Urban Builder General Contracting Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jun 2026
- Last 24 months
- 11 permits filed
180 permits since 2000: 167 completed, 6 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 180.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jul 2026 | 67 Potomac St | replace 6 windows in kind at front facade.Details
replace 6 windows in kind at front facade. | $12,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 151 Upper Tr | structural & lateral repairs & strengthening of structural post supporting rear bay structure. strengthening & reinforcement of side cantilever structuresDetails
structural & lateral repairs & strengthening of structural post supporting rear bay structure. strengthening & reinforcement of side cantilever structures | $28,000 |
| Feb 5, 2026 | In progress issued Mar 2026 | 833 Lake St | (n) foundation & structural framing to replace (e), reducing garage sf to create room for storage, pantry & bedroom, (n) interior stair, remodel upper level bathroom, (n) closets in primary bedrm, slight modification to rear deck & paint front of house. electric upgrade,replace (e) furnace w/ heat..Details
(n) foundation & structural framing to replace (e), reducing garage sf to create room for storage, pantry & bedroom, (n) interior stair, remodel upper level bathroom, (n) closets in primary bedrm, slight modification to rear deck & paint front of house. electric upgrade,replace (e) furnace w/ heat.. | $850,000 |
| Sep 9, 2025 | In progress issued Oct 2025 | 1758 47th Av | construct (n) roof and rear yard deck. replace in kind bathroom fixtures. swap out rear facade windows with doors.Details
construct (n) roof and rear yard deck. replace in kind bathroom fixtures. swap out rear facade windows with doors. | $85,000 |
| Sep 8, 2025 | Completed final sign-off Dec 2025 | 336 Day St | dry rot repair at front garage and staircase walls. install new siding to match siding on house. replace garage door in same opening . approx 280 sq ft of sidingDetails
dry rot repair at front garage and staircase walls. install new siding to match siding on house. replace garage door in same opening . approx 280 sq ft of siding | $5,000 |
| Jul 25, 2025 | In progress issued Jul 2025 | 2128 Vallejo St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 2 shower pan(s). | $100,000 |
| Jul 22, 2025 | Completed final sign-off Mar 2026 | 1108 Cabrillo St | demolish existing sunroom and rebuild in its place and increasing it's size by 65 sq. ft unconditioned space. new deck on ground levelDetails
demolish existing sunroom and rebuild in its place and increasing it's size by 65 sq. ft unconditioned space. new deck on ground level | $99,660 |
| Jul 8, 2025 | Completed final sign-off Aug 2025 | 118 06th Av | dry rot repair and siding replacement at front garage using like siding to match existing. approximately 200 sf. street facing.Details
dry rot repair and siding replacement at front garage using like siding to match existing. approximately 200 sf. street facing. | $5,000 |
| Apr 29, 2025 | Completed final sign-off Dec 2025 | 639 Belvedere St | 3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage.Details
3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage. | $85,000 |
| Oct 21, 2024 | Completed final sign-off Nov 2025 | 621 27th St | revision to 202406114157. update foundations to accomodate 6" ceiling height increase (8'0" from 7'6"). at new ground flr bedroom only. existing foundations are shallow and required upgrades. foundation work only.Details
revision to 202406114157. update foundations to accomodate 6" ceiling height increase (8'0" from 7'6"). at new ground flr bedroom only. existing foundations are shallow and required upgrades. foundation work only. | $40,000 |
| Oct 11, 2024 | In progress issued Oct 2024 | 2605 Diamond St | construct new exterior stair in rear yard, construct new wood fence at rear yard.Details
construct new exterior stair in rear yard, construct new wood fence at rear yard. | $20,000 |
| Sep 23, 2024 | Completed final sign-off Mar 2026 | 151 Upper Tr | installtion of pneumatic elevator to replace a substandard winding stairs (which is 27" wide, winding, with 8/9" rise and 0" inside) replace a 1/2 bath and add a flight of stairs from the garage to the 1st fl under the existing stairs aboveDetails
installtion of pneumatic elevator to replace a substandard winding stairs (which is 27" wide, winding, with 8/9" rise and 0" inside) replace a 1/2 bath and add a flight of stairs from the garage to the 1st fl under the existing stairs above | $155,000 |
