Permits filed here

96 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 19, 2026In progress
filed Oct 2026, not yet issued
650 Davis StBcci Construction Company2nd floor: interior t.i. to construct private offices, workstations, meeting space, lounge, pantries, and refresh existing restrooms. mep deferred
Details
Permit
202610199637

2nd floor: interior t.i. to construct private offices, workstations, meeting space, lounge, pantries, and refresh existing restrooms. mep deferred

Open the permit page

$2,959,528
Sep 20, 2026In progress
filed Sep 2026, not yet issued
650 Davis StField Construction Inc.2nd fl, ste 205 structural for pa 202601304901
Details
Permit
202608066156

2nd fl, ste 205 structural for pa 202601304901

Open the permit page

$40,000
Jul 22, 2026In progress
issued Aug 2026
650 Davis StField Construction Inc.revision 202601304901-suite 205- replace (e) window frame and glazing with mechanical louver
Details
Permit
202607225426
Permit issued
Aug 6, 2026

revision 202601304901-suite 205- replace (e) window frame and glazing with mechanical louver

Open the permit page

$5,000
Jul 16, 2026In progress
issued Sep 2026
650 Davis StField Construction Inc.meps for project: 2026.0130.4901 - ste 250
Details
Permit
202607165152
Permit issued
Sep 16, 2026

meps for project: 2026.0130.4901 - ste 250

Open the permit page

$397,000
May 5, 2026In progress
issued May 2026
650 Davis StMcclure Electric Inc2/fl- ref 202602186079- title 24 for lighting only
Details
Permit
202605050650
Permit issued
May 5, 2026

2/fl- ref 202602186079- title 24 for lighting only

Open the permit page

$60,000
Mar 25, 2026In progress
issued Apr 2026
650 Davis StBcci Construction Company2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included
Details
Permit
202603258251
Permit issued
Apr 7, 2026

2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included

Open the permit page

$2,959,528
Feb 24, 2026In progress
issued Feb 2026
650 Davis StBcci Construction Company2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru.
Details
Permit
202602246405
Permit issued
Feb 25, 2026

2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru.

Open the permit page

$110,000
Feb 18, 2026In progress
issued Mar 2026
650 Davis StMarchetti Groupground & 2nd fl - ti include new ceiling, lighting & finishes, mep,l/s & sprinklers work to be design build & filed under separate permit (bldg is fully sprinklered).
Details
Permit
202602186079
Permit issued
Mar 5, 2026

ground & 2nd fl - ti include new ceiling, lighting & finishes, mep,l/s & sprinklers work to be design build & filed under separate permit (bldg is fully sprinklered).

Open the permit page

$350,000
Feb 12, 2026Completed
final sign-off Mar 2026
650 Davis StAyoob & Peery Plumbing Co Inc2nd fl - add 11, relocate 16 change out 3 fire sprinkler ti ref 202512020740
Details
Permit
202602125839
Permit issued
Feb 20, 2026
Final sign-off
Mar 17, 2026

2nd fl - add 11, relocate 16 change out 3 fire sprinkler ti ref 202512020740

Open the permit page

$17,490
Jan 30, 2026In progress
issued May 2026
650 Davis StField Construction Inc.ste: 205: tenant improvement to include new space plan and program, new walls, ceilings and finishes, new plumbing fixtures, mechanical distribution, electrical distribution and lighting.
Details
Permit
202601304901
Permit issued
May 19, 2026

ste: 205: tenant improvement to include new space plan and program, new walls, ceilings and finishes, new plumbing fixtures, mechanical distribution, electrical distribution and lighting.

Open the permit page

$700,000
Dec 22, 2025Completed
final sign-off Jun 2026
650 Davis StBcci Construction Company2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740
Details
Permit
202512222386
Permit issued
Dec 23, 2025
Final sign-off
Jun 8, 2026

2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740

Open the permit page

$180,000
Dec 12, 2025In progress
issued Dec 2025
650 Davis StMcclure Electric Inctitle 24 compliance for lighting only ref#: 202510298368
Details
Permit
202512121626
Permit issued
Dec 15, 2025

title 24 compliance for lighting only ref#: 202510298368

Open the permit page

$19,380
Dec 8, 2025Completed
final sign-off Dec 2025
650 Davis StPioneer Fire Inc.relocate (16) pendents in restrooms. gc ti #202510298368
Details
Permit
202512081158
Permit issued
Dec 8, 2025
Final sign-off
Dec 19, 2025

relocate (16) pendents in restrooms. gc ti #202510298368

Open the permit page

$4,000
Dec 2, 2025In progress
issued Dec 2025
650 Davis StBcci Construction Companypartial 2nd/f bldg #1 t.i. new partitions, conference rooms & break room, mep deferred
Details
Permit
202512020740
Permit issued
Dec 18, 2025

partial 2nd/f bldg #1 t.i. new partitions, conference rooms & break room, mep deferred

Open the permit page

$2,659,843
Nov 19, 2025Completed
final sign-off Jan 2026
650 Davis StBilcor Incref 202510026575-install (13) ceiling mount strobes, (3) celiing mount horn strobes, (6) control relays, (1) smoke dectector, (5) duct detectors, (5) duct smoke heads.
Details
Permit
202511199946
Permit issued
Nov 19, 2025
Final sign-off
Jan 9, 2026

ref 202510026575-install (13) ceiling mount strobes, (3) celiing mount horn strobes, (6) control relays, (1) smoke dectector, (5) duct detectors, (5) duct smoke heads.

Open the permit page

$21,000
Nov 5, 2025In progress
issued Dec 2025
650 Davis StMarchetti Group2nd floor: revision to pa#202509115071. removal of 2 double doors from scope, construction of a wall.
Details
Permit
202511058987
Permit issued
Dec 4, 2025

2nd floor: revision to pa#202509115071. removal of 2 double doors from scope, construction of a wall.

