Block 0523, lot 013
1472 Filbert St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 6
- Units
- 73
- Rooms
- 26 bedrooms, 73 bathrooms
- Building
- 51,660 sq ft
- Lot
- 11,627 sq ft
- Zoning
- RM3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2022 | Completed final sign-off Mar 2023 | 1472 Filbert St | Brighter Bay Builders Inc | 405: new bedroom. new kitchen cabinets and new plumbing fixtures. new dishwasher & washer/dryer. new lighting at (e) j-boxes. no change to mechanical. no exterior work. no fire alarm work or sprinkler work. no structural work.Details
405: new bedroom. new kitchen cabinets and new plumbing fixtures. new dishwasher & washer/dryer. new lighting at (e) j-boxes. no change to mechanical. no exterior work. no fire alarm work or sprinkler work. no structural work. | $65,000 |
| May 3, 2022 | Never finaled issued Jul 2022, no final | 1472 Filbert St | Holland Brooks Builders Inc | renovation of 1 apt unit #201 on the 3rd level. new bedroom. new kitchen cabinets and new plmg fixtures. new dishwasher and washer/dryer. new lighting at extg j-boxes . no change to mechanical. no exterior work, no fire alarm, or sprinkler. no structural work.Details
renovation of 1 apt unit #201 on the 3rd level. new bedroom. new kitchen cabinets and new plmg fixtures. new dishwasher and washer/dryer. new lighting at extg j-boxes . no change to mechanical. no exterior work, no fire alarm, or sprinkler. no structural work. | $65,000 |
| May 7, 2021 | Completed final sign-off Sep 2021 | 1472 Filbert St | unit #602: new bedroom, new kitchen cabinets, new plumbing fixtures, new dishwasher, and washer/dryer. new lighting at (e) j-boxes. no change to mechanical. no exterior work, no fire alarm, or sprinkler. no structural workDetails
unit #602: new bedroom, new kitchen cabinets, new plumbing fixtures, new dishwasher, and washer/dryer. new lighting at (e) j-boxes. no change to mechanical. no exterior work, no fire alarm, or sprinkler. no structural work | $65,000 | |
| Feb 26, 2021 | Never finaled issued May 2021, no final | 1472 Filbert St | Holland Brooks Builders Inc | #302: renovation of 1 apartment: unit 302 on 4th level. new bedroom, new kitchen cabinets and new plumbing fixtures. new dishwasher & washer/dryer. new lighting at (e) j-boxes. no change to mechanical. no exterior work, no fire alarm, or sprinkler.no structural work.Details
#302: renovation of 1 apartment: unit 302 on 4th level. new bedroom, new kitchen cabinets and new plumbing fixtures. new dishwasher & washer/dryer. new lighting at (e) j-boxes. no change to mechanical. no exterior work, no fire alarm, or sprinkler.no structural work. | $65,000 |
| Jan 26, 2021 | Never finaled issued Jan 2021, no final | 1472 Filbert St | San Francisco Fire Protection | as-built plans, heat detectors removed from ground floor smoke detectors in front of elevators removed reference number # 2020 0206 3749Details
as-built plans, heat detectors removed from ground floor smoke detectors in front of elevators removed reference number # 2020 0206 3749 | |
| Oct 29, 2020 | Never finaled filed Oct 2020, never issued | 1472 Filbert St | adding four (4) units on first level per ordinance 162-16. convert existing parking into new dwelling units within (e) envelope. new bedrooms, new bathrooms, new dishwashers, new washer/dryers. new windows.Details
adding four (4) units on first level per ordinance 162-16. convert existing parking into new dwelling units within (e) envelope. new bedrooms, new bathrooms, new dishwashers, new washer/dryers. new windows. | $500,000 | |
| Aug 26, 2020 | Completed final sign-off Mar 2021 | 1472 Filbert St | Brighter Bay Builders Inc | renovation of 3 apts - units #206 on 3rd fl, unit 411 on 5th fl, unit 612 on 7th fl, new bedrooms & bathrooms, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no exterior work, fire alarm or sprinkler. no structural work.Details
renovation of 3 apts - units #206 on 3rd fl, unit 411 on 5th fl, unit 612 on 7th fl, new bedrooms & bathrooms, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no exterior work, fire alarm or sprinkler. no structural work. | $150,000 |
