Block 0238, lot 008
350 California St
- City’s use
- Commercial Office
- Built
- 1976
- Stories
- 22
- Building
- 286,332 sq ft
- Lot
- 19,003 sq ft
- Zoning
- C3O
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | Completed final sign-off Sep 2026 | 350 California St | Prima Acquire Inc Dba Lahue And Associat | 4 evacuation maps on 17th floorDetails
4 evacuation maps on 17th floor | $1,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 350 California St | Field Construction Inc. | 12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes.Details
12th floor suites: 1250, 1220 fitness center, tenant amenity, management office ti to include demolition of non-structural partitions and ceiling, contruction of new partitions, ceiling, power and finishes. | $125,000 |
| Aug 10, 2026 | In progress issued Sep 2026 | 350 California St | Field Construction Inc. | 11/f suites 1100, 1120, 1150: tenant improvements include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. mep deferred. suite 1100 - 58 occupants suite 1120 - 20 occupants suite 1150 - 57 occupantsDetails
11/f suites 1100, 1120, 1150: tenant improvements include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. mep deferred. suite 1100 - 58 occupants suite 1120 - 20 occupants suite 1150 - 57 occupants | $125,000 |
| Jul 6, 2026 | Completed final sign-off Aug 2026 | 350 California St | C C I Commercial Construction & Improv | construction revision to 202605060831: add 4 additoinal phone booths for a total of 11.Details
construction revision to 202605060831: add 4 additoinal phone booths for a total of 11. | $20,000 |
| May 28, 2026 | Completed final sign-off Sep 2026 | 350 California St | C C I Commercial Construction & Improv | ste 1700: mep for 250 california permit: 202604028807 - 17th floorDetails
ste 1700: mep for 250 california permit: 202604028807 - 17th floor | $130,000 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 350 California St | C C I Commercial Construction & Improv | 4/f: installation of (7) phone booths x 13sf = 91 sf.Details
4/f: installation of (7) phone booths x 13sf = 91 sf. | $40,000 |
| Apr 27, 2026 | Completed final sign-off Jun 2026 | 350 California St | C C I Commercial Construction & Improv | 18th floor (n) gypsum ceiling in the conference room including new light fixtures.Details
18th floor (n) gypsum ceiling in the conference room including new light fixtures. | $90,000 |
| Apr 2, 2026 | Completed final sign-off Sep 2026 | 350 California St | C C I Commercial Construction & Improv | suite 1700: demolition of ceiling, scope includes construction of ceiling power and finishes. fire alarm system, fire sprinklers deferred.Details
suite 1700: demolition of ceiling, scope includes construction of ceiling power and finishes. fire alarm system, fire sprinklers deferred. | $136,000 |
| Feb 26, 2026 | Completed final sign-off May 2026 | 350 California St | Prima Acquire Inc Dba Lahue And Associat | 15th fl - 4 evacuation signsDetails
15th fl - 4 evacuation signs | |
| Feb 11, 2026 | Completed final sign-off Feb 2026 | 350 California St | Pioneer Fire Inc. | as-builts for f/a 202512020678: replaced 24 semi recessed sprinklers with concealed sprinkles. convert 31 uprights to pendant. relocate 8 concealded spirnklers, 12 upright and 3 pendants sprinklres to accomdate new build out.Details
as-builts for f/a 202512020678: replaced 24 semi recessed sprinklers with concealed sprinkles. convert 31 uprights to pendant. relocate 8 concealded spirnklers, 12 upright and 3 pendants sprinklres to accomdate new build out. | |
| Feb 9, 2026 | In progress issued Feb 2026 | 350 California St | Tri-Signal Integration Inc. | 21/fl- install (n) and relocate (e) notification devices due to ti 202511149598. all devices appliances and equipment are (e) unless notedDetails
21/fl- install (n) and relocate (e) notification devices due to ti 202511149598. all devices appliances and equipment are (e) unless noted | $6,367 |
| Jan 27, 2026 | Completed final sign-off Apr 2026 | 350 California St | C C I Commercial Construction & Improv | 15/f: office tenant retrofit. light fixtures and associated circuiting, controls, power and signal. ref permit 202509115093Details
15/f: office tenant retrofit. light fixtures and associated circuiting, controls, power and signal. ref permit 202509115093 | $150,000 |
| Jan 27, 2026 | Completed final sign-off Apr 2026 | 350 California St | C C I Commercial Construction & Improv | 15th fl deferred mechanical modifications for pa 2025-0911-5093Details
15th fl deferred mechanical modifications for pa 2025-0911-5093 | $250,000 |
| Jan 15, 2026 | Completed final sign-off Apr 2026 | 350 California St | C C I Commercial Construction & Improv | revision to pa # 202509115093: change of layout to suite 1500, 1550, 1560.Details
revision to pa # 202509115093: change of layout to suite 1500, 1550, 1560. | |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 350 California St | Tri-Signal Integration Inc. | install new devices and appliances due to tenant improvement. all devices appliances and equipment are existing unless otherwide noted as new or relocation to new location ref 2025-09-11-5093Details
install new devices and appliances due to tenant improvement. all devices appliances and equipment are existing unless otherwide noted as new or relocation to new location ref 2025-09-11-5093 | $30,000 |
| Jan 7, 2026 | In progress issued Jan 2026 | 350 California St | Anderson, Rowe & Buckley, Inc. | 21st floor-fire sprinkler t.i. relocate 3 heads. add 1 head. total 4 ref #202511149598Details
21st floor-fire sprinkler t.i. relocate 3 heads. add 1 head. total 4 ref #202511149598 | $2,060 |
| Dec 19, 2025 | In progress issued Dec 2025 | 350 California St | Mc Millan Electric | 14th floor. installation if new lighting and controls on the 14th floor in suite 1400.Details
14th floor. installation if new lighting and controls on the 14th floor in suite 1400. | $68,000 |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 350 California St | San Francisco Commercial Builders Inc | ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency.Details
ground flr. this t.i. project involves renovation of (e) entry lobby doors including retrofit of (e) stand along mag locs located in head of the door frame. (n) surface mounted mag locks held to the (e) building life safey to fail safe in an emergency. | $6,000 |
| Dec 2, 2025 | Completed final sign-off Feb 2026 | 350 California St | Pioneer Fire Inc. | 15th fl suite 1500, 1550 & 1560 ref pa # 2025-0911-5093: relocate 16 uprights, 8 pendents, convert 32 uprights to pendentsDetails
15th fl suite 1500, 1550 & 1560 ref pa # 2025-0911-5093: relocate 16 uprights, 8 pendents, convert 32 uprights to pendents | $14,000 |
| Nov 25, 2025 | Completed final sign-off Feb 2026 | 350 California St | Golden Gate Sign Company Inc. | non electric sign: limoncellaDetails
non electric sign: limoncella | $5,000 |
| Nov 25, 2025 | In progress filed Nov 2025, not yet issued | 350 California St | Golden Gate Sign Company Inc. | non electric sign: limoncellaDetails
non electric sign: limoncella | $5,000 |
| Nov 14, 2025 | Completed final sign-off Aug 2026 | 350 California St | Dpr Construction A | 21st fl - minor renovation of non-load bearing interior partitions and ceilings w/in 800 sf. a limited number of non-load bearing interior partitions, ceilings and finishes will be added. new furnishings will be provided within the limited affected areas. no change to building use, egress orDetails
