Block 3820, lot 004
1140 07th St
- City’s use
- Commercial Misc
- Built
- 2024
- Stories
- 4
- Building
- 100,732 sq ft
- Lot
- 198,000 sq ft
- Zoning
- M2
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
51 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2026 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | to obtain final inspection for work approved under 202010315479 and 202002144560Details
to obtain final inspection for work approved under 202010315479 and 202002144560 | |
| Aug 1, 2025 | In progress issued Aug 2025 | 450 Irwin St | Everon Llc | fire alarm t.i. on 2nd flr - replace 3 conventional smake def w/addressable, add 6 smoke det. revised 1 monitoring module and power supply. replace 3 h/s add 1 h/s, add 1 duct def w/relay for heat pump and remove 1 frame det. ref#: 202505287353Details
fire alarm t.i. on 2nd flr - replace 3 conventional smake def w/addressable, add 6 smoke det. revised 1 monitoring module and power supply. replace 3 h/s add 1 h/s, add 1 duct def w/relay for heat pump and remove 1 frame det. ref#: 202505287353 | $12,000 |
| Jun 17, 2025 | Completed final sign-off Jun 2025 | 1140 07th St | Siemens Industry, Inc. | fire only revision to obtain an as-built permit for the installation done under ref#: 202407267317; addition of 4 speaker/staples and 3 strobes total on floor 1,2, and 3 restrooms.Details
fire only revision to obtain an as-built permit for the installation done under ref#: 202407267317; addition of 4 speaker/staples and 3 strobes total on floor 1,2, and 3 restrooms. | $5,710 |
| May 28, 2025 | Completed final sign-off Jun 2026 | 450 Irwin St | Field Construction Inc. | 2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor, and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation.Details
2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor, and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation. | $180,000 |
| Aug 30, 2024 | Completed final sign-off Sep 2024 | 1140 07th St | Hathaway Dinwiddie Co. | to add new address of 145 hopper street for new building bpa # 201806283199Details
to add new address of 145 hopper street for new building bpa # 201806283199 | |
| Aug 6, 2024 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | rev to pa 201806283199-s3: to document approved assembly loads.Details
rev to pa 201806283199-s3: to document approved assembly loads. | |
| Jul 26, 2024 | Completed final sign-off Jul 2025 | 1140 07th St | Siemens Industry, Inc. | fire only revision to pa 201806283199 (s5); all changes indicate the actual dvice layouts which adds 13 duct detectors and 16 modules; but has the deletion of 7 msoke detectors and 5 strobes, permit submission for corrections onlyDetails
fire only revision to pa 201806283199 (s5); all changes indicate the actual dvice layouts which adds 13 duct detectors and 16 modules; but has the deletion of 7 msoke detectors and 5 strobes, permit submission for corrections only | $36,285 |
| Jul 24, 2024 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | revision to bpa 201806283199 s3 interior updated spaces provided in level 2 of irwin and hooper pavilions, as well as levels 3-4 of hooper pavilion 1-hr fire separation added between levels 1 and 2 of hooper pavilion at group a occupancy. back check hours to be applied, dmj 07/23/2024;Details
revision to bpa 201806283199 s3 interior updated spaces provided in level 2 of irwin and hooper pavilions, as well as levels 3-4 of hooper pavilion 1-hr fire separation added between levels 1 and 2 of hooper pavilion at group a occupancy. back check hours to be applied, dmj 07/23/2024; | |
| Jul 19, 2024 | Completed final sign-off Dec 2025 | 1140 07th St | Arrow Sign Company, Hathaway Dinwiddie Co. | ref 201806283199-install evacaution signage for 1st to 4th floor.Details
ref 201806283199-install evacaution signage for 1st to 4th floor. | $5,400 |
