Back to bathroom remodel contractors
Urban Builder General Contracting Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Jun 2026
- Last 24 months
- 11 permits filed
180 permits since 2000: 167 completed, 6 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
55 bathroom remodel permits: 50 completed, 3 in progress, 2 never finaled. Typically 6 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2026 | In progress issued Mar 2026 | 833 Lake St | (n) foundation & structural framing to replace (e), reducing garage sf to create room for storage, pantry & bedroom, (n) interior stair, remodel upper level bathroom, (n) closets in primary bedrm, slight modification to rear deck & paint front of house. electric upgrade,replace (e) furnace w/ heat..Details
(n) foundation & structural framing to replace (e), reducing garage sf to create room for storage, pantry & bedroom, (n) interior stair, remodel upper level bathroom, (n) closets in primary bedrm, slight modification to rear deck & paint front of house. electric upgrade,replace (e) furnace w/ heat.. | $850,000 |
| Sep 9, 2025 | In progress issued Oct 2025 | 1758 47th Av | construct (n) roof and rear yard deck. replace in kind bathroom fixtures. swap out rear facade windows with doors.Details
construct (n) roof and rear yard deck. replace in kind bathroom fixtures. swap out rear facade windows with doors. | $85,000 |
| Jul 25, 2025 | In progress issued Jul 2025 | 2128 Vallejo St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 2 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 2 shower pan(s). | $100,000 |
| Apr 29, 2025 | Completed final sign-off Dec 2025 | 639 Belvedere St | 3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage.Details
3/f: convert (e) single bath to (2) full baths. new stacked laundry closet. new shearwall. add new skylight and 1-hr rated parapet at roof level. voluntary framing upgrade at garage. | $85,000 |
| Sep 23, 2024 | Completed final sign-off Mar 2026 | 151 Upper Tr | installtion of pneumatic elevator to replace a substandard winding stairs (which is 27" wide, winding, with 8/9" rise and 0" inside) replace a 1/2 bath and add a flight of stairs from the garage to the 1st fl under the existing stairs aboveDetails
installtion of pneumatic elevator to replace a substandard winding stairs (which is 27" wide, winding, with 8/9" rise and 0" inside) replace a 1/2 bath and add a flight of stairs from the garage to the 1st fl under the existing stairs above | $155,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2025 | 621 27th St | remodeling of (e) bathroom & (n) bedrm @ 1st fl; add 450 sf conditioned space @ 1st fl; remodel (e) foyer, kitchen, dining rm & 2 bedrms @ 2nd fl; enlarge 1st fl street facing bedrm window for light and ventilation; strengthening living rm floorDetails
remodeling of (e) bathroom & (n) bedrm @ 1st fl; add 450 sf conditioned space @ 1st fl; remodel (e) foyer, kitchen, dining rm & 2 bedrms @ 2nd fl; enlarge 1st fl street facing bedrm window for light and ventilation; strengthening living rm floor | $50,000 |
| Sep 21, 2022 | Completed final sign-off Jun 2024 | 1343 38th Av | replace in kind cabinets and fixtures in kitchen and bathroom.Details
replace in kind cabinets and fixtures in kitchen and bathroom. | $5,000 |
| Sep 1, 2021 | Completed final sign-off Jun 2024 | 1343 38th Av | remodel existing first level extend (e) rear exterior wall to accomodate a new 1 bed 1 bath "streamlined" adu. adu is occupying existing non-conditioned space and new addition space. no conditioned occupied spaced for main residence has been converted for adu. remodel (e) 2nd level & (e) 3rd levelDetails
remodel existing first level extend (e) rear exterior wall to accomodate a new 1 bed 1 bath "streamlined" adu. adu is occupying existing non-conditioned space and new addition space. no conditioned occupied spaced for main residence has been converted for adu. remodel (e) 2nd level & (e) 3rd level | $180,000 |
