John Grcina
- Listed as
- authorized agent-others, contractor
- Firm
- Field Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Sep 2026
1,520 permits since 2000 (contractor on 1,520 permits, authorized agent-others on 7 permits): 1,208 completed, 46 in progress, 105 never finaled, 161 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 1,520.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 750 Battery St | Field Construction Inc. | demo existing mains, ductowrk, vav boxes, fan coil, fsds; install new mains, ductwork vav boxes, fsd, fds & mechanical pipingDetails
demo existing mains, ductowrk, vav boxes, fan coil, fsds; install new mains, ductwork vav boxes, fsd, fds & mechanical piping | |
| Sep 20, 2026 | In progress filed Sep 2026, not yet issued | 650 Davis St | Field Construction Inc. | 2nd fl, ste 205 structural for pa 202601304901Details
2nd fl, ste 205 structural for pa 202601304901 | $40,000 |
| Sep 15, 2026 | In progress issued Sep 2026 | 135 Main St | Field Construction Inc. | to obtain final inspection under pa#: 202405142070. all work is complete.Details
to obtain final inspection under pa#: 202405142070. all work is complete. | |
| Sep 14, 2026 | In progress issued Sep 2026 | 44 Montgomery St | Field Construction Inc. | 15/f: mechanical and electrical work for office tenant improvement project under main arch 202608206963Details
15/f: mechanical and electrical work for office tenant improvement project under main arch 202608206963 | $142,000 |
| Sep 2, 2026 | In progress issued Sep 2026 | 575 Market St | Field Construction Inc. | 40th floor. revision to 202608196849, anchoring of 2 single occupant phone booths including structural plans and calculations. new signage to be dedicated to accessible phone room.Details
40th floor. revision to 202608196849, anchoring of 2 single occupant phone booths including structural plans and calculations. new signage to be dedicated to accessible phone room. | |
| Sep 1, 2026 | In progress filed Sep 2026, not yet issued | 575 Market St | Field Construction Inc. | deferred mep for pa 202608196849Details
deferred mep for pa 202608196849 | $450,000 |
| Aug 26, 2026 | In progress issued Aug 2026 | 135 Main St | Field Construction Inc. | to obtain final inspection for work approved under pa# 202503031385. all work is complete.Details
to obtain final inspection for work approved under pa# 202503031385. all work is complete. | |
| Aug 20, 2026 | In progress issued Aug 2026 | 44 Montgomery St | Field Construction Inc. | ste 1500, 15th fl: minimal partition demo and associated doors/ frames/ glazing, lighting, and ceiling tile and grid. (n) open ceiling and lighting and finishes. no (n) doors, frames or millwork requires. any changes to mep, sprinklers and/or fls system will be submitted under separate permit.Details
ste 1500, 15th fl: minimal partition demo and associated doors/ frames/ glazing, lighting, and ceiling tile and grid. (n) open ceiling and lighting and finishes. no (n) doors, frames or millwork requires. any changes to mep, sprinklers and/or fls system will be submitted under separate permit. | $250,000 |
| Aug 19, 2026 | In progress issued Aug 2026 | 575 Market St | Field Construction Inc. | revision to 202512172010. convert open office areas to private office areas to private offices, conference room reconfiguration and additional private offices to previous tenant improvement permit.Details
revision to 202512172010. convert open office areas to private office areas to private offices, conference room reconfiguration and additional private offices to previous tenant improvement permit. | |
| Aug 13, 2026 | In progress issued Oct 2026 | 220 Montgomery St | Field Construction Inc. | 7th floor suite #700: t.i. to include demolition of non structural partitions & ceiling. construction of new partitions, ceiling, power & finishes. fire, life safety sprinklers to be on seperate permits.Details
7th floor suite #700: t.i. to include demolition of non structural partitions & ceiling. construction of new partitions, ceiling, power & finishes. fire, life safety sprinklers to be on seperate permits. | $125,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 350 California St | Field Construction Inc. | 12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes.Details
12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes. | $125,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 350 California St | Field Construction Inc. | 11/f suites 1100, 1120, 1150: tenant improvements include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. mep deferred. suite 1100 - 58 occupants suite 1120 - 20 occupants suite 1150 - 57 occupantsDetails
11/f suites 1100, 1120, 1150: tenant improvements include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. mep deferred. suite 1100 - 58 occupants suite 1120 - 20 occupants suite 1150 - 57 occupants | $125,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 750 Battery St | Field Construction Inc. | 4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demo/install of nw finishes & fixtures mech/electrical deferDetails
