x 5/8" drywall around bath tub walls, vanity sink to be replaced. kitchen. remove replace counter top and sink. in kind.Details
unit # 412. bathroom, remove & replace ceramic, tile around bathtub walls &floors. install type x 5/8" drywall around bath tub walls, vanity sink to be replaced. kitchen. remove replace counter top and sink. in kind. | $10,700 |
| Aug 3, 2009 | Completed final sign-off Aug 2009 | 1472 Filbert St | work in unit 605. in bath, remove and replace ceramic tile around bathtub walls and on bath floor. install tub/shoer pressure balance valve, install 5/8" type x drywall around bath. lay new ceramic tile in mortar base around bath tub walls and on floor. change vanity cabinet, sinktop and faucetDetails
work in unit 605. in bath, remove and replace ceramic tile around bathtub walls and on bath floor. install tub/shoer pressure balance valve, install 5/8" type x drywall around bath. lay new ceramic tile in mortar base around bath tub walls and on floor. change vanity cabinet, sinktop and faucet | $5,200 |
| Jul 9, 2009 | Completed final sign-off Jul 2009 | 1635 Gough St | in unit#404: in bathroom only, remove deteriorated ceramic tile & mortar base. expose plumbing & install pressure balance tub/shower valve. enclose wall with type x 5/8"drywall, install ceramic tile in a mortar base around bathtub walls, replace vanity cabinet & counter (partial upgrade).Details
in unit#404: in bathroom only, remove deteriorated ceramic tile & mortar base. expose plumbing & install pressure balance tub/shower valve. enclose wall with type x 5/8"drywall, install ceramic tile in a mortar base around bathtub walls, replace vanity cabinet & counter (partial upgrade). | $4,800 |
| Jul 3, 2009 | Completed final sign-off Sep 2009 | 530 Stockton St | unit 201: remove and replace kitchen cabinets in kind. install new sountertops. in bathroom remove and replace ceramic tile around bath tub walls. install 5/8" type x drywall. new ceramic tile to be installed in a mortar base around bathtubDetails
unit 201: remove and replace kitchen cabinets in kind. install new sountertops. in bathroom remove and replace ceramic tile around bath tub walls. install 5/8" type x drywall. new ceramic tile to be installed in a mortar base around bathtub | $21,500 |
| Jun 11, 2009 | Completed final sign-off Jul 2009 | 1935 Franklin St | work @ unit# 102 only. in kitchen, remove & replace deteriorated cabinets & countertop. in bathroom: replace ceramic tile around bathtub walls & set new ceramic tile in mortor base. replace deteriorated vanity cabinet & sink.Details
work @ unit# 102 only. in kitchen, remove & replace deteriorated cabinets & countertop. in bathroom: replace ceramic tile around bathtub walls & set new ceramic tile in mortor base. replace deteriorated vanity cabinet & sink. | $17,500 |
| Jan 12, 2009 | Completed final sign-off Mar 2009 | 1935 Franklin St | #405- in kitchen, remove & replace deteriorated coutnertop, sink base & adjacent cabinets (base cab. only), all other kitchen cabinets to remain. in bathroom, replace ceramic tile around bath tub wall & set new ceramic tile in morter base, replace deteriorated vanity cabinet & sink.Details
#405- in kitchen, remove & replace deteriorated coutnertop, sink base & adjacent cabinets (base cab. only), all other kitchen cabinets to remain. in bathroom, replace ceramic tile around bath tub wall & set new ceramic tile in morter base, replace deteriorated vanity cabinet & sink. | $20,000 |
| Jan 12, 2009 | Completed final sign-off Mar 2009 | 530 Stockton St | #501- remove & replace kitchen cabinets in kind, install new countertop. in bathroom, remove & replace ceramic tile around bath tubs walls & floor, new ceramic tile to be installed in a morter base on floor & around bath tub walls.Details
#501- remove & replace kitchen cabinets in kind, install new countertop. in bathroom, remove & replace ceramic tile around bath tubs walls & floor, new ceramic tile to be installed in a morter base on floor & around bath tub walls. | $24,200 |
| Mar 4, 2008 | Completed final sign-off May 2008 | 1920 Pacific Av | unit 10: remove and replace deteriorated kitchen countertop and cabinets. in bath remove and replace deteriorated vanity cabinet and countertop along ceramic tile around bathtub. install 5/8 green drywall around tub with ceramic tile in mortar base. no structuralDetails
unit 10: remove and replace deteriorated kitchen countertop and cabinets. in bath remove and replace deteriorated vanity cabinet and countertop along ceramic tile around bathtub. install 5/8 green drywall around tub with ceramic tile in mortar base. no structural | $12,600 |
