Andy Lin
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Jensen Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Mar 2026
215 permits since 2000 (architect on 209 permits, authorized agent-others on 4 permits, designer on 4 permits, engineer on 1 permit): 141 completed, 7 in progress, 35 never finaled, 32 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 215.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 12, 2026 | In progress issued Apr 2026 | 2471 Washington St | Achill Beg Construction Inc | rear building: demolition of a 1-story commercial type v-b building.Details
rear building: demolition of a 1-story commercial type v-b building. | $2,500 |
| Dec 3, 2025 | In progress filed Dec 2025, not yet issued | 2471 Washington St | Achill Beg Construction Inc | construction of a new 2 unit residential type-v building.Details
construction of a new 2 unit residential type-v building. | $2,400,000 |
| Feb 25, 2025 | In progress filed Feb 2025, not yet issued | 401 Hunters Point Bl | Clark Construction Group Ca Lp | proj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc.Details
proj-25-0614:ancillary site structures for indian basin shoreline park, including shade structure, pergola, playground structures, misc. structures > 4' in height including retaining walls etc. | $200,000 |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 333 Dolores St | Guzman Construction Group Inc. | revision to addendum #3 of 202209071941 to memorialize allowable age group in specific classrooms per 2019 cbc occupancy group e definitionsDetails
revision to addendum #3 of 202209071941 to memorialize allowable age group in specific classrooms per 2019 cbc occupancy group e definitions | |
| May 14, 2024 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | revision to addendum #2 (foundation and structure) of pa# 202209071941: to remove (2) windows from east elevation in accordance with changes made during plan check revisions of addendum #3 (amep).Details
revision to addendum #2 (foundation and structure) of pa# 202209071941: to remove (2) windows from east elevation in accordance with changes made during plan check revisions of addendum #3 (amep). | |
| Apr 4, 2024 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | rev to pa2022-0907-1941 to remove fire rating from window 111e. opening to be projected with water curtain per cbc.705.8.2 exceptionDetails
rev to pa2022-0907-1941 to remove fire rating from window 111e. opening to be projected with water curtain per cbc.705.8.2 exception | |
| Jan 18, 2024 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | revision to pa# 202209071941, amep to incorporate machine room for lula elevator into the propose design.Details
revision to pa# 202209071941, amep to incorporate machine room for lula elevator into the propose design. | $5,000 |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 401 Hunters Point Bl | Clark Construction Group Ca Lp | proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge.Details
proj-25-0614:indian basin shoreline park project includes a series of wood terraces extending into the park along the hunter's point blvd sidewalk.a great lawn framed by 2 concrete pathways & stairs that connect the wood decks to the gravel shore @ the water's edge. | $29,000,000 |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 401 Hunters Point Bl | Clark Construction Group Ca Lp | proj-25-0614:erect a one story public restroom. type vb.Details
proj-25-0614:erect a one story public restroom. type vb. | $500,000 |
| Oct 25, 2023 | In progress filed Oct 2023, not yet issued | 401 Hunters Point Bl | Clark Construction Group Ca Lp | proj-25-0614:erect a one story storage and recreation building (boat house)- type vb.Details
proj-25-0614:erect a one story storage and recreation building (boat house)- type vb. | $2,000,000 |
| Aug 4, 2023 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | civil stormwatr design & building plumbing design associated with bpa#202209071941Details
civil stormwatr design & building plumbing design associated with bpa#202209071941 | |
| Mar 31, 2023 | Completed final sign-off Aug 2023 | 1201 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | new temporary non-structural partitions within an existing factory warehouse bldg in pdr-1-g district to serve the approved temp use as exhibition space. supplmental accessibility upgrades include 3-pt panic hardware exit doors, new grab bars & accessories at e restrooms & new illuminated exit signsDetails
new temporary non-structural partitions within an existing factory warehouse bldg in pdr-1-g district to serve the approved temp use as exhibition space. supplmental accessibility upgrades include 3-pt panic hardware exit doors, new grab bars & accessories at e restrooms & new illuminated exit signs | $42,500 |
| Feb 28, 2023 | Expired or cancelled cancelled Jan 2026 | 3271 16th St | prop h - temporary change of use of (e) business space to education, in order to provide temporary classroom space during construction of new school bldg at adjacent property 333 dolores st (site pa #202209071941). no proposed demo or construction. no change to (e) school enrollment.Details
prop h - temporary change of use of (e) business space to education, in order to provide temporary classroom space during construction of new school bldg at adjacent property 333 dolores st (site pa #202209071941). no proposed demo or construction. no change to (e) school enrollment. | ||
