Block 4268, lot 053
1261 Florida St
- City’s use
- Single Family Residential
- Built
- 1913
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,216 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 1261 Florida St | street spaceDetails
street space | ||
| Oct 4, 2019 | Completed final sign-off Feb 2020 | 1261 Florida St | Golden Gate Enterprises Inc. | revision to existing permit 201910033465 per building inspector request. repair and replace rotted siding/framing as needed around all 12 windows and shear wall. 12 windows are in same size/location as original. framing replace in like kind window locations per attached schedule... (see permit).Details
revision to existing permit 201910033465 per building inspector request. repair and replace rotted siding/framing as needed around all 12 windows and shear wall. 12 windows are in same size/location as original. framing replace in like kind window locations per attached schedule... (see permit). | |
| Oct 3, 2019 | Completed final sign-off Feb 2020 | 1261 Florida St | Golden Gate Enterprises Inc. | 2/f: repair front per associated dryrot. replace 4 windows on side of house same openings title 24 compliant windows.Details
2/f: repair front per associated dryrot. replace 4 windows on side of house same openings title 24 compliant windows. | $10,000 |
| Apr 17, 2019 | Completed final sign-off Feb 2020 | 1261 Florida St | Golden Gate Enterprises Inc. | replace 7 windows on the front and 1 on the side.Details
replace 7 windows on the front and 1 on the side. | $25,000 |
| Jun 1, 2012 | Completed final sign-off Jul 2012 | 1261 Florida St | Urban Builder General Contracting Inc | new powder room made by enclosing a extg space. all new walls to be painted gypsum board.there will be a new sink, cabinet, faucet and toilet. there wil be a new interior sconce and fan.Details
new powder room made by enclosing a extg space. all new walls to be painted gypsum board.there will be a new sink, cabinet, faucet and toilet. there wil be a new interior sconce and fan. | $10,000 |
| Jul 11, 2011 | Completed final sign-off Dec 2011 | 1261 Florida St | Urban Builder General Contracting Inc | remodel of kitchen & bathroom on lower unit (2nd floor).Details
remodel of kitchen & bathroom on lower unit (2nd floor). | $50,126 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Golden Gate Enterprises Inc. (3), Urban Builder General Contracting Inc (2)
- Engineers
- Seyed Noorbakhsh
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.