21st fl - minor renovation of non-load bearing interior partitions and ceilings w/in 800 sf. a limited number of non-load bearing interior partitions, ceilings and finishes will be added. new furnishings will be provided within the limited affected areas. no change to building use, egress or | $190,000 |
| Sep 11, 2025 | Completed final sign-off Apr 2026 | 350 California St | C C I Commercial Construction & Improv | 15th fl: construction of non-load bearing partitions, doors, glazing and frames, new ceiling tile & grid, new light fixtures, and new finishes.Details
15th fl: construction of non-load bearing partitions, doors, glazing and frames, new ceiling tile & grid, new light fixtures, and new finishes. | $1,500,000 |
| Aug 26, 2025 | In progress issued Aug 2025 | 350 California St | Tri-Signal Integration Inc. | suite 1400: install new devices and appliances due to tenant improvements. fire alarm devices.Details
suite 1400: install new devices and appliances due to tenant improvements. fire alarm devices. | $14,700 |
| Aug 26, 2025 | In progress issued Aug 2025 | 350 California St | Tri-Signal Integration Inc. | 14th fl ref pa #2025-0513-6314: relocate existing and install new devices and appliances due to tenant improvementsDetails
14th fl ref pa #2025-0513-6314: relocate existing and install new devices and appliances due to tenant improvements | $27,600 |
| Aug 25, 2025 | In progress filed Aug 2025, not yet issued | 350 California St | new partition wall in office space. work limited to 4th floor only - no mep.Details
new partition wall in office space. work limited to 4th floor only - no mep. | ||
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14/f- deferred mep submittal for bpa# 202506249354.Details
14/f- deferred mep submittal for bpa# 202506249354. | $20,000 |
| Aug 8, 2025 | Completed final sign-off Oct 2025 | 350 California St | R L H Fire Protection Inc | 14/f. fire sprinkler: relocate 27, add 7 , delete 5 sprinklers on the 14th fl 202505136314Details
14/f. fire sprinkler: relocate 27, add 7 , delete 5 sprinklers on the 14th fl 202505136314 | $22,000 |
| Aug 8, 2025 | Completed final sign-off Sep 2025 | 350 California St | R L H Fire Protection Inc | fire sprinkler permit. relocate 1 , delete 1 sprinkler on th 14th floor . ti 202506249354Details
fire sprinkler permit. relocate 1 , delete 1 sprinkler on th 14th floor . ti 202506249354 | $1,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred.Details
14th floor, suite 1400. demolition of non-bearing partiions. new light fixtures, new millwork and finishes at break area and new office glazing and frame. mep/life safety deferred. | $60,000 |
| May 13, 2025 | Completed final sign-off Oct 2025 | 350 California St | Field Construction Inc. | 14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishesDetails
14th fl suite 1450 & 1460: ti project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions, new and relocated light fixtures, new doors & frames and glazing system and new finishes | $478,000 |
| Apr 9, 2025 | In progress issued Apr 2025 | 350 California St | Tri-Signal Integration Inc. | rev to pa# 2025-0213-0266: as builts for remving 1 smoke and relabeled 3 devices 77, 74, 73 per field inspectorDetails
rev to pa# 2025-0213-0266: as builts for remving 1 smoke and relabeled 3 devices 77, 74, 73 per field inspector | |
| Feb 13, 2025 | In progress issued Feb 2025 | 350 California St | Tri-Signal Integration Inc. | 19th fl: reference to pa # 2024-1211-6571 remodel floor layout relocate (e) & install (n) devices & appliances for tiDetails
19th fl: reference to pa # 2024-1211-6571 remodel floor layout relocate (e) & install (n) devices & appliances for ti | $14,987 |
| Jan 15, 2025 | Completed final sign-off Feb 2025 | 350 California St | Ayoob & Peery Plumbing Co Inc | 19/f: add (6), relocate (16) fire sprinkler per t.i. ref permit 202412116571Details
19/f: add (6), relocate (16) fire sprinkler per t.i. ref permit 202412116571 | $13,664 |
| Jan 15, 2025 | Completed final sign-off Apr 2025 | 350 California St | Field Construction Inc. | 19th floor:mech: replace existing pneumatic vav controllers with ddc controller. low pressure duct work for new layout. new vav boxes with reheat coils. new exhaust fans. new piping to new vav coils. electrical: lighting fixtures and associated controls, power & signal devices and wiring.Details
19th floor:mech: replace existing pneumatic vav controllers with ddc controller. low pressure duct work for new layout. new vav boxes with reheat coils. new exhaust fans. new piping to new vav coils. electrical: lighting fixtures and associated controls, power & signal devices and wiring. | |
| Jan 9, 2025 | Completed final sign-off Nov 2025 | 350 California St | Swinerton Builders | 23/f: installation of a new emergency generator. the scope inlcudes installation of (n) generator, connection of em generator to building systems w/related mechanical,electrical & structural tie-down to (e) mechanical pad.Details
23/f: installation of a new emergency generator. the scope inlcudes installation of (n) generator, connection of em generator to building systems w/related mechanical,electrical & structural tie-down to (e) mechanical pad. | $181,000 |
| Dec 11, 2024 | Completed final sign-off Apr 2025 | 350 California St | Field Construction Inc. | 19th fl- ti involves modification of (e) tenant suite to include selective demo & construction of non load bearing partitions, new & relocated light fixtures, new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices.Details
19th fl- ti involves modification of (e) tenant suite to include selective demo & construction of non load bearing partitions, new & relocated light fixtures, new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices. | $620,000 |
| Nov 19, 2024 | In progress issued Apr 2025 | 350 California St | Tri-Signal Integration Inc. | 23rd fl- ref pa # 2024-1108-4657 disconnect fire alarm safety connections of (e) generator on roof & reconnect to a (n) generatorDetails
23rd fl- ref pa # 2024-1108-4657 disconnect fire alarm safety connections of (e) generator on roof & reconnect to a (n) generator | $8,978 |
| Oct 15, 2024 | Completed final sign-off Oct 2024 | 350 California St | Tri-Signal Integration Inc. | 19/fl- ste 1920-ti 202408229227- relocate (e) and install (n) devices and appliances due to tiDetails
19/fl- ste 1920-ti 202408229227- relocate (e) and install (n) devices and appliances due to ti | $14,987 |
| Oct 15, 2024 | Completed final sign-off Oct 2024 | 350 California St | Ayoob & Peery Plumbing Co Inc | 19/f: add (1) and relocate (12) fire sprinkler per ti. job# 24-679. ref ti# 202408229227Details
19/f: add (1) and relocate (12) fire sprinkler per ti. job# 24-679. ref ti# 202408229227 | $8,074 |
| Oct 9, 2024 | Completed final sign-off Jan 2025 | 350 California St | Field Construction Inc. | ref pa # 2024-0822-9227 fgic project #44-094 deferred mechanical & eletrical upgrade submittalDetails
ref pa # 2024-0822-9227 fgic project #44-094 deferred mechanical & eletrical upgrade submittal | $135,000 |
| Oct 7, 2024 | Completed final sign-off Jan 2025 | 350 California St | Field Construction Inc. | revision to 202408229227: removal of 1 exit door of the e) suiteDetails