| Jan 23, 2023 | Completed final sign-off Sep 2023 | 333 Dolores St | Guzman Construction Group Inc. | demolition of three (3) existing portable buildings and other miscellaneous site elements in preparation for a new construction project. no work at the existing st. joseph's hall building.Details
demolition of three (3) existing portable buildings and other miscellaneous site elements in preparation for a new construction project. no work at the existing st. joseph's hall building. | $17,000 |
| Sep 7, 2022 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | erect a 1 story preschool bldg,no dwelling,no basement.type -vDetails
erect a 1 story preschool bldg,no dwelling,no basement.type -v | $7,500,000 |
| Feb 14, 2022 | Completed final sign-off Mar 2023 | 1405 Indiana St | Johnstone - Mc Auliffe Const. Inc. | t.i. warehouse/accessory office, new non-load-bearing interior partitions, ceilings & finishes. no structural/exterior work, no new plumbing fixtures. mep/life safety/sprinkler/emer lighting permits under separate submittals.Details
t.i. warehouse/accessory office, new non-load-bearing interior partitions, ceilings & finishes. no structural/exterior work, no new plumbing fixtures. mep/life safety/sprinkler/emer lighting permits under separate submittals. | $459,182 |
| Jan 3, 2022 | Never finaled filed Jan 2022, never issued | 901 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | demo (e) partitions, (n) art gall space, (n) plumb fixtrs. change of land use-retail to arts activity, change occupancy type b occupancy to type a-3. installation of security gates at recess entry & exit.Details
demo (e) partitions, (n) art gall space, (n) plumb fixtrs. change of land use-retail to arts activity, change occupancy type b occupancy to type a-3. installation of security gates at recess entry & exit. | $170,000 |
| Dec 23, 2021 | Expired or cancelled withdrawn Mar 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | install 1 electric double faced projecting sign: "ideo"Details
install 1 electric double faced projecting sign: "ideo" | $3,000 |
| Aug 25, 2021 | Completed final sign-off Mar 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | deferred health permit submittal work specific to boh kitchen & food equipment for pa 2020-1221-1460. mep under pa 2021-0816-6500Details
deferred health permit submittal work specific to boh kitchen & food equipment for pa 2020-1221-1460. mep under pa 2021-0816-6500 | |
| Jul 9, 2021 | Never finaled issued Mar 2022, no final | 1755 Egbert Av | C. Overaa & Co | pid review of storm water control plan. plumbing scope reference bpa 202103196889Details
pid review of storm water control plan. plumbing scope reference bpa 202103196889 | $18,000 |
| May 21, 2021 | Completed final sign-off Mar 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | new roof deck addition to an (e) building. new structural steel framing & concrete deck. elevator & stair extention including penthouse enclosure & (n) skylightsDetails
new roof deck addition to an (e) building. new structural steel framing & concrete deck. elevator & stair extention including penthouse enclosure & (n) skylights | $1,000,000 |
| Mar 24, 2021 | Completed final sign-off Oct 2025 | 900 Innes Av | Swinerton Builders | erect a 2 stories food concessions & public restroom,type vb with no basements,no dwellings.Details
erect a 2 stories food concessions & public restroom,type vb with no basements,no dwellings. | $2,220,000 |
| Mar 24, 2021 | Completed final sign-off Oct 2025 | 900 Innes Av | Swinerton Builders | erect a 1 story community pavillion,no dwellings, no basements. type vb bldgDetails
erect a 1 story community pavillion,no dwellings, no basements. type vb bldg | $1,200,000 |
| Mar 24, 2021 | Completed final sign-off Oct 2025 | 900 Innes Av | Swinerton Builders | erect a 1 story office, storage,no dwellings,no basement. type vb bldgDetails
erect a 1 story office, storage,no dwellings,no basement. type vb bldg | $1,000,000 |
| Mar 23, 2021 | Completed final sign-off Oct 2025 | 900 Innes Av | Swinerton Builders | includes the rehabilitation & rescue of a historic landmark residential building (landmark #250)Details
includes the rehabilitation & rescue of a historic landmark residential building (landmark #250) | $1,868,000 |
| Mar 19, 2021 | Never finaled issued Apr 2022, no final | 1755 Egbert Av | C. Overaa & Co | priority process. erect 1 story, type 2b, pg&e electric utility switchstationDetails
priority process. erect 1 story, type 2b, pg&e electric utility switchstation | $9,000,000 |
| Feb 16, 2021 | Completed final sign-off Mar 2022 | 2525 16th St | Brennan Strong Hold Construction Inc | flrs 2,3,4: interior demo of non sturctural, non load bearing walls. no exterior work,. egress components to remain free and clar for operation. fire alarm and fire sprinklers to remain in working order.remain vacancy per ab-017Details
flrs 2,3,4: interior demo of non sturctural, non load bearing walls. no exterior work,. egress components to remain free and clar for operation. fire alarm and fire sprinklers to remain in working order.remain vacancy per ab-017 | $80,000 |
| Dec 22, 2020 | Completed final sign-off Jan 2022 | 1041 25th St | Johnstone - Mc Auliffe Const. Inc. | interior tenant improvements within a one-story building in a pdr-1-g district. new interior partitions & finishes for art packaging & distribution facility.. m.e.p. will be under separate permit. no structural or exterior work.Details