| May 12, 2021 | Never finaled issued Feb 2023, no final | 79 Homestead St | site. remodel (e) 2-story 2-fam residence. raise (e) building 15'-9 1/2". add garage at street lvl, curb cut/infill at front yard for (n) driveway. remodel/reconfig interior of both dwellings- stairs, kitch & bath rms. rear yard decks. reconfig (e) rear deck stairs. (n) rear deck & stairs at 3rd flrDetails
site. remodel (e) 2-story 2-fam residence. raise (e) building 15'-9 1/2". add garage at street lvl, curb cut/infill at front yard for (n) driveway. remodel/reconfig interior of both dwellings- stairs, kitch & bath rms. rear yard decks. reconfig (e) rear deck stairs. (n) rear deck & stairs at 3rd flr | $330,000 |
| Apr 2, 2021 | Completed final sign-off Mar 2024 | 22 Flint St | convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights.Details
convert part of open entry way on ground flr into interior conditioned space. repair and replace (e) batten system in kind. replace street facing windows in kind. replace roll up door and sheetrock to (e) garage with exposed framing. kitchen/bathroom remodel. replace windows and skylights. | $325,000 |
| Jan 14, 2021 | Completed final sign-off Jan 2023 | 651 19th Av | kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well.Details
kitchen & main bathroom renovation. expansion of (e) roof to include (e) floor space. infill light well. | $100,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2024 | 160 Buena Vista Tr | interior remodel units 160 and 162: demo (e) secondary staircase in unit 160 and 162, transfer into bathroom; remodel kitchens; new rear deck w/ stair for unit 162; ground floor new residential area: shared office, closet, office & bathroom; select window replacement on west & south facadesDetails
interior remodel units 160 and 162: demo (e) secondary staircase in unit 160 and 162, transfer into bathroom; remodel kitchens; new rear deck w/ stair for unit 162; ground floor new residential area: shared office, closet, office & bathroom; select window replacement on west & south facades | $347,147 |
| Sep 25, 2019 | Completed final sign-off Sep 2020 | 191 San Felipe Av | kitchen remodel, bathroom remodel, window replacement in kindDetails
kitchen remodel, bathroom remodel, window replacement in kind | $37,000 |
| May 6, 2019 | Completed final sign-off Nov 2019 | 1258 33rd Av | renovate (e) bathroom.Details
renovate (e) bathroom. | $5,000 |
| Feb 7, 2019 | Completed final sign-off Jan 2021 | 108 11th Av | renovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom.Details
renovation includes repairs to front facade & stairs, 3rd fl window change, rear yard addition interior renovation & landscape improvements. kitchen & bath remodel. addition of bathroom. | $350,000 |
| Jan 9, 2018 | Completed final sign-off Oct 2018 | 33 Farnum St | alterations of (e) residence at 1st fl replace (e) bathroom & laundry with (n) in a different location; remove (e) bearing wall to create a single undivided space; replace 2 (e) sliding glass doors with a single set of a larger sliding glass doors. remove & replace in-kind the (e) 2nd floor deckDetails
alterations of (e) residence at 1st fl replace (e) bathroom & laundry with (n) in a different location; remove (e) bearing wall to create a single undivided space; replace 2 (e) sliding glass doors with a single set of a larger sliding glass doors. remove & replace in-kind the (e) 2nd floor deck | $120,000 |
| Oct 2, 2017 | Completed final sign-off Apr 2018 | 3621 Scott St | remodel interior of single family dwelling, kitchen, 3 baths, 2 new roof decks with new exterior stairs to roof, new int stairs.partial lightwell infills at no and so lightwells. 1st fl new habitable space at e storage maher not reqDetails
remodel interior of single family dwelling, kitchen, 3 baths, 2 new roof decks with new exterior stairs to roof, new int stairs.partial lightwell infills at no and so lightwells. 1st fl new habitable space at e storage maher not req | $180,000 |