revision to 202408229227: removal of 1 exit door of the e) suite | |
| Aug 22, 2024 | Completed final sign-off Jan 2025 | 350 California St | Field Construction Inc. | modification of an (e) tenant suite to include selective demo and construction of non-load bearing partions, new light fixtures, ceiling, doors and frames and glazing systm and new finishes (mep deffered) suite 1920Details
modification of an (e) tenant suite to include selective demo and construction of non-load bearing partions, new light fixtures, ceiling, doors and frames and glazing systm and new finishes (mep deffered) suite 1920 | $185,000 |
| May 6, 2024 | Completed final sign-off May 2024 | 350 California St | Tri-Signal Integration Inc. | 16/f (ste 1600): relocate (e) and install new appliances due to tenant improvements (fire alarm). ref pa# 202401113782Details
16/f (ste 1600): relocate (e) and install new appliances due to tenant improvements (fire alarm). ref pa# 202401113782 | $24,739 |
| May 6, 2024 | Completed final sign-off Jun 2024 | 350 California St | Tri-Signal Integration Inc. | relocate (e) and install new devices and appliances due to tenant improvementDetails
relocate (e) and install new devices and appliances due to tenant improvement | $14,665 |
| May 2, 2024 | Completed final sign-off Jun 2024 | 350 California St | C C I Commercial Construction & Improv | revision to 202404119776. application of appproval of technical infeasibility request to the existing ada stall in womans restroom.Details
revision to 202404119776. application of appproval of technical infeasibility request to the existing ada stall in womans restroom. | |
| May 1, 2024 | Completed final sign-off Jun 2024 | 350 California St | Field Construction Inc. | 16/f: mechanical - demo supply duct, ceiling diffusers and transfer grilles, rebalance cfms as necessary, relocated t-stats and c02 sensors. electrical power lighting and signal reference.Details
16/f: mechanical - demo supply duct, ceiling diffusers and transfer grilles, rebalance cfms as necessary, relocated t-stats and c02 sensors. electrical power lighting and signal reference. | $130,000 |
| May 1, 2024 | Completed final sign-off May 2024 | 350 California St | Pioneer Fire Inc. | suite 1910 relocate 6 pendents; add 3 pendents ref pa 202404119776Details
suite 1910 relocate 6 pendents; add 3 pendents ref pa 202404119776 | $1,350 |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 350 California St | C C I Commercial Construction & Improv | 19th fl: selective demolition and construction of non loading bearing partitions. new and relocated light fixtures, new doors, frames and glazing system. new light fixtures mep defferedDetails
19th fl: selective demolition and construction of non loading bearing partitions. new and relocated light fixtures, new doors, frames and glazing system. new light fixtures mep deffered | $300,168 |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 350 California St | Field Construction Inc. | 16/f: rev 202401113782 - application for infeasibility request to the existing ada stall in women's restroom.Details
16/f: rev 202401113782 - application for infeasibility request to the existing ada stall in women's restroom. | |
| Mar 29, 2024 | Completed final sign-off Apr 2024 | 350 California St | Ayoob & Peery Plumbing Co Inc | 16/f: add (3) relocate (9) fire sprinkler per t.i. job #24-621. ref pa# 202401113782Details
16/f: add (3) relocate (9) fire sprinkler per t.i. job #24-621. ref pa# 202401113782 | $7,453 |
| Mar 13, 2024 | Completed final sign-off May 2024 | 350 California St | Field Construction Inc. | 4th floor: reconfigure duct work for new floor layout, install 1 new vav box and heat hot water supply and return piping. new power and signal devices throughout the space,new title 24 lights controls. reference pa#202401194261Details
4th floor: reconfigure duct work for new floor layout, install 1 new vav box and heat hot water supply and return piping. new power and signal devices throughout the space,new title 24 lights controls. reference pa#202401194261 | $87,000 |
| Mar 11, 2024 | Completed final sign-off Mar 2024 | 350 California St | Ayoob & Peery Plumbing Co Inc | 4/f: add (7) relocate (10) changeout (2) fire sprinkler per ti job # 24-616. ref pa# 202401194261Details
4/f: add (7) relocate (10) changeout (2) fire sprinkler per ti job # 24-616. ref pa# 202401194261 | $11,042 |
| Mar 7, 2024 | Completed final sign-off May 2024 | 350 California St | Field Construction Inc. | revision to pa 202401194261 application of infeasibility to ada compliance of accessible toilet stall in wonmen's restroom. added card reader @ suite entry doorsDetails
revision to pa 202401194261 application of infeasibility to ada compliance of accessible toilet stall in wonmen's restroom. added card reader @ suite entry doors | |
| Mar 6, 2024 | Completed final sign-off May 2024 | 350 California St | Tri-Signal Integration Inc. | 4th floor: relocating extg and install new devices and appliances due to t.i.Details
4th floor: relocating extg and install new devices and appliances due to t.i. | $17,897 |
| Jan 19, 2024 | Completed final sign-off May 2024 | 350 California St | Field Construction Inc. | 4/f: modification of (e) tenant suite - selective demo and construction of non-load bearing partitions, new light fixtures, doors and frames, glazing system and new finishes. (mep deferred)Details
4/f: modification of (e) tenant suite - selective demo and construction of non-load bearing partitions, new light fixtures, doors and frames, glazing system and new finishes. (mep deferred) | $551,764 |
| Jan 18, 2024 | Completed final sign-off Jul 2024 | 350 California St | Tri-Signal Integration Inc. | 20/f: add a call box station with instruction sign at the elevator lobby on the 20th floor.Details
20/f: add a call box station with instruction sign at the elevator lobby on the 20th floor. | $36,340 |
| Jan 11, 2024 | Completed final sign-off Jun 2024 | 350 California St | Field Construction Inc. | 16/f: modification of (e) tenant suite to include selected demo and construction of non-load bearing partitions, new and relocated ceiling, light fixtures, doors and frames, new glazing system and finishes. (mep deferred)Details
16/f: modification of (e) tenant suite to include selected demo and construction of non-load bearing partitions, new and relocated ceiling, light fixtures, doors and frames, new glazing system and finishes. (mep deferred) | $500,000 |
| Nov 15, 2023 | Completed final sign-off Apr 2024 | 350 California St | Pioneer Fire Inc. | 20/f: relocate (48) pendants, add (4) pendants, remove (8) pendants. ref 2023-0808-4008Details
20/f: relocate (48) pendants, add (4) pendants, remove (8) pendants. ref 2023-0808-4008 | $9,000 |
| Nov 13, 2023 | Completed final sign-off May 2024 | 350 California St | Tri-Signal Integration Inc. | 20th fl - replace and adjust locations of devices and appliancces due to tiDetails
20th fl - replace and adjust locations of devices and appliancces due to ti | $36,340 |
| Sep 12, 2023 | Completed final sign-off Sep 2023 | 350 California St | Tri-Signal Integration Inc. | re submittals for demolition of fire alarm devices in work areas for phase 3 seismic retrofit - arch re #: 201911217894; as-builts for f/a ti 202001151890 & 202308224947; remove 14th floor from scope of work; add 2 strobes to 11th floor; add 3 strobes to 15th floorDetails