interior tenant improvements within a one-story building in a pdr-1-g district. new interior partitions & finishes for art packaging & distribution facility.. m.e.p. will be under separate permit. no structural or exterior work. | $240,000 |
| Dec 21, 2020 | Completed final sign-off Mar 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | ti to an (e) office building. scope of work consist of (n) office space including (n) interconnecting stair. additional scope includes restrooms, kitchen/dining areas, shop facilities, & other office support spaces. minor exterior work includes new storefront entries & infill (e) openings.Details
ti to an (e) office building. scope of work consist of (n) office space including (n) interconnecting stair. additional scope includes restrooms, kitchen/dining areas, shop facilities, & other office support spaces. minor exterior work includes new storefront entries & infill (e) openings. | $11,000,000 |
| Nov 13, 2020 | Completed final sign-off Jun 2021 | 3725 Washington St | Upscale Construction Inc. | the permit scope consists of revision to approved building permit application #2015-0522-7038 s/r2. the revision consists of a metal balustrade to replace existing balustrade, a base detail articulation at the front facade, and landscape accent uplighting at the front facade street level.Details
the permit scope consists of revision to approved building permit application #2015-0522-7038 s/r2. the revision consists of a metal balustrade to replace existing balustrade, a base detail articulation at the front facade, and landscape accent uplighting at the front facade street level. | $10,000 |
| Mar 11, 2020 | Expired or cancelled withdrawn Dec 2020 | 2525 16th St | Stronghold Builders Inc | building alterations to comply with accessible buiness entrance program per ordinance 51-16.Details
building alterations to comply with accessible buiness entrance program per ordinance 51-16. | $20,000 |
| Aug 5, 2019 | Completed final sign-off Jun 2021 | 3725 Washington St | Upscale Construction Inc. | rev pa# 201505227038; revision to garage facade articulation, rmoval of a portion of a fence on west side, and an additional stone wall at rear yardDetails
rev pa# 201505227038; revision to garage facade articulation, rmoval of a portion of a fence on west side, and an additional stone wall at rear yard | $20,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2021 | 3725 Washington St | Upscale Construction Inc. | revision pa 2015-0522-7038 s/r2 reconfigure of windows & door on north & east elevationDetails
revision pa 2015-0522-7038 s/r2 reconfigure of windows & door on north & east elevation | $15,000 |
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 528 Washington St | Northern Sun Associates | revision to 201804035422. revision limited to operation of service window onlyDetails
revision to 201804035422. revision limited to operation of service window only | |
| Jun 21, 2018 | Completed final sign-off Dec 2018 | 350 Kansas St | Johnstone - Mc Auliffe Const. Inc. | interior work only. no exterior work or change of use is proposed. new partial height interior partitions. new interior doors & new flooring. new electrial work on separate permit- sffd assembly permit changes on occupant load.Details
interior work only. no exterior work or change of use is proposed. new partial height interior partitions. new interior doors & new flooring. new electrial work on separate permit- sffd assembly permit changes on occupant load. | $40,000 |
| Apr 17, 2018 | Never finaled issued May 2018, no final | 161 Jessie St | R 3 Builders Inc. | g/f: scope of work includes new lighting , kitchenette, and accessible restrooms. majority of existing mechanical to remain with minor modifications. ref #201803305083. maher naDetails
g/f: scope of work includes new lighting , kitchenette, and accessible restrooms. majority of existing mechanical to remain with minor modifications. ref #201803305083. maher na | |
| Mar 30, 2018 | Completed final sign-off Oct 2018 | 161 Jessie St | R 3 Builders Inc. | project is a t.i. w/in an extg ground floor space: scope includes new accessible restrooms, kitchenette, and minor non structural partition framing. defered mech, elect, plmg, & fire life safety. n/a for maherDetails
project is a t.i. w/in an extg ground floor space: scope includes new accessible restrooms, kitchenette, and minor non structural partition framing. defered mech, elect, plmg, & fire life safety. n/a for maher | $400,000 |
| Mar 7, 2018 | Never finaled issued Jul 2018, no final | 3465 20th St | Loughran Construction Inc. | project consists of interior alterations to the lower dwelling unit in an (e) 2 unit residential bldg including remodeled kitchen & bathroom. new finishes, heating system & lighting. work also include new appliances, water heater & furnace in garage. no exterior work. mep to be submitted as separateDetails
project consists of interior alterations to the lower dwelling unit in an (e) 2 unit residential bldg including remodeled kitchen & bathroom. new finishes, heating system & lighting. work also include new appliances, water heater & furnace in garage. no exterior work. mep to be submitted as separate | $123,933 |