| Jun 18, 2024 | Completed final sign-off Dec 2024 | 289 Frederick St | replace 18 street facing windows with new wood windows to match existing window style (double hung) with lugs. paint facadeDetails
replace 18 street facing windows with new wood windows to match existing window style (double hung) with lugs. paint facade | $50,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2025 | 621 27th St | remodeling of (e) bathroom & (n) bedrm @ 1st fl; add 450 sf conditioned space @ 1st fl; remodel (e) foyer, kitchen, dining rm & 2 bedrms @ 2nd fl; enlarge 1st fl street facing bedrm window for light and ventilation; strengthening living rm floorDetails
remodeling of (e) bathroom & (n) bedrm @ 1st fl; add 450 sf conditioned space @ 1st fl; remodel (e) foyer, kitchen, dining rm & 2 bedrms @ 2nd fl; enlarge 1st fl street facing bedrm window for light and ventilation; strengthening living rm floor | $50,000 |
| Mar 22, 2024 | Completed final sign-off May 2024 | 160 Buena Vista Tr | replacement fence and gate at 15th st. new fence to be 8'-0" height.Details
replacement fence and gate at 15th st. new fence to be 8'-0" height. | $2,000 |
| Sep 26, 2023 | Completed final sign-off Jun 2024 | 662 Hearst Av | replace front facade in kind. minor dry rot repair. approx 500 sq ft.Details
replace front facade in kind. minor dry rot repair. approx 500 sq ft. | $10,000 |
| Sep 18, 2023 | Completed final sign-off Aug 2024 | 509 Oak St | replace (e)masonry foundation walls adjacent to garage door, install steel moment frame around garage door opening, replace dry=rot damaged entry stair post supportingn 3/f bay, 50% dry rot repair of entry stair to address inadequate waterproofing.exterior finish at replmnt walls to match(e)stuccoDetails
replace (e)masonry foundation walls adjacent to garage door, install steel moment frame around garage door opening, replace dry=rot damaged entry stair post supportingn 3/f bay, 50% dry rot repair of entry stair to address inadequate waterproofing.exterior finish at replmnt walls to match(e)stucco | $48,000 |
| Aug 9, 2023 | Completed final sign-off Jun 2024 | 1343 38th Av | revision to 202109017637-s1. new stair orientation for approved deck & as-built framing revisionsDetails
revision to 202109017637-s1. new stair orientation for approved deck & as-built framing revisions | |
| May 17, 2023 | Completed final sign-off May 2023 | 1258 33rd Av | to comply w/ complaint # 202295259, build new fence in backyard, total height will be 8ft with 6ft of vertical boards and 2ft of square lattice above.Details
to comply w/ complaint # 202295259, build new fence in backyard, total height will be 8ft with 6ft of vertical boards and 2ft of square lattice above. | $3,000 |
| Apr 25, 2023 | Completed final sign-off Mar 2026 | 1651 09th Av | horizontal rear addition to existing single family residence. remodel existing second and third floors. new rear deck.Details
horizontal rear addition to existing single family residence. remodel existing second and third floors. new rear deck. | $400,000 |
| Dec 9, 2022 | Completed final sign-off Nov 2023 | 22 Flint St | replace existing, grooved, failing paint grade wood siding w/ composite grooved siding. historic resource assessment provided.Details
replace existing, grooved, failing paint grade wood siding w/ composite grooved siding. historic resource assessment provided. | $5,000 |
| Oct 14, 2022 | Completed final sign-off Aug 2023 | 479 21st Av | revision to permit 202001021169. extend existing deck to the west 9' and north by 4' for an additional 27sf. extend 1 hr fire wall to protect deck extension. new grade beams and framing details due to existing conditions.Details
revision to permit 202001021169. extend existing deck to the west 9' and north by 4' for an additional 27sf. extend 1 hr fire wall to protect deck extension. new grade beams and framing details due to existing conditions. | $10,000 |
| Sep 21, 2022 | Completed final sign-off Jun 2024 | 1343 38th Av | replace in kind cabinets and fixtures in kitchen and bathroom.Details
replace in kind cabinets and fixtures in kitchen and bathroom. | $5,000 |
| Aug 26, 2022 | Completed final sign-off Nov 2023 | 22 Flint St | lower unit only (22f): replace (e) in-wall electric heaters with new hydronic heating system.Details
lower unit only (22f): replace (e) in-wall electric heaters with new hydronic heating system. | $15,000 |
| Jun 9, 2022 | Completed final sign-off Aug 2024 | 162 Buena Vista Tr | revision to pa# 202008262663. revise rear door from new french door to new sliding door.Details