| Feb 11, 2020 | Completed final sign-off Mar 2021 | 1472 Filbert St | Brighter Bay Builders Inc | renovation of 3 apts - units #102 on 2nd fl, unit 208 on 3rd fl, unit 401 on 5th fl, new bedrooms & bathrooms, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. no structural.Details
renovation of 3 apts - units #102 on 2nd fl, unit 208 on 3rd fl, unit 401 on 5th fl, new bedrooms & bathrooms, new kitchen, cabinets & plumbing fixtures, new washer/dryers & dishwashers, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. no structural. | $195,000 |
| Feb 6, 2020 | Completed final sign-off Feb 2021 | 1472 Filbert St | San Francisco Fire Protection | like for like upgrade & 2021 mandate fire alarm system in sprinkler building. replace existing facu with new ifp-75, pull station & bells. new aes7707, power supply, smoke detector, heat detector, low frequency & modules.Details
like for like upgrade & 2021 mandate fire alarm system in sprinkler building. replace existing facu with new ifp-75, pull station & bells. new aes7707, power supply, smoke detector, heat detector, low frequency & modules. | $90,500 |
| Nov 20, 2019 | Completed final sign-off Oct 2020 | 1472 Filbert St | Sure, Inc. | unit 304, 4th fl - reno new bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lighting @ (e) j-boxes. no change to mechanical, no exterior work, fire alarm or sprinkler, no structure work neededDetails
unit 304, 4th fl - reno new bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer & dishwasher. new lighting @ (e) j-boxes. no change to mechanical, no exterior work, fire alarm or sprinkler, no structure work needed | $65,000 |
| Oct 29, 2019 | Completed final sign-off Oct 2020 | 1472 Filbert St | Sure, Inc. | renovation of 2 apts unit 502 6th lvl and 611 on 7th lvl. new bedrms. new kitchen cabinets, plumb fixtures. new washer/dryer dishwasher. new lighting e jboxes. no change to mech. no exterior work fire alarm, no sprinlker workDetails
renovation of 2 apts unit 502 6th lvl and 611 on 7th lvl. new bedrms. new kitchen cabinets, plumb fixtures. new washer/dryer dishwasher. new lighting e jboxes. no change to mech. no exterior work fire alarm, no sprinlker work | $135,000 |
| Jun 20, 2019 | Completed final sign-off Oct 2020 | 1472 Filbert St | Sure, Inc. | renovation of (10) apartments: units 108, 209, 212, 305, 403, 404, 409, 507, 511, 605. new bedrooms, bathrooms, dishwasher, washer/dryers, kitchen cabinets, plumbing fixtures, lighting at (e) j-boxes. no change to mechanical, exterior work, fire alarm or sprinkler work. no structural work.Details
renovation of (10) apartments: units 108, 209, 212, 305, 403, 404, 409, 507, 511, 605. new bedrooms, bathrooms, dishwasher, washer/dryers, kitchen cabinets, plumbing fixtures, lighting at (e) j-boxes. no change to mechanical, exterior work, fire alarm or sprinkler work. no structural work. | $750,000 |
| Aug 15, 2018 | Completed final sign-off May 2019 | 1472 Filbert St | Sure, Inc. | renovation of 3 apartments units 106, 107 and 308. new kitchens, new plumbing, new lighting, new finishes, new bedrooms. add washer/dryers, add dishwashers. no change to mechanical, no exterior work, no fire alarm or sprinkler work. no structural workDetails
renovation of 3 apartments units 106, 107 and 308. new kitchens, new plumbing, new lighting, new finishes, new bedrooms. add washer/dryers, add dishwashers. no change to mechanical, no exterior work, no fire alarm or sprinkler work. no structural work | $90,000 |
| May 24, 2018 | Completed final sign-off May 2019 | 1472 Filbert St | Sure, Inc. | renovation of 12 apartments: 109, 110, 205, 210, 309, 310, 312, 408, 412, 508, 509 & 606. new: kitchen cabinets, plm fixtures, lighting, finishes. add w/d. no change to mech or exterior. no fire alarm or sprinkler work maher naDetails
renovation of 12 apartments: 109, 110, 205, 210, 309, 310, 312, 408, 412, 508, 509 & 606. new: kitchen cabinets, plm fixtures, lighting, finishes. add w/d. no change to mech or exterior. no fire alarm or sprinkler work maher na | $100,000 |
| May 22, 2018 | Completed final sign-off Nov 2018 | 1472 Filbert St | Sure, Inc. | unit #a: kitchen and bath remodeling approx 8x10 kitchen; approx 5x7bath; n/a maherDetails