4th floor:interior demo & construction of non structural partitions, finishes, fixtures, power/data, ceiling elements & lighting. in addition the scope includes a full interior gut & redo of the commen area restrooms within the e envelope.demo/install of nw finishes & fixtures mech/electrical defer | $2,509,029 |
| Aug 3, 2026 | In progress issued Aug 2026 | 303 02nd St | Field Construction Inc. | 5th fl: mechanical and electrical for pa#202604038836.Details
5th fl: mechanical and electrical for pa#202604038836. | $35,000 |
| Jul 30, 2026 | In progress issued Jul 2026 | 300 Mission St | Field Construction Inc. | basemen restroom exhaust air fan upgrade. new exhaust fan is being provided to replace existing exhaust fan. no new fsas are being added.Details
basemen restroom exhaust air fan upgrade. new exhaust fan is being provided to replace existing exhaust fan. no new fsas are being added. | $80,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 650 Davis St | Field Construction Inc. | revision 202601304901-suite 205- replace (e) window frame and glazing with mechanical louverDetails
revision 202601304901-suite 205- replace (e) window frame and glazing with mechanical louver | $5,000 |
| Jul 16, 2026 | In progress issued Sep 2026 | 650 Davis St | Field Construction Inc. | meps for project: 2026.0130.4901 - ste 250Details
meps for project: 2026.0130.4901 - ste 250 | $397,000 |
| Jul 10, 2026 | In progress issued Jul 2026 | 1 Market St | Field Construction Inc. | to obtain final inspection for work approved under pa# 202410243673. all work is complete.Details
to obtain final inspection for work approved under pa# 202410243673. all work is complete. | |
| Jul 6, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | 21st flr/suite 2100 + 2150. ref#: 202606032424. mechanicalDetails
21st flr/suite 2100 + 2150. ref#: 202606032424. mechanical | $40,000 |
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | 21st fl suite 2100 and 2150: electrical only. ref drawings 202606032424Details
21st fl suite 2100 and 2150: electrical only. ref drawings 202606032424 | $168,564 |
| Jun 26, 2026 | In progress issued Jun 2026 | 2 Embarcadero Center | Field Construction Inc. | 18/f: mechanical and electrical for bpa# 202605141295Details
18/f: mechanical and electrical for bpa# 202605141295 | $545,000 |
| Jun 24, 2026 | In progress issued Jul 2026 | 1 Market St | Field Construction Inc. | 25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panelDetails
25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panel | $150,000 |
| Jun 22, 2026 | In progress issued Jun 2026 | 1 Embarcadero Center | Field Construction Inc. | 5th floor: mechanical & electrical for arch. ref.202605191540. provide and install new van boxes. demo the paneumatic thermostats and install new ddc thermostats.Details
5th floor: mechanical & electrical for arch. ref.202605191540. provide and install new van boxes. demo the paneumatic thermostats and install new ddc thermostats. | $785,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 750 Battery St | Field Construction Inc. | 6th fl - ref pa 202502266563/202605221763 electrical only power & signal/lightingDetails
6th fl - ref pa 202502266563/202605221763 electrical only power & signal/lighting | $15,000 |
| Jun 3, 2026 | Completed final sign-off Sep 2026 | 575 Market St | Field Construction Inc. | level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixtureDetails
level 21:modification of (e) t.i. to include demolition & construction of new non-load bearing partitions. a new demising partition, new doors, frames, & hardware, glazing, modification of (e) ceiling tile & grid system, new light fixtures & switching, new power/data, new millwork & plumbing fixture | $500,000 |
| Jun 3, 2026 | In progress issued Aug 2026 | 1 Market St | Field Construction Inc. | 28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at opening in an existing unoccupied space. no hvac or electrical modifications.Details
28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at opening in an existing unoccupied space. no hvac or electrical modifications. | $150,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 575 Market St | Field Construction Inc. | 35th floor: revision to 202512232517. convert 1 library lounge room to 3 phone rooms and adding 1 additional private office to previous tenant improvement permitDetails
35th floor: revision to 202512232517. convert 1 library lounge room to 3 phone rooms and adding 1 additional private office to previous tenant improvement permit | |
| May 22, 2026 | In progress issued Jun 2026 | 750 Battery St | Field Construction Inc. | revision to pa 202602266563 drinking fountain alcove changes to accommodate (e) conditions - after exploratory demo. revision of deferred submittals, accesory specifications, rcp layout & light fixture quantitiesDetails