| Dec 5, 2017 | Completed final sign-off Dec 2018 | 528 Washington St | Northern Sun Associates | ti to (e) restaurant and adjacent retail space. (e) commercial kitchen to remain. scope includes new ceiling, and finishes, build out of bar and minor structural work. mep work submitted under sep permit. no change to use/building height/area. no exterior work. maher naDetails
ti to (e) restaurant and adjacent retail space. (e) commercial kitchen to remain. scope includes new ceiling, and finishes, build out of bar and minor structural work. mep work submitted under sep permit. no change to use/building height/area. no exterior work. maher na | $250,000 |
| Sep 7, 2017 | Completed final sign-off Mar 2018 | 350 Kansas St | this permit is per sf planning dept. request for administrative documentation of existing, permitted, allowable institutional use and no work is proposed on this permit. cafeteria serving college/university in existing banquet space. maher naDetails
this permit is per sf planning dept. request for administrative documentation of existing, permitted, allowable institutional use and no work is proposed on this permit. cafeteria serving college/university in existing banquet space. maher na | ||
| Sep 7, 2017 | Completed final sign-off Mar 2018 | 360 Kansas St | this permit is per sf planning dept. request for administrative documentation of existing, permitted, allowable institutional use and no work is proposed on this permit. use as college/university gallery. maher naDetails
this permit is per sf planning dept. request for administrative documentation of existing, permitted, allowable institutional use and no work is proposed on this permit. use as college/university gallery. maher na | ||
| Jul 11, 2017 | Expired or cancelled expired May 2026 | 2880 Vallejo St | Il Nido Designs Llc, Add A Garage Inc. | horizontal addition. rear addition including new roof at north rear. interior remodel at existing floors of associated structural work.Details
horizontal addition. rear addition including new roof at north rear. interior remodel at existing floors of associated structural work. | $500,000 |
| Jun 23, 2017 | Completed final sign-off Jun 2019 | 2121 Webster St | Black Mountain Development | gph3 - revision to pa 2017-0427-5003 - add 9 skylights. structural work submitted under separate permit. (related arch. shown on pa#201706230211)Details
gph3 - revision to pa 2017-0427-5003 - add 9 skylights. structural work submitted under separate permit. (related arch. shown on pa#201706230211) | $85,000 |
| Jun 14, 2017 | Expired or cancelled withdrawn Dec 2017 | 550 Washington St | Northern Sun Associates | interior tenant improvement to (e) restaurant and adjacent retail space. (e) commercial kitchen to remain. scope includes new partitions, ceilings, finishes, build out bar, new dumbwaiter, minor structural work, mep under separate permit. no change build height or area, no exterior work. *maher:n/a*Details
interior tenant improvement to (e) restaurant and adjacent retail space. (e) commercial kitchen to remain. scope includes new partitions, ceilings, finishes, build out bar, new dumbwaiter, minor structural work, mep under separate permit. no change build height or area, no exterior work. *maher:n/a* | $515,000 |
| May 24, 2017 | Completed final sign-off May 2019 | 3515 Washington St | Cairn Construction | basement level: foundation upgrade and interior remodel, expansion of basement below grade. top 2 levels: door infill, maintain extg building shell.Details
basement level: foundation upgrade and interior remodel, expansion of basement below grade. top 2 levels: door infill, maintain extg building shell. | $250,000 |
| May 11, 2017 | Completed final sign-off Mar 2019 | 3647 Washington St | J M K Construction Inc | add 2 dormers to (e) habitable area at rear, (1) dormer at front west side, refisnishe e deck and add new guardrail at se rear side of house. interior remodel 3rd fl. all structural work associated. replace e roof and sheating. n/a maherDetails
add 2 dormers to (e) habitable area at rear, (1) dormer at front west side, refisnishe e deck and add new guardrail at se rear side of house. interior remodel 3rd fl. all structural work associated. replace e roof and sheating. n/a maher | $40,000 |
| May 2, 2017 | Never finaled issued Aug 2017, no final | 24 Presidio Tr | Clonduff Construction Inc. | basement remodel within existing building footprint. window replacement in kind. new door at rear facade. includes structural work. no exterior work visible from the street.Details
basement remodel within existing building footprint. window replacement in kind. new door at rear facade. includes structural work. no exterior work visible from the street. | $100,000 |
| Apr 21, 2017 | Expired or cancelled withdrawn Sep 2018 | 200 Locust St | revision to pa#201503312451, sprinkler system to be 13r, to be permitted at future date.Details
revision to pa#201503312451, sprinkler system to be 13r, to be permitted at future date. | ||
| Apr 4, 2017 | Completed final sign-off May 2021 | 10 Normandie Tr | Cook Construction | interior ti on all floors including window and door replacement.Details
interior ti on all floors including window and door replacement. | $300,000 |
| Mar 9, 2017 | Never finaled issued May 2017, no final | 80 Carolina St | Johnstone - Mc Auliffe Const. Inc. | interior t.i. to include new partitions, ceilings and finishes. electrical, mechanical, fire protection & fire alarm under seperate permit. no change in building height or floor area. bldg. is fully accessible, no exterior work included in this permit. n/a ordinance #155-13Details