re submittals for demolition of fire alarm devices in work areas for phase 3 seismic retrofit - arch re #: 201911217894; as-builts for f/a ti 202001151890 & 202308224947; remove 14th floor from scope of work; add 2 strobes to 11th floor; add 3 strobes to 15th floor | |
| Aug 22, 2023 | Completed final sign-off Sep 2023 | 350 California St | Tri-Signal Integration Inc. | 11th, 14th, & 15th floor:to renew approved pa#202001151890. fire only permit.Details
11th, 14th, & 15th floor:to renew approved pa#202001151890. fire only permit. | |
| Aug 8, 2023 | Completed final sign-off Oct 2024 | 350 California St | Swinerton Builders | 20/f suite 2018 and 2020: revision to permit 202212289249. partial acoustical tile suspended ceiling and new lighting throughout the suites.Details
20/f suite 2018 and 2020: revision to permit 202212289249. partial acoustical tile suspended ceiling and new lighting throughout the suites. | |
| Dec 28, 2022 | Completed final sign-off Oct 2024 | 350 California St | Swinerton Builders, Plant Construction Co, Lp | 20/f: tenant improvement to renovate 2 (e) mufg bank, ltd office suites (2018 and 2020). to create 3 independent suites. ti to include partial demo of (e) walls, acoustical tile suspended ceiling and lighting, new offices, conference/huddle rooms, lockers, mother's room, work/print/copy and...Details
20/f: tenant improvement to renovate 2 (e) mufg bank, ltd office suites (2018 and 2020). to create 3 independent suites. ti to include partial demo of (e) walls, acoustical tile suspended ceiling and lighting, new offices, conference/huddle rooms, lockers, mother's room, work/print/copy and... | $2,000,000 |
| Jun 15, 2022 | Completed final sign-off Jun 2022 | 350 California St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa# 201810294356. all work is complete.Details
to obtain final inspection for work approved under pa# 201810294356. all work is complete. | |
| Jun 13, 2022 | Completed final sign-off Jul 2022 | 350 California St | Ayoob & Peery Plumbing Co Inc | mezzanine: add 6 and changeout 4 fire sprinklers per ti. ref permit 202203018977.Details
mezzanine: add 6 and changeout 4 fire sprinklers per ti. ref permit 202203018977. | $7,800 |
| May 3, 2022 | Never finaled issued May 2022, no final | 350 California St | Ad Art Inc. | to install 2 illuminated single faced wall signs: "us bank"Details
to install 2 illuminated single faced wall signs: "us bank" | $10,000 |
| Mar 9, 2022 | Never finaled issued Mar 2022, no final | 350 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only. work on 14th floor, limited demo phase 3 (14th floor) remove ceiling grid; turn pendent heads to uprights. 50 sprinkler head total.Details
fire sprinkler only. work on 14th floor, limited demo phase 3 (14th floor) remove ceiling grid; turn pendent heads to uprights. 50 sprinkler head total. | $25,000 |
| Mar 4, 2022 | Completed final sign-off Oct 2022 | 350 California St | Plant Construction Co, Lp | revised storage condition permit for phase 5 pa 202105130318. floors 7,8Details
revised storage condition permit for phase 5 pa 202105130318. floors 7,8 | |
| Mar 4, 2022 | Completed final sign-off Sep 2024 | 350 California St | Plant Construction Co, Lp | rev to pa 201911217894, phase 3 minor storage condiiton for close out. 6th floor only.Details
rev to pa 201911217894, phase 3 minor storage condiiton for close out. 6th floor only. | |
| Mar 4, 2022 | Completed final sign-off Apr 2022 | 350 California St | Plant Construction Co, Lp | revision pa 202010166614 revise storage condition. 4th anf 5th flDetails
revision pa 202010166614 revise storage condition. 4th anf 5th fl | |
| Mar 2, 2022 | Never finaled issued Mar 2022, no final | 350 California St | Anderson, Rowe & Buckley, Inc. | fire sprinkler only, 6th floor ceiling to removed; seismic retrofit sprinkler protection to remainDetails
fire sprinkler only, 6th floor ceiling to removed; seismic retrofit sprinkler protection to remain | $1,000 |
| Mar 1, 2022 | Never finaled issued Mar 2022, no final | 350 California St | Tri-Signal Integration Inc. | mezzanine: relocate 3 speaker/strobes & 4 strobes. remove 1 speaker strobe & 2 speakers & 7 strobes due to tenant improvement on the mezzanine.Details
mezzanine: relocate 3 speaker/strobes & 4 strobes. remove 1 speaker strobe & 2 speakers & 7 strobes due to tenant improvement on the mezzanine. | $14,770 |
| Mar 1, 2022 | Completed final sign-off Dec 2022 | 350 California St | Bcci Construction Company | 2/f: demo and construction of non-structural partitions, ceilings, lighting, fixtures, doors and millwork. structural drawings and calcs and mep included. changing b occupancy to a-3.Details
2/f: demo and construction of non-structural partitions, ceilings, lighting, fixtures, doors and millwork. structural drawings and calcs and mep included. changing b occupancy to a-3. | $611,600 |
| Oct 18, 2021 | Expired or cancelled cancelled Jan 2026 | 350 California St | 22nd floor: demo of existing toilet rooms & janitor closet. new partitions,plumbing,lighting & finishes for updated toilet rooms. mep included.Details
22nd floor: demo of existing toilet rooms & janitor closet. new partitions,plumbing,lighting & finishes for updated toilet rooms. mep included. | $90,000 | |
| Oct 12, 2021 | Never finaled issued Oct 2021, no final | 350 California St | Ayoob & Peery Plumbing Co Inc | 4th floor: add(8) & relocate (29) fire sprinklers, per t.i. 5th floor: add (2) & relocate (17) fire sprinkers per t.i. ref #202107265075Details
4th floor: add(8) & relocate (29) fire sprinklers, per t.i. 5th floor: add (2) & relocate (17) fire sprinkers per t.i. ref #202107265075 | $15,600 |
| Oct 12, 2021 | Never finaled issued Oct 2021, no final | 350 California St | Ayoob & Peery Plumbing Co Inc | 6th floor: add(14)& relocate (98) fire sprinklers per t.i. ref#2021/0726/5075.Details
6th floor: add(14)& relocate (98) fire sprinklers per t.i. ref#2021/0726/5075. | $29,400 |
| Jul 26, 2021 | Completed final sign-off Sep 2021 | 350 California St | Anderson, Rowe & Buckley, Inc. | 4th -5th fl- (e) fire sprinkler system- domo siesmic upgrade remove and reinstall 34 sprinklers.Details
4th -5th fl- (e) fire sprinkler system- domo siesmic upgrade remove and reinstall 34 sprinklers. | $8,500 |
| Jul 26, 2021 | Completed final sign-off Mar 2022 | 350 California St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - demo seismic upgrade, remove & re-install 51 sprinklers.Details
existing fire sprinkler system - demo seismic upgrade, remove & re-install 51 sprinklers. | $11,000 |
| May 13, 2021 | Completed final sign-off Oct 2022 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floorDetails
voluntary seismic retrofit-phase 5; at 7th, 8th, & 16th floor | $1,500,000 |
| Apr 27, 2021 | Completed final sign-off Oct 2022 | 350 California St | Plant Construction Co, Lp | limited demolition for voluntary seismic retrofit. phase 5- 7th, 8th, and 16th floorsDetails
limited demolition for voluntary seismic retrofit. phase 5- 7th, 8th, and 16th floors | $1,500,000 |
| Apr 6, 2021 | Completed final sign-off Jun 2021 | 350 California St | R L H Fire Protection Inc | fire sprinkler permit. relocate 2 pendent sprinklers on the 1st floor. t.i. #2020-0901-3182Details