revision to pa 202602266563 drinking fountain alcove changes to accommodate (e) conditions - after exploratory demo. revision of deferred submittals, accesory specifications, rcp layout & light fixture quantities | |
| May 21, 2026 | Completed final sign-off Jun 2026 | 750 Battery St | Field Construction Inc. | revision to pa 202601234385 permit set consists od drinking fountation alcove changes to accomoodate existing condition after exploratory demo. revisions to deferred submittals & accessory specs. original permit 202601234385Details
revision to pa 202601234385 permit set consists od drinking fountation alcove changes to accomoodate existing condition after exploratory demo. revisions to deferred submittals & accessory specs. original permit 202601234385 | |
| May 19, 2026 | In progress issued May 2026 | 1 Embarcadero Center | Field Construction Inc. | 5th flr. t.i. single tenant flr, demo and nonstructure partitions +building back non-str. partitions and finishes. all new or revised mep+ life safety work deferred submittal (bldg is fully sprinklered).Details
5th flr. t.i. single tenant flr, demo and nonstructure partitions +building back non-str. partitions and finishes. all new or revised mep+ life safety work deferred submittal (bldg is fully sprinklered). | $1,800,000 |
| May 14, 2026 | In progress issued May 2026 | 2 Embarcadero Center | Field Construction Inc. | 18/f: interior ti improvement - demo of non-structural partitions, finishes, fixtures, and lighting. restroom ada upgrades. mep, fire safety under separate permit.Details
18/f: interior ti improvement - demo of non-structural partitions, finishes, fixtures, and lighting. restroom ada upgrades. mep, fire safety under separate permit. | $1,150,000 |
| May 14, 2026 | In progress issued Jun 2026 | 1 Market St | Field Construction Inc. | 25/f: ref# 202604149378 - mech: demo all mech system. install 2 (n) vav boxes to supplort ventilation and temp controls.Details
25/f: ref# 202604149378 - mech: demo all mech system. install 2 (n) vav boxes to supplort ventilation and temp controls. | $50,000 |
| May 14, 2026 | In progress issued Jul 2026 | 750 Battery St | Field Construction Inc. | foundation wall, crack damage repair. structural only. no exterior work.Details
foundation wall, crack damage repair. structural only. no exterior work. | $150,000 |
| May 1, 2026 | In progress filed May 2026, not yet issued | 1 Market St | Field Construction Inc. | ev charging station - basement level garage. electrical and structural.Details
ev charging station - basement level garage. electrical and structural. | $300,000 |
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 575 Market St | Field Construction Inc. | 38/f - ste 3800- mechanical: install ductwork (8) variable. electrical: lighting and controls. ref bpa 202512172042.Details
38/f - ste 3800- mechanical: install ductwork (8) variable. electrical: lighting and controls. ref bpa 202512172042. | $179,000 |
| Apr 23, 2026 | In progress issued May 2026 | 575 Market St | Field Construction Inc. | suite 3500. mech-furnish and install supply and return duct work, variable air volume boxes. furnish and transfer fan in the it room. elec- power lighting t-24. 202202512232517Details
suite 3500. mech-furnish and install supply and return duct work, variable air volume boxes. furnish and transfer fan in the it room. elec- power lighting t-24. 202202512232517 | $250,000 |
| Apr 23, 2026 | Completed final sign-off Jun 2026 | 750 Battery St | Field Construction Inc. | 7th floor provide new lighting and branch circuiting to existing panel. ref pa#: 202601234385Details
7th floor provide new lighting and branch circuiting to existing panel. ref pa#: 202601234385 | $10,000 |
| Apr 23, 2026 | Completed final sign-off Aug 2026 | 555 Market St | Field Construction Inc. | mech- furnish and install supply and return duct work. (13) variable air volume boxes, supply and return registers, hot water piping. furnished and install a transfer fan in the it room. demolished existing variable air volume boxes. elec new panels and signal devices. ref#: 202512192344.Details
mech- furnish and install supply and return duct work. (13) variable air volume boxes, supply and return registers, hot water piping. furnished and install a transfer fan in the it room. demolished existing variable air volume boxes. elec new panels and signal devices. ref#: 202512192344. | $189,000 |
| Apr 21, 2026 | Completed final sign-off May 2026 | 270 Brannan St | Field Construction Inc. | permit revision for pa#202510227852 to remove "mep deferred" stamp that was stamped on this set in error, no mep scope or defferred permits. all work completed under 2025-1022-7852. this is an adminstrative permit onlyDetails
permit revision for pa#202510227852 to remove "mep deferred" stamp that was stamped on this set in error, no mep scope or defferred permits. all work completed under 2025-1022-7852. this is an adminstrative permit only | |
| Apr 14, 2026 | In progress issued Apr 2026 | 55 Spear St | Field Construction Inc. | 25/f: demolition of (e) non-structural partitions, doors & grames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac & electrical to be pulled back to source. and plumbing to be capped at source. construction of new non-structural partitions,Details
