Seth Davis
- License
- C39514
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Dec 2025 to Sep 2026
3 permits since 2000 (architect on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Field Construction Inc., Jdl Build Group Dba Jdl Construction, Skyline Construction
- Engineers
- Benson Balan, Horon Lee
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress issued Sep 2026 | 236 King St | Jdl Build Group Dba Jdl Construction | interior t.i. for new fitness center. demolition of non-load partitions. new non-load bearing partitions, new mep and finishesDetails
interior t.i. for new fitness center. demolition of non-load partitions. new non-load bearing partitions, new mep and finishes | $300,000 |
| Apr 29, 2026 | Completed final sign-off Nov 2026 | 221 Main St | Skyline Construction | ste 770: 2 new phone booths in existing office. new outlets for phone boothsDetails
ste 770: 2 new phone booths in existing office. new outlets for phone booths | $10,000 |
| Dec 30, 2025 | Completed final sign-off Jun 2026 | 2300 Harrison St | Field Construction Inc. | 12 ev chargers to be instal at (e) parking stalls in a private fenced building park lot. 2 new 600v transformers instal on a new concrete pad with safety bollards. parking restriping where faded in same loc. trenching for a new below grade conduit run to new ev charger. level 2 chargers only.Details
12 ev chargers to be instal at (e) parking stalls in a private fenced building park lot. 2 new 600v transformers instal on a new concrete pad with safety bollards. parking restriping where faded in same loc. trenching for a new below grade conduit run to new ev charger. level 2 chargers only. | $100,000 |