| Jul 3, 2024 | Expired or cancelled withdrawn Apr 2025 | 450 Irwin St | interior ti (n0n-structural) of partial 2nd fl of (e) schoool, addition of rooftop mech w/structural support, no area increase. no change in occupancyDetails
interior ti (n0n-structural) of partial 2nd fl of (e) schoool, addition of rooftop mech w/structural support, no area increase. no change in occupancy | $186,000 | |
| Jun 10, 2024 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | comprehensive master sign plan per g-04, reference pa 2018-0628-3199.Details
comprehensive master sign plan per g-04, reference pa 2018-0628-3199. | $14,466 |
| Apr 8, 2024 | Completed final sign-off Aug 2024 | 1140 07th St | Paganini Electric Corp(See Signatories) | installl emergency responder radio coverage system.Details
installl emergency responder radio coverage system. | $50,000 |
| Aug 11, 2023 | Completed final sign-off Apr 2024 | 1111 08th St | Everon Llc | as built for pa#202207229106. update floor plan to reflect correct devices location, added all floor plans per sffd inspector requestDetails
as built for pa#202207229106. update floor plan to reflect correct devices location, added all floor plans per sffd inspector request | |
| Apr 20, 2023 | Completed final sign-off Nov 2023 | 1111 08th St | Johnstone - Mc Auliffe Const. Inc. | alteration to extg clerestoru window, replace w/temp insul window units. not visible from streetDetails
alteration to extg clerestoru window, replace w/temp insul window units. not visible from street | $450,000 |
| Mar 22, 2023 | Expired or cancelled withdrawn Jun 2023 | 1140 07th St | new nfpa 13 automatic wet fire sprinkler system,1160 new sprinklers.new nfpa 14 class 1 manual wet standpipe system including combination standpipe,28 hose valves.new nfpa 20 horizontal splitcase fire pump system including jockey pump,controllers, and test assemblies. reference bpa#2018/0628/3199.Details
new nfpa 13 automatic wet fire sprinkler system,1160 new sprinklers.new nfpa 14 class 1 manual wet standpipe system including combination standpipe,28 hose valves.new nfpa 20 horizontal splitcase fire pump system including jockey pump,controllers, and test assemblies. reference bpa#2018/0628/3199. | $732,300 | |
| Dec 28, 2022 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | revision to bpa# 202207087976. storm water control plans for pa# 201806283199. for pid review only.Details
revision to bpa# 202207087976. storm water control plans for pa# 201806283199. for pid review only. | |
| Dec 9, 2022 | Completed final sign-off Dec 2025 | 1140 07th St | Eco Fire Sprinklers Inc | install stub infor (n) 6" fire service. coming off of 16" main on irwin street. ref pa# 201806283199Details
install stub infor (n) 6" fire service. coming off of 16" main on irwin street. ref pa# 201806283199 | $16,000 |
| Oct 31, 2022 | Expired or cancelled expired Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | auger cast pileDetails
auger cast pile | $1,500,000 |
| Aug 12, 2022 | Completed final sign-off Nov 2022 | 1111 08th St | Ayoob & Peery Plumbing Co Inc | 2/f: add (5), relocate (2) fire sprinklers per t.i. ref bpa#202204222823Details
2/f: add (5), relocate (2) fire sprinklers per t.i. ref bpa#202204222823 | $22,500 |
| Aug 3, 2022 | Never finaled issued Aug 2022, no final | 1111 08th St | Everon Llc | fire alarm ti alpha bldg add 4 horn strobes, beta bldg. add (4) wall mount horn strobes. 1 ceiling horn/strobe. 1 ceiling strobe, 1 pull station. ref 202204222823Details
fire alarm ti alpha bldg add 4 horn strobes, beta bldg. add (4) wall mount horn strobes. 1 ceiling horn/strobe. 1 ceiling strobe, 1 pull station. ref 202204222823 | $7,000 |
| Jul 22, 2022 | Completed final sign-off Apr 2024 | 1111 08th St | Everon Llc | emergency fire alarm panel replacement. revise all (e) intiating devices and wiring. all existing devices are compatible with new facu. add (1) wireless communicator.Details