25/f: demolition of (e) non-structural partitions, doors & grames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac & electrical to be pulled back to source. and plumbing to be capped at source. construction of new non-structural partitions, | $1,000,000 |
| Apr 13, 2026 | Completed final sign-off Jul 2026 | 2300 Harrison St | Field Construction Inc. | new gender neutral resterooms - demo, new partitions, ceilings, and finishes.Details
new gender neutral resterooms - demo, new partitions, ceilings, and finishes. | $35,000 |
| Apr 3, 2026 | In progress issued Jun 2026 | 303 02nd St | Field Construction Inc. | 5th floor: interior tenant improvement work including selective non-strucutral demolition and new interior construction. scope includes new partitions, ceilings, lighting, power/data layout, and finishers per plans.Details
5th floor: interior tenant improvement work including selective non-strucutral demolition and new interior construction. scope includes new partitions, ceilings, lighting, power/data layout, and finishers per plans. | $250,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 1 Market St | Field Construction Inc. | level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331)Details
level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331) | $10,000 |
| Mar 18, 2026 | In progress issued May 2026 | 260 California St | Field Construction Inc. | 6th fl, suite 600 ti to add card reader to existing suite/entry. all new or revised electrical and life safety work will be design - build and submitted for permit separately. no plumbing fixtures.Details
6th fl, suite 600 ti to add card reader to existing suite/entry. all new or revised electrical and life safety work will be design - build and submitted for permit separately. no plumbing fixtures. | $3,500 |
| Mar 9, 2026 | In progress issued Aug 2026 | 1 Market St | Field Construction Inc. | 29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl onlyDetails
29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only | |
| Feb 26, 2026 | In progress issued Mar 2026 | 750 Battery St | Field Construction Inc. | 6/fl- soft demo of non sturtcrual partitions, finishes and fixtures. install (n) lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered.Details
6/fl- soft demo of non sturtcrual partitions, finishes and fixtures. install (n) lighting and remodel of restrooms. ti permit will be on separte permit as well as fire and mep deffered. | $199,000 |
| Jan 30, 2026 | In progress issued May 2026 | 650 Davis St | Field Construction Inc. | ste: 205: tenant improvement to include new space plan and program, new walls, ceilings and finishes, new plumbing fixtures, mechanical distribution, electrical distribution and lighting.Details
ste: 205: tenant improvement to include new space plan and program, new walls, ceilings and finishes, new plumbing fixtures, mechanical distribution, electrical distribution and lighting. | $700,000 |
| Jan 23, 2026 | Completed final sign-off Jun 2026 | 750 Battery St | Field Construction Inc. | 7/f: bathroom full remodel. full removal of existing fixtures and finishes new fixtures and finishes and lightening and devices signage. deferred fire & mep.Details
7/f: bathroom full remodel. full removal of existing fixtures and finishes new fixtures and finishes and lightening and devices signage. deferred fire & mep. | $27,350 |
| Jan 12, 2026 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | 6/fl- ste 605- revision 202510087015 for space plan reivisons. ti to include soft demo of non strucrtural partitions and ceiling, construction of (n) partitions, ceiling, power and finishes. market ready condiditon suite will be used for marketing of vacant suite and is not intended for occupancyDetails
6/fl- ste 605- revision 202510087015 for space plan reivisons. ti to include soft demo of non strucrtural partitions and ceiling, construction of (n) partitions, ceiling, power and finishes. market ready condiditon suite will be used for marketing of vacant suite and is not intended for occupancy | |
| Jan 7, 2026 | Completed final sign-off Jun 2026 | 1 Front St | Field Construction Inc. | 34 and 36th floor: electrical-power, lighting and signal, title 24. ref pa #202511200096Details
34 and 36th floor: electrical-power, lighting and signal, title 24. ref pa #202511200096 | $15,000 |
| Dec 30, 2025 | Completed final sign-off Jun 2026 | 2300 Harrison St | Field Construction Inc. | 12 ev chargers to be instal at (e) parking stalls in a private fenced building park lot. 2 new 600v transformers instal on a new concrete pad with safety bollards. parking restriping where faded in same loc. trenching for a new below grade conduit run to new ev charger. level 2 chargers only.Details