revision to pa# 202008262663. revise rear door from new french door to new sliding door. | |
| May 10, 2022 | Completed final sign-off Feb 2025 | 1472 Sanchez St | renovation & remodel of (e) 3-story, 2-unit residential bldg, 2nd flr horizontal addition. work is to include demolition of (e) construction, a structural upgrade w/ (n) foundation & structural framing, upgraded eletrical & plumbing systems & a (n) elevator.Details
renovation & remodel of (e) 3-story, 2-unit residential bldg, 2nd flr horizontal addition. work is to include demolition of (e) construction, a structural upgrade w/ (n) foundation & structural framing, upgraded eletrical & plumbing systems & a (n) elevator. | $255,000 |
| Mar 17, 2022 | Completed final sign-off Aug 2022 | 85 San Jacinto Wy | replace remaining stucco around house and install eleven new windows at the rear of building replacing non original windows with aluminum clad. u-factor 0.30 or better.Details
replace remaining stucco around house and install eleven new windows at the rear of building replacing non original windows with aluminum clad. u-factor 0.30 or better. | $20,000 |
| Mar 17, 2022 | Expired or cancelled suspend Sep 2025 | 85 San Jacinto Wy | to obtain a final inspection for work approved under pa 202101112420. all work is complete.Details
to obtain a final inspection for work approved under pa 202101112420. all work is complete. | |
| Mar 17, 2022 | Completed final sign-off Aug 2022 | 85 San Jacinto Wy | to obtain final inspection for work approved under pa# 202101112420. all work is completed.Details
to obtain final inspection for work approved under pa# 202101112420. all work is completed. | |
| Feb 11, 2022 | Completed final sign-off Nov 2022 | 436 Hugo St | ground fl lateral upgrade to comply with sfab-094 (per asce 7-16 standards). plywood shearwalls, holddowns and new concrete foundations. dowel conc stem wall to (e) foundations at exterior wall plywood shearwall foundation.Details
ground fl lateral upgrade to comply with sfab-094 (per asce 7-16 standards). plywood shearwalls, holddowns and new concrete foundations. dowel conc stem wall to (e) foundations at exterior wall plywood shearwall foundation. | $78,000 |
| Dec 10, 2021 | Completed final sign-off Jul 2024 | 1283 06th Av | create (n) 565 sf habitable space by infilling under existing deck & converting portion of exiting storage area. expand (e) deck 17' from rear wall. move mechanical room in storage area. remodel (e) kitchen including new cabinets, fixtures, lighting & equipment.Details
create (n) 565 sf habitable space by infilling under existing deck & converting portion of exiting storage area. expand (e) deck 17' from rear wall. move mechanical room in storage area. remodel (e) kitchen including new cabinets, fixtures, lighting & equipment. | $249,000 |
| Nov 2, 2021 | Completed final sign-off Nov 2023 | 22 Flint St | rev to pa 202104027846: structural revision to shear wall, skylight, parapet walls.Details
rev to pa 202104027846: structural revision to shear wall, skylight, parapet walls. | $1,500 |
| Oct 19, 2021 | Completed final sign-off Apr 2023 | 1060 Cole St | retrofit work has reavealed concrete foundation around permieter of structure.replce w/ (n) reinfored concrete foundation. no (n) habitable space (e) brick facade to remain untouched. 18in excvation in rear to match front lobby/unit. ref: 201709158383 (soft-story)Details
retrofit work has reavealed concrete foundation around permieter of structure.replce w/ (n) reinfored concrete foundation. no (n) habitable space (e) brick facade to remain untouched. 18in excvation in rear to match front lobby/unit. ref: 201709158383 (soft-story) | $108,000 |
| Oct 8, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | rev to pa 202101142640 and 202108277317 (n) foundation wall (n) shear wallDetails
rev to pa 202101142640 and 202108277317 (n) foundation wall (n) shear wall | $1,000 |
| Sep 15, 2021 | Completed final sign-off Apr 2022 | 249 Rivoli St | revision to 202104158594. reconfigure sky light, upgrade rf framing, revise post footingDetails
revision to 202104158594. reconfigure sky light, upgrade rf framing, revise post footing | |
| Sep 1, 2021 | Completed final sign-off Jun 2024 | 1343 38th Av | remodel existing first level extend (e) rear exterior wall to accomodate a new 1 bed 1 bath "streamlined" adu. adu is occupying existing non-conditioned space and new addition space. no conditioned occupied spaced for main residence has been converted for adu. remodel (e) 2nd level & (e) 3rd levelDetails