| Sep 11, 2017 | Completed final sign-off Apr 2018 | 3621 Scott St | upgrade of appliace in kitchen & toilets & sinks in bathrooms. exploratory sheet rock removal 20 sf at kitchen & 20 sf in bathroom. na for maher.Details
upgrade of appliace in kitchen & toilets & sinks in bathrooms. exploratory sheet rock removal 20 sf at kitchen & 20 sf in bathroom. na for maher. | $5,000 |
| Jun 22, 2017 | Completed final sign-off Apr 2019 | 44 Lower Tr | interior remodel in lower unit on 1st floor & basement. convert crawl space to (n) habitable space, relocating kitchen, living & dining to basement. add 1 master suite on 1st floor & new bath & den in basementDetails
interior remodel in lower unit on 1st floor & basement. convert crawl space to (n) habitable space, relocating kitchen, living & dining to basement. add 1 master suite on 1st floor & new bath & den in basement | $70,000 |
| May 30, 2017 | Completed final sign-off Apr 2019 | 42 Lower Tr | work on upper unit on 2nd floor only - interior remodeling kitchen, bathroom, set back wall 3'-11" increase guardrail ht from 36" to 42" ht. replace roofing & reinforce roof framing (flat roof)Details
work on upper unit on 2nd floor only - interior remodeling kitchen, bathroom, set back wall 3'-11" increase guardrail ht from 36" to 42" ht. replace roofing & reinforce roof framing (flat roof) | $100,000 |
| Mar 27, 2017 | Completed final sign-off Aug 2017 | 1322 Masonic Av | remodel (e) powder bath on 2nd flr. add new playroom and new full bath on 1st floor.Details
remodel (e) powder bath on 2nd flr. add new playroom and new full bath on 1st floor. | $20,000 |
| Mar 16, 2017 | Completed final sign-off Dec 2017 | 4425 20th St | alteration of (e) kitchen and dining rooms to open up space & remodel kitchen. conversion of pantry & closet into new bath. conversion of closet to laundry closetDetails
alteration of (e) kitchen and dining rooms to open up space & remodel kitchen. conversion of pantry & closet into new bath. conversion of closet to laundry closet | $50,000 |
| Dec 20, 2016 | Completed final sign-off Jan 2019 | 294 31st Av | remodel lower level to create new bedroom & ensuite bath, renovate kitchen @2nd flr,repl fixtures/finishes @ powder rm, remodel 3rd flr bathrooms & powder rms.merge north & west bedrms @3rd flr into one master bedroom. new window @ front wood clad.Details
remodel lower level to create new bedroom & ensuite bath, renovate kitchen @2nd flr,repl fixtures/finishes @ powder rm, remodel 3rd flr bathrooms & powder rms.merge north & west bedrms @3rd flr into one master bedroom. new window @ front wood clad. | $96,000 |
| Nov 1, 2016 | Completed final sign-off Dec 2017 | 4425 20th St | alteration/remodel of (e) bathroom in (e) space, replace 2 (e) windows w/(n) of same dimension. windows to be wood .Details
alteration/remodel of (e) bathroom in (e) space, replace 2 (e) windows w/(n) of same dimension. windows to be wood . | $6,500 |
| Oct 31, 2016 | Completed final sign-off Mar 2017 | 166 Casitas Av | remodel (e) bathroom in kind on 2nd floor. provide high efficacy light fixtures and vacancy sensors per cec 150.0(k)5. exhaust fan w/humid/stat per calgreen 4.506.1Details
remodel (e) bathroom in kind on 2nd floor. provide high efficacy light fixtures and vacancy sensors per cec 150.0(k)5. exhaust fan w/humid/stat per calgreen 4.506.1 | $14,000 |
| Aug 4, 2016 | Completed final sign-off Jan 2019 | 2820 Sacramento St | 2 story addition to rear yard to enlarge (e) bedrooms & add (n) bathroom to (e) residential units. associated exterior sitework at the nw corner of building to extend (e) deck & replace upper set of stairs to the rear yard. alterations of (e) interior walls at master bedroom closets @ 2nd & 3rd flrsDetails
2 story addition to rear yard to enlarge (e) bedrooms & add (n) bathroom to (e) residential units. associated exterior sitework at the nw corner of building to extend (e) deck & replace upper set of stairs to the rear yard. alterations of (e) interior walls at master bedroom closets @ 2nd & 3rd flrs | $125,000 |
