Block 0535, lot 004E
2328 Union St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2016 | Expired or cancelled cancelled Jan 2026 | 2328 Union St | Finbarr Collins Construction Inc. | (n) deck over (e) roof @ 4th floor & associated structural work.Details
(n) deck over (e) roof @ 4th floor & associated structural work. | $100,000 |
| Sep 24, 2015 | Expired or cancelled withdrawn Oct 2015 | 2326 Union St | remove (e) window in rear- replace with french doors & metal balcony. remove (e) door between recreation room and utility roo. relocate w/d. add wash sink and toiletDetails
remove (e) window in rear- replace with french doors & metal balcony. remove (e) door between recreation room and utility roo. relocate w/d. add wash sink and toilet | $4,000 | |
| Dec 16, 2014 | Completed final sign-off Dec 2014 | 2326 Union St | remove metal gate and side metal fence. replace with door at entry and fill in side opening with stucco wall at front entrance.Details
remove metal gate and side metal fence. replace with door at entry and fill in side opening with stucco wall at front entrance. | $4,500 | |
| Dec 11, 2012 | Completed final sign-off Aug 2014 | 2326 Union St | 2326 union st.: bathroom remodel, 2328 union st. : bathrooms (2) & kitchen remodel.Details
2326 union st.: bathroom remodel, 2328 union st. : bathrooms (2) & kitchen remodel. | $25,000 | |
| Jul 27, 2012 | Completed final sign-off Aug 2014 | 2326 Union St | remove untility sink, bathroom sink, toilet and shower. install wall to block shower area in compliance with report of physical inspection report cc7012. to be restored back to storage on first floor.Details
remove untility sink, bathroom sink, toilet and shower. install wall to block shower area in compliance with report of physical inspection report cc7012. to be restored back to storage on first floor. | $1,200 | |
| Jun 11, 2008 | Completed final sign-off Jul 2008 | 2326 Union St | J O Roofing Co. | renew application #200612018911 for final inspection.Details
renew application #200612018911 for final inspection. | |
| Dec 1, 2006 | Expired or cancelled expired Jan 2008 | 2326 Union St | J O Roofing Co. | reroofing.Details
reroofing. | $8,500 |
| Sep 27, 2005 | Completed final sign-off Oct 2005 | 2326 Union St | renew 200309124688, 200407169058,200403128503 for final.Details
renew 200309124688, 200407169058,200403128503 for final. | ||
| Jun 23, 2005 | Never finaled issued Jun 2005, no final | 2328 Union St | street spaceDetails
street space | ||
| Jul 16, 2004 | Expired or cancelled expired Oct 2005 | 2326 Union St | renew expired pa 200309124688- for final inspectionDetails
renew expired pa 200309124688- for final inspection | ||
| Mar 12, 2004 | Expired or cancelled expired Aug 2005 | 2326 Union St | to renew permit app 200309185107 for 1500 to complete workDetails
to renew permit app 200309185107 for 1500 to complete work | $1,500 | |
| Sep 18, 2003 | Expired or cancelled expired Oct 2005 | 2326 Union St | replace wood shutters&trim,stucco repair,dryrot repair.new entry door,planter box,remove brick,.....Details
replace wood shutters&trim,stucco repair,dryrot repair.new entry door,planter box,remove brick,..... | $1,500 | |
| Sep 12, 2003 | Expired or cancelled expired Oct 2005 | 2326 Union St | replace kchn cabinets and countertopDetails
replace kchn cabinets and countertop | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- J O Roofing Co. (2), Finbarr Collins Construction Inc.
- Architects
- Andy Lin
- Engineers
- Staci Chase
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.