unit #a: kitchen and bath remodeling approx 8x10 kitchen; approx 5x7bath; n/a maher | $30,000 |
| Feb 22, 2017 | Expired or cancelled cancelled Jan 2026 | 1472 Filbert St | replace (e) handrail at one i(e) interior stair for barrier removal to meet current code reqs. new handrail to match (e) arch style o f the interior bld. no exterior work maher naDetails
replace (e) handrail at one i(e) interior stair for barrier removal to meet current code reqs. new handrail to match (e) arch style o f the interior bld. no exterior work maher na | $4,000 | |
| Jan 24, 2017 | Completed final sign-off Apr 2017 | 1472 Filbert St | Brady Construction | unit #311 only - remove & replace kitchen cabinets in kind. install new countertop, in bathroom removes ceramic tiles on floor, vanity cabinet, install new cermaic tile floor and new vanity cabinet. no wall changes.Details
unit #311 only - remove & replace kitchen cabinets in kind. install new countertop, in bathroom removes ceramic tiles on floor, vanity cabinet, install new cermaic tile floor and new vanity cabinet. no wall changes. | $28,000 |
| Oct 3, 2014 | Completed final sign-off Jan 2015 | 1472 Filbert St | Brady Construction | unit 305 only. remove and replace kitchen cabinets in kind. install new countertop. bathroom remove ceramic tile around bathtub walls and floor. new vanity cabinet. new ceramic tile on bath tud walls and floor. no structural workDetails
unit 305 only. remove and replace kitchen cabinets in kind. install new countertop. bathroom remove ceramic tile around bathtub walls and floor. new vanity cabinet. new ceramic tile on bath tud walls and floor. no structural work | $25,500 |
| May 2, 2012 | Completed final sign-off Jun 2012 | 1472 Filbert St | Brady Construction | work in unit 510 only: in bathroom, remove ceramic tile around bath tub walls, install tub/shower pressure balance valve, type x 5/8' purple drywall around batht tub walls, ceramic tile to finish tub walls in a mortar base, no new lighting replace vanity cabinet & top. in kitchen: repl formicaDetails
work in unit 510 only: in bathroom, remove ceramic tile around bath tub walls, install tub/shower pressure balance valve, type x 5/8' purple drywall around batht tub walls, ceramic tile to finish tub walls in a mortar base, no new lighting replace vanity cabinet & top. in kitchen: repl formica | $5,200 |
| Mar 30, 2012 | Completed final sign-off May 2012 | 1472 Filbert St | Brady Construction | work in unit #308 only: in bathroom remove ceramic tile around bath tub, walls and floor,install tub/shower pressure balance valve, type x 5/8" purple drywall arnd bath tub walls, new vanity cabinet & top, ceramic tile in a mortar base on tub walls and floor no new lighting in kitchen: repl counterDetails
work in unit #308 only: in bathroom remove ceramic tile around bath tub, walls and floor,install tub/shower pressure balance valve, type x 5/8" purple drywall arnd bath tub walls, new vanity cabinet & top, ceramic tile in a mortar base on tub walls and floor no new lighting in kitchen: repl counter | $6,500 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 1472 Filbert St | Brady Construction | #401- in bathroom, remove ceramic tile at tub walls and floor, install pressure balance valve @ tub, install type x 5/8" purple dry wall and ceramic tile in a mortar base, replace vanity cabinet & sink, toilet & med. cabinet. in kitchen, replace kitchen cabinets in kind along with counter top,Details
#401- in bathroom, remove ceramic tile at tub walls and floor, install pressure balance valve @ tub, install type x 5/8" purple dry wall and ceramic tile in a mortar base, replace vanity cabinet & sink, toilet & med. cabinet. in kitchen, replace kitchen cabinets in kind along with counter top, | $17,500 |
| Feb 17, 2010 | Completed final sign-off Mar 2010 | 1472 Filbert St | Brady Construction | unit # 411. bathroom remodel. remove ceramic tile around bath tub walls. install tub/shower pressure balance valve. install 5/8" type x drywall around bath, tub walls. install ceramic tile in a mortar base around bath tub walls. new vanity cabinet & top. no new lighting.Details