emergency fire alarm panel replacement. revise all (e) intiating devices and wiring. all existing devices are compatible with new facu. add (1) wireless communicator. | $3,500 |
| Jul 8, 2022 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | storm water control plans for pa# 2018-0628-3199. for pid review only.Details
storm water control plans for pa# 2018-0628-3199. for pid review only. | |
| Jul 6, 2022 | Completed final sign-off Aug 2022 | 1111 08th St | Ayoob & Peery Plumbing Co Inc | 1/f: add 1, relocate 24 fire srinklers heads per ti.i pa202204222823.Details
1/f: add 1, relocate 24 fire srinklers heads per ti.i pa202204222823. | $5,925 |
| Jun 29, 2022 | Expired or cancelled withdrawn Jul 2022 | 1140 07th St | Hathaway Dinwiddie Co. | administratvie permit for dph review of site mitigation compliance to start work associated with site permit 2018-0628-3199 per sfbc 106a.3.2.4.2Details
administratvie permit for dph review of site mitigation compliance to start work associated with site permit 2018-0628-3199 per sfbc 106a.3.2.4.2 | |
| Apr 22, 2022 | Never finaled issued May 2022, no final | 1111 08th St | Johnstone - Mc Auliffe Const. Inc. | interior tenant improvement, non structural, approx. 9200 sq ft.Details
interior tenant improvement, non structural, approx. 9200 sq ft. | $110,000 |
| Sep 27, 2021 | Completed final sign-off Feb 2023 | 1111 08th St | Everon Llc | fire alarm t.i. add 1 flame detector with monitoring module, 1 power supply, and 1 monitoring module for suppression system.Details
fire alarm t.i. add 1 flame detector with monitoring module, 1 power supply, and 1 monitoring module for suppression system. | $6,000 |
| Jun 26, 2020 | Completed final sign-off Apr 2024 | 1140 07th St | Hathaway Dinwiddie Co. | test pile program associated with 201806283199, cordon-johnson & assoct will install 4 sacraficial test piles, 4 sacrificial reaction piles & perform load testing in advance of installation of appox production piles.Details
test pile program associated with 201806283199, cordon-johnson & assoct will install 4 sacraficial test piles, 4 sacrificial reaction piles & perform load testing in advance of installation of appox production piles. | $100,000 |
| Feb 14, 2020 | Expired or cancelled expired Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | pre construction grading and ground improvement associated w/ pa# 2018-0628-3199.Details
pre construction grading and ground improvement associated w/ pa# 2018-0628-3199. | |
| May 17, 2019 | Never finaled issued May 2019, no final | 450 Irwin St | Johnstone - Mc Auliffe Const. Inc. | t.i. to convert (e) conference room into two classrooms. total of 1260 sq ft.Details
t.i. to convert (e) conference room into two classrooms. total of 1260 sq ft. | $45,000 |
| Jun 28, 2018 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | to erect 4 stories, no basement, type i-a & v-b, post secondary education.Details
to erect 4 stories, no basement, type i-a & v-b, post secondary education. | $70,000,000 |
| Oct 17, 2017 | Never finaled issued Oct 2017, no final | 1111 08th St | 1st floor - for open studio, determine: occupancy type, occupancy load. operational permit req'd for special events. post occupant load sign at main exit door. ref #201602038686 & 201701116964Details
1st floor - for open studio, determine: occupancy type, occupancy load. operational permit req'd for special events. post occupant load sign at main exit door. ref #201602038686 & 201701116964 | ||
| Jan 17, 2017 | Completed final sign-off Jan 2017 | 1111 08th St | Pribuss Engineering Inc | as built fire sprinkler, ref. to as built app#201606109702 (cost $1.00), t.i. ref app#201602038686Details
as built fire sprinkler, ref. to as built app#201606109702 (cost $1.00), t.i. ref app#201602038686 | |