Open the permit page

Oct 29, 2025Completed
final sign-off Apr 2026
650 Davis StMarchetti Group2nd floor: commercial interior improvement at restrooms. partial non-structural demo, new nonstructural partitions, doors, frames, lighting, plumbing, interior finishes and new millwork. mep, l/s and sprinkler work to be design-built and filed seperately. bldg is fully sprinklered. barrier removal.
Details
Permit
202510298368
Permit issued
Nov 7, 2025
Final sign-off
Apr 24, 2026

2nd floor: commercial interior improvement at restrooms. partial non-structural demo, new nonstructural partitions, doors, frames, lighting, plumbing, interior finishes and new millwork. mep, l/s and sprinkler work to be design-built and filed seperately. bldg is fully sprinklered. barrier removal.

Open the permit page

$50,000
Oct 8, 2025Completed
final sign-off Jan 2026
650 Davis StAyoob & Peery Plumbing Co Inc1st fl: add 7 relocate 26 fire sprinkler ti. job #25-653. ref pa # 202504073829
Details
Permit
202510086944
Permit issued
Oct 8, 2025
Final sign-off
Jan 14, 2026

1st fl: add 7 relocate 26 fire sprinkler ti. job #25-653. ref pa # 202504073829

Open the permit page

$20,496
Oct 2, 2025Completed
final sign-off Mar 2026
650 Davis StField Construction Inc.unit 175: mechanical- 3 new water sources, 2 new outside air fans, 1 new transfer exhaust fan. electrical power, lighting and signal. ref #202504073829
Details
Permit
202510026575
Permit issued
Oct 29, 2025
Final sign-off
Mar 10, 2026

unit 175: mechanical- 3 new water sources, 2 new outside air fans, 1 new transfer exhaust fan. electrical power, lighting and signal. ref #202504073829

Open the permit page

$153,000
Sep 11, 2025Completed
final sign-off Feb 2026
650 Davis StMarchetti Group2nd fl - office ti, non-structural demo, non structural, partitions, doors/frames, lighting and interior finishes. meps, l/s & sprinklers work (if needed) to be deferreed submittal (bldg fully sprinklered)
Details
Permit
202509115071
Permit issued
Sep 24, 2025
Final sign-off
Feb 18, 2026

2nd fl - office ti, non-structural demo, non structural, partitions, doors/frames, lighting and interior finishes. meps, l/s & sprinklers work (if needed) to be deferreed submittal (bldg fully sprinklered)

Open the permit page

$53,000
Apr 7, 2025Completed
final sign-off Mar 2026
650 Davis StField Construction Inc.interior office improvement: to include demolition of (e) non load bearing partitions, ceilings, lighting and finishes. improvements are to include new partitions, millwork, ceiling, lighting and finishes to match adjacent suite 170.
Details
Permit
202504073829
Permit issued
Jul 18, 2025
Final sign-off
Mar 10, 2026

interior office improvement: to include demolition of (e) non load bearing partitions, ceilings, lighting and finishes. improvements are to include new partitions, millwork, ceiling, lighting and finishes to match adjacent suite 170.

Open the permit page

$728,480
Aug 18, 2023Completed
final sign-off Mar 2026
650 Davis StField Construction Inc.suite 175:title 24 compliant lighting controls ref 202302282751
Details
Permit
202308184710
Permit issued
Aug 21, 2023
Final sign-off
Mar 5, 2026

suite 175:title 24 compliant lighting controls ref 202302282751

Open the permit page

Jun 9, 2023Completed
final sign-off Jun 2023
650 Davis StAyoob & Peery Plumbing Co Increv to pa# 202212198673; change of architectural permit number to reflect buildout scope (previously entered as demo scope). no chanes to piping or head count
Details
Permit
202306099652
Permit issued
Jun 9, 2023
Final sign-off
Jun 26, 2023

rev to pa# 202212198673; change of architectural permit number to reflect buildout scope (previously entered as demo scope). no chanes to piping or head count

Open the permit page

Jun 6, 2023Completed
final sign-off Mar 2026
650 Davis StBilcor Incinstall 1 booster panek, 16 ceiling mount stroes, 8 ceiling mount horn strobes, 8 duct detector housing 9 smoke detects, 1 smoke detector base, 8 control relays
Details
Permit
202306069312
Permit issued
Jun 6, 2023
Final sign-off
Mar 4, 2026

install 1 booster panek, 16 ceiling mount stroes, 8 ceiling mount horn strobes, 8 duct detector housing 9 smoke detects, 1 smoke detector base, 8 control relays

Open the permit page

$33,000
May 2, 2023Completed
final sign-off Aug 2023
650 Davis StField Construction Inc.suite 2010: revision to permit 202212279158. revision shows existing roof drainage barrier causing infeasibility for ada toilet relocation, existing ada toilet location to remain.
Details
Permit
202305026883
Permit issued
Jun 15, 2023
Final sign-off
Aug 22, 2023

suite 2010: revision to permit 202212279158. revision shows existing roof drainage barrier causing infeasibility for ada toilet relocation, existing ada toilet location to remain.