| Jun 3, 2016 | Completed final sign-off Jan 2018 | 535 15th Av | horizontal expansion on all 3 floors. (n) kitchen, bathsDetails
horizontal expansion on all 3 floors. (n) kitchen, baths | $80,000 |
| Dec 16, 2015 | Completed final sign-off Feb 2017 | 3639 21st St | alteration of interior spaces (kitchen, baths) replacement of fenestration, no change of building footprint. small 2nd floor dormer extension.Details
alteration of interior spaces (kitchen, baths) replacement of fenestration, no change of building footprint. small 2nd floor dormer extension. | $110,000 |
| Aug 28, 2015 | Completed final sign-off Jan 2016 | 2447 Vallejo St | unit #4: removate & expand (e) bathroom into adjoing bedrrom, consolidate dining rm & living rm & add bedroom in the formal dining rm area. relocate door opening at (e) center hall. add closet to master bedroom. new laundry area at north end of kitchen. maher na er egress windows compliantDetails
unit #4: removate & expand (e) bathroom into adjoing bedrrom, consolidate dining rm & living rm & add bedroom in the formal dining rm area. relocate door opening at (e) center hall. add closet to master bedroom. new laundry area at north end of kitchen. maher na er egress windows compliant | $57,000 |
| Jul 16, 2015 | Completed final sign-off Nov 2016 | 2605 Diamond St | g/f-relocate front door, create 1 hr separation @ garage, 1/f- add (n) masterbath, remodel (e) bath. 2/f- remodel kitchen/bathroom, enclose 9e) lightwell @ south. exterior-replace wood windows, stamped stucco @ front with siding, replace roof, 2 new skylights.Details
g/f-relocate front door, create 1 hr separation @ garage, 1/f- add (n) masterbath, remodel (e) bath. 2/f- remodel kitchen/bathroom, enclose 9e) lightwell @ south. exterior-replace wood windows, stamped stucco @ front with siding, replace roof, 2 new skylights. | $365,000 |
| Jun 16, 2015 | Completed final sign-off Jan 2016 | 807 Noe St | convert 1/f storage room into rec. room, bathroom & closet. enlarge bedroom & add bathroom/dressing room. new foundation.Details
convert 1/f storage room into rec. room, bathroom & closet. enlarge bedroom & add bathroom/dressing room. new foundation. | $55,000 |
| May 20, 2015 | Completed final sign-off Jan 2016 | 807 Noe St | enlarge wall opening between kitchen and dining room on second floor. covert a closet into a new bathroom on the 3rd floor. remodel existing kitchen and second floor bathroom.Details
enlarge wall opening between kitchen and dining room on second floor. covert a closet into a new bathroom on the 3rd floor. remodel existing kitchen and second floor bathroom. | $30,000 |
| Apr 13, 2015 | Completed final sign-off Sep 2015 | 4100 20th St | remodel (e) kitchen, remodel (e) bathrom, add bathroom, replace (e) deck.Details
remodel (e) kitchen, remodel (e) bathrom, add bathroom, replace (e) deck. | $150,000 |
| Apr 7, 2015 | Completed final sign-off Aug 2015 | 119 09th Av | new bathroom and kitchen remodel on 2nd floor. no structural work.Details
new bathroom and kitchen remodel on 2nd floor. no structural work. | $50,000 |
| Feb 13, 2015 | Completed final sign-off May 2015 | 2447 Vallejo St | unit 6. renovate exsting bath with all new fixtures and tile. rearrange interior walls to add new 2nd bedroom. relocate interior doorways at center hall. replace existing glass block window with new fixed.Details
unit 6. renovate exsting bath with all new fixtures and tile. rearrange interior walls to add new 2nd bedroom. relocate interior doorways at center hall. replace existing glass block window with new fixed. | $52,000 |
| Apr 14, 2014 | Completed final sign-off Aug 2014 | 33 Farnum St | removate exisiting bathroom , inatall new tub, fixtures, & tile install new bath fan and recessed light with occupancy sensorDetails
removate exisiting bathroom , inatall new tub, fixtures, & tile install new bath fan and recessed light with occupancy sensor | $10,000 |