12 ev chargers to be instal at (e) parking stalls in a private fenced building park lot. 2 new 600v transformers instal on a new concrete pad with safety bollards. parking restriping where faded in same loc. trenching for a new below grade conduit run to new ev charger. level 2 chargers only. | $100,000 |
| Dec 23, 2025 | In progress issued Jan 2026 | 575 Market St | Field Construction Inc. | 35/fl- suite 3500 interior ti , soft demo of non structural partitions, finishes, ceiling, light fixtures and millwork. new non structrual partitions, finishes, ceiling, light fixtures and millwork. mep and fire/life safety under separte permitsDetails
35/fl- suite 3500 interior ti , soft demo of non structural partitions, finishes, ceiling, light fixtures and millwork. new non structrual partitions, finishes, ceiling, light fixtures and millwork. mep and fire/life safety under separte permits | $300,000 |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 220 Montgomery St | Field Construction Inc. | ste 1200- ti to include demo of non structural partitions and ceiling. construction of (n) partitions, ceiling, power and finishes. market ready coalition of will be used for marketing of vacant suite and not intended to be occupied. under separte permit life/safety fire sprinklers mepDetails
ste 1200- ti to include demo of non structural partitions and ceiling. construction of (n) partitions, ceiling, power and finishes. market ready coalition of will be used for marketing of vacant suite and not intended to be occupied. under separte permit life/safety fire sprinklers mep | $136,000 |
| Dec 19, 2025 | Completed final sign-off Aug 2026 | 555 Market St | Field Construction Inc. | 20/f suite 2000: interior tenant improvement - demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep and fire/life safety under separate permit.Details
20/f suite 2000: interior tenant improvement - demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep and fire/life safety under separate permit. | $300,000 |
| Dec 17, 2025 | In progress issued Jan 2026 | 575 Market St | Field Construction Inc. | 40/f suite 4000: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. fire and mep/life safety under separate permit.Details
40/f suite 4000: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. fire and mep/life safety under separate permit. | $300,000 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 575 Market St | Field Construction Inc. | 38/f suite 3800: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep fire/life safety under separate permit.Details
38/f suite 3800: interior tenant improvement. demolition of non-structural partitions, finishes, ceilings, light fixtures, and millwork. new non-structural partitions, finishes, ceilings, light fixtures, and millwork. mep fire/life safety under separate permit. | $150,000 |
| Dec 15, 2025 | In progress issued Feb 2026 | 1 Market St | Field Construction Inc. | 29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space.Details
29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space. | $150,000 |
| Dec 15, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | removal of mep scope of work for pa: 202503182502 and 202503242917, 202503242918. stair infill work does not require mep.Details
removal of mep scope of work for pa: 202503182502 and 202503242917, 202503242918. stair infill work does not require mep. | |
| Dec 4, 2025 | Completed final sign-off Apr 2026 | 220 Montgomery St | Field Construction Inc. | ste 406/4/fl-t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit.Details
ste 406/4/fl-t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit. | |
| Nov 21, 2025 | Completed final sign-off Jun 2026 | 333 Pine St | Field Construction Inc. | 2/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 2/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only.Details
2/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 2/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only. | $30,000 |
| Nov 20, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Field Construction Inc. | 31/f suite 3150: deferred mechanical and electrical for t.i permit 202510207739. power, lighting and signal.Details
31/f suite 3150: deferred mechanical and electrical for t.i permit 202510207739. power, lighting and signal. | $45,000 |
| Nov 20, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Field Construction Inc. | fls 34 & 36: fl. demo removal of non-structural ptns, light fixtures, millwork, fixtures, and fnishes. new light fixtures for minimum req'd lighting ab-017 exception to requirements for disabled access to vacant spaces, suite to remain vacant until future t.i. permit is filed. ref pa# 2025-1114-9689Details
fls 34 & 36: fl. demo removal of non-structural ptns, light fixtures, millwork, fixtures, and fnishes. new light fixtures for minimum req'd lighting ab-017 exception to requirements for disabled access to vacant spaces, suite to remain vacant until future t.i. permit is filed. ref pa# 2025-1114-9689 | $575,000 |
| Nov 5, 2025 | Completed final sign-off Jun 2026 | 333 Pine St | Field Construction Inc. | 4/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 4/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only........Details