interior t.i. to include new partitions, ceilings and finishes. electrical, mechanical, fire protection & fire alarm under seperate permit. no change in building height or floor area. bldg. is fully accessible, no exterior work included in this permit. n/a ordinance #155-13 | $1,050,000 |
| Mar 7, 2017 | Completed final sign-off Feb 2021 | 77 Belgrave Av | Hughes & Company Construction, Inc | alter sign revision to site permit #201508184575s, adding a landcape ramp.Details
alter sign revision to site permit #201508184575s, adding a landcape ramp. | $500 |
| Mar 1, 2017 | Never finaled issued Mar 2017, no final | 1275 Minnesota St | Northern Sun Associates | revision to pa 2016-0906-6847 work includes relocation of bar to restaurant space and revised finishes.Details
revision to pa 2016-0906-6847 work includes relocation of bar to restaurant space and revised finishes. | |
| Feb 16, 2017 | Completed final sign-off May 2021 | 10 Normandie Tr | Cook Construction | new foundation with minor addition at 1st level; minimal interior remodel within (e) bldg 1st & 2ndDetails
new foundation with minor addition at 1st level; minimal interior remodel within (e) bldg 1st & 2nd | $30,000 |
| Feb 7, 2017 | Completed final sign-off Nov 2022 | 2508 Green St | Partners Contracting Inc., Farallon General Contractors Inc. | horizontal addition @ 1st through 3rd levels. 4th floor dormer, bay window @ rear & interior remodel throughout. 1 new full bath @ 1st floor. 1 (e) powder room moved to new location @ 2nd floor. 2 (e) baths moved to new location @ 3rd lfoor. 1 (e) bath moved to new location @ 4th floor.Details
horizontal addition @ 1st through 3rd levels. 4th floor dormer, bay window @ rear & interior remodel throughout. 1 new full bath @ 1st floor. 1 (e) powder room moved to new location @ 2nd floor. 2 (e) baths moved to new location @ 3rd lfoor. 1 (e) bath moved to new location @ 4th floor. | $800,000 |
| Dec 20, 2016 | Completed final sign-off Jan 2018 | 920 Ashbury St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | for documentation purposes to correct bpa#201601217651 that incorrectly listed the number of stories as (4) over basement; building is (3) stories over basement. see grade plane calculation on bpa#201506159044.Details
for documentation purposes to correct bpa#201601217651 that incorrectly listed the number of stories as (4) over basement; building is (3) stories over basement. see grade plane calculation on bpa#201506159044. | |
| Dec 16, 2016 | Expired or cancelled expired Mar 2019 | 241 Telegraph Hill Bl | Dijeau Poage Construction Inc. | #5 & #6- replace extg floor tile and glass guardrails at front and rear decks, new windows and doors as noted in plans. removal of skylight at north property line.Details
#5 & #6- replace extg floor tile and glass guardrails at front and rear decks, new windows and doors as noted in plans. removal of skylight at north property line. | $15,000 |
| Dec 9, 2016 | Expired or cancelled expired Oct 2020 | 1630 Union St | Rod Heisler Construction | 3/f- interior remodel, structural and mep. under a seperate permit.Details
3/f- interior remodel, structural and mep. under a seperate permit. | $105,000 |
| Nov 14, 2016 | Completed final sign-off Sep 2021 | 1988 Jackson St | Ashbury Gen Constructing & Eng | side addition, rear addition, rooftop terrace, interior renovation, structural work, bathroom & kitchen remodel.Details
side addition, rear addition, rooftop terrace, interior renovation, structural work, bathroom & kitchen remodel. | $350,000 |
| Oct 5, 2016 | Completed final sign-off Apr 2024 | 3620 Buchanan St | Granite Excavation & Demolition Inc | to demolish 1 story art studio building.Details
to demolish 1 story art studio building. | $2,000 |
| Oct 5, 2016 | Never finaled issued May 2020, no final | 3620 Buchanan St | Granite Excavation & Demolition Inc | to erect 4 stories, 1 basement, type iii-a over i-a, 8 units residential building. ** maher: n/a **Details
to erect 4 stories, 1 basement, type iii-a over i-a, 8 units residential building. ** maher: n/a ** | $2,500,000 |
| Sep 28, 2016 | Never finaled issued Sep 2016, no final | 80 Turk St | Priority Architectural Graphics Dba Prio | b,1,2 floors: revien of emergency evac maps by sffd only 4 evacuation plan mapsDetails
b,1,2 floors: revien of emergency evac maps by sffd only 4 evacuation plan maps | $1,600 |
| Sep 23, 2016 | Completed final sign-off Jun 2017 | 1150 25th St | Johnstone - Mc Auliffe Const. Inc. | revision to 201606271005 to correct the mislabeling of bld construction type o ncover sheet and application. bld id type v fully sprinklered maher naDetails
revision to 201606271005 to correct the mislabeling of bld construction type o ncover sheet and application. bld id type v fully sprinklered maher na | |
| Sep 16, 2016 | Never finaled issued Oct 2016, no final | 132 Jordan Av | Millans Construction | 1st floor: new fireplace insert in living room 106; remove extg fireplace in dining room 103; replace window in kind in family room 102; replace slider with new french door in family room 102; new wall in kitchen 101. 2nd fl: 4 windows to be replaced in kind.Details
1st floor: new fireplace insert in living room 106; remove extg fireplace in dining room 103; replace window in kind in family room 102; replace slider with new french door in family room 102; new wall in kitchen 101. 2nd fl: 4 windows to be replaced in kind. | $20,000 |
