Block 0651, lot 020
2159 California St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 11
- Rooms
- 11 bathrooms
- Building
- 7,385 sq ft
- Lot
- 3,767 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2021 | Completed final sign-off Dec 2021 | 2159 California St | M Bay Area Construction Inc | unit 1a, 1b, 3: in kind kitchen and one bathroom remodel. unit 2: in kind kitchen and one bathroom remodel, and wood panels/plaster for drywall.Details
unit 1a, 1b, 3: in kind kitchen and one bathroom remodel. unit 2: in kind kitchen and one bathroom remodel, and wood panels/plaster for drywall. | $80,000 |
| Apr 19, 2021 | Completed final sign-off Dec 2021 | 2159 California St | M Bay Area Construction Inc | install new laundry room at location of extg bathroom at 3rd floor common area.Details
install new laundry room at location of extg bathroom at 3rd floor common area. | $5,000 |
| Mar 22, 2021 | Completed final sign-off Dec 2021 | 2159 California St | M Bay Area Construction Inc | unit 1a: demo bathroom & kitchen, no walls moved/removed, demo only.Details
unit 1a: demo bathroom & kitchen, no walls moved/removed, demo only. | $10,000 |
| Oct 21, 2020 | Expired or cancelled cancelled Feb 2021 | 2159 California St | M Bay Area Construction Inc | unit 5: in kind kitchen remodelDetails
unit 5: in kind kitchen remodel | $25,000 |
| Dec 6, 2018 | Never finaled issued Dec 2018, no final | 2159 California St | street spaceDetails
street space | ||
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 2159 California St | street spaceDetails
street space | ||
| Oct 6, 2017 | Never finaled issued Oct 2017, no final | 2159 California St | street space permit - renewal of permit # m778467Details
street space permit - renewal of permit # m778467 | ||
| Sep 12, 2017 | Completed final sign-off Mar 2018 | 2159 California St | revision to pa 2017-0711-1549 structural changes only to reflect as built conditionsDetails
revision to pa 2017-0711-1549 structural changes only to reflect as built conditions | ||
| Jul 11, 2017 | Completed final sign-off Mar 2018 | 2159 California St | Sf Twin Boys Corp. Dba Master Builders | revision to app#201612285999. relocate electrical panel. unit 8: eliminate window and change furnace location. unit 9a: replace interior stair in kind, change window type . retain chimneys thoughout, retain crawlspace at entry.Details
revision to app#201612285999. relocate electrical panel. unit 8: eliminate window and change furnace location. unit 9a: replace interior stair in kind, change window type . retain chimneys thoughout, retain crawlspace at entry. | |
| Jun 9, 2017 | Completed final sign-off Mar 2018 | 2159 California St | Sf Twin Boys Corp. Dba Master Builders | revisionto 201612165142: shear walls; adjusted structural engineering plans for unexpected chimneys.Details
revisionto 201612165142: shear walls; adjusted structural engineering plans for unexpected chimneys. | $20,000 |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 2159 California St | street spaceDetails
street space | ||
| Dec 28, 2016 | Completed final sign-off Mar 2019 | 2159 California St | Sf Twin Boys Corp. Dba Master Builders | units #8,9a & 9b: demolish rear deck & storage room, remodel/reconfigure three (3) apartment units @ ground floor incl kitchens,baths,windows finishes & fixtures. mep and f/a under separate permit.Details
units #8,9a & 9b: demolish rear deck & storage room, remodel/reconfigure three (3) apartment units @ ground floor incl kitchens,baths,windows finishes & fixtures. mep and f/a under separate permit. | $100,000 |
| Dec 16, 2016 | Completed final sign-off Mar 2019 | 2159 California St | Sf Twin Boys Corp. Dba Master Builders | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $120,000 |
| May 28, 2013 | Never finaled issued May 2013, no final | 2159 California St | Brady Construction | repair deteriorated posts and rails at rear roof deck less than 50% replacement in kind.Details
repair deteriorated posts and rails at rear roof deck less than 50% replacement in kind. | $1,800 |
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 2159 California St | street space permit ( 201212105804)Details
street space permit ( 201212105804) | ||
| Dec 10, 2012 | Completed final sign-off Mar 2013 | 2159 California St | unit #5 only, 3rd fl. one bathroom addition that includes sink, toilet & bathtub. no exterior or structural work & no windows or exterior doors.Details
unit #5 only, 3rd fl. one bathroom addition that includes sink, toilet & bathtub. no exterior or structural work & no windows or exterior doors. | $19,500 | |
| Oct 17, 2012 | Completed final sign-off Jul 2013 | 2159 California St | partial foundation replacement along east property line per plans approx 27'-0"Details
partial foundation replacement along east property line per plans approx 27'-0" | $6,500 | |
| Jul 10, 2012 | Never finaled issued Jul 2012, no final | 2159 California St | street space &Details
street space & | ||
| May 29, 2012 | Never finaled issued May 2012, no final | 2159 California St | street spaceDetails
street space | ||
| May 25, 2012 | Completed final sign-off Aug 2019 | 2159 California St | Gateway Roofing And Water Proofing Inc | reroofingDetails
reroofing | $24,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.