| Sep 23, 2013 | Completed final sign-off Apr 2014 | 166 Casitas Av | new stairs & railing at rear yard, new sliding glass door at rear, new windows at side yard. interior renovation on 1st floor-kitchen, bathroom, laundry. remove walls. interior renovation on 2nd floor-master bathroom & closetDetails
new stairs & railing at rear yard, new sliding glass door at rear, new windows at side yard. interior renovation on 1st floor-kitchen, bathroom, laundry. remove walls. interior renovation on 2nd floor-master bathroom & closet | $95,000 |
| Aug 14, 2013 | Completed final sign-off Apr 2014 | 2277 Bryant St | 1) 1st floor: voluntary structural upgrade and expansion of 14 sq ft to accomodate 2nd means of egress. 2)2nd and 3rd floor alterations to residential 2 units: renovate kitchens at both units, new master baths at both units, renovation of 1 extg bath at both units. reframe & change 6 windows.Details
1) 1st floor: voluntary structural upgrade and expansion of 14 sq ft to accomodate 2nd means of egress. 2)2nd and 3rd floor alterations to residential 2 units: renovate kitchens at both units, new master baths at both units, renovation of 1 extg bath at both units. reframe & change 6 windows. | $420,000 |
| Jun 14, 2013 | Completed final sign-off Aug 2013 | 1860 Church St | renovate existing bathroom includes new plumbing fixtures, lighting, exhaust fan, occupancy sensors.Details
renovate existing bathroom includes new plumbing fixtures, lighting, exhaust fan, occupancy sensors. | $15,000 |
| Apr 29, 2013 | Completed final sign-off Aug 2013 | 241 05th Av | main floor-bathroom remodel, relocate single interior non load bearing wall. no change to building envelope.Details
main floor-bathroom remodel, relocate single interior non load bearing wall. no change to building envelope. | $35,000 |
| Feb 5, 2013 | Never finaled issued Feb 2013, no final | 155 States St | bathroom renovation: new plumbing for shower, new tiled shower & floors, new recessed lighting & bath fan, no structural work. permanently installed lights in bathroom shall be high efficacy unless they are controlled bvy manual on occupancy sensors.Details
bathroom renovation: new plumbing for shower, new tiled shower & floors, new recessed lighting & bath fan, no structural work. permanently installed lights in bathroom shall be high efficacy unless they are controlled bvy manual on occupancy sensors. | $15,000 |
| Jul 10, 2012 | Completed final sign-off Aug 2012 | 211 Eureka St | bathroom renovation, install new vanity, toilet, tile, lighting will comply with t-24, install (n) bath exist fan and vent to outside at least 3' away from bldg openingDetails
bathroom renovation, install new vanity, toilet, tile, lighting will comply with t-24, install (n) bath exist fan and vent to outside at least 3' away from bldg opening | $10,000 |
| Apr 30, 2012 | Completed final sign-off Sep 2012 | 1258 33rd Av | interior renovation: add a bathroom to (e) master bedroom. create hallway to back bedroom. install outlets & lighting in 2nd floor. replace gravity furnace with a new high efficiency forced air unit. removal of non structural bearing walls.Details
interior renovation: add a bathroom to (e) master bedroom. create hallway to back bedroom. install outlets & lighting in 2nd floor. replace gravity furnace with a new high efficiency forced air unit. removal of non structural bearing walls. | $15,000 |
| Feb 28, 2012 | Completed final sign-off May 2012 | 634 Miramar Av | remodel of kitchen, removal of home office closet, removal of bedroom closet, construction of 2nd bathroom. relocate laundry to bsmt.Details
remodel of kitchen, removal of home office closet, removal of bedroom closet, construction of 2nd bathroom. relocate laundry to bsmt. | $40,000 |
| Jul 11, 2011 | Completed final sign-off Dec 2011 | 1261 Florida St | remodel of kitchen & bathroom on lower unit (2nd floor).Details
remodel of kitchen & bathroom on lower unit (2nd floor). | $50,126 |
| Jun 22, 2011 | Completed final sign-off Oct 2011 | 670 34th Av | remodel (e) bathroom. add new bathroom within (e) second floor, add 1 skylightDetails