remodel existing first level extend (e) rear exterior wall to accomodate a new 1 bed 1 bath "streamlined" adu. adu is occupying existing non-conditioned space and new addition space. no conditioned occupied spaced for main residence has been converted for adu. remodel (e) 2nd level & (e) 3rd level | $180,000 |
| Aug 27, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | rev to pa202101142640 - rev to structural to including removal of w/c addition & kitchen windows. new layout for main bedroom. new 2hr enclosure for path of travel light well to rear yard.Details
rev to pa202101142640 - rev to structural to including removal of w/c addition & kitchen windows. new layout for main bedroom. new 2hr enclosure for path of travel light well to rear yard. | |
| Jul 1, 2021 | Completed final sign-off Aug 2022 | 85 San Jacinto Wy | dryrot repair and stucco patch (1000sf) at side of the house facing street.Details
dryrot repair and stucco patch (1000sf) at side of the house facing street. | $20,000 |
| May 12, 2021 | Never finaled issued Feb 2023, no final | 79 Homestead St | site. remodel (e) 2-story 2-fam residence. raise (e) building 15'-9 1/2". add garage at street lvl, curb cut/infill at front yard for (n) driveway. remodel/reconfig interior of both dwellings- stairs, kitch & bath rms. rear yard decks. reconfig (e) rear deck stairs. (n) rear deck & stairs at 3rd flrDetails
site. remodel (e) 2-story 2-fam residence. raise (e) building 15'-9 1/2". add garage at street lvl, curb cut/infill at front yard for (n) driveway. remodel/reconfig interior of both dwellings- stairs, kitch & bath rms. rear yard decks. reconfig (e) rear deck stairs. (n) rear deck & stairs at 3rd flr | $330,000 |
| Apr 15, 2021 | Completed final sign-off Apr 2022 | 249 Rivoli St | infill roof of interior courtyard to match existing roof height. add 4 new skylights, remove 1 existing skylight, renovate kichen. structural work at ground floor foundation.Details
infill roof of interior courtyard to match existing roof height. add 4 new skylights, remove 1 existing skylight, renovate kichen. structural work at ground floor foundation. | $150,000 |
| Apr 2, 2021 | Completed final sign-off Mar 2024 | 22 Flint St | convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights.Details
convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights. | $325,000 |
| Jan 28, 2021 | Completed final sign-off Mar 2024 | 22 Flint St | construct roof deck over (e) roof w/ 4 ft parapet wall along north & south property ln. install exterior spiral stairway for access to rf deck. 7 ft high firewall construct on (e) flr deck along prop ln. (e) flr deck to be repaired in-kind.Details
construct roof deck over (e) roof w/ 4 ft parapet wall along north & south property ln. install exterior spiral stairway for access to rf deck. 7 ft high firewall construct on (e) flr deck along prop ln. (e) flr deck to be repaired in-kind. | $81,000 |
| Jan 14, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well.Details
kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well. | $100,000 |
| Jan 11, 2021 | Completed final sign-off Aug 2022 | 85 San Jacinto Wy | replace 6 existing windows at front and side of building in kind. replace 2 slider doors at the rear -wood aluminum cald and casements.Details
replace 6 existing windows at front and side of building in kind. replace 2 slider doors at the rear -wood aluminum cald and casements. | $20,000 |
| Nov 9, 2020 | Completed final sign-off Jan 2021 | 3618 25th St | repair dry rot in side staircase, < 50%, common areaDetails
repair dry rot in side staircase, < 50%, common area | $3,000 |
| Oct 17, 2020 | Completed final sign-off Feb 2021 | 422 Lyon St | revision to pa 201709158388. soft story upgrade.Details
revision to pa 201709158388. soft story upgrade. | $100,000 |
| Oct 1, 2020 | Completed final sign-off Jun 2021 | 2138 Vallejo St | add 3 windows and 1 skylight, not visible from street - rear elevatio.Details
add 3 windows and 1 skylight, not visible from street - rear elevatio. | $16,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2024 | 160 Buena Vista Tr | interior remodel units 160 and 162: demo (e) secondary staircase in unit 160 and 162, transfer into bathroom; remodel kitchens; new rear deck w/ stair for unit 162; ground floor new residential area: shared office, closet, office & bathroom; select window replacement on west & south facadesDetails
interior remodel units 160 and 162: demo (e) secondary staircase in unit 160 and 162, transfer into bathroom; remodel kitchens; new rear deck w/ stair for unit 162; ground floor new residential area: shared office, closet, office & bathroom; select window replacement on west & south facades | $347,147 |
