Block 3046, lot 002
191 San Felipe Ave
- City’s use
- Single Family Residential
- Built
- 1926
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,971 sq ft
- Lot
- 3,933 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2026 | In progress filed May 2026, not yet issued | 191 San Felipe Av | Hunter Dale Builders Inc. | demo type 5b 2-car garage at rear.Details
demo type 5b 2-car garage at rear. | $10,000 |
| May 13, 2026 | In progress filed May 2026, not yet issued | 191 San Felipe Av | Hunter Dale Builders Inc. | attached adu addition @ basement level of (e) rear yard. minor interior remodel at the lower level only, new deck at lower level. construction of new, one-car garage at the rear yard, and new grading and surface improvements to (e) shared access driveway at the alley. demo garage under seperate pa.Details
attached adu addition @ basement level of (e) rear yard. minor interior remodel at the lower level only, new deck at lower level. construction of new, one-car garage at the rear yard, and new grading and surface improvements to (e) shared access driveway at the alley. demo garage under seperate pa. | $390,000 |
| Jul 19, 2024 | Expired or cancelled cancelled Aug 2024 | 191 San Felipe Av | demo a dettached 2 car garage.Details
demo a dettached 2 car garage. | $10,000 | |
| Jul 18, 2024 | Expired or cancelled cancelled Aug 2024 | 191 San Felipe Av | construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garageDetails
construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garage | $390,000 | |
| Mar 28, 2024 | Expired or cancelled cancelled Jul 2024 | 191 San Felipe Av | construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garageDetails
construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garage | $350,000 | |
| Mar 28, 2024 | Expired or cancelled cancelled Jul 2024 | 191 San Felipe Av | demo a dettached 2 car garage.Details
demo a dettached 2 car garage. | $10,000 | |
| Feb 10, 2020 | Completed final sign-off Sep 2020 | 191 San Felipe Av | Urban Builder General Contracting Inc | revision to 201909252632. changes to rear facing window sizes, revised title 24, add structural beam at kitchen where wall removed, dry rot repair of 8' wall at rear, wall strengthening voluntary plywood.Details
revision to 201909252632. changes to rear facing window sizes, revised title 24, add structural beam at kitchen where wall removed, dry rot repair of 8' wall at rear, wall strengthening voluntary plywood. | $12,000 |
| Sep 25, 2019 | Completed final sign-off Sep 2020 | 191 San Felipe Av | Urban Builder General Contracting Inc | kitchen remodel, bathroom remodel, window replacement in kindDetails
kitchen remodel, bathroom remodel, window replacement in kind | $37,000 |
| Mar 28, 2007 | Completed final sign-off Apr 2007 | 191 San Felipe Av | Accessibility Management Inc | supply and install stair way lift and run the electrical for battery operated system at extg stairwayDetails
supply and install stair way lift and run the electrical for battery operated system at extg stairway | $10,000 |
| Oct 10, 2006 | Completed final sign-off Jan 2007 | 191 San Felipe Av | 21st Century Home Improvt | install 10 wood windows in kind. double paint. not visible from street.Details
install 10 wood windows in kind. double paint. not visible from street. | $6,000 |
| Oct 4, 2006 | Completed final sign-off Jan 2007 | 191 San Felipe Av | 21st Century Home Improvt | reroofing.Details
reroofing. | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- 21st Century Home Improvt (2), Hunter Dale Builders Inc. (2), Urban Builder General Contracting Inc (2), Accessibility Management Inc
- Architects
- Cameron Helland (4)
- Engineers
- Reece Relatores (3)
- Authorized agent-otherss
- Cameron Helland
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.