fire sprinkler permit. relocate 2 pendent sprinklers on the 1st floor. t.i. #2020-0901-3182 | $1,000 |
| Mar 18, 2021 | Completed final sign-off Jun 2021 | 350 California St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system-tenant improvements 80 sprinklers - turned upDetails
existing fire sprinkler system-tenant improvements 80 sprinklers - turned up | $40,000 |
| Mar 17, 2021 | Completed final sign-off Jul 2021 | 350 California St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - tenant improvements 80 sprinklers - turned upDetails
existing fire sprinkler system - tenant improvements 80 sprinklers - turned up | $40,000 |
| Oct 26, 2020 | Completed final sign-off Mar 2021 | 350 California St | Tri-Signal Integration Inc. | as-built drawings, added 1 command center and 1 call box.Details
as-built drawings, added 1 command center and 1 call box. | |
| Oct 16, 2020 | Completed final sign-off Apr 2022 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit-phase 4, 4th & 5th floorDetails
voluntary seismic retrofit-phase 4, 4th & 5th floor | $1,000,000 |
| Oct 1, 2020 | Completed final sign-off Apr 2022 | 350 California St | Plant Construction Co, Lp | phase 4. 4th & 5th flr structural demo.Details
phase 4. 4th & 5th flr structural demo. | $144,000 |
| Sep 1, 2020 | Completed final sign-off Jun 2022 | 350 California St | Plant Construction Co, Lp | revision to pa #2019-0611-3057: partial height demo & construction of a ceiling height non-load bearing partition.Details
revision to pa #2019-0611-3057: partial height demo & construction of a ceiling height non-load bearing partition. | |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 350 California St | Tri-Signal Integration Inc. | fire alarm as built to be submitted for 20910164546. revision of pa 201910164546. correction of the address of initiation of and notification devicesDetails
fire alarm as built to be submitted for 20910164546. revision of pa 201910164546. correction of the address of initiation of and notification devices | |
| Feb 13, 2020 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | operable interior partition system made of glass and aluminum. deferred submittal form dated 6/0/19 20190611305Details
operable interior partition system made of glass and aluminum. deferred submittal form dated 6/0/19 20190611305 | $40,000 |
| Feb 7, 2020 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | demo (e) atm machine wall enclosure. salvaged glass storefront will be replacedDetails
demo (e) atm machine wall enclosure. salvaged glass storefront will be replaced | $8,000 |
| Jan 29, 2020 | Expired or cancelled cancelled Jan 2026 | 350 California St | Plant Construction Co, Lp | installation of operable interior partition system. glass and aluminum with integral exit door. reference to pa #2019-0611-3057Details
installation of operable interior partition system. glass and aluminum with integral exit door. reference to pa #2019-0611-3057 | $30,000 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 350 California St | Golden Gate Sign Company Inc. | install 2 illuminated double-faced projecting sign for "proper food". (sign p1, p2)Details
install 2 illuminated double-faced projecting sign for "proper food". (sign p1, p2) | $5,000 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 350 California St | Golden Gate Sign Company Inc. | install 2 illuminated single-faced wall sign for "union bank" & 8 blank panels. (signs a-1, a-2).Details
install 2 illuminated single-faced wall sign for "union bank" & 8 blank panels. (signs a-1, a-2). | $10,000 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 350 California St | Golden Gate Sign Company Inc. | install 1 non-illuminated single-faced projecting wall sign for "proper food". (sign o)Details
install 1 non-illuminated single-faced projecting wall sign for "proper food". (sign o) | $5,000 |
| Jan 17, 2020 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | deferred submittal for interior portion system (glass & aluminum) ref pa 2019-0611-3057Details
deferred submittal for interior portion system (glass & aluminum) ref pa 2019-0611-3057 | $30,000 |
| Jan 16, 2020 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipmentDetails
revision to pa 2019-0611-3060 to reflect partition wall revisions, relocation of light fixtures & equipment | |
| Jan 15, 2020 | Never finaled issued Jan 2020, no final | 350 California St | Tri-Signal Integration Inc. | fire alarm on 11th, 14th, 15th fl. demolition of fire alarm devices in work areas for phase 3 seismic retrofit. ref pa #201911217894.Details
fire alarm on 11th, 14th, 15th fl. demolition of fire alarm devices in work areas for phase 3 seismic retrofit. ref pa #201911217894. | $3,500 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 350 California St | Dpr Construction | 21/f: partial t.i. of office lighting: retrofit lighting, power and signal, wiring and lighting controls. ref t.i. pa201904178249. maher n/a.Details
21/f: partial t.i. of office lighting: retrofit lighting, power and signal, wiring and lighting controls. ref t.i. pa201904178249. maher n/a. | $208,549 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 350 California St | Dpr Construction | 21/f: demo of (e) ductwork per 21m2.0. install (n) vav boxes, fan coil, exhaust fans, ductwork 7 piping for vavs/fan coil. test & balance. ref pa201904178249. maher n/a.Details
21/f: demo of (e) ductwork per 21m2.0. install (n) vav boxes, fan coil, exhaust fans, ductwork 7 piping for vavs/fan coil. test & balance. ref pa201904178249. maher n/a. | $389,319 |
| Dec 13, 2019 | Expired or cancelled cancelled May 2020 | 350 California St | Source Planning And Construction Inc | 22nd fl: construction of non-load bearing partitions, new ceiling tile & grid, new gyp. bd. ceiling, new light fixtures, doors & frames, millwork and finishes. mep. fire life safety deferred. maher naDetails
22nd fl: construction of non-load bearing partitions, new ceiling tile & grid, new gyp. bd. ceiling, new light fixtures, doors & frames, millwork and finishes. mep. fire life safety deferred. maher na | $1,508,910 |
| Nov 21, 2019 | Completed final sign-off Sep 2024 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floorDetails
voluntary seismic retrofit phase 3 - 6th, 11th, 14th and 15th floor | $1,000,000 |
| Nov 14, 2019 | Completed final sign-off Feb 2020 | 350 California St | R L H Fire Protection Inc | 1/f: t.i. upgrade of (e) f/s system. relocate 12 pendent sprinklers, 4 additional pendent sprinklers, remove 1 pendent. pa#201906113057.Details
1/f: t.i. upgrade of (e) f/s system. relocate 12 pendent sprinklers, 4 additional pendent sprinklers, remove 1 pendent. pa#201906113057. | $3,600 |
| Oct 16, 2019 | Never finaled issued Oct 2019, no final | 350 California St | Tri-Signal Integration Inc. | ref pa# 201906113057; fa ti include: add (2) duct detectors, (10) smoke detectors, (2) relay modules (5) strobes, (4) speaker strobes, (1) speaker to (e) fire alarm systemDetails
ref pa# 201906113057; fa ti include: add (2) duct detectors, (10) smoke detectors, (2) relay modules (5) strobes, (4) speaker strobes, (1) speaker to (e) fire alarm system | $16,500 |
| Oct 7, 2019 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | ground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maherDetails