| Sep 16, 2016 | Completed final sign-off Jan 2017 | 77 Steuart St | Rfj Inc Dba Rfj Meiswinkel | building 3 one hour fire rated partition walls with 3 45mn fire rated doors for mechanical closet seperation; completion of drywall at mechanical closet. n/a maher ord. 155-13Details
building 3 one hour fire rated partition walls with 3 45mn fire rated doors for mechanical closet seperation; completion of drywall at mechanical closet. n/a maher ord. 155-13 | $5,000 |
| Sep 15, 2016 | Completed final sign-off Mar 2017 | 3737 Clay St | Cairn Construction | moving front door from west wall to (n) north facing street wall. extending entry vestibule by enclosing entry porch.Details
moving front door from west wall to (n) north facing street wall. extending entry vestibule by enclosing entry porch. | $4,000 |
| Aug 2, 2016 | Expired or cancelled expired Jul 2023 | 960 Cole St | Dajani Construction | work on 960 cole st only, voluntary accessibility improvement include demolition of non-compliant bathrooms and entry doors, install (1) unisex accessible restroom and (1) unisex restroom and new entry doors.Details
work on 960 cole st only, voluntary accessibility improvement include demolition of non-compliant bathrooms and entry doors, install (1) unisex accessible restroom and (1) unisex restroom and new entry doors. | $65,000 |
| Aug 2, 2016 | Expired or cancelled expired Mar 2019 | 241 Telegraph Hill Bl | Dijeau Poage Construction Inc. | revision to pa#201607152519 structural drawings revised.Details
revision to pa#201607152519 structural drawings revised. | $40,000 |
| Jul 21, 2016 | Completed final sign-off Jun 2017 | 1150 25th St | Johnstone - Mc Auliffe Const. Inc. | ti to existing, empty, warehouse component of building. ti includes partitons to divide warehouse into 3 spe art activity spaces used for art archiving and sales. enxterior work consists of renovation to existing roll up door to allow for code compliant egress. mep and ls under sep permitDetails
ti to existing, empty, warehouse component of building. ti includes partitons to divide warehouse into 3 spe art activity spaces used for art archiving and sales. enxterior work consists of renovation to existing roll up door to allow for code compliant egress. mep and ls under sep permit | $440,000 |
| Jun 27, 2016 | Never finaled issued Jul 2016, no final | 1150 25th St | Johnstone - Mc Auliffe Const. Inc. | scope of work is construction of new accessible restrooms on 1/f and fire rated partition at property line. n/a ordinance #155-13Details
scope of work is construction of new accessible restrooms on 1/f and fire rated partition at property line. n/a ordinance #155-13 | $310,000 |
| Jun 14, 2016 | Completed final sign-off Mar 2017 | 3737 Clay St | Cairn Construction | interior remodel including limited structural. remodel kitchen and master bath 2/f, powder room and mud room at 1st fl, stair to basement family roomDetails
interior remodel including limited structural. remodel kitchen and master bath 2/f, powder room and mud room at 1st fl, stair to basement family room | $250,000 |
| Jun 7, 2016 | Completed final sign-off Aug 2016 | 1275 Minnesota St | revision to pa #201502067724 r1 to correct the occupancy designation at the 1st floor exhibition from a-3 to an a-2 occupancy. n/a maher ordinaceDetails
revision to pa #201502067724 r1 to correct the occupancy designation at the 1st floor exhibition from a-3 to an a-2 occupancy. n/a maher ordinace | ||
| May 18, 2016 | Completed final sign-off Apr 2017 | 2730 Broderick St | Cairn Construction | interior remodel within extg bldg, includes limited structural work. remodel 3 extg full bath and 1 half bath, remodel kitchen, (e) garage door and planter to remain. replace 1 glas block window on front facade w/ (n) double hung wood window to match adjacent. n/a for maherDetails
interior remodel within extg bldg, includes limited structural work. remodel 3 extg full bath and 1 half bath, remodel kitchen, (e) garage door and planter to remain. replace 1 glas block window on front facade w/ (n) double hung wood window to match adjacent. n/a for maher | $750,000 |
| May 4, 2016 | Never finaled issued Mar 2018, no final | 333 Dolores St | Guzman Construction Group Inc., Plant Construction Co, Lp | revision to appl #2007-0124-2501 r1. exterior improvements to buildings exterior. work include accessibility, entrances and path of travel upgrades. remove (e) fire escape. existing retrofit windows and doors will be replaced with units to match original. no change of use or addition of floor area.Details
revision to appl #2007-0124-2501 r1. exterior improvements to buildings exterior. work include accessibility, entrances and path of travel upgrades. remove (e) fire escape. existing retrofit windows and doors will be replaced with units to match original. no change of use or addition of floor area. | |
| Apr 27, 2016 | Expired or cancelled expired Oct 2019 | 2126 Pierce St | Loughran Construction Inc. | horizontal addition & remodel to an existing single family dwelling, work includes horizontal rear yard addition w/ deck above. no change in building use or height.Details
horizontal addition & remodel to an existing single family dwelling, work includes horizontal rear yard addition w/ deck above. no change in building use or height. | $75,000 |