4/f: t.i to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. misc. upgrades at (e) 4/f restroom and elevator lobby. this t.i is to be used as a market ready condition for marketing pruposes only........ | $136,000 |
| Oct 22, 2025 | Completed final sign-off May 2026 | 270 Brannan St | Field Construction Inc. | 4th - 6th fl consists of adding 19 phone booths and installation of life safety and seismic requirements in an existing office. path of travel and restroom accessibility upgrades up to 20% construction cost are included. deferred mep and flsDetails
4th - 6th fl consists of adding 19 phone booths and installation of life safety and seismic requirements in an existing office. path of travel and restroom accessibility upgrades up to 20% construction cost are included. deferred mep and fls | $190,000 |
| Oct 20, 2025 | Completed final sign-off Jun 2026 | 1 Front St | Field Construction Inc. | suite 3150 interior tenant improvement, removal and new non-structural partitions, doors, ceilings, light fixtures, plumbing fixtures, millwork and finishes. mep and fire/life safety under defered permitDetails
suite 3150 interior tenant improvement, removal and new non-structural partitions, doors, ceilings, light fixtures, plumbing fixtures, millwork and finishes. mep and fire/life safety under defered permit | $850,000 |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | ste 605, 6th flr; t.i. to include demolition non-structural partitions and ceiling, construction of new partitions, ceiling, power + finishes. market ready condition suite will be uder for marketing of vacant suite and not for occupancy at time. submitted under separate permit: mepDetails
ste 605, 6th flr; t.i. to include demolition non-structural partitions and ceiling, construction of new partitions, ceiling, power + finishes. market ready condition suite will be uder for marketing of vacant suite and not for occupancy at time. submitted under separate permit: mep | $136,000 |
| Oct 7, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | 4/fl- ti include demo of non structrual partitions, ceilings, construction of (n) partitions, ceiling, power and finishes. market ready condition of site will be used for marketing and vacant site and is no intended for occupant at this time. under separte mep and fire under seperate permits.Details
4/fl- ti include demo of non structrual partitions, ceilings, construction of (n) partitions, ceiling, power and finishes. market ready condition of site will be used for marketing and vacant site and is no intended for occupant at this time. under separte mep and fire under seperate permits. | $136,000 |
| Oct 2, 2025 | Completed final sign-off Mar 2026 | 650 Davis St | Field Construction Inc. | unit 175: mechanical- 3 new water sources, 2 new outside air fans, 1 new transfer exhaust fan. electrical power, lighting and signal. ref #202504073829Details
unit 175: mechanical- 3 new water sources, 2 new outside air fans, 1 new transfer exhaust fan. electrical power, lighting and signal. ref #202504073829 | $153,000 |
| Sep 25, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | ste 437 439, tenant improvement to include demo of non structural partitons, ceiling. construction of new partitons, lighting, power and fin. submit under separate permit: electrical, plumbing, fire, life safety and fire sprinklers.Details
ste 437 439, tenant improvement to include demo of non structural partitons, ceiling. construction of new partitons, lighting, power and fin. submit under separate permit: electrical, plumbing, fire, life safety and fire sprinklers. | $136,000 |
| Sep 18, 2025 | Completed final sign-off Mar 2026 | 220 Montgomery St | Field Construction Inc. | suite #905: t.i. to include demolition of non-structural partitions and ceiling, construction and new partitions, ceiling, power and finishes. under a seperate permit: electrical, plumbing, mechanical, fire, life safty and fire sprinklers.Details
suite #905: t.i. to include demolition of non-structural partitions and ceiling, construction and new partitions, ceiling, power and finishes. under a seperate permit: electrical, plumbing, mechanical, fire, life safty and fire sprinklers. | $136,000 |
| Sep 8, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12th fl- revision to pa # 2025-0709-0400. new entry suite door and structural detail for tv mounting system.Details
12th fl- revision to pa # 2025-0709-0400. new entry suite door and structural detail for tv mounting system. | |
| Sep 3, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | mep mechanical & electrical ref pa 202508132909Details
mep mechanical & electrical ref pa 202508132909 | $135,000 |
| Aug 15, 2025 | Completed final sign-off Dec 2025 | 1 Front St | Field Construction Inc. | 19/fl- ref. 202505237198- mech and electrical to install (n) vavs grilles and transfer boots, power light and signal -title 24Details