Open the permit page

Apr 13, 2023Completed
final sign-off Apr 2023
650 Davis StAyoob & Peery Plumbing Co Inc1/f: relocate 2 and change out 1 fire sprinkler head per ti. ref permit 202302282751
Details
Permit
202304135649
Permit issued
Apr 13, 2023
Final sign-off
Apr 28, 2023

1/f: relocate 2 and change out 1 fire sprinkler head per ti. ref permit 202302282751

Open the permit page

$1,482
Feb 28, 2023Completed
final sign-off Oct 2023
650 Davis StField Construction Inc.office t.i.#175: demo (e) non-load bearing partitions ceilings, lighthig and finishes standard improvements are to include new doors millwork, plumbing corridor lighting and new finishes
Details
Permit
202302282751
Permit issued
Mar 30, 2023
Final sign-off
Oct 17, 2023

office t.i.#175: demo (e) non-load bearing partitions ceilings, lighthig and finishes standard improvements are to include new doors millwork, plumbing corridor lighting and new finishes

Open the permit page

$95,000
Dec 27, 2022Completed
final sign-off Aug 2023
650 Davis StField Construction Inc.interior ti demo non load bearing partitions, ceilings, lighting and finishes. new partitions, millwork, ceilings, lighting and finishes. new restrooms, shower room, mothers room.
Details
Permit
202212279158
Permit issued
Mar 7, 2023
Final sign-off
Aug 22, 2023

interior ti demo non load bearing partitions, ceilings, lighting and finishes. new partitions, millwork, ceilings, lighting and finishes. new restrooms, shower room, mothers room.

Open the permit page

$800,000
Dec 19, 2022Completed
final sign-off Apr 2023
650 Davis StAyoob & Peery Plumbing Co Inc1st floor/suite 2010: add (21) and relocate (37) fire sprinklers per nfpa 13 (2016) for t.i. ref #202210265247. job # 22-693.
Details
Permit
202212198673
Permit issued
Jan 6, 2023
Final sign-off
Apr 28, 2023

1st floor/suite 2010: add (21) and relocate (37) fire sprinklers per nfpa 13 (2016) for t.i. ref #202210265247. job # 22-693.

Open the permit page

$20,800
Oct 26, 2022Completed
final sign-off Aug 2023
650 Davis StField Construction Inc.suite 2010 on 1/f: demolition of non-load bearing partitions, ceilings, lighting, and finishes per ab-017.
Details
Permit
202210265247
Permit issued
Oct 27, 2022
Final sign-off
Aug 22, 2023

suite 2010 on 1/f: demolition of non-load bearing partitions, ceilings, lighting, and finishes per ab-017.

Open the permit page

$80,000
Oct 26, 2022Completed
final sign-off Apr 2023
650 Davis StAyoob & Peery Plumbing Co Inc1st floor: add (9), relocate (9) and changeout (3) fire sprinklers over t.i. ref pa# 202210265163. job # 22-683.
Details
Permit
202210265198
Permit issued
Oct 26, 2022
Final sign-off
Apr 28, 2023

1st floor: add (9), relocate (9) and changeout (3) fire sprinklers over t.i. ref pa# 202210265163. job # 22-683.

Open the permit page

$5,200
May 20, 2021Completed
final sign-off Aug 2021
650 Davis StAyoob & Peery Plumbing Co Incas-built for #2021-0304-5846 1st floor: add (4), relocate (6) change out (7) 2nd floor: add (5), relocate (25) changeout (41) sprinklers per t.i. job #: 21-617
Details
Permit
202105200756
Permit issued
Jul 2, 2021
Final sign-off
Aug 4, 2021

as-built for #2021-0304-5846 1st floor: add (4), relocate (6) change out (7) 2nd floor: add (5), relocate (25) changeout (41) sprinklers per t.i. job #: 21-617

Open the permit page

Mar 4, 2021Completed
final sign-off Oct 2022
650 Davis StAyoob & Peery Plumbing Co Incfire sprinkler - 1st floor relocate 38, change out 88; 2nd floor - add 3, relocate 47, change out 350
Details
Permit
202103045846
Permit issued
Mar 30, 2021
Final sign-off
Oct 24, 2022

fire sprinkler - 1st floor relocate 38, change out 88; 2nd floor - add 3, relocate 47, change out 350

Open the permit page

$11,000
Mar 1, 2021Completed
final sign-off Dec 2021
650 Davis StField Construction Inc.1st and 2nd flrs: demo of non-load bearing partition, doors and millwork, power lighting. sprinkler under separate permit 202103045846.
Details
Permit
202103015554
Permit issued
Apr 23, 2021
Final sign-off
Dec 20, 2021

1st and 2nd flrs: demo of non-load bearing partition, doors and millwork, power lighting. sprinkler under separate permit 202103045846.

Open the permit page

$200,000
Dec 3, 2020Completed
final sign-off Nov 2021
650 Davis StField Construction Inc.furnish & install new landscape lighting. rev to pa202001172184. new landscape lighting.
Details
Permit
202012030198
Permit issued
Dec 23, 2020
Final sign-off
Nov 12, 2021

furnish & install new landscape lighting. rev to pa202001172184. new landscape lighting.

Open the permit page

Oct 27, 2020Never finaled
issued Jul 2021, no final
650 Davis StField Construction Inc.plumbing - furnish & install new gas piping to exterior hearth. structural - install new rebar & concrete for exterior hearth. new outdoor hearth with insert, emergency shutoff, full glass guards with vents, shutdown timer and fire extinguisher.
Details
Permit
202010277507
Permit issued
Jul 19, 2021

plumbing - furnish & install new gas piping to exterior hearth. structural - install new rebar & concrete for exterior hearth. new outdoor hearth with insert, emergency shutoff, full glass guards with vents, shutdown timer and fire extinguisher.