| Feb 10, 2020 | Completed final sign-off Sep 2020 | 191 San Felipe Av | revision to 201909252632. changes to rear facing window sizes, revised title 24, add structural beam at kitchen where wall removed, dry rot repair of 8' wall at rear, wall strengthening voluntary plywood.Details
revision to 201909252632. changes to rear facing window sizes, revised title 24, add structural beam at kitchen where wall removed, dry rot repair of 8' wall at rear, wall strengthening voluntary plywood. | $12,000 |
| Nov 18, 2019 | Completed final sign-off Jan 2021 | 108 11th Av | rev pa# 201902072362; new condenser unit and update to title 24Details
rev pa# 201902072362; new condenser unit and update to title 24 | |
| Oct 11, 2019 | Completed final sign-off Feb 2020 | 1322 Masonic Av | construction of garage hallway to connect to pre-existing home office off of garage. build "utility closet" aorund furnace & furnace & water heater. relocate (e) laundry from 2/f into 1/f empty space.Details
construction of garage hallway to connect to pre-existing home office off of garage. build "utility closet" aorund furnace & furnace & water heater. relocate (e) laundry from 2/f into 1/f empty space. | $30,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2020 | 191 San Felipe Av | kitchen remodel, bathroom remodel, window replacement in kindDetails
kitchen remodel, bathroom remodel, window replacement in kind | $37,000 |
| Jul 19, 2019 | Completed final sign-off Apr 2023 | 1258 33rd Av | convert half of (e) garage to living space. remodel & expand (e) 2nd floor sitting room & first floor office. remove (e) deck & stairs & replace with new compliant deck & stairs.Details
convert half of (e) garage to living space. remodel & expand (e) 2nd floor sitting room & first floor office. remove (e) deck & stairs & replace with new compliant deck & stairs. | $50,000 |
| Jul 18, 2019 | Completed final sign-off May 2020 | 514 Funston Av | (n) roof deck over (e) roof @ 2nd floor.Details
(n) roof deck over (e) roof @ 2nd floor. | $10,000 |
| Jul 1, 2019 | Completed final sign-off May 2020 | 514 Funston Av | interior remodelgr, 2nd, 3rd, gr: new bdrm, bth, laundry, replace e stair w/ new (interior). 2nd: new kitchen ,powder rm. 3rd: mstr bdrm remodel. deck under seperate permitDetails
interior remodelgr, 2nd, 3rd, gr: new bdrm, bth, laundry, replace e stair w/ new (interior). 2nd: new kitchen ,powder rm. 3rd: mstr bdrm remodel. deck under seperate permit | $150,000 |
| Jun 11, 2019 | Completed final sign-off Oct 2019 | 553 Frederick St | replace cantilevered deck framing at upper floor rear deck. replace deck boards on both rear decks. (work in kind)Details
replace cantilevered deck framing at upper floor rear deck. replace deck boards on both rear decks. (work in kind) | $12,000 |
| Jun 7, 2019 | Completed final sign-off Nov 2019 | 1258 33rd Av | relocate 2nd fl bearing wall and remodel e kitchen. remodel 3rd fl hall to provide laundry closetDetails
relocate 2nd fl bearing wall and remodel e kitchen. remodel 3rd fl hall to provide laundry closet | $15,000 |
| May 29, 2019 | Completed final sign-off Apr 2020 | 457 Lombard St | structural calculations & drawings for the replacement of the damaged beam in the garage and ceiling, reconfiguration of garage beam support posts,Details
structural calculations & drawings for the replacement of the damaged beam in the garage and ceiling, reconfiguration of garage beam support posts, | $28,000 |
| May 6, 2019 | Completed final sign-off Nov 2019 | 1258 33rd Av | renovate (e) bathroom.Details
renovate (e) bathroom. | $5,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2019 | 118 Bache St | replace approx 22' of s' high retaining wall and 11' of foundationDetails
replace approx 22' of s' high retaining wall and 11' of foundation | $18,000 |
| Feb 7, 2019 | Completed final sign-off Jan 2021 | 108 11th Av | renovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom.Details
renovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom. | $350,000 |
| Jan 15, 2019 | Completed final sign-off Jun 2019 | 2820 Sacramento St | renovate exiting one kitchen, no walls removed, all work in kind.Details
renovate exiting one kitchen, no walls removed, all work in kind. | $10,000 |
| Jan 15, 2019 | Completed final sign-off Nov 2019 | 2822 Sacramento St | renovate exiting one kitchen, no walls removed, all work in kind.Details