19/fl- ref. 202505237198- mech and electrical to install (n) vavs grilles and transfer boots, power light and signal -title 24 | $169,354 |
| Aug 15, 2025 | Completed final sign-off Apr 2026 | 1 Front St | Field Construction Inc. | 31/fl- ref. 202504043763- mech and electrical to install (n) vavs grilles and transfer boots, power light and signal -title 24Details
31/fl- ref. 202504043763- mech and electrical to install (n) vavs grilles and transfer boots, power light and signal -title 24 | $69,354 |
| Aug 13, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12th floor: revision to permit#202507090400. reduce(2) new conference rooms, (e) reception millwork to remain. (n) spec for finishes and lighting.Details
12th floor: revision to permit#202507090400. reduce(2) new conference rooms, (e) reception millwork to remain. (n) spec for finishes and lighting. | |
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14/f- deferred mep submittal for bpa# 202506249354.Details
14/f- deferred mep submittal for bpa# 202506249354. | $20,000 |
| Aug 6, 2025 | Completed final sign-off Dec 2025 | 4 Embarcadero Center | Field Construction Inc. | suite 3120 31st fl ref pa # 202505287367. remove heatpump & pumpDetails
suite 3120 31st fl ref pa # 202505287367. remove heatpump & pump | |
| Jul 23, 2025 | Completed final sign-off Nov 2025 | 220 Montgomery St | Field Construction Inc. | 10th/f ste# 1060: t.i. to included demo of non structural partitions & ceiling, construction of new partitions, ceiling, power & finihesDetails
10th/f ste# 1060: t.i. to included demo of non structural partitions & ceiling, construction of new partitions, ceiling, power & finihes | $136,000 |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 220 Montgomery St | Field Construction Inc. | suite 406 - ti improvement to include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling, power and finishes. electrical, plumbing, fire/life/safety and fire sprinklers to be submitted under a separate permit.Details
suite 406 - ti improvement to include demolition of non-structural partitions and ceiling, construction of new partitions, ceiling, power and finishes. electrical, plumbing, fire/life/safety and fire sprinklers to be submitted under a separate permit. | $136,000 |
| Jul 16, 2025 | Expired or cancelled withdrawn May 2026 | 220 Montgomery St | Field Construction Inc. | ste: 600 & 692. t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit.Details
ste: 600 & 692. t.i. improvement to include demolition of non-structrual partitions & ceiling, construction of (n) partitions, ceilings, power and finishes. electrical, plumbing, life/safety/fire & fire sprinklers to be submitted on a separate permit. | $136,000 |
| Jul 9, 2025 | Completed final sign-off May 2026 | 201 03rd St | Field Construction Inc. | 12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgradesDetails
12 flr; t.i. on 12th flr. scope of work includes demolition of non-structural partitions,doors, and sidelights, millwork, ceiling and lighting, and finishes and power, construction of mother's room and accessible single user all gender restroom and existing accessibility upgrades | $1,200,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred.Details
14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred. | $60,000 |
| Jun 18, 2025 | Completed final sign-off Dec 2025 | 220 Montgomery St | Field Construction Inc. | 4/f: electrical power & lighting for t.i. pa 2025-0410-4102.Details
4/f: electrical power & lighting for t.i. pa 2025-0410-4102. | $10,000 |
| Jun 18, 2025 | Completed final sign-off Jan 2026 | 333 Pine St | Field Construction Inc. | 3/f: suite 300 - electrical power & lighting for t.i. pa 2025-0411-4189.Details
3/f: suite 300 - electrical power & lighting for t.i. pa 2025-0411-4189. | $2,500 |
| Jun 18, 2025 | Completed final sign-off Feb 2026 | 220 Montgomery St | Field Construction Inc. | 13/f: suite 1300 - electrical power & lighting for t.i. pa 20250411-4250.Details
13/f: suite 1300 - electrical power & lighting for t.i. pa 20250411-4250. | $2,500 |
| Jun 17, 2025 | Completed final sign-off Dec 2025 | 220 Montgomery St | Field Construction Inc. | ste# 424: electrical, power & lighting for t.i. pa# 202504285363Details
ste# 424: electrical, power & lighting for t.i. pa# 202504285363 | $10,000 |
| May 30, 2025 | In progress issued Jun 2025 | 201 03rd St | Field Construction Inc. | 1st fl electrical only ref 2025-0325-2997Details
1st fl electrical only ref 2025-0325-2997 | $10,000 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 4 Embarcadero Center | Field Construction Inc. | suite 3120 ref pa # 2025-0411-4228: mech- new single duct vav boxes, new water source heat pump, new circulation condenser water pump & new ductwork & air distribution . electrical- power, lighting & signalDetails
suite 3120 ref pa # 2025-0411-4228: mech- new single duct vav boxes, new water source heat pump, new circulation condenser water pump & new ductwork & air distribution . electrical- power, lighting & signal | $150,000 |