| Apr 11, 2016 | Completed final sign-off May 2017 | 3972 Sacramento St | O'shaughnessy Construction | configuration of upper unit only: includes replacing (e) deck in kind, addition of new bath and laundry, replace (e) interior stairs. alteration to approved site permit 201204178457Details
configuration of upper unit only: includes replacing (e) deck in kind, addition of new bath and laundry, replace (e) interior stairs. alteration to approved site permit 201204178457 | |
| Feb 29, 2016 | Completed final sign-off Apr 2018 | 1240 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | t.i. of extg warehouse space to create 12' tall partitions to divide space into individual artist studios on 1/f & also work in mezzanine. mep, life safty under seperate permit. n/a for maherDetails
t.i. of extg warehouse space to create 12' tall partitions to divide space into individual artist studios on 1/f & also work in mezzanine. mep, life safty under seperate permit. n/a for maher | $317,000 |
| Feb 18, 2016 | Expired or cancelled expired Apr 2021 | 1055 Post St | Clayton Timbrell & Co | interior build out within existing building including new partitions, fixtures and lighting includes change of use. n/a ordinance #155-13. no exterior work under this permitDetails
interior build out within existing building including new partitions, fixtures and lighting includes change of use. n/a ordinance #155-13. no exterior work under this permit | $250,000 |
| Jan 15, 2016 | Expired or cancelled cancelled Jan 2026 | 2328 Union St | Finbarr Collins Construction Inc. | (n) deck over (e) roof @ 4th floor & associated structural work.Details
(n) deck over (e) roof @ 4th floor & associated structural work. | $100,000 |
| Nov 18, 2015 | Completed final sign-off Nov 2016 | 1166 Filbert St | Clayton Timbrell & Co | interior remodel only. no changes to exterior. remodel of the kitchen, laundry, and closet. replacing (e) windows w/new on 2nd level. compliance with maher ordinance no 155-13 not required.Details
interior remodel only. no changes to exterior. remodel of the kitchen, laundry, and closet. replacing (e) windows w/new on 2nd level. compliance with maher ordinance no 155-13 not required. | $500,000 |
| Sep 25, 2015 | Never finaled issued Sep 2015, no final | 843 Montgomery St | Design Line Construction | revision to app#201504284786. revision is to remove scope of work including kitchen scope, updated bathroom layout. n/a maher.Details
revision to app#201504284786. revision is to remove scope of work including kitchen scope, updated bathroom layout. n/a maher. | |
| Sep 15, 2015 | Never finaled issued Sep 2015, no final | 910 Clayton St | Fontana Construction, Inc. | (n) open guardrail & decking @ 1/f roof, (n) property line window @ kitchen; replace (e) window @ bedroom w/(n) door, remove exterior stair @ bedroom. ref. to pa# 201411212193 & 201410280097Details
(n) open guardrail & decking @ 1/f roof, (n) property line window @ kitchen; replace (e) window @ bedroom w/(n) door, remove exterior stair @ bedroom. ref. to pa# 201411212193 & 201410280097 | $1,000 |
| Aug 18, 2015 | Completed final sign-off Apr 2021 | 77 Belgrave Av | Hughes & Company Construction, Inc | erect 4-story, 1 basement, type 5-b, single family dwelling building.Details
erect 4-story, 1 basement, type 5-b, single family dwelling building. | $2,500,000 |
| Aug 18, 2015 | Completed final sign-off Mar 2021 | 77 Belgrave Av | Hughes & Company Construction, Inc | demolish 3-story, 1 basement, type 5, single family dwelling building.Details
demolish 3-story, 1 basement, type 5, single family dwelling building. | $10,000 |
| Aug 14, 2015 | Completed final sign-off Jul 2018 | 685 Marina Bl | Redhorse Constructors Inc., Design Line Construction | horizontal addition @ rear at all 3 levels. (e) 4 bed, 3 powder, 2 bath. new 4 bed, 2 powder, 4 bath. remove (e) stair penthouse & add new motorized skylight above (e) stairhall & all assocated interior remodel & structural work. replace (e) single pane windows to double pane (in kind). maher: n/aDetails
horizontal addition @ rear at all 3 levels. (e) 4 bed, 3 powder, 2 bath. new 4 bed, 2 powder, 4 bath. remove (e) stair penthouse & add new motorized skylight above (e) stairhall & all assocated interior remodel & structural work. replace (e) single pane windows to double pane (in kind). maher: n/a | $400,000 |
| Aug 12, 2015 | Completed final sign-off Mar 2018 | 3880 Jackson St | Plath & Company Inc | lightwell infill @ 3rd fl & roof, addition of habitable space @ (e) bldg's crawlspace within bldg footprint. ** maher: n/a **Details
lightwell infill @ 3rd fl & roof, addition of habitable space @ (e) bldg's crawlspace within bldg footprint. ** maher: n/a ** | $42,100 |
| Jul 10, 2015 | Never finaled issued Jan 2016, no final | 3370 Washington St | Upscale Construction Inc. | horizontal addition @ the rear, garage floor. (e) deck & (e) handrail @ 1st floor to be replace. associated structural work. scope of work for this permit in dashed areas only. ** maher: n/a **Details
horizontal addition @ the rear, garage floor. (e) deck & (e) handrail @ 1st floor to be replace. associated structural work. scope of work for this permit in dashed areas only. ** maher: n/a ** | $30,000 |