renovate exiting one kitchen, no walls removed, all work in kind. | $10,000 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 1267 Chestnut St | street spaceDetails
street space | |
| Jun 15, 2018 | Completed final sign-off Nov 2018 | 2575 Judah St | interior demolition. ab-017. construction/t.i. will be sep permit.Details
interior demolition. ab-017. construction/t.i. will be sep permit. | $2,000 |
| Jun 1, 2018 | Completed final sign-off Apr 2019 | 42 Lower Tr | revision to 201705307950 structural revision to relocate steel column on 3rd flr and update u-factor for doors & windows t-24Details
revision to 201705307950 structural revision to relocate steel column on 3rd flr and update u-factor for doors & windows t-24 | |
| Jun 1, 2018 | Completed final sign-off Apr 2019 | 44 Lower Tr | revision to 201706220116 structural revision to add steel beam & update t24 (u-factor) for door & windowDetails
revision to 201706220116 structural revision to add steel beam & update t24 (u-factor) for door & window | |
| May 30, 2018 | Completed final sign-off Nov 2018 | 2575 Judah St | ti- (e) commercial space in a mixed use bld. the (e) retail space already functions as light food facility. the new space will serve coffee & sandwiches. new interior finishes, upgrade bld systems, new accessible restroom. casework maher naDetails
ti- (e) commercial space in a mixed use bld. the (e) retail space already functions as light food facility. the new space will serve coffee & sandwiches. new interior finishes, upgrade bld systems, new accessible restroom. casework maher na | $40,000 |
| Apr 26, 2018 | Completed final sign-off Jan 2019 | 2820 Sacramento St | revision to 201608044252. removal of dry rot and replace with concrete wallsDetails
revision to 201608044252. removal of dry rot and replace with concrete walls | $2,000 |
| Apr 4, 2018 | Completed final sign-off Oct 2018 | 118 06th Av | revision to 201801108268 scope reduction/elimination of work at top fllor east rear, east of grideline 4Details
revision to 201801108268 scope reduction/elimination of work at top fllor east rear, east of grideline 4 | |
| Mar 16, 2018 | Completed final sign-off Apr 2019 | 42 Lower Tr | revision to app#201705307950. add a new roof deck & roof hatch.Details
revision to app#201705307950. add a new roof deck & roof hatch. | $5,000 |
| Mar 8, 2018 | Completed final sign-off Sep 2018 | 571 20th Av | voluntary structural seismic retrofit. replace gas furnace and ductwork. upgrade electrical service to 200a. replace elec panel full elec. rewure and nw receptacles. new hardwired/interconnected smoke/co2 detectors. demo bearing wall on 2nd fl & provide nw structural beams/colomns.Details
voluntary structural seismic retrofit. replace gas furnace and ductwork. upgrade electrical service to 200a. replace elec panel full elec. rewure and nw receptacles. new hardwired/interconnected smoke/co2 detectors. demo bearing wall on 2nd fl & provide nw structural beams/colomns. | $200,000 |
| Jan 10, 2018 | Completed final sign-off Oct 2018 | 118 06th Av | interior remodel at 4th fl & dormer addition (all within no.3) includes limited structural workDetails
interior remodel at 4th fl & dormer addition (all within no.3) includes limited structural work | $75,000 |
| Jan 9, 2018 | Completed final sign-off Oct 2018 | 33 Farnum St | alterations of (e) residence at 1st fl replace (e) bathroom & laundry with (n) in a different location; remove (e) bearing wall to create a single undivided space; replace 2 (e) sliding glass doors with a single set of a larger sliding glass doors. remove & replace in-kind the (e) 2nd floor deckDetails
alterations of (e) residence at 1st fl replace (e) bathroom & laundry with (n) in a different location; remove (e) bearing wall to create a single undivided space; replace 2 (e) sliding glass doors with a single set of a larger sliding glass doors. remove & replace in-kind the (e) 2nd floor deck | $120,000 |
| Jan 4, 2018 | Completed final sign-off Jan 2019 | 625 Rhode Island St | revision to 201705267809, addition shears walls added to location where previously assumed shear walls do not existDetails
revision to 201705267809, addition shears walls added to location where previously assumed shear walls do not exist | |
| Nov 27, 2017 | Completed final sign-off Apr 2018 | 3621 Scott St | revision to 201710020059. reduce garage expand den at 1st flr. new window at den, reduce depth of alcove outside garage door, reduce extent of approved roof parapets, change roof deck guardrail from glass to wood siding. maher naDetails
