Craig Rice
- License
- C38580
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Jan 2026 to Apr 2026
4 permits since 2000 (architect on 4 permits): 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Skyline Construction (3), Field Construction Inc.
- Engineers
- Keith Miller (2), Lloyd Mariner (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2026 | In progress issued Jul 2026 | 301 Howard St | Skyline Construction | 3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater.Details
3rd floor: office full floor ti construction includes interior partitions, door, walls, finished, ceiling,mep upgrades. structural work for phone booths, trans firework, water heater. | $1,200,000 |
| Apr 29, 2026 | In progress issued Jul 2026 | 301 Howard St | Skyline Construction | 4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demo separate permitDetails
4th fl office t.i. entire floor. includes non bearing partitions, office glass, door, walls, finishes, mep upgrades. demo separate permit | $1,200,000 |
| Mar 10, 2026 | In progress issued May 2026 | 301 Howard St | Skyline Construction | interior demo only permit for level 3 and 4. tenant improvement seperate permit.Details
interior demo only permit for level 3 and 4. tenant improvement seperate permit. | $100,000 |
| Jan 30, 2026 | In progress issued May 2026 | 650 Davis St | Field Construction Inc. | ste: 205: tenant improvement to include new space plan and program, new walls, ceilings and finishes, new plumbing fixtures, mechanical distribution, electrical distribution and lighting.Details
ste: 205: tenant improvement to include new space plan and program, new walls, ceilings and finishes, new plumbing fixtures, mechanical distribution, electrical distribution and lighting. | $700,000 |