Block 0271, lot 017
530 Stockton St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 6
- Units
- 46
- Rooms
- 46 bathrooms
- Building
- 25,110 sq ft
- Lot
- 6,459 sq ft
- Zoning
- RM4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
43 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 14, 2024 | Completed final sign-off Jul 2025 | 530 Stockton St | Young's Roofing, Inc. | reroofingDetails
reroofing | $88,850 |
| Aug 17, 2022 | Completed final sign-off Jul 2023 | 530 Stockton St | Grizzly Builders Inc. | revision to adu permit 2019 1231 1128. architectural layout change due to field conditions. additional structural fooring per insp req. relocate trash from rear yard into bldg. relocate bike locker from bldg to rear yard. add 1 step down to unit 3. change window size in unit 2 kitchen. add footingDetails
revision to adu permit 2019 1231 1128. architectural layout change due to field conditions. additional structural fooring per insp req. relocate trash from rear yard into bldg. relocate bike locker from bldg to rear yard. add 1 step down to unit 3. change window size in unit 2 kitchen. add footing | $5,000 |
| Jul 14, 2022 | Completed final sign-off Dec 2022 | 530 Stockton St | Grizzly Builders Inc. | unit's: 206, 405, 601: kitchen bathroom remodel like for like. no change on layouts: new light fixtures, plumbing fixtures for all units mentioned.Details
unit's: 206, 405, 601: kitchen bathroom remodel like for like. no change on layouts: new light fixtures, plumbing fixtures for all units mentioned. | $75,000 |
| Apr 19, 2022 | Never finaled issued Apr 2022, no final | 530 Stockton St | Grizzly Builders Inc. | unit 609: remodel of (1)(e) kitchen and (1) bathroom, new plumbing fixtures, new cab,new lights, no change to layoutDetails
unit 609: remodel of (1)(e) kitchen and (1) bathroom, new plumbing fixtures, new cab,new lights, no change to layout | $30,000 |
| Jan 19, 2022 | Completed final sign-off May 2023 | 530 Stockton St | Fire & Security & Alarm Co/ F.S.A.C. | like for like fire system replacement w/ new panel smoke det & pull stations at the same location. install new radio comm monitor modules to tie in flow & tamper. tie in existing horn/strobes to new panel. install low frequency horns in every unit. no elevator recall. 202111303300, 201912311128Details
like for like fire system replacement w/ new panel smoke det & pull stations at the same location. install new radio comm monitor modules to tie in flow & tamper. tie in existing horn/strobes to new panel. install low frequency horns in every unit. no elevator recall. 202111303300, 201912311128 | $28,000 |
| Nov 30, 2021 | Completed final sign-off Jun 2023 | 530 Stockton St | Station 1 Fire Protection | install residential fire sprinklers nfpa13 and new 2" copper underground piping from the meter to fire riser 2" dedicated fire service to cover new adu units on ground floor only. 49 sprinklersDetails
install residential fire sprinklers nfpa13 and new 2" copper underground piping from the meter to fire riser 2" dedicated fire service to cover new adu units on ground floor only. 49 sprinklers | $35,000 |
| Oct 15, 2021 | Completed final sign-off Oct 2021 | 530 Stockton St | Brighter Bay Builders Inc | unit 407: revision to 202010317906, enclose window at bathroomDetails
unit 407: revision to 202010317906, enclose window at bathroom | $2,000 |
| Oct 31, 2020 | Completed final sign-off Oct 2021 | 530 Stockton St | Brighter Bay Builders Inc | unit #407: renovation of new bedroom, new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no exterior, fire alarm/sprinkler and no structural work.Details
unit #407: renovation of new bedroom, new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. no exterior, fire alarm/sprinkler and no structural work. | $65,000 |
| Dec 31, 2019 | Completed final sign-off Jul 2023 | 530 Stockton St | Grizzly Builders Inc., Halyard Inc | ground fl adus per ord 162-16, convert existing garage & storage (3) units at space into new dwelling unit w/ (e) envelope, five new bathrms, 3 new dishwashers, 3 new washer/dryers, new windows facing street, sprinkler & fire alarm under sepreary permit.Details