Open the permit page

$40,000
Jan 17, 2020Completed
final sign-off Feb 2022
650 Davis StField Construction Inc.provide new landscapeing and lighting and brick pavers
Details
Permit
202001172184
Permit issued
Jan 24, 2020
Final sign-off
Feb 14, 2022

provide new landscapeing and lighting and brick pavers

Open the permit page

$750,000
Jul 9, 2019Completed
final sign-off Nov 2019
650 Davis StField Construction Inc.suite 2002: mechanical and electrical in spec suite build-out in 2,925 sq ft of total floor space. maher n/a.
Details
Permit
201907095389
Permit issued
Jul 12, 2019
Final sign-off
Nov 21, 2019

suite 2002: mechanical and electrical in spec suite build-out in 2,925 sq ft of total floor space. maher n/a.

Open the permit page

$60,000
May 30, 2019Completed
final sign-off Nov 2019
650 Davis Sttenant improvement spec suite build out 2925 sq ft of total floor area. new wall, ppower lighting, and finishes. ste 2002a
Details
Permit
201905301979
Permit issued
Jun 11, 2019
Final sign-off
Nov 21, 2019

tenant improvement spec suite build out 2925 sq ft of total floor area. new wall, ppower lighting, and finishes. ste 2002a

Open the permit page

$225,000
Jan 24, 2017Completed
final sign-off Jan 2017
650 Davis StRed Hawk Fire & Security Ca Llc2/f- add 2 horn/strobes, t.i. pa#201606069172
Details
Permit
201701247729
Permit issued
Jan 24, 2017
Final sign-off
Jan 27, 2017

2/f- add 2 horn/strobes, t.i. pa#201606069172

Open the permit page

$2,500
Oct 13, 2016Never finaled
issued Oct 2016, no final
650 Davis StC B F Incsuite #2003 -rovided new lighting & branch circuiting to (e) panel, maintained some of the (e) power & signal outlets & provided additional new power branch circuiting & raceway systems as required to new power & signal outlets. provided ca title 24 compliance forms. ref #201606109650.
Details
Permit
201610130148
Permit issued
Oct 13, 2016

suite #2003 -rovided new lighting & branch circuiting to (e) panel, maintained some of the (e) power & signal outlets & provided additional new power branch circuiting & raceway systems as required to new power & signal outlets. provided ca title 24 compliance forms. ref #201606109650.

Open the permit page

$45,000
Aug 25, 2016Completed
final sign-off Nov 2016
50 Pacific AvAyoob & Peery Plumbing Co Incper ti- relocate 14 fire sprinklers and plug 12 outlets to conform with new wall & ceiling layout ref pa 201606109650
Details
Permit
201608255964
Permit issued
Aug 25, 2016
Final sign-off
Nov 2, 2016

per ti- relocate 14 fire sprinklers and plug 12 outlets to conform with new wall & ceiling layout ref pa 201606109650

Open the permit page

$2,845
Jun 10, 2016Completed
final sign-off Nov 2016
650 Davis StCity Building Inc.suite #2003: this is a commercial t.i. on a single floor, work includes new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical and mechanical. f/a and sprinklers under separate permit.
Details
Permit
201606109650
Permit issued
Jun 15, 2016
Final sign-off
Nov 18, 2016

suite #2003: this is a commercial t.i. on a single floor, work includes new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical and mechanical. f/a and sprinklers under separate permit.

Open the permit page

$310,000
Jun 6, 2016Completed
final sign-off Jan 2017
650 Davis StNovo Construction Inc2/f- barrier removal, demolition and construction of interior non-load bearing partitions and finishes, restroom fixture and accessories. mep under separate permit. no exterior work.
Details
Permit
201606069172
Permit issued
Oct 25, 2016
Final sign-off
Jan 26, 2017

2/f- barrier removal, demolition and construction of interior non-load bearing partitions and finishes, restroom fixture and accessories. mep under separate permit. no exterior work.

Open the permit page

$100,000
Mar 18, 2016Completed
final sign-off Jul 2016
455 The EmbarcaderoRed Hawk Fire & Security Ca Llcfire alarm ti add (1) relay for security door interface. ref pa 2014-0630-9966, 2015-0624-9756
Details
Permit
201603182475
Permit issued
Mar 21, 2016
Final sign-off
Jul 23, 2016

fire alarm ti add (1) relay for security door interface. ref pa 2014-0630-9966, 2015-0624-9756

Open the permit page

$600
Nov 4, 2015Never finaled
issued Mar 2016, no final
650 Davis StMarchetti Groupdemolition of extg vinyl paneled soffit and framing to exterior "colonnades" provision of new exterior gyp board soffit with integral l.e.d. lighting and replacement l.e.d. column lighting intergrated space heaters. n/a for maher.
Details
Permit
201511041751
Permit issued
Mar 23, 2016

demolition of extg vinyl paneled soffit and framing to exterior "colonnades" provision of new exterior gyp board soffit with integral l.e.d. lighting and replacement l.e.d. column lighting intergrated space heaters. n/a for maher.

Open the permit page

$32,000
Jun 25, 2015Never finaled
issued Jun 2015, no final
455 The EmbarcaderoMc Millan Electric, Novo Construction Inc1/f: electrical- furnish and install new lighting and power, relocate existing panel boards make safe demo prior to job start; reference pa#201406309966
Details
Permit
201506259880
Permit issued
Jun 25, 2015

1/f: electrical- furnish and install new lighting and power, relocate existing panel boards make safe demo prior to job start; reference pa#201406309966

Open the permit page

$350,000
Jun 24, 2015Never finaled
issued Jul 2015, no final
455 The EmbarcaderoNovo Construction Inc1st floor:revision to app#201406309966 to modify entry doors and add turnstiles. ref arch. #201406309966
Details
Permit
201506249756
Permit issued
Jul 15, 2015

1st floor:revision to app#201406309966 to modify entry doors and add turnstiles. ref arch. #201406309966

Open the permit page

$110,000
Jun 22, 2015Completed
final sign-off Jul 2015
455 The EmbarcaderoRed Hawk Fire & Security Ca Llc1st floor: add 13 horn/strobes, 15 strobes, 1 booster power supply and 11 duct dtectors. ref. appl. 2014.0630.9966.
Details
Permit
201506229554
Permit issued
Jun 22, 2015
Final sign-off
Jul 13, 2015

1st floor: add 13 horn/strobes, 15 strobes, 1 booster power supply and 11 duct dtectors. ref. appl. 2014.0630.9966.

