Block 0774, lot 014
1040 Steiner St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 6,711 sq ft
- Lot
- 2,944 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 25, 2025 | Completed final sign-off May 2025 | 1040 Steiner St | Brady Construction | unit #10: revision to pa# 202503031386 replace bathroom and kitchen window w/ double hung vinyl. both windows in light court and not visible from street. max u-factor 0.3Details
unit #10: revision to pa# 202503031386 replace bathroom and kitchen window w/ double hung vinyl. both windows in light court and not visible from street. max u-factor 0.3 | $3,200 |
| Apr 25, 2025 | Completed final sign-off Jul 2025 | 1040 Steiner St | Brady Construction | unit #2: bathroom - replace toilet, vanity cabinet and bathtub surround. install 2 vinyl window in bathroom and kitchen, windows in light court. kitchen - replace in kind cabinets, countertop, sink. no wall change, no structural work. max u-factor .30. add fan in bathroom.Details
unit #2: bathroom - replace toilet, vanity cabinet and bathtub surround. install 2 vinyl window in bathroom and kitchen, windows in light court. kitchen - replace in kind cabinets, countertop, sink. no wall change, no structural work. max u-factor .30. add fan in bathroom. | $64,000 |
| Mar 3, 2025 | Completed final sign-off Apr 2025 | 1040 Steiner St | Brady Construction | unit #12: to comply with nov #202534422 repair all fire damage to unit #12 repaird all finishes electrical, plumbing, minor damage to framing, repair as neededDetails
unit #12: to comply with nov #202534422 repair all fire damage to unit #12 repaird all finishes electrical, plumbing, minor damage to framing, repair as needed | $10,500 |
| Mar 3, 2025 | Completed final sign-off May 2025 | 1040 Steiner St | Brady Construction | unit #10: bathroom: replace toilet, vainity, cabinet and bath tub surround kitchen: replace in kind cabinets, countertop, sink no wall change no structural workDetails
unit #10: bathroom: replace toilet, vainity, cabinet and bath tub surround kitchen: replace in kind cabinets, countertop, sink no wall change no structural work | $40,000 |
| Dec 23, 2022 | Completed final sign-off Jul 2024 | 1040 Steiner St | Redwood City Alarms Inc | voluntary upgrading the existing fire alarm system from conventional to addressable on a one to one basis and installing low-frequency horns in the dwelling unit's sleeping areas.Details
voluntary upgrading the existing fire alarm system from conventional to addressable on a one to one basis and installing low-frequency horns in the dwelling unit's sleeping areas. | $28,135 |
| Aug 5, 2021 | Completed final sign-off Dec 2021 | 1040 Steiner St | Brady Construction | apt 1: remodel one bathroom & onr kitchen. replace in-kind. (b) vanity cabinet, creamid tile, surround of tub, toilet and flooring. (k): replae in-kind cabinets, countertop and sink. no wall change. no structural work.Details
apt 1: remodel one bathroom & onr kitchen. replace in-kind. (b) vanity cabinet, creamid tile, surround of tub, toilet and flooring. (k): replae in-kind cabinets, countertop and sink. no wall change. no structural work. | $30,000 |
| Apr 27, 2021 | Completed final sign-off Jun 2021 | 1040 Steiner St | Brady Construction | unit# 6 - bathroom: replace in kind venity cabinet, ceramic tile surround of tub, toilet and flooring. kitchen: replace in kind cabinets, counter top and sink. no wall change or structural work in closet.Details
unit# 6 - bathroom: replace in kind venity cabinet, ceramic tile surround of tub, toilet and flooring. kitchen: replace in kind cabinets, counter top and sink. no wall change or structural work in closet. | $30,000 |
| Aug 24, 2020 | Completed final sign-off Dec 2020 | 1040 Steiner St | Brady Construction | unit 7 only - bathroom: replace in kind bathtub, vanity cabinet, toilet kitchen: replace in kind cabinets, countertop and sink, no wall change or structural work in unitDetails
unit 7 only - bathroom: replace in kind bathtub, vanity cabinet, toilet kitchen: replace in kind cabinets, countertop and sink, no wall change or structural work in unit | $30,000 |
| Dec 3, 2018 | Completed final sign-off Mar 2019 | 1040 Steiner St | Brady Construction | all work in unit # 9. bathroom: replace ceramic tile around 3 walls of bathtub, install new vanity cabinet, top and faucet. existing bathtub to remain. kitchen: replace cabinets in kind, change counter top, sink and faucet. no wall change.Details
all work in unit # 9. bathroom: replace ceramic tile around 3 walls of bathtub, install new vanity cabinet, top and faucet. existing bathtub to remain. kitchen: replace cabinets in kind, change counter top, sink and faucet. no wall change. | $34,500 |
| Sep 15, 2017 | Completed final sign-off May 2021 | 1040 Steiner St | Urban Builder General Contracting Inc | soft story upgrades per sfbc ch 4dDetails
soft story upgrades per sfbc ch 4d | $100,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 1040 Steiner St | Brady Construction | unit 5 - bathroom -replace tile around bathtub, vanity cabiet, top & faucet. kitchen : replace cabinets, countertop, sink & faucet.Details
unit 5 - bathroom -replace tile around bathtub, vanity cabiet, top & faucet. kitchen : replace cabinets, countertop, sink & faucet. | $34,000 |
| Feb 19, 2008 | Never finaled issued Feb 2008, no final | 1040 Steiner St | street spaceDetails
street space |