| Jul 1, 2015 | Completed final sign-off Nov 2016 | 301 Mission St | Black Mountain Development | remodel of entire unit, demo all ceiling sheetrock for new led light can through the unit. new cabinets at kitchen and bathroom vanities. remove & install hardwood flooring throughout. remodel bathroom to include removal of old tub and tub deck with new version. n/a ordinance #155-13;Details
remodel of entire unit, demo all ceiling sheetrock for new led light can through the unit. new cabinets at kitchen and bathroom vanities. remove & install hardwood flooring throughout. remodel bathroom to include removal of old tub and tub deck with new version. n/a ordinance #155-13; | $610,000 |
| Jul 1, 2015 | Never finaled issued Jul 2015, no final | 301 Mission St | Black Mountain Development | unit 49c: demo & remodel of powder room (#108) back bathroom, and office #2-work to include removal toilets, vanity & all finishes & replace with new finishes;maher n/aDetails
unit 49c: demo & remodel of powder room (#108) back bathroom, and office #2-work to include removal toilets, vanity & all finishes & replace with new finishes;maher n/a | $25,000 |
| Jun 23, 2015 | Completed final sign-off Feb 2017 | 1919 Sacramento St | Fma Builders, Design Line Construction | residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers)Details
residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers) | $50,000 |
| Jun 19, 2015 | Completed final sign-off Feb 2017 | 1919 Sacramento St | Design Line Construction | (n) windows to replace (e) in kind & one new window & door opening on rear facade.Details
(n) windows to replace (e) in kind & one new window & door opening on rear facade. | $15,000 |
| Jun 17, 2015 | Expired or cancelled cancelled Jan 2026 | 78 Piedmont St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | new foundation for extg cottage. no other scopeDetails
new foundation for extg cottage. no other scope | $30,000 |
| Jun 15, 2015 | Completed final sign-off Jan 2018 | 920 Ashbury St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | interior remodel & landscape, hardscape, replacing fence, new skylights & replacement of window in kind. replacing deck in kind.Details
interior remodel & landscape, hardscape, replacing fence, new skylights & replacement of window in kind. replacing deck in kind. | $185,000 |
| Jun 8, 2015 | Completed final sign-off Oct 2015 | 184 Hooper St | Johnstone - Mc Auliffe Const. Inc. | interior work only, this project consists of the demolition of existing partial height partitions. accessible restrooms, elevator and path of travel are existing to remain. n/a ordinance #155-13Details
interior work only, this project consists of the demolition of existing partial height partitions. accessible restrooms, elevator and path of travel are existing to remain. n/a ordinance #155-13 | $80,000 |
| Jun 2, 2015 | Completed final sign-off Feb 2017 | 1919 Sacramento St | Design Line Construction | interior remodel within existing building all floors includes limited structural work. no exterior work to be done on this permit.Details
interior remodel within existing building all floors includes limited structural work. no exterior work to be done on this permit. | $50,000 |
| May 22, 2015 | Completed final sign-off Oct 2021 | 3725 Washington St | Upscale Construction Inc. | vertical & horizontal addition @ 2nd & 3rd floor in front. add 3 new dormers. structural work. interior remodel within (e) building. 4 bedroom, 6 bathrooms, 2 powder rooms.Details
vertical & horizontal addition @ 2nd & 3rd floor in front. add 3 new dormers. structural work. interior remodel within (e) building. 4 bedroom, 6 bathrooms, 2 powder rooms. | $850,000 |
| Apr 28, 2015 | Completed final sign-off Oct 2015 | 843 Montgomery St | Design Line Construction | interior mercantile build out, (n) partitions fixtures, finishes & lighting. place remain vacant, t.i. for future tenant will follow. n/a ordinance #155-13 not a change of occupancy - existing "m" occupancy.Details
interior mercantile build out, (n) partitions fixtures, finishes & lighting. place remain vacant, t.i. for future tenant will follow. n/a ordinance #155-13 not a change of occupancy - existing "m" occupancy. | $500,000 |
| Apr 27, 2015 | Completed final sign-off Apr 2025 | 1007 Market St | Aquamatic Fire Protection | install new fire sprinkler system throughout.Details
install new fire sprinkler system throughout. | $24,000 |
| Apr 27, 2015 | Completed final sign-off May 2017 | 80 Turk St | Aquamatic Fire Protection | install new fire sprinkler system throughout.Details
install new fire sprinkler system throughout. | $24,000 |
| Mar 27, 2015 | Completed final sign-off Nov 2016 | 910 Clayton St | Fontana Construction, Inc. | revision to pa 2014 1121 2193. new concrete footing to be used for deck and planter - to be used to support future additionDetails
revision to pa 2014 1121 2193. new concrete footing to be used for deck and planter - to be used to support future addition | $3,000 |
| Mar 17, 2015 | Expired or cancelled cancelled Aug 2022 | 1522 Bush St | change of use. convert (e) automotive repair structure into (3) dwelling units & a separate arts activities space. new window systems, new entries, new garage doors, new automated fire sprinkler system, new m.e.p systems & interior improvements throughout.Details
change of use. convert (e) automotive repair structure into (3) dwelling units & a separate arts activities space. new window systems, new entries, new garage doors, new automated fire sprinkler system, new m.e.p systems & interior improvements throughout. | $3,250,000 |