| May 28, 2025 | Completed final sign-off Jun 2026 | 450 Irwin St | Field Construction Inc. | 2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor, and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation.Details
2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor, and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation. | $180,000 |
| May 23, 2025 | Completed final sign-off Dec 2025 | 1 Front St | Field Construction Inc. | 19/fl- interior ti to include (n) non structural walls, (n) light fixtures, millwork, and finishes, mep and fire/life safety under separate permitDetails
19/fl- interior ti to include (n) non structural walls, (n) light fixtures, millwork, and finishes, mep and fire/life safety under separate permit | $300,000 |
| May 21, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | removal of interconnecting stair beteween flrs 33-34, and infill of slabs on fl 34. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal.Details
removal of interconnecting stair beteween flrs 33-34, and infill of slabs on fl 34. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 21, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | 34/f and 35/f: removal of interconnecting stair beteween flrs 34-35, and infill of slabs on fl 35. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal.Details
34/f and 35/f: removal of interconnecting stair beteween flrs 34-35, and infill of slabs on fl 35. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 21, 2025 | Completed final sign-off Jan 2026 | 1 Front St | Field Construction Inc. | 35/f and 36/f: removal of interconnecting stair beteween flrs 35-36, and infill of slabs on fl 36. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal.Details
35/f and 36/f: removal of interconnecting stair beteween flrs 35-36, and infill of slabs on fl 36. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mech and elec to be deferred permit submittal. | $200,000 |
| May 13, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishesDetails
14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishes | $478,000 |
| May 1, 2025 | Completed final sign-off Nov 2025 | 1 Front St | Field Construction Inc. | 35/f: electrical and mechanical for restroom upgrade. ref building permit 202503172355.Details
35/f: electrical and mechanical for restroom upgrade. ref building permit 202503172355. | $60,453 |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 300 Mission St | Field Construction Inc. | 15/f: interior ti including multi-use men and women restrooms, new partitions, finsihes, light fixutres, ceiling assemblies, millwork, and plumbing fixtures. mep and fire life safety under separate permit.Details
15/f: interior ti including multi-use men and women restrooms, new partitions, finsihes, light fixutres, ceiling assemblies, millwork, and plumbing fixtures. mep and fire life safety under separate permit. | $2,000,000 |
| Apr 28, 2025 | Completed final sign-off Dec 2025 | 220 Montgomery St | Field Construction Inc. | 4/fl- suite 424- ti to include demo of non structural partitions and ceiling. construction of (n) partitions ceiling power and finishes.Details
4/fl- suite 424- ti to include demo of non structural partitions and ceiling. construction of (n) partitions ceiling power and finishes. | $45,000 |
| Apr 11, 2025 | Completed final sign-off Dec 2025 | 4 Embarcadero Center | Field Construction Inc. | suite 3120 (31st/fl): interior demo of non-structural partitions, doors, ceiling, lighting, and finishes. new construction consists of partitions, doors ceilings, lighting, millwork, and finishes. mep and fire safety deferred permits.Details
suite 3120 (31st/fl): interior demo of non-structural partitions, doors, ceiling, lighting, and finishes. new construction consists of partitions, doors ceilings, lighting, millwork, and finishes. mep and fire safety deferred permits. | $250,000 |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 220 Montgomery St | Field Construction Inc. | 13/fl- ti to include demo of non structural partitions and celing, construction (n) partitions, ceiling, power and finishes. mep fire like safety and fire sprinkler under separate permitDetails
13/fl- ti to include demo of non structural partitions and celing, construction (n) partitions, ceiling, power and finishes. mep fire like safety and fire sprinkler under separate permit | $136,000 |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 333 Pine St | Field Construction Inc. | ste 300: 3rd fl tenant improvement to include demolition of non structural partitions and ceiling construction o new partitions, ceiling, power and finishes. misc upgrades on e 3rd fl restroom and elevator lobby. mei, fire, life safe and fire sprinklers shall be on a sep permit.Details
ste 300: 3rd fl tenant improvement to include demolition of non structural partitions and ceiling construction o new partitions, ceiling, power and finishes. misc upgrades on e 3rd fl restroom and elevator lobby. mei, fire, life safe and fire sprinklers shall be on a sep permit. | $136,000 |