Open the permit page

$12,500
Apr 29, 2015Completed
final sign-off Jun 2015
455 The EmbarcaderoGolden Gate Fire Protection Inc1/f: fire sprinkler only. relocate 45 sprinkler pendents, add 4 pendents, relocate 66 sprinkler uprights, add 15 uprights, delete 46 sprinkler pendents total 130. ref pa#201406309966
Details
Permit
201504294895
Permit issued
Apr 29, 2015
Final sign-off
Jun 24, 2015

1/f: fire sprinkler only. relocate 45 sprinkler pendents, add 4 pendents, relocate 66 sprinkler uprights, add 15 uprights, delete 46 sprinkler pendents total 130. ref pa#201406309966

Open the permit page

$65,000
Apr 27, 2015Never finaled
issued Apr 2015, no final
455 The EmbarcaderoCa United Mechanical, Inc1st flr: work in common area - revise ductwork at (e) wshp units. relocate 2 wshp that are (e) ref pa 2014 0630 9966
Details
Permit
201504274702
Permit issued
Apr 30, 2015

1st flr: work in common area - revise ductwork at (e) wshp units. relocate 2 wshp that are (e) ref pa 2014 0630 9966

Open the permit page

$160,000
Mar 27, 2015Never finaled
issued Mar 2015, no final
455 The EmbarcaderoNovo Construction Incdemolition on 1st fl. ab-017
Details
Permit
201503272022
Permit issued
Mar 27, 2015

demolition on 1st fl. ab-017

Open the permit page

$5,000
Aug 14, 2014Expired or cancelled
cancelled Jan 2026
650 Davis StSan Francisco Commercial Builders Incbldg 2, 1/f- tenant improvements including removal 1 construction of non-structural framed walls, doors, minor electrical, painting & ceiling repairs.
Details
Permit
201408143856

bldg 2, 1/f- tenant improvements including removal 1 construction of non-structural framed walls, doors, minor electrical, painting & ceiling repairs.

Open the permit page

$27,600
Jun 30, 2014Never finaled
issued Apr 2015, no final
455 The EmbarcaderoNovo Construction Inc1st floor: construction of non load bearing partitions door and finishes. no change of use and no exterior work. no building expansion. mep and life safety under seperate permit.
Details
Permit
201406309966
Permit issued
Apr 14, 2015

1st floor: construction of non load bearing partitions door and finishes. no change of use and no exterior work. no building expansion. mep and life safety under seperate permit.

Open the permit page

$250,000
Jun 27, 2014Completed
final sign-off Sep 2014
650 Davis StPeacock Constructiondemo only under ab-017, selective demo of non-structural, non-rated partitions. n/a ordinance #155-13
Details
Permit
201406279784
Permit issued
Jul 7, 2014
Final sign-off
Sep 15, 2014

demo only under ab-017, selective demo of non-structural, non-rated partitions. n/a ordinance #155-13

Open the permit page

$21,000
Sep 10, 2013Completed
final sign-off Dec 2013
650 Davis StRcm Fire Protection Inc.remove and replace deteriorating sprinkler pipe and sprinklers for new water cooling tower construction. ref app#201309096256
Details
Permit
201309106348
Permit issued
Sep 10, 2013
Final sign-off
Dec 9, 2013

remove and replace deteriorating sprinkler pipe and sprinklers for new water cooling tower construction. ref app#201309096256

Open the permit page

$5,000
Sep 9, 2013Completed
final sign-off Mar 2014
650 Davis StMatrix Hg Incinstall additional structural beams under mechanical mezzanine for added metal pan deck support. replace cooling tower walls & coils. (e) pumps & fans to remain
Details
Permit
201309096256
Permit issued
Sep 9, 2013
Final sign-off
Mar 10, 2014

install additional structural beams under mechanical mezzanine for added metal pan deck support. replace cooling tower walls & coils. (e) pumps & fans to remain

Open the permit page

$25,000
Jul 6, 2011Completed
final sign-off Nov 2011
455 The EmbarcaderoPeacock Construction Incremodel extg restrooms to comply with a.d.a new finishes(barrier removal)
Details
Permit
201107069562
Permit issued
Jul 6, 2011
Final sign-off
Nov 4, 2011

remodel extg restrooms to comply with a.d.a new finishes(barrier removal)

Open the permit page

$60,000
Jun 17, 2011Completed
final sign-off Nov 2011
475 The EmbarcaderoPeacock Construction Inc1st floor bldg 2 - remodel existing bathrooms to comply with ada new finishes. (barrier removal)
Details
Permit
201106178426
Permit issued
Jun 22, 2011
Final sign-off
Nov 4, 2011

1st floor bldg 2 - remodel existing bathrooms to comply with ada new finishes. (barrier removal)

Open the permit page

$60,000
Oct 8, 2010Completed
final sign-off Feb 2011
50 Pacific AvPeacock Construction Incremodel of existing restrooms to comply ith ada, new finishes, gr fl office
Details
Permit
201010082597
Permit issued
Oct 8, 2010
Final sign-off
Feb 22, 2011

remodel of existing restrooms to comply ith ada, new finishes, gr fl office

Open the permit page

$60,000
Sep 21, 2010Completed
final sign-off Jan 2011
650 Davis StPeacock Construction Incground floor-demo of (e) ceiling & non structural partitions, mill work to accomodate new layout. install new ceiling, new mill work, new lights, patch (e) partitions to take new finishes. sprinkler, lighting under seperate permit
Details
Permit
201009211241
Permit issued
Sep 21, 2010
Final sign-off
Jan 19, 2011

ground floor-demo of (e) ceiling & non structural partitions, mill work to accomodate new layout. install new ceiling, new mill work, new lights, patch (e) partitions to take new finishes. sprinkler, lighting under seperate permit