ground fl adus per ord 162-16, convert existing garage & storage (3) units at space into new dwelling unit w/ (e) envelope, five new bathrms, 3 new dishwashers, 3 new washer/dryers, new windows facing street, sprinkler & fire alarm under sepreary permit. | $800,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2019 | 530 Stockton St | unit 303. kitchen and bath remodel. install new kitchen cabinets & appliances, (n) flooring throughout, (n) tub, navity, sink & toilet. no mechanical change, no fire sprinklers, no structural, no exterior workDetails
unit 303. kitchen and bath remodel. install new kitchen cabinets & appliances, (n) flooring throughout, (n) tub, navity, sink & toilet. no mechanical change, no fire sprinklers, no structural, no exterior work | $30,000 | |
| Aug 21, 2019 | Completed final sign-off Oct 2019 | 530 Stockton St | Us Construction California, Inc | unit 207 & 304: kitchen & bath remodel. new kitchen cabinets, bath fixtuers, flooring. bath sq ft approx 30. kitchen sq ft approx 48. nol alteratiion of walls.Details
unit 207 & 304: kitchen & bath remodel. new kitchen cabinets, bath fixtuers, flooring. bath sq ft approx 30. kitchen sq ft approx 48. nol alteratiion of walls. | $37,000 |
| May 28, 2019 | Never finaled issued May 2019, no final | 530 Stockton St | street spaceDetails
street space | ||
| Apr 26, 2019 | Completed final sign-off Oct 2019 | 530 Stockton St | Us Construction California, Inc | unit 308 & 505: remodel kitchens & baths, kitchen approx 4'x8', bath approx 5'x6'Details
unit 308 & 505: remodel kitchens & baths, kitchen approx 4'x8', bath approx 5'x6' | $37,000 |
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 530 Stockton St | street spaceDetails
street space | ||
| Feb 27, 2019 | Completed final sign-off Jun 2019 | 530 Stockton St | Us Construction California, Inc | units 104 and 508: remodel kitchen and bathroom. install new electrical subpanel.Details
units 104 and 508: remodel kitchen and bathroom. install new electrical subpanel. | $36,000 |
| Jan 11, 2019 | Completed final sign-off Jun 2019 | 530 Stockton St | Us Construction California, Inc | units 406 and 605 kitchen and bath remodel, replace kitchen cabinets and bath fixtures, add washer and dryer, replace existing light fixtures. all in kind.Details
units 406 and 605 kitchen and bath remodel, replace kitchen cabinets and bath fixtures, add washer and dryer, replace existing light fixtures. all in kind. | $40,000 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 530 Stockton St | Us Construction California, Inc | kitchen bath remodel, replace existing light fixtures. no structural, no outside work.Details
kitchen bath remodel, replace existing light fixtures. no structural, no outside work. | $40,000 |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 530 Stockton St | street spaceDetails
street space | ||
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 530 Stockton St | street spaceDetails
street space | ||
| Aug 7, 2018 | Completed final sign-off Jan 2019 | 530 Stockton St | Us Construction California, Inc | (unit #607)renovation on 6th floor:new bedroom, new dishwasher, new washer dryer, nw kitchen cabinets, nw plmg fixtures, nw lighting at extg jbox locations. no change to mech. no exterior work. no fire alarm or sprnkl work. no structural work.Details
(unit #607)renovation on 6th floor:new bedroom, new dishwasher, new washer dryer, nw kitchen cabinets, nw plmg fixtures, nw lighting at extg jbox locations. no change to mech. no exterior work. no fire alarm or sprnkl work. no structural work. | $30,000 |
| Jul 26, 2018 | Completed final sign-off Jan 2019 | 530 Stockton St | Us Construction California, Inc | kitchen and bathroom remodel, new cabinets, sinks, toilets. no walls moved.Details
kitchen and bathroom remodel, new cabinets, sinks, toilets. no walls moved. | $33,000 |
| May 17, 2018 | Never finaled issued May 2018, no final | 530 Stockton St | Us Construction California, Inc | renovation of 3 units 107 & 102 on 1st floor and 307 on 3rd fl. new bedrooms, new dishwashers, new kitchen cabinets, new plumbing fixts. new lighting at j-boc locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work. n/a for maher.Details
renovation of 3 units 107 & 102 on 1st floor and 307 on 3rd fl. new bedrooms, new dishwashers, new kitchen cabinets, new plumbing fixts. new lighting at j-boc locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work. n/a for maher. | $60,000 |
| Dec 12, 2016 | Completed final sign-off Feb 2017 | 530 Stockton St | Brady Construction | unit #107 kitchen & bathroom remodel. no wall changed or structural work. n/a for maher.Details
unit #107 kitchen & bathroom remodel. no wall changed or structural work. n/a for maher. | $30,000 |