ground fl: tenant improvement project involves the construction of a new security desk, lobby feature wall, new finishes, and light fixture installation.n/a for maher | $230,000 |
| Sep 18, 2019 | Never finaled issued Sep 2019, no final | 350 California St | street spaceDetails
street space | ||
| Sep 9, 2019 | Completed final sign-off Dec 2019 | 350 California St | R L H Fire Protection Inc | ti upgrade (e) fire sprinkler syste. 39 relocate pendents, 3 add pendednts. 8 deleted pendents, 1 relocat upright, ` add upright, 2 deleted upright ref 201906113057Details
ti upgrade (e) fire sprinkler syste. 39 relocate pendents, 3 add pendednts. 8 deleted pendents, 1 relocat upright, ` add upright, 2 deleted upright ref 201906113057 | $9,200 |
| Jul 31, 2019 | Completed final sign-off Apr 2021 | 350 California St | Tri-Signal Integration Inc. | new er8 system for stairs #1 & #2 back bone per preapplication meeting 04/25/2019 - ten call boxes command center with distribution module, supervisory board with monitor module, power, supply with add-on module. add to fa system: one dual monitor module and one annunciator.Details
new er8 system for stairs #1 & #2 back bone per preapplication meeting 04/25/2019 - ten call boxes command center with distribution module, supervisory board with monitor module, power, supply with add-on module. add to fa system: one dual monitor module and one annunciator. | $30,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2019 | 350 California St | Anderson, Rowe & Buckley, Inc. | 9th flr - base building demo 80 sprinklersDetails
9th flr - base building demo 80 sprinklers | $16,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2019 | 350 California St | Anderson, Rowe & Buckley, Inc. | 10th flr - base building demo 80 sprinklersDetails
10th flr - base building demo 80 sprinklers | $16,000 |
| Jun 13, 2019 | Completed final sign-off Jun 2019 | 350 California St | Anderson, Rowe & Buckley, Inc. | 22nd fl: existing fire sprinkler system - demo permit. relocate 80 sprinklers. maher naDetails
22nd fl: existing fire sprinkler system - demo permit. relocate 80 sprinklers. maher na | $16,000 |
| Jun 11, 2019 | Completed final sign-off Jun 2022 | 350 California St | Plant Construction Co, Lp | t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maherDetails
t.i. upgrade of extg retail branch on the 1st floor: includes new finishes new finishes, lighting, office work spaces teller/banking area, atms and banking machines, security and restrooms. n/a for maher | $1,300,000 |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 350 California St | Tri-Signal Integration Inc. | 21/f: fati inclucdes: add 65 smoke detector 1 relay module, 19 spearker strobes, 1 strobe to (e) fa system add 1 call box for ecs, add 1 power supply, 1 control module n/a maherDetails
21/f: fati inclucdes: add 65 smoke detector 1 relay module, 19 spearker strobes, 1 strobe to (e) fa system add 1 call box for ecs, add 1 power supply, 1 control module n/a maher | $56,000 |
| Jun 11, 2019 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | t.i. of extg basement pump room & bank vault converting into a safety deposit room, storage room and viewing area with artifact display cases. n/a for maherDetails
t.i. of extg basement pump room & bank vault converting into a safety deposit room, storage room and viewing area with artifact display cases. n/a for maher | $220,000 |
| May 31, 2019 | Completed final sign-off Jul 2019 | 350 California St | Anderson, Rowe & Buckley, Inc. | 12th fl: existing fire sprinkler system- demo 80 sprinklers- turned up. ref #201812128130.Details
12th fl: existing fire sprinkler system- demo 80 sprinklers- turned up. ref #201812128130. | $16,000 |
| May 21, 2019 | Completed final sign-off Jul 2019 | 350 California St | Anderson, Rowe & Buckley, Inc. | 21st fl - existing fire sprinkler system ti. 10 added & 47 relocated. ref pa 2019-0417-8249Details
21st fl - existing fire sprinkler system ti. 10 added & 47 relocated. ref pa 2019-0417-8249 | $29,000 |
| May 14, 2019 | Completed final sign-off Jun 2019 | 350 California St | Plant Construction Co, Lp | lobby - demo of (e) pendant light fixutre @ 350 california st ground floorDetails
lobby - demo of (e) pendant light fixutre @ 350 california st ground floor | $20,000 |
| May 8, 2019 | Completed final sign-off Sep 2024 | 350 California St | Plant Construction Co, Lp | demo of e lobby fountain and & infill of floor slab. includes demo of basement pump room and selective finishes in basement hallwaysDetails
demo of e lobby fountain and & infill of floor slab. includes demo of basement pump room and selective finishes in basement hallways | $230,000 |
| May 7, 2019 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | voluntary seismic retrofit. phase 2- 9th, 10th and 12th floors. this project includes modification to the existing steel frame bldg. at 350 california st to volundary improve the structure for lateral forces in accordance ca.403.9 of sfbc.Details
voluntary seismic retrofit. phase 2- 9th, 10th and 12th floors. this project includes modification to the existing steel frame bldg. at 350 california st to volundary improve the structure for lateral forces in accordance ca.403.9 of sfbc. | $500,000 |
| Apr 17, 2019 | Completed final sign-off Mar 2020 | 350 California St | Dpr Construction | scope of work ti 21st fl approx 13,166 sq ft tenant improvement includes construction of open office, conference, restroom, breakroom, and typical office support spacesDetails
scope of work ti 21st fl approx 13,166 sq ft tenant improvement includes construction of open office, conference, restroom, breakroom, and typical office support spaces | $1,070,790 |
| Apr 3, 2019 | Completed final sign-off Aug 2019 | 350 California St | Dpr Construction | 21st floor: interior demolition for approx. 13,000 sq ft in prep for t.i. (under seperate permit). demolition includes partitions, ceilings, doors, and finishes. typical in an office environment. n/a for maherDetails
21st floor: interior demolition for approx. 13,000 sq ft in prep for t.i. (under seperate permit). demolition includes partitions, ceilings, doors, and finishes. typical in an office environment. n/a for maher | $150,000 |
| Mar 15, 2019 | Completed final sign-off Jul 2019 | 350 California St | Anderson, Rowe & Buckley, Inc. | demo all pendent sprinklers & install upright sprinklers temporarily. 91 new uprightsDetails
demo all pendent sprinklers & install upright sprinklers temporarily. 91 new uprights | $45,000 |
| Mar 7, 2019 | Completed final sign-off Jun 2020 | 350 California St | Plant Construction Co, Lp | 9th,10th,12th & 22nd flrs. non structural/structural demo of floors 9,10,12,22 (unoccupied) remove all finishes in prep for future voluntary seismic retrofit (under sep permit) no demo of restrooms or bld core maher naDetails
9th,10th,12th & 22nd flrs. non structural/structural demo of floors 9,10,12,22 (unoccupied) remove all finishes in prep for future voluntary seismic retrofit (under sep permit) no demo of restrooms or bld core maher na | $350,000 |
| Mar 6, 2019 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | 21st floor: demo of (e) men's and women's restroom and provision of acces to (e) pre-cast for (n) panel connection strengthening maher n/a. ab-017 100% da upgrades under future permit. floor is unoccupied.Details