| Jan 11, 2017 | Completed final sign-off Mar 2017 | 1111 08th St | remove e max occupany 299 sign and install new "max occupany 497" sign at open space gr flDetails
remove e max occupany 299 sign and install new "max occupany 497" sign at open space gr fl | ||
| Dec 14, 2016 | Completed final sign-off Jan 2017 | 1111 08th St | Red Hawk Fire & Security Ca Llc | emergency fire alarm replacementDetails
emergency fire alarm replacement | $20,000 |
| Dec 6, 2016 | Completed final sign-off Mar 2017 | 1111 08th St | Fire Detection Unlimited, Mc Grath Electric Inc | modification of existing fire alarm system. new existing audible/visible occupant notification devices provided in common areas of ti classroom pool will be powered by existing remote power supplies. replace all discarded devices with new devices, smoke detectors horn strobes 2 new duct detectorsDetails
modification of existing fire alarm system. new existing audible/visible occupant notification devices provided in common areas of ti classroom pool will be powered by existing remote power supplies. replace all discarded devices with new devices, smoke detectors horn strobes 2 new duct detectors | $11,000 |
| Aug 8, 2016 | Never finaled issued Aug 2016, no final | 1111 08th St | construction of gates, fence and striping for parking area.Details
construction of gates, fence and striping for parking area. | $20,000 | |
| Jul 29, 2016 | Never finaled issued Jul 2016, no final | 1111 08th St | alter site to original pa#: 2014/07/31/2724-s. addition of accessary off street parking area & altered container layout.Details
alter site to original pa#: 2014/07/31/2724-s. addition of accessary off street parking area & altered container layout. | $5,000 | |
| Jul 28, 2016 | Completed final sign-off Mar 2017 | 1111 08th St | Mc Grath Electric Inc | install lights, plugs, conduit & cabling; also fire alarm data for 2 new classroom pods & 1 open class room area. ref pa 2016-0203-8656Details
install lights, plugs, conduit & cabling; also fire alarm data for 2 new classroom pods & 1 open class room area. ref pa 2016-0203-8656 | $376,000 |
| Jun 22, 2016 | Never finaled issued Jun 2016, no final | 1111 08th St | Oliver & Company Inc. | revision to 201602038686: partition type was mis-labeled. labeled as fire rated where type ii-b construction does not require fire rated walls. make corrections on partition type labels.Details
revision to 201602038686: partition type was mis-labeled. labeled as fire rated where type ii-b construction does not require fire rated walls. make corrections on partition type labels. | |
| Jun 10, 2016 | Never finaled issued Jun 2016, no final | 1111 08th St | Pribuss Engineering Inc | 1st & 2nd floor fire sprinkler for t.i. #201602038686 - added total 29 to protect under 'mezzanine' level for one classroom areaDetails
1st & 2nd floor fire sprinkler for t.i. #201602038686 - added total 29 to protect under 'mezzanine' level for one classroom area | $14,924 |
| Jun 10, 2016 | Completed final sign-off Mar 2017 | 1111 08th St | American Mechanical Inc | no addt'l space conditioning capacity to be installed as part of this permit,install rooftop exhaust fan for open studio 150,install rooftop exhaust fan for vocational classrm studio 240,install rooftop exhaust fan for classroom 140 & 121.install reheat coil complete w/ductwork to rms 140 &141,Details
no addt'l space conditioning capacity to be installed as part of this permit,install rooftop exhaust fan for open studio 150,install rooftop exhaust fan for vocational classrm studio 240,install rooftop exhaust fan for classroom 140 & 121.install reheat coil complete w/ductwork to rms 140 &141, | $160,000 |
| Feb 3, 2016 | Completed final sign-off Mar 2017 | 1111 08th St | Oliver & Company Inc. | interior remodel in (e) college of the arts bldg. remodel includes 2-story "classroom pod" w/ (3) offices on 1st fl & double height space "open studio". relocate (e) stair & extend (e) interior balcony to access 2nd fl of the classroom pod. replace (e) skylight.Details