| Nov 4, 2016 | Never finaled issued Nov 2016, no final | 530 Stockton St | street space permitDetails
street space permit | ||
| Sep 23, 2016 | Completed final sign-off Dec 2016 | 530 Stockton St | Brady Construction | unit #403: remove and replace kitchen cabinets in kind & replace countertop. bathroom : remove & replace ceramic tile on floor & around 3 walls of bath tub. replace vanity cabinet.no wall change, no structural work.; maher n/aDetails
unit #403: remove and replace kitchen cabinets in kind & replace countertop. bathroom : remove & replace ceramic tile on floor & around 3 walls of bath tub. replace vanity cabinet.no wall change, no structural work.; maher n/a | $25,000 |
| Apr 19, 2016 | Completed final sign-off Jun 2016 | 530 Stockton St | Brady Construction | unit 103. remove and replace kitchen cabinets in kind and replace countertop, bath. remove and replace ceramic tile on floor and around 3 walls of bath. replace vanity cabinet, no wall change. no structural workDetails
unit 103. remove and replace kitchen cabinets in kind and replace countertop, bath. remove and replace ceramic tile on floor and around 3 walls of bath. replace vanity cabinet, no wall change. no structural work | $25,000 |
| Oct 1, 2015 | Completed final sign-off Dec 2015 | 530 Stockton St | Brady Construction | #306- kitchen- remove & replace cabinets & counter top in kind. bathroom- remove & replace ceramic tile on floor & around 3 walls of bath tub, replace vanity cabinet. no structural work.Details
#306- kitchen- remove & replace cabinets & counter top in kind. bathroom- remove & replace ceramic tile on floor & around 3 walls of bath tub, replace vanity cabinet. no structural work. | $25,000 |
| Jul 24, 2015 | Completed final sign-off Oct 2015 | 530 Stockton St | Brady Construction | unit #207 and #603: bathroom: remove and replace ceramic tile floor and vanity cabinet. kitchen: remove and replace cabinets in kind and countertops. unit #603: replace ceramic tiles on the 3 walls around bathtubs. no structural workDetails
unit #207 and #603: bathroom: remove and replace ceramic tile floor and vanity cabinet. kitchen: remove and replace cabinets in kind and countertops. unit #603: replace ceramic tiles on the 3 walls around bathtubs. no structural work | $56,000 |
| Jun 19, 2015 | Completed final sign-off Jul 2015 | 530 Stockton St | Brady Construction | in bathroom only: remove ceramic tile on floors and walls, re-work plumbing, install new ceramic tile on 3 walls around bath tub and on floor. replace vanity cabinet and countertopDetails
in bathroom only: remove ceramic tile on floors and walls, re-work plumbing, install new ceramic tile on 3 walls around bath tub and on floor. replace vanity cabinet and countertop | $8,200 |
| Aug 11, 2014 | Never finaled issued Aug 2014, no final | 530 Stockton St | street spaceDetails
street space | ||
| May 30, 2014 | Completed final sign-off Sep 2014 | 530 Stockton St | Brady Construction | in unit #505 only: remove and replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bath tub walls, install new ceramic tile in it's place. new tile to be set in a mortor base. replace vanity cabinets. no structural work, no wall change.Details
in unit #505 only: remove and replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bath tub walls, install new ceramic tile in it's place. new tile to be set in a mortor base. replace vanity cabinets. no structural work, no wall change. | $18,500 |
| Nov 15, 2013 | Completed final sign-off Jan 2014 | 530 Stockton St | Brady Construction | unit #307 only: remove/replace kitchen cabinets in kind,install new countertop,5/8" type x drywall where walls are opened in kitchen area. in bathrm remove ceramic tile around bathtub & replace tub/shower valve. install type x 5/8 drywall,ceramic tile in a mortar base. replace vanity cabinet,faucetDetails
unit #307 only: remove/replace kitchen cabinets in kind,install new countertop,5/8" type x drywall where walls are opened in kitchen area. in bathrm remove ceramic tile around bathtub & replace tub/shower valve. install type x 5/8 drywall,ceramic tile in a mortar base. replace vanity cabinet,faucet | $24,000 |
| Sep 11, 2013 | Completed final sign-off Nov 2013 | 530 Stockton St | Brady Construction | work in unit #404 only: remove and replace kitchen cabinets in-kind. install new countertop. install 5/8" type x drywall where walls are opened at kitchen area. no structural work, no new wall & no existing wall relocation. kitchen remodel shall comply with cec 150(k)8.Details