Open the permit page

$120,000
Sep 2, 2010Completed
final sign-off Jan 2011
50 Pacific Avti upgrade ot existing sprinkler system. relocate 26 heads and add 1 sprinkler head. relocate 26, add 1
Details
Permit
201009020134
Permit issued
Sep 2, 2010
Final sign-off
Jan 28, 2011

ti upgrade ot existing sprinkler system. relocate 26 heads and add 1 sprinkler head. relocate 26, add 1

Open the permit page

$8,200
Aug 6, 2010Completed
final sign-off Jan 2011
650 Davis StPeacock Construction Incdemo non-bearing partitions, millwork, doors, build back to new layout, new cieling and lights. new millwork.(mep and sprinkler under seperate permit) construct 1-hr wall at infilled door opening.
Details
Permit
201008068307
Permit issued
Sep 1, 2010
Final sign-off
Jan 28, 2011

demo non-bearing partitions, millwork, doors, build back to new layout, new cieling and lights. new millwork.(mep and sprinkler under seperate permit) construct 1-hr wall at infilled door opening.

Open the permit page

$95,000
Aug 6, 2010Expired or cancelled
cancelled Jan 2026
650 Davis Stdemo non-bearing partitions, millwork, doors, build back to new layout, new cielings and lights, new millwork
Details
Permit
201008068305

demo non-bearing partitions, millwork, doors, build back to new layout, new cielings and lights, new millwork

Open the permit page

$72,450
Jan 19, 2010Completed
final sign-off Mar 2010
455 The Embarcaderot/i upgrade on the (e) fire sprinkler system; for acs server. relocate 4-heads in scope of work. ref. appl.#2009/1221/3553.
Details
Permit
201001194931
Permit issued
Jan 20, 2010
Final sign-off
Mar 15, 2010

t/i upgrade on the (e) fire sprinkler system; for acs server. relocate 4-heads in scope of work. ref. appl.#2009/1221/3553.

Open the permit page

$800
Jan 14, 2010Completed
final sign-off Mar 2010
650 Davis StRed Hawk Fire & Security Ca Llcste 30 - add 2 horn/strobes & 2 strobes to open office area.
Details
Permit
201001144762
Permit issued
Jan 14, 2010
Final sign-off
Mar 16, 2010

ste 30 - add 2 horn/strobes & 2 strobes to open office area.

Open the permit page

$5,000
Jan 14, 2010Completed
final sign-off Mar 2010
650 Davis StRed Hawk Fire & Security Ca Llcste 455 - add 3 relay modules for unit shut down 2 relays for fsd control, 1 smoke added to acs server room for area coverage.
Details
Permit
201001144763
Permit issued
Jan 14, 2010
Final sign-off
Mar 16, 2010

ste 455 - add 3 relay modules for unit shut down 2 relays for fsd control, 1 smoke added to acs server room for area coverage.

Open the permit page

$5,000
Dec 21, 2009Completed
final sign-off Mar 2010
455 The EmbarcaderoPeacock Construction Inc1st floor. remove non-structural partitions, add 1 partition to active expansion of structural room. (mechanica, electrical, life safety under separate permit).
Details
Permit
200912213553
Permit issued
Dec 24, 2009
Final sign-off
Mar 16, 2010

1st floor. remove non-structural partitions, add 1 partition to active expansion of structural room. (mechanica, electrical, life safety under separate permit).

Open the permit page

$75,000
Aug 29, 2008Completed
final sign-off Jan 2009
650 Davis StRed Hawk Fire & Security Ca Llcadd new fire alarm devices to extg fire alarm panel. 3 pull stations,2 strobes, 3 horn/strobes
Details
Permit
200808290365
Permit issued
Aug 29, 2008
Final sign-off
Jan 28, 2009

add new fire alarm devices to extg fire alarm panel. 3 pull stations,2 strobes, 3 horn/strobes

Open the permit page

$5,000
Apr 26, 2007Expired or cancelled
expired Apr 2011
650 Davis StPacific Auxiliary Fire Alarmrenew pa# 2006/06/20/4467 for final inspection only.
Details
Permit
200704269746
Permit issued
Apr 26, 2007

renew pa# 2006/06/20/4467 for final inspection only.

Open the permit page

Sep 21, 2006Completed
final sign-off Jan 2007
455 The EmbarcaderoAnderson, Rowe & Buckley, Inc.t.i. extg fire spnkler system/46 relocates/4 removed
Details
Permit
200609212950
Permit issued
Sep 21, 2006
Final sign-off
Jan 31, 2007

t.i. extg fire spnkler system/46 relocates/4 removed

Open the permit page

$9,500
Aug 17, 2006Completed
final sign-off Jan 2007
455 The EmbarcaderoPeacock Construction Incinstallation of mechanical duct work, diffusers etc to supply space. installation of lights, wall plugs, and switches and all associated piping. power for partitions (furniture) at streetlevel
Details
Permit
200608179749
Permit issued
Aug 17, 2006
Final sign-off
Jan 31, 2007

installation of mechanical duct work, diffusers etc to supply space. installation of lights, wall plugs, and switches and all associated piping. power for partitions (furniture) at streetlevel

Open the permit page

$105,000
Aug 15, 2006Completed
final sign-off Jan 2007
455 The EmbarcaderoPacific Auxiliary Fire Alarm1st floor, ste 100-installation of 1 power supply, 3 smoke detectors and 6 horn/strobes.
Details
Permit
200608159547
Permit issued
Aug 15, 2006
Final sign-off
Jan 31, 2007

1st floor, ste 100-installation of 1 power supply, 3 smoke detectors and 6 horn/strobes.