| Oct 1, 2007 | Completed final sign-off Oct 2007 | 1472 Filbert St | work on unit#108 only. in bathroom, remove and replace ceramic tile around bathtub and bathroom floor, new ceramic tile on floor and bathtub walls to be in a morton base. bath tub walls to also have 5/8" green drywall beneath morton base.change vanity cabinet, sink top and faucet, n o structuralDetails
work on unit#108 only. in bathroom, remove and replace ceramic tile around bathtub and bathroom floor, new ceramic tile on floor and bathtub walls to be in a morton base. bath tub walls to also have 5/8" green drywall beneath morton base.change vanity cabinet, sink top and faucet, n o structural | $6,400 |
| Jun 1, 2007 | Completed final sign-off Aug 2007 | 1635 Gough St | unit #303 - remove and replace deteriorated kitchen sink base and adjacent base cabinet. other kitchen cabinets to remain. install new counter top. in bathroom remove and replace ceramic tile around bathtub. install 5/8" green type x drywall with ceramic tile in a mortar base. no structural work.Details
unit #303 - remove and replace deteriorated kitchen sink base and adjacent base cabinet. other kitchen cabinets to remain. install new counter top. in bathroom remove and replace ceramic tile around bathtub. install 5/8" green type x drywall with ceramic tile in a mortar base. no structural work. | $12,500 |
| Dec 15, 2006 | Completed final sign-off Mar 2007 | 1920 Pacific Av | work @ unit# 9 only. remove & replace deteriorated kitchen countertop & cabinets. new sink & appliances. in bathroom, remove & replace deteriorated vanity cabinet & countertop along with ceramic tile around bathtub. install 5/8" green dry wall around bathtub with ceramic tile in a master base.Details
work @ unit# 9 only. remove & replace deteriorated kitchen countertop & cabinets. new sink & appliances. in bathroom, remove & replace deteriorated vanity cabinet & countertop along with ceramic tile around bathtub. install 5/8" green dry wall around bathtub with ceramic tile in a master base. | $16,500 |
| May 5, 2006 | Completed final sign-off Jul 2006 | 1920 Pacific Av | work in unit #3 only: remove & replace deteriorated kitchen countertop and cabinets. in bathroom remove and replace deteriorated vanity cabinet and countertop along with bathtub and ceramic tile around bathtub. install new 5/8" green dry wall around new bathtub and ceramic tile in a mortar baseDetails
work in unit #3 only: remove & replace deteriorated kitchen countertop and cabinets. in bathroom remove and replace deteriorated vanity cabinet and countertop along with bathtub and ceramic tile around bathtub. install new 5/8" green dry wall around new bathtub and ceramic tile in a mortar base | $16,500 |
| Oct 6, 2005 | Completed final sign-off Jan 2006 | 1920 Pacific Av | work in unit 1 only. remove and replace det kitchen cntrtop/cabinets. in bath remove and replace det vanity cabinet and cntrtop along with tub and ceramic tile around bath. new 5/8"grn drywall around new bath and ceramic tile in mortar baseDetails
work in unit 1 only. remove and replace det kitchen cntrtop/cabinets. in bath remove and replace det vanity cabinet and cntrtop along with tub and ceramic tile around bath. new 5/8"grn drywall around new bath and ceramic tile in mortar base | $16,500 |
| Sep 29, 2005 | Completed final sign-off Nov 2005 | 1935 Franklin St | work in unit#304. remove and replace in kitchen deteriorated counterop and sink base cabinet. in bathroom remove ceramic tile at bathtub and install pressure balance valve. install new green type x 5/8" drywall and new ceramic tile in a morton base.Details
work in unit#304. remove and replace in kitchen deteriorated counterop and sink base cabinet. in bathroom remove ceramic tile at bathtub and install pressure balance valve. install new green type x 5/8" drywall and new ceramic tile in a morton base. | $9,200 |
| Apr 18, 2005 | Completed final sign-off Jan 2006 | 1935 Franklin St | unit #204:remove/replace in kitchen:deteriorated countertop & sink base cabinet.in bath:bathtubDetails
unit #204:remove/replace in kitchen:deteriorated countertop & sink base cabinet.in bath:bathtub | $19,000 |
| Oct 1, 2004 | Completed final sign-off Feb 2005 | 2070 Jackson St | remodel one kitchen & 2 baths, remove cabs, countertop, flrng, fixtures & appliances, replace w/newDetails
remodel one kitchen & 2 baths, remove cabs, countertop, flrng, fixtures & appliances, replace w/new | $71,000 |
| Aug 12, 2000 | Completed final sign-off Nov 2000 | 1026 Sacramento St | remove kitchen cabinets and replace with new cabaients install new counter top remove bath tub toiltDetails
remove kitchen cabinets and replace with new cabaients install new counter top remove bath tub toilt | $18,500 |