21st floor: demo of (e) men's and women's restroom and provision of acces to (e) pre-cast for (n) panel connection strengthening maher n/a. ab-017 100% da upgrades under future permit. floor is unoccupied. | $110,000 |
| Feb 25, 2019 | Completed final sign-off Jul 2019 | 350 California St | Bcci Construction Company | lower level - demo and relocation of partions. revision to approved architectual ref #201808016173.Details
lower level - demo and relocation of partions. revision to approved architectual ref #201808016173. | $3,000 |
| Dec 12, 2018 | Expired or cancelled cancelled Jun 2019 | 350 California St | Bcci Construction Company | modific & expansion of e ti- selective demo & const. of non load bearing part., n ceiling, grid & tile. n gypboard ceiling, n light fixtures, door & frames, millwork & finishes. idf rm- does not create and "infomation tech room" as described in sfbc ab-060. determine occup. load for assembly spaces.Details
modific & expansion of e ti- selective demo & const. of non load bearing part., n ceiling, grid & tile. n gypboard ceiling, n light fixtures, door & frames, millwork & finishes. idf rm- does not create and "infomation tech room" as described in sfbc ab-060. determine occup. load for assembly spaces. | $650,000 |
| Nov 28, 2018 | Completed final sign-off Dec 2018 | 350 California St | Anderson, Rowe & Buckley, Inc. | ref pa# 20180806173; fire sprinkler t.i. relocate (3) fire sprinkler. n/a for maher.Details
ref pa# 20180806173; fire sprinkler t.i. relocate (3) fire sprinkler. n/a for maher. | $1,500 |
| Oct 29, 2018 | Expired or cancelled expired Jun 2022 | 350 California St | Plant Construction Co, Lp | t.i. project involves the addition of a new temporary atm in the central window bay, which will be accessed from the exterior entry door on california st. and serviced from the bldg lobby. scope of work includes new temporary partial height atm enclosure with entry door. n/a for maherDetails
t.i. project involves the addition of a new temporary atm in the central window bay, which will be accessed from the exterior entry door on california st. and serviced from the bldg lobby. scope of work includes new temporary partial height atm enclosure with entry door. n/a for maher | $55,000 |
| Oct 12, 2018 | Completed final sign-off Dec 2018 | 350 California St | Anderson, Rowe & Buckley, Inc. | basement - fire sprinkler ti - added heads (1), relocated heads (17), plugged heads (3) total - 18. ref pa 2018-0801-6173Details
basement - fire sprinkler ti - added heads (1), relocated heads (17), plugged heads (3) total - 18. ref pa 2018-0801-6173 | $9,500 |
| Oct 12, 2018 | Never finaled issued Oct 2018, no final | 350 California St | Anderson, Rowe & Buckley, Inc. | 19th fl - fire sprinkler relocate 34 ref pa 2018-0622-2729Details
19th fl - fire sprinkler relocate 34 ref pa 2018-0622-2729 | $17,680 |
| Oct 5, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | 19th fl. ref pa# 201806222729; these are mechanical plans only. install new vav box, relocate register, new ductwork & piping. n/a for maher.Details
19th fl. ref pa# 201806222729; these are mechanical plans only. install new vav box, relocate register, new ductwork & piping. n/a for maher. | $25,000 |
| Oct 5, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | ref pa# 201807235232; submittal for previous approved archetecturals, demo registers & ductwork, install new vav boxes & exhaust fans, new ductwork, new pipingDetails
ref pa# 201807235232; submittal for previous approved archetecturals, demo registers & ductwork, install new vav boxes & exhaust fans, new ductwork, new piping | $75,000 |
| Sep 28, 2018 | Completed final sign-off Jul 2019 | 350 California St | Bcci Construction Company | basement mechanical system to support approved arch #201808016173. n/a for maherDetails
basement mechanical system to support approved arch #201808016173. n/a for maher | $55,000 |
| Sep 28, 2018 | Completed final sign-off Jul 2019 | 350 California St | Bcci Construction Company | basement demo of extg ducts, install new mechanical duct and hvac. new plumbing for area structural for underground plmg arch #201806222731. n/a for maherDetails
basement demo of extg ducts, install new mechanical duct and hvac. new plumbing for area structural for underground plmg arch #201806222731. n/a for maher | $50,000 |
| Sep 6, 2018 | Completed final sign-off Sep 2020 | 350 California St | Plant Construction Co, Lp | architectural demolition of extg finishes(flooring, ceiling, etc) and non structural office partitions along the perimeters of floors 1-3 in preperation for seismic retrofit of floors 1-3 (phase 1)Details
architectural demolition of extg finishes(flooring, ceiling, etc) and non structural office partitions along the perimeters of floors 1-3 in preperation for seismic retrofit of floors 1-3 (phase 1) | $100,000 |
| Aug 28, 2018 | Completed final sign-off Dec 2018 | 350 California St | Tri-Signal Integration Inc. | basement - fa ti includes: remove 1 strobe, relocate 1 speaker/strobe, add 1 relay module, 1 strobe, 2 weatherproof strobes, 2 smk dtrs, 3 speak/strobes, 2 sync modules to (e) fa system, replace 18 non-sychronized strobes, 12 non synchronized speaker/strobes w/ new synchronized strobes & speaker/strDetails
basement - fa ti includes: remove 1 strobe, relocate 1 speaker/strobe, add 1 relay module, 1 strobe, 2 weatherproof strobes, 2 smk dtrs, 3 speak/strobes, 2 sync modules to (e) fa system, replace 18 non-sychronized strobes, 12 non synchronized speaker/strobes w/ new synchronized strobes & speaker/str | $24,000 |
| Aug 28, 2018 | Completed final sign-off Nov 2018 | 350 California St | Tri-Signal Integration Inc. | 19th flr- fa ti includes: remove 2(e)smk detrs, 4(e)speakers & 4(e) strobes. r/r 3 (e) ion smk dtrs w/ photoelectric dtrs, 2 (n) speakers, 5 (n) speaker/strobes & 4(n) strobes ref pa#201807235232. n/a for maher.Details
19th flr- fa ti includes: remove 2(e)smk detrs, 4(e)speakers & 4(e) strobes. r/r 3 (e) ion smk dtrs w/ photoelectric dtrs, 2 (n) speakers, 5 (n) speaker/strobes & 4(n) strobes ref pa#201807235232. n/a for maher. | $9,200 |
| Aug 2, 2018 | Completed final sign-off Dec 2018 | 350 California St | Plant Construction Co, Lp | ground fl ti - existing food retail service tenant (proper food) due to building voluntary seismic retrofit under pa 2015-0615-2013. food preprared & packaged off-site with no equipment for additional food preparation. no exterior work, no changes to (e) building footprint, area or height. noDetails
ground fl ti - existing food retail service tenant (proper food) due to building voluntary seismic retrofit under pa 2015-0615-2013. food preprared & packaged off-site with no equipment for additional food preparation. no exterior work, no changes to (e) building footprint, area or height. no | $294,117 |
| Aug 1, 2018 | Completed final sign-off Sep 2019 | 350 California St | Bcci Construction Company | tenant improvement at basement to existing storage room (approx 400 sq ft) to include selective demolition and construction of non load bearing paritions, new ceiling grid and tile, new lights and finishes for new breakroom. minor work to janitorial closet. mep and fire under separate permits.Details