Open the permit page

$10,000
Jul 24, 2006Completed
final sign-off Jan 2007
455 The Embarcaderointerior non-structural demolition & construction of partitions, ceilings & finishes in an (e) tenant space. any mechanical, plumbing work to be done as a result of this scope of work. shall be performed under a separate permit. ref. pa# 2006/03/08/6275. no structural work.
Details
Permit
200607247421
Permit issued
Jul 24, 2006
Final sign-off
Jan 31, 2007

interior non-structural demolition & construction of partitions, ceilings & finishes in an (e) tenant space. any mechanical, plumbing work to be done as a result of this scope of work. shall be performed under a separate permit. ref. pa# 2006/03/08/6275. no structural work.

Open the permit page

$80,000
Jul 17, 2006Completed
final sign-off Jan 2007
650 Davis StPeacock Construction Increvision to sway bracing (new detail) unistrut sway bracing detail on fp2. reference to permit 200604108602 r1 sprinkler work
Details
Permit
200607176678
Permit issued
Aug 8, 2006
Final sign-off
Jan 31, 2007

revision to sway bracing (new detail) unistrut sway bracing detail on fp2. reference to permit 200604108602 r1 sprinkler work

Open the permit page

$15,000
Jun 20, 2006Expired or cancelled
expired Apr 2011
650 Davis StPacific Auxiliary Fire Alarminstallation of outdoor strobes on the 3rd level buildings to identity building with waterflow alarm for the fire dept. & installation of interior graphic map & addition of 1 horn / strobe at residential lobby.
Details
Permit
200606204467
Permit issued
Jun 20, 2006

installation of outdoor strobes on the 3rd level buildings to identity building with waterflow alarm for the fire dept. & installation of interior graphic map & addition of 1 horn / strobe at residential lobby.

Open the permit page

$8,000
May 2, 2006Completed
final sign-off Jan 2007
650 Davis StPacific Auxiliary Fire Alarmadditions to extg fire alarm system due to a tenant improvement on the second floor
Details
Permit
200605020430
Permit issued
May 2, 2006
Final sign-off
Jan 31, 2007

additions to extg fire alarm system due to a tenant improvement on the second floor

Open the permit page

$30,000
Apr 10, 2006Completed
final sign-off Jan 2007
650 Davis StPeacock Construction Inc2nd floor - mechanical new exhaust fan schedule, new server room, hvac system, new duct work on whole floor, electrical lighting, power in walls, install new elec. panels.
Details
Permit
200604108603
Permit issued
Jun 14, 2006
Final sign-off
Jan 31, 2007

2nd floor - mechanical new exhaust fan schedule, new server room, hvac system, new duct work on whole floor, electrical lighting, power in walls, install new elec. panels.

Open the permit page

$205,000
Apr 10, 2006Expired or cancelled
expired Feb 2009
650 Davis StPeacock Construction Incsprinkler work in space, relocate 372 heads, 206 heads to be removed. pre action system for server room.
Details
Permit
200604108602
Permit issued
Jul 14, 2006

sprinkler work in space, relocate 372 heads, 206 heads to be removed. pre action system for server room.

Open the permit page

$48,000
Mar 28, 2006Completed
final sign-off Jan 2007
650 Davis StIntelligent Technologies & Services Incinstall hfc-22 tea/pre-action system for 2/f server room 210.
Details
Permit
200603287634
Permit issued
Mar 28, 2006
Final sign-off
Jan 31, 2007

install hfc-22 tea/pre-action system for 2/f server room 210.

Open the permit page

$15,000
Mar 8, 2006Completed
final sign-off Jan 2007
650 Davis Stinterior non-structural construction of partitions. ceilings & finishes in an (e) multi-tenant building. no change in use, occupancy, or exiting. any mechanical, electrical, plumbing, or sprinkler to be performed under a separate permit. no exterior work.
Details
Permit
200603086275
Permit issued
Mar 30, 2006
Final sign-off
Jan 31, 2007

interior non-structural construction of partitions. ceilings & finishes in an (e) multi-tenant building. no change in use, occupancy, or exiting. any mechanical, electrical, plumbing, or sprinkler to be performed under a separate permit. no exterior work.

Open the permit page

$250,000
Jan 31, 2006Completed
final sign-off Jan 2007
650 Davis Stinterior non-structural demolition only. any mechanical electrical or plumbing work to be performed under a separate permit. all accessibility or barrier removal to be addressed under a separate t.i. construction permit.
Details
Permit
200601313469
Permit issued
Jan 31, 2006
Final sign-off
Jan 31, 2007

interior non-structural demolition only. any mechanical electrical or plumbing work to be performed under a separate permit. all accessibility or barrier removal to be addressed under a separate t.i. construction permit.

Open the permit page

$15,000
May 19, 2005Expired or cancelled
expired Oct 2005
650 Davis Stvoluntary accessible restroom upgrade relocate extg fixture per ada clearance & height requirements
Details
Permit
200505192895
Permit issued
May 19, 2005

voluntary accessible restroom upgrade relocate extg fixture per ada clearance & height requirements

Open the permit page

$25,000
Mar 22, 2005Expired or cancelled
expired Apr 2011
650 Davis StPacific Auxiliary Fire Alarminstallation of 2 new notifier 640 fire alarm panel to replace the (e) fire alarm panel.
Details
Permit
200503228061
Permit issued
May 17, 2005

installation of 2 new notifier 640 fire alarm panel to replace the (e) fire alarm panel.