interior remodel in (e) college of the arts bldg. remodel includes 2-story "classroom pod" w/ (3) offices on 1st fl & double height space "open studio". relocate (e) stair & extend (e) interior balcony to access 2nd fl of the classroom pod. replace (e) skylight. | $1,600,000 |
| Aug 7, 2015 | Never finaled issued Aug 2015, no final | 1111 08th St | Wells Electrical, Inc | title 24 lighting controls. ref pa: 2015 0514 6386Details
title 24 lighting controls. ref pa: 2015 0514 6386 | $10,000 |
| May 14, 2015 | Never finaled issued May 2015, no final | 1111 08th St | Johnstone - Mc Auliffe Const. Inc. | interior work only includes demolition of three non-bearing interior partitions. addition of four new classroom spaces and one office space. no change of use or floor area. mechanical and electrical and life safety under separate permit.Details
interior work only includes demolition of three non-bearing interior partitions. addition of four new classroom spaces and one office space. no change of use or floor area. mechanical and electrical and life safety under separate permit. | $60,000 |
| Feb 19, 2015 | Never finaled issued Apr 2015, no final | 1111 08th St | construction of fabric awining at extg entrance.Details
construction of fabric awining at extg entrance. | $22,000 | |
| Aug 29, 2014 | Completed final sign-off Apr 2015 | 1111 08th St | installation of exterior debris chuteDetails
installation of exterior debris chute | $6,000 | |
| Aug 11, 2014 | Expired or cancelled withdrawn Feb 2016 | 1111 08th St | minor demo non load bearing interior; demo/fix wall scarsDetails
minor demo non load bearing interior; demo/fix wall scars | $4,500 | |
| Jul 31, 2014 | Never finaled issued Apr 2016, no final | 1111 08th St | site permit for interim use storage container, landscape and recreational elements. campus supporting retail space.Details
site permit for interim use storage container, landscape and recreational elements. campus supporting retail space. | $20,000 | |
| Jul 25, 2014 | Completed final sign-off Apr 2015 | 1111 08th St | addition of new exterior lights with light stanshings and perimeter electrical site work.Details
addition of new exterior lights with light stanshings and perimeter electrical site work. | $45,000 | |
| May 28, 2014 | Never finaled issued Jun 2014, no final | 1111 08th St | new egresss doors in existing storefront glass. accessible rame and stair to meet grade. new exterior doors with stair to meet gradeDetails
new egresss doors in existing storefront glass. accessible rame and stair to meet grade. new exterior doors with stair to meet grade | $42,000 | |
| May 28, 2014 | Expired or cancelled cancelled Jan 2026 | 1140 07th St | revision to 201403191137 add a0.2 accessible path of travelDetails
revision to 201403191137 add a0.2 accessible path of travel |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (13), Everon Llc (5), Johnstone - Mc Auliffe Const. Inc. (4), Ayoob & Peery Plumbing Co Inc (2), Mc Grath Electric Inc (2), Oliver & Company Inc. (2), Pribuss Engineering Inc (2), Siemens Industry, Inc. (2), American Mechanical Inc, Arrow Sign Company, Eco Fire Sprinklers Inc, Field Construction Inc., Fire Detection Unlimited, Paganini Electric Corp(See Signatories), Red Hawk Fire & Security Ca Llc, Wells Electrical, Inc
- Architects
- Douglas Burnham (7), Jeanne Gang (5), Joshua Cohn (4), Bill Leddy, Hassan Afrookteh
- Engineers
- Shauna D. Dunton (3), Yue Xu (2), Chris Warner, Clayton J. Proto, Dennis Cheung, Dennis Cheung, Paul Mcgrath, Susanna See
- Authorized agent-otherss
- Edward Damien Conlon, Hassan Afrookteh, Roger Cruz, Sam Gazale
- Designers
- Ronald Demartini
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.