revision to 201710020059. reduce garage expand den at 1st flr. new window at den, reduce depth of alcove outside garage door, reduce extent of approved roof parapets, change roof deck guardrail from glass to wood siding. maher na | $12,000 |
| Nov 20, 2017 | Completed final sign-off Jan 2019 | 1267 Chestnut St | mandatory soft story retrofit using fema p-807. ** maher: n/a **Details
mandatory soft story retrofit using fema p-807. ** maher: n/a ** | $75,000 |
| Nov 3, 2017 | Completed final sign-off Jan 2019 | 294 31st Av | revision to 201612205398, revise framing plan and details, modify floor plan at kitchen, relocate powder rm, rebuild interior stairway add skyklight, window at south elevation and rear of buildingDetails
revision to 201612205398, revise framing plan and details, modify floor plan at kitchen, relocate powder rm, rebuild interior stairway add skyklight, window at south elevation and rear of building | $10,000 |
| Oct 2, 2017 | Completed final sign-off Apr 2018 | 3621 Scott St | remodel interior of single family dwelling, kitchen, 3 baths, 2 new roof decks with new exterior stairs to roof, new int stairs.partial lightwell infills at no and so lightwells. 1st fl new habitable space at e storage maher not reqDetails
remodel interior of single family dwelling, kitchen, 3 baths, 2 new roof decks with new exterior stairs to roof, new int stairs.partial lightwell infills at no and so lightwells. 1st fl new habitable space at e storage maher not req | $180,000 |
| Sep 15, 2017 | Completed final sign-off Apr 2023 | 1060 Cole St | soft story retrofit to comply w/2019 sfebc chapter 4d per 2019 cebc appendix a-4 standards, plywood shearwalls & new foundationsDetails
soft story retrofit to comply w/2019 sfebc chapter 4d per 2019 cebc appendix a-4 standards, plywood shearwalls & new foundations | $72,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2021 | 422 Lyon St | soft story upgrades per sfbc ch 40.Details
soft story upgrades per sfbc ch 40. | $100,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2021 | 101 Broderick St | soft story retrofit to comply with 2019 sfebc chap 40 per 2019 cebc appendix a-4 standards. steel special moment frames, plywood shear wall, new foundations. ref pa# 200808048366 for conc sh's to comply with soft story ordiance.Details
soft story retrofit to comply with 2019 sfebc chap 40 per 2019 cebc appendix a-4 standards. steel special moment frames, plywood shear wall, new foundations. ref pa# 200808048366 for conc sh's to comply with soft story ordiance. | $100,000 |
| Sep 15, 2017 | Completed final sign-off May 2021 | 1040 Steiner St | soft story upgrades per sfbc ch 4dDetails
soft story upgrades per sfbc ch 4d | $100,000 |
| Sep 15, 2017 | Completed final sign-off Dec 2021 | 1329 Grove St | soft story retrof to comply with sfebc ch 4d per 2019 cebc appendix a4 standards. plywood shearwalls, strong walls, holddowns, new concrete foundationsDetails
soft story retrof to comply with sfebc ch 4d per 2019 cebc appendix a4 standards. plywood shearwalls, strong walls, holddowns, new concrete foundations | $45,000 |
| Sep 11, 2017 | Completed final sign-off Apr 2018 | 3621 Scott St | upgrade of appliace in kitchen & toilets & sinks in bathrooms. exploratory sheet rock removal 20 sf at kitchen & 20 sf in bathroom. na for maher.Details
upgrade of appliace in kitchen & toilets & sinks in bathrooms. exploratory sheet rock removal 20 sf at kitchen & 20 sf in bathroom. na for maher. | $5,000 |
| Jun 22, 2017 | Completed final sign-off Apr 2019 | 44 Lower Tr | interior remodel in lower unit on 1st floor & basement. convert crawl space to (n) habitable space, relocating kitchen, living & dining to basement. add 1 master suite on 1st floor & new bath & den in basementDetails
interior remodel in lower unit on 1st floor & basement. convert crawl space to (n) habitable space, relocating kitchen, living & dining to basement. add 1 master suite on 1st floor & new bath & den in basement | $70,000 |
| Jun 7, 2017 | Completed final sign-off Oct 2017 | 1000 Cortland Av | revision to 201606109718 and 201703211981 replace e posts with concrete materialDetails
revision to 201606109718 and 201703211981 replace e posts with concrete material | $20,000 |
| May 30, 2017 | Completed final sign-off Apr 2019 | 42 Lower Tr | work on upper unit on 2nd floor only - interior remodeling kitchen, bathroom, set back wall 3'-11" increase guardrail ht from 36" to 42" ht. replace roofing & reinforce roof framing (flat roof)Details
work on upper unit on 2nd floor only - interior remodeling kitchen, bathroom, set back wall 3'-11" increase guardrail ht from 36" to 42" ht. replace roofing & reinforce roof framing (flat roof) | $100,000 |