unit # 411. bathroom remodel. remove ceramic tile around bath tub walls. install tub/shower pressure balance valve. install 5/8" type x drywall around bath, tub walls. install ceramic tile in a mortar base around bath tub walls. new vanity cabinet & top. no new lighting. | $4,700 |
| Jan 22, 2010 | Expired or cancelled suspend Aug 2025 | 1472 Filbert St | work on unit#205 only; in bathrm., remove ceramic tile around bathtub walls. install tub/shower pressure balance valve. install 5/8" type 'x' drywall around bath tub walls, install ceramic tile in a mortar base around bath tub walls. remove & replace vanity cabinet & countertop along w/(n) facet(n).Details
work on unit#205 only; in bathrm., remove ceramic tile around bathtub walls. install tub/shower pressure balance valve. install 5/8" type 'x' drywall around bath tub walls, install ceramic tile in a mortar base around bath tub walls. remove & replace vanity cabinet & countertop along w/(n) facet(n). | $4,700 | |
| Jan 22, 2010 | Completed final sign-off Feb 2010 | 1472 Filbert St | Brady Construction | work in unit 205. in bath remove/replace ceramic tile around tub. press valve, 5/9" type x drywall, new cabinet, countertop along with faucet. no new lightingDetails
work in unit 205. in bath remove/replace ceramic tile around tub. press valve, 5/9" type x drywall, new cabinet, countertop along with faucet. no new lighting | $4,700 |
| Nov 16, 2009 | Completed final sign-off Dec 2009 | 1472 Filbert St | Brady Construction | work in unit #105 only, i bathroom: remove ceramic tile around bathtub walls. install tub/shower pressure balance valve,install 5/8" type z drywall around bathtub walls.install cermic tile in a mortar bage around bathtub walls, remove & replace vanity cabinet &countertop along w/faucet.no new lightgDetails
work in unit #105 only, i bathroom: remove ceramic tile around bathtub walls. install tub/shower pressure balance valve,install 5/8" type z drywall around bathtub walls.install cermic tile in a mortar bage around bathtub walls, remove & replace vanity cabinet &countertop along w/faucet.no new lightg | $5,500 |
| Oct 7, 2009 | Completed final sign-off Oct 2009 | 1472 Filbert St | Brady Construction | unit # 412. bathroom, remove & replace ceramic, tile around bathtub walls &floors. install type x 5/8" drywall around bath tub walls, vanity sink to be replaced. kitchen. remove replace counter top and sink. in kind.Details
unit # 412. bathroom, remove & replace ceramic, tile around bathtub walls &floors. install type x 5/8" drywall around bath tub walls, vanity sink to be replaced. kitchen. remove replace counter top and sink. in kind. | $10,700 |
| Aug 3, 2009 | Completed final sign-off Aug 2009 | 1472 Filbert St | Brady Construction | work in unit 605. in bath, remove and replace ceramic tile around bathtub walls and on bath floor. install tub/shoer pressure balance valve, install 5/8" type x drywall around bath. lay new ceramic tile in mortar base around bath tub walls and on floor. change vanity cabinet, sinktop and faucetDetails
work in unit 605. in bath, remove and replace ceramic tile around bathtub walls and on bath floor. install tub/shoer pressure balance valve, install 5/8" type x drywall around bath. lay new ceramic tile in mortar base around bath tub walls and on floor. change vanity cabinet, sinktop and faucet | $5,200 |
| Oct 1, 2007 | Completed final sign-off Oct 2007 | 1472 Filbert St | Brady Construction | work on unit#108 only. in bathroom, remove and replace ceramic tile around bathtub and bathroom floor, new ceramic tile on floor and bathtub walls to be in a morton base. bath tub walls to also have 5/8" green drywall beneath morton base.change vanity cabinet, sink top and faucet, n o structuralDetails
work on unit#108 only. in bathroom, remove and replace ceramic tile around bathtub and bathroom floor, new ceramic tile on floor and bathtub walls to be in a morton base. bath tub walls to also have 5/8" green drywall beneath morton base.change vanity cabinet, sink top and faucet, n o structural | $6,400 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.