remodel (e) bathroom. add new bathroom within (e) second floor, add 1 skylight | $20,366 |
| Feb 17, 2011 | Completed final sign-off Dec 2011 | 15 North View Ct | remodel rear of garage-add 698 sq ft of habitable space. new stairs, new doors & windows/wood. remodel bathroom, closet on 2nd floorDetails
remodel rear of garage-add 698 sq ft of habitable space. new stairs, new doors & windows/wood. remodel bathroom, closet on 2nd floor | $115,000 |
| Aug 24, 2010 | Completed final sign-off Dec 2010 | 3633 23rd St | remodel (e) bathroom & water closet - see plans; additon of (1) toilet & (1) sink; replace (2) lightwell windows; remodel (e) kitchen, pull & replace cabinets, flooring & appliancesDetails
remodel (e) bathroom & water closet - see plans; additon of (1) toilet & (1) sink; replace (2) lightwell windows; remodel (e) kitchen, pull & replace cabinets, flooring & appliances | $25,000 |
| Jul 8, 2010 | Completed final sign-off Dec 2010 | 95 Eagle St | master bedroom and bathroom renovation. upgrade plumbing and electrical fixtures. nes window at rear in existing opening , not visible from street. tile shower and floor. work on 2nd floor.Details
master bedroom and bathroom renovation. upgrade plumbing and electrical fixtures. nes window at rear in existing opening , not visible from street. tile shower and floor. work on 2nd floor. | $20,000 |
| Jul 2, 2010 | Completed final sign-off Nov 2010 | 521 Laidley St | 1st floor:replace garage door&garage entry doors;master bedroom/bath/closet remodel;relocate water heater &laundry;replace back window. 2nd floor:replace 1 wall with two structural columns and beam;remodel kitchen w/lights,cabs,cntrs,appliances; lights/elctr. in liv.rm.;new flooringDetails
1st floor:replace garage door&garage entry doors;master bedroom/bath/closet remodel;relocate water heater &laundry;replace back window. 2nd floor:replace 1 wall with two structural columns and beam;remodel kitchen w/lights,cabs,cntrs,appliances; lights/elctr. in liv.rm.;new flooring | $175,000 |
| Dec 4, 2009 | Completed final sign-off Mar 2010 | 4640 18th St | demolish some interior walls, cabinets & appliances in (e) kitchen & bathrooms as shown. replace with new cabinets, appliances, finishes. add rear window to nookDetails
demolish some interior walls, cabinets & appliances in (e) kitchen & bathrooms as shown. replace with new cabinets, appliances, finishes. add rear window to nook | $28,800 |
| Nov 25, 2009 | Completed final sign-off Feb 2010 | 95 Eagle St | demo existing kids bath. new plumbing, elec fixtures, tile, vanity.Details
demo existing kids bath. new plumbing, elec fixtures, tile, vanity. | $20,000 |
| Apr 20, 2009 | Completed final sign-off Aug 2009 | 1259 Florida St | demo extg kitchen, bathroom, dining room, bedroom:upgrade electrical and plmg to meet sf bldg codes. install new cabnets and appliances in kitchens. install new tile and fixtures in bathroom. install new forced air heating, replace single pane wndw with double pane.Details
demo extg kitchen, bathroom, dining room, bedroom:upgrade electrical and plmg to meet sf bldg codes. install new cabnets and appliances in kitchens. install new tile and fixtures in bathroom. install new forced air heating, replace single pane wndw with double pane. | $40,000 |
| Feb 14, 2008 | Completed final sign-off May 2008 | 4638 18th St | remodel (e) bathroom adding new plumbing and electrical fixtures and new tile.Details
remodel (e) bathroom adding new plumbing and electrical fixtures and new tile. | $15,000 |
| Sep 20, 2006 | Completed final sign-off Mar 2007 | 106 Collins St | demo (e) bathroom & guestroom. new plumbing fixtures & electrical fixtures in bathroom. new tile, new electrical & sheetrock in guestroom. high efficiency lighting @ bathroom.Details
demo (e) bathroom & guestroom. new plumbing fixtures & electrical fixtures in bathroom. new tile, new electrical & sheetrock in guestroom. high efficiency lighting @ bathroom. | $20,000 |