work in unit #404 only: remove and replace kitchen cabinets in-kind. install new countertop. install 5/8" type x drywall where walls are opened at kitchen area. no structural work, no new wall & no existing wall relocation. kitchen remodel shall comply with cec 150(k)8. | $18,500 |
| Jan 10, 2012 | Completed final sign-off Mar 2012 | 530 Stockton St | Brady Construction | in unit #604 only: remove and replace kitchen cabinets in kind. install new counter tops. install 5/8" type x drywall where walls opened. in bathroom: remove and replace ceramic tile around bath tub walls along with vanity cabinet. tile to be set in mortar bed. no structural work.Details
in unit #604 only: remove and replace kitchen cabinets in kind. install new counter tops. install 5/8" type x drywall where walls opened. in bathroom: remove and replace ceramic tile around bath tub walls along with vanity cabinet. tile to be set in mortar bed. no structural work. | $23,400 |
| Mar 19, 2010 | Completed final sign-off May 2010 | 530 Stockton St | Brady Construction | unit #106 only-remove & replace kitchen cabinets in kind, install new countertops, install 5/8 type x sheetrock where walls opened & some lights. no structural work. no adding & moving walls. provide high efficacy lighting per title 24 requirements.Details
unit #106 only-remove & replace kitchen cabinets in kind, install new countertops, install 5/8 type x sheetrock where walls opened & some lights. no structural work. no adding & moving walls. provide high efficacy lighting per title 24 requirements. | $22,200 |
| Feb 3, 2010 | Completed final sign-off Feb 2010 | 530 Stockton St | Brady Construction | unit#207 only: in bathroom, remove & replace ceramic tile around bathtub walls. install 5/8" type "x" drywall, (n) ceramic tile to be installed in a mortar base around bathtub.Details
unit#207 only: in bathroom, remove & replace ceramic tile around bathtub walls. install 5/8" type "x" drywall, (n) ceramic tile to be installed in a mortar base around bathtub. | $5,200 |
| Jul 3, 2009 | Completed final sign-off Sep 2009 | 530 Stockton St | Brady Construction | unit 201: remove and replace kitchen cabinets in kind. install new sountertops. in bathroom remove and replace ceramic tile around bath tub walls. install 5/8" type x drywall. new ceramic tile to be installed in a mortar base around bathtubDetails
unit 201: remove and replace kitchen cabinets in kind. install new sountertops. in bathroom remove and replace ceramic tile around bath tub walls. install 5/8" type x drywall. new ceramic tile to be installed in a mortar base around bathtub | $21,500 |
| Jan 12, 2009 | Completed final sign-off Mar 2009 | 530 Stockton St | Brady Construction | #501- remove & replace kitchen cabinets in kind, install new countertop. in bathroom, remove & replace ceramic tile around bath tubs walls & floor, new ceramic tile to be installed in a morter base on floor & around bath tub walls.Details
#501- remove & replace kitchen cabinets in kind, install new countertop. in bathroom, remove & replace ceramic tile around bath tubs walls & floor, new ceramic tile to be installed in a morter base on floor & around bath tub walls. | $24,200 |
| Oct 1, 2004 | Completed final sign-off Jan 2005 | 530 Stockton St | Brady Construction | complete wood destroying pest & organisms inspection report no. 44169 -items 3a-7b, 7d onlyDetails
complete wood destroying pest & organisms inspection report no. 44169 -items 3a-7b, 7d only | $1,890 |
| Jun 4, 2004 | Completed final sign-off Aug 2004 | 530 Stockton St | Anderson Roofing & Sheet Metal | reroofingDetails
reroofing | $34,500 |
| Dec 17, 2001 | Expired or cancelled expired Apr 2002 | 530 Stockton St | side walk repairDetails
side walk repair | ||
| Sep 23, 2000 | Completed final sign-off Nov 2000 | 530 Stockton St | Brady Construction | repl kitchen cabinets & counter top in unit #303 ;add gfi plugsDetails
repl kitchen cabinets & counter top in unit #303 ;add gfi plugs | $14,600 |
| Jun 10, 2000 | Completed final sign-off Jul 2000 | 530 Stockton St | Brady Construction | replace kitchen cabinets and counter top in unit #305 add gfi plugs no structural work unit 305Details
replace kitchen cabinets and counter top in unit #305 add gfi plugs no structural work unit 305 | $12,500 |