| May 26, 2017 | Completed final sign-off Feb 2018 | 625 Rhode Island St | mandatory soft story seismic retrofit per soft story mandate using iebc app a4Details
mandatory soft story seismic retrofit per soft story mandate using iebc app a4 | $10,000 |
| May 15, 2017 | Completed final sign-off Apr 2019 | 44 Lower Tr | replace 2 (e) windows on front elevation in kind with aluminum clad wood windows (no grills), marvin or equal, remove dryrot wood feature below window sill and at roof line (not original per applicants research in bldg permit), and patch and repair w stucco as needed.Details
replace 2 (e) windows on front elevation in kind with aluminum clad wood windows (no grills), marvin or equal, remove dryrot wood feature below window sill and at roof line (not original per applicants research in bldg permit), and patch and repair w stucco as needed. | $5,000 |
| Apr 20, 2017 | Completed final sign-off Jan 2019 | 294 31st Av | revision to app#201612205398. depressing portion of slab on grade at lower floor, requiring underpinning of extg footings.Details
revision to app#201612205398. depressing portion of slab on grade at lower floor, requiring underpinning of extg footings. | $46,000 |
| Mar 27, 2017 | Completed final sign-off Aug 2017 | 1322 Masonic Av | remodel (e) powder bath on 2nd flr. add new playroom and new full bath on 1st floor.Details
remodel (e) powder bath on 2nd flr. add new playroom and new full bath on 1st floor. | $20,000 |
| Mar 21, 2017 | Completed final sign-off Oct 2017 | 1000 Cortland Av | revision to 201606109716 for foundation changesDetails
revision to 201606109716 for foundation changes | $1,000 |
| Mar 16, 2017 | Completed final sign-off Dec 2017 | 4425 20th St | alteration of (e) kitchen and dining rooms to open up space & remodel kitchen. conversion of pantry & closet into new bath. conversion of closet to laundry closetDetails
alteration of (e) kitchen and dining rooms to open up space & remodel kitchen. conversion of pantry & closet into new bath. conversion of closet to laundry closet | $50,000 |
| Jan 19, 2017 | Completed final sign-off Jan 2018 | 535 15th Av | rev. to approved pa#201606039075. scope includes changes on 3/f reconfiguration,window changes on n/s. switch deck railing from glass to cable, hvac change from furnace to radiant heating.Details
rev. to approved pa#201606039075. scope includes changes on 3/f reconfiguration,window changes on n/s. switch deck railing from glass to cable, hvac change from furnace to radiant heating. | |
| Dec 20, 2016 | Completed final sign-off Jan 2019 | 294 31st Av | remodel lower level to create new bedroom & ensuite bath, renovate kitchen @2nd flr,repl fixtures/finishes @ powder rm, remodel 3rd flr bathrooms & powder rms.merge north & west bedrms @3rd flr into one master bedroom. new window @ front wood clad.Details
remodel lower level to create new bedroom & ensuite bath, renovate kitchen @2nd flr,repl fixtures/finishes @ powder rm, remodel 3rd flr bathrooms & powder rms.merge north & west bedrms @3rd flr into one master bedroom. new window @ front wood clad. | $96,000 |
| Nov 1, 2016 | Completed final sign-off Dec 2017 | 4425 20th St | alteration/remodel of (e) bathroom in (e) space, replace 2 (e) windows w/(n) of same dimension. windows to be wood .Details
alteration/remodel of (e) bathroom in (e) space, replace 2 (e) windows w/(n) of same dimension. windows to be wood . | $6,500 |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 166 Casitas Av | remodel (e) bathroom in kind on 2nd floor. provide high efficacy light fixtures and vacancy sensors per cec 150.0(k)5. exhaust fan w/humid/stat per calgreen 4.506.1Details
remodel (e) bathroom in kind on 2nd floor. provide high efficacy light fixtures and vacancy sensors per cec 150.0(k)5. exhaust fan w/humid/stat per calgreen 4.506.1 | $14,000 |
| Oct 24, 2016 | Completed final sign-off Nov 2016 | 79 Homestead St | install backyard fence 25' wide 8' tall at highest point. fence will be in redwood.Details
install backyard fence 25' wide 8' tall at highest point. fence will be in redwood. | $3,500 |
| Oct 12, 2016 | Completed final sign-off Jan 2018 | 535 15th Av | exploratory demo in advance of renovation to determine location of structure and services. removal of 500 sq. ft. drywall on 1st and 2nd floors.Details
exploratory demo in advance of renovation to determine location of structure and services. removal of 500 sq. ft. drywall on 1st and 2nd floors. | $1,200 |