Open the permit page

$125,000
Dec 2, 2004Completed
final sign-off Feb 2005
455 The Embarcaderome & sprinkler permit for previously issued construction permit 200410136684.
Details
Permit
200412020535
Permit issued
Dec 2, 2004
Final sign-off
Feb 17, 2005

me & sprinkler permit for previously issued construction permit 200410136684.

Open the permit page

$15,000
Oct 13, 2004Completed
final sign-off Feb 2005
455 The Embarcaderodemolition & construciton or non structural partitions. ceilings & finishes in (e) bldg. no changes
Details
Permit
200410136684
Permit issued
Oct 13, 2004
Final sign-off
Feb 17, 2005

demolition & construciton or non structural partitions. ceilings & finishes in (e) bldg. no changes

Open the permit page

$50,000
Jul 13, 2004Expired or cancelled
expired Jul 2006
455 The Embarcaderominor alterations to (e) tenant space
Details
Permit
200407138711
Permit issued
Jul 13, 2004

minor alterations to (e) tenant space

Open the permit page

$35,000
May 9, 2003Completed
final sign-off May 2003
650 Davis StGiampolini & Co., Incto renew app#2002/08/21/4542 for final inspection
Details
Permit
200305094169
Permit issued
May 9, 2003
Final sign-off
May 19, 2003

to renew app#2002/08/21/4542 for final inspection

Open the permit page

Dec 24, 2002Completed
final sign-off Jul 2003
650 Davis Stinstall railing for visually impared persons beneath existing open stairs
Details
Permit
200212244150
Permit issued
Mar 24, 2003
Final sign-off
Jul 17, 2003

install railing for visually impared persons beneath existing open stairs

Open the permit page

$4,411
Aug 21, 2002Expired or cancelled
expired May 2003
650 Davis Strepair & replace damaged brick veneer. maintenance repairs.
Details
Permit
200208214542
Permit issued
Aug 21, 2002

repair & replace damaged brick veneer. maintenance repairs.

Open the permit page

$15,000
Feb 20, 2002Expired or cancelled
expired Oct 2002
650 Davis StToll Architectural Graphicserect electric single faced sign
Details
Permit
200202209558
Permit issued
Feb 20, 2002

erect electric single faced sign

Open the permit page

Jun 27, 2001Completed
final sign-off Jul 2001
475 The EmbarcaderoSouth Bay Constructionmechanical-lighting for office t.i. on 1st floor per app # 200105179440
Details
Permit
200106272461
Permit issued
Jun 27, 2001
Final sign-off
Jul 18, 2001

mechanical-lighting for office t.i. on 1st floor per app # 200105179440

Open the permit page

$90,000
Jun 4, 2001Completed
final sign-off Jul 2001
475 The EmbarcaderoDpw Inc.relocate sprinkler heads on ground floor for new t.i. work
Details
Permit
200106040627
Permit issued
Jun 4, 2001
Final sign-off
Jul 18, 2001

relocate sprinkler heads on ground floor for new t.i. work

Open the permit page

$6,000
May 17, 2001Completed
final sign-off Jul 2001
475 The EmbarcaderoSouth Bay Constructiontenant improvement 4 new rooms in open office
Details
Permit
200105179440
Permit issued
May 17, 2001
Final sign-off
Jul 18, 2001

tenant improvement 4 new rooms in open office

Open the permit page

$60,000
May 15, 2001Completed
final sign-off Sep 2001
650 Davis StPeacock Construction Incremove ceilings, fur out walls, replace ceilings.
Details
Permit
200105159245
Permit issued
May 22, 2001
Final sign-off
Sep 5, 2001

remove ceilings, fur out walls, replace ceilings.

Open the permit page

$25,000
May 7, 2001Completed
final sign-off Mar 2002
650 Davis StWard & Son's Construction1st fl-entry area&display cases. remove demo wall at rear.2nd fl-add new office space, upgrade,rest.
Details
Permit
200105078553
Permit issued
Jul 25, 2001
Final sign-off
Mar 20, 2002

1st fl-entry area&display cases. remove demo wall at rear.2nd fl-add new office space, upgrade,rest.

Open the permit page

$160,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Field Construction Inc. (16), Peacock Construction Inc (11), Ayoob & Peery Plumbing Co Inc (9), Red Hawk Fire & Security Ca Llc (6), Bcci Construction Company (5), Marchetti Group (5), Novo Construction Inc (5), Pacific Auxiliary Fire Alarm (5), Bilcor Inc (2), Mcclure Electric Inc (2), South Bay Construction (2), Anderson, Rowe & Buckley, Inc., C B F Inc, Ca United Mechanical, Inc, City Building Inc., Dpw Inc., Giampolini & Co., Inc, Golden Gate Fire Protection Inc, Intelligent Technologies & Services Inc, Matrix Hg Inc, Mc Millan Electric, Peacock Construction, Pioneer Fire Inc., Rcm Fire Protection Inc., San Francisco Commercial Builders Inc, Toll Architectural Graphics, Ward & Son's Construction
Architects
James Terry (5), Ariane Lebrilla (4), Stephanie Kwan (4), Ahmad Mohazab (3), George S Soskin (2), Anthony Cataldo, Craig Rice, David Ross, Joel Villalon, Joyce Polhamus, Nelson Algaze
Engineers
Jesus B Cabellon Jr (2), Ahmad Mohazab, Amit Wadhwa, Ayoob & Beery, David Rossi, Jason Lau, Jg Engineers, Jordan Malabed, Levi Abarte, Mary Katherine Vasquez, William J Hadinger
Designers
Leanne Goff

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.