tenant improvement at basement to existing storage room (approx 400 sq ft) to include selective demolition and construction of non load bearing paritions, new ceiling grid and tile, new lights and finishes for new breakroom. minor work to janitorial closet. mep and fire under separate permits. | $350,000 |
| Jul 30, 2018 | Completed final sign-off Jul 2019 | 350 California St | Bcci Construction Company | basement electrical to support approved arch ref 201806222731 maher naDetails
basement electrical to support approved arch ref 201806222731 maher na | $30,000 |
| Jul 23, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | 19th flr ste#1940 & 1950 ti project includes modification to existing tenant suites to include selective demolition and the construction of a non-load bearing partitions, new lights ceiling grid and tile,new millwork & finishes, new break room. sprinklers, fire alarm & mep separate permit maher n/aDetails
19th flr ste#1940 & 1950 ti project includes modification to existing tenant suites to include selective demolition and the construction of a non-load bearing partitions, new lights ceiling grid and tile,new millwork & finishes, new break room. sprinklers, fire alarm & mep separate permit maher n/a | $750,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2018 | 350 California St | Tri-Signal Integration Inc. | 16th fl - fa ti includes: remove 4 existing strobe and re-adjust 2 existing strobes; install 2 ceiling mounted strobes and relocate 3 existing smoke detectors. ref pa 2018-0626-2979Details
16th fl - fa ti includes: remove 4 existing strobe and re-adjust 2 existing strobes; install 2 ceiling mounted strobes and relocate 3 existing smoke detectors. ref pa 2018-0626-2979 | $1,500 |
| Jun 27, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | 8th flr - partial scope office tenant retrofit - lighting, power & signal, wiring, lighting & controls. reference p.a. 2018 0405 5575. n/a for maher.Details
8th flr - partial scope office tenant retrofit - lighting, power & signal, wiring, lighting & controls. reference p.a. 2018 0405 5575. n/a for maher. | $75,000 |
| Jun 26, 2018 | Completed final sign-off Sep 2018 | 350 California St | Bcci Construction Company | 16th - ti- modification to (e) suite. selective demo & construction of non load bearing partitions, new gyp board, doors, frames and glazing systems. new finishes. life safety deferred. maher n/aDetails
16th - ti- modification to (e) suite. selective demo & construction of non load bearing partitions, new gyp board, doors, frames and glazing systems. new finishes. life safety deferred. maher n/a | $250,000 |
| Jun 22, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | ti modification of an existing tenant suite, inclusion on an (e) conference room to (2) private offices this scope of work includes selection demo. and the construction of a non-load bearing partitions, modification to ceiling tile & grid as needed in area of work and finishes. n/a for maher.Details
ti modification of an existing tenant suite, inclusion on an (e) conference room to (2) private offices this scope of work includes selection demo. and the construction of a non-load bearing partitions, modification to ceiling tile & grid as needed in area of work and finishes. n/a for maher. | $48,000 |
| Jun 22, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | b/f -ti involves modification of (e) tenant suite to include selective demo & construction of non-load bearing partition, new ceiling tile & grid, new gyp. board, ceiling light fixutes, doors & frames, millwork & new finishes. n/a for maher.Details
b/f -ti involves modification of (e) tenant suite to include selective demo & construction of non-load bearing partition, new ceiling tile & grid, new gyp. board, ceiling light fixutes, doors & frames, millwork & new finishes. n/a for maher. | $750,000 |
| Jun 20, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | 8th floor:demo mechanical equipment and low pressure ductwork. install new mechanical equipment and low pressure duct work. ref app#201804055575. n/a for maherDetails
8th floor:demo mechanical equipment and low pressure ductwork. install new mechanical equipment and low pressure duct work. ref app#201804055575. n/a for maher | $150,000 |
| Jun 19, 2018 | Completed final sign-off Sep 2018 | 350 California St | Golden Gate Fire Protection Inc | fire sprinkler 201804055575, relocate 92 pendents, add 7 pendents, delete 5 pendents total 99 heads for union bank 8th floorDetails
fire sprinkler 201804055575, relocate 92 pendents, add 7 pendents, delete 5 pendents total 99 heads for union bank 8th floor | $24,750 |
| Jun 15, 2018 | Completed final sign-off Oct 2020 | 350 California St | Plant Construction Co, Lp | modifications to the (e) steel frame building at 350 california st to voluntarily improve the structure for lateral forces in accordance with chatper 403.9 of the sfbc. maher naDetails
modifications to the (e) steel frame building at 350 california st to voluntarily improve the structure for lateral forces in accordance with chatper 403.9 of the sfbc. maher na | $9,000,000 |
| Jun 14, 2018 | Completed final sign-off Oct 2018 | 350 California St | Tri-Signal Integration Inc. | 8th fl: fa ti includes - add 1 (n) power supply, 25 (n) photo detectors, 21 (n) speakers/strobes, 1 (n) strobe, 1 (n) relay module, 1 (n) multivoltage relay to existing fa system. ref #201804055575. maher naDetails
8th fl: fa ti includes - add 1 (n) power supply, 25 (n) photo detectors, 21 (n) speakers/strobes, 1 (n) strobe, 1 (n) relay module, 1 (n) multivoltage relay to existing fa system. ref #201804055575. maher na | $40,000 |
| Jun 5, 2018 | Never finaled issued Jun 2018, no final | 350 California St | Anderson, Rowe & Buckley, Inc. | sprinkler ti suite 1455: existing fire sprinkler system ti 1 sprinkler ref pa 201802232064Details
sprinkler ti suite 1455: existing fire sprinkler system ti 1 sprinkler ref pa 201802232064 | $500 |
| May 14, 2018 | Completed final sign-off Oct 2018 | 350 California St | Bcci Construction Company | 14th - install new vav box, ductwork, piping & balance system ref pa 208-0223-2064Details
14th - install new vav box, ductwork, piping & balance system ref pa 208-0223-2064 | $50,000 |
| Apr 5, 2018 | Completed final sign-off Mar 2019 | 350 California St | Bcci Construction Company | 8th flr - ti, modify of (e) tenant space to include selective demo and construction of non load bearing partitions. new ceiling grid & tile, light fixtures, doors & frames, millwork and new finishes maher naDetails
8th flr - ti, modify of (e) tenant space to include selective demo and construction of non load bearing partitions. new ceiling grid & tile, light fixtures, doors & frames, millwork and new finishes maher na | $1,100,000 |
| Apr 4, 2018 | Never finaled issued Apr 2018, no final | 350 California St | Bcci Construction Company | 5th fl l- removal of shelf unit from previously approved scope of work. ref pa 2017-1109-3588Details
5th fl l- removal of shelf unit from previously approved scope of work. ref pa 2017-1109-3588 | |
| Feb 23, 2018 | Never finaled issued Mar 2018, no final | 350 California St | Bcci Construction Company | ti involves an expansion of (e) suite 1460. ti to include selective demo & construction of non-load bearing partitions, modifications to (e) ceiling grid, new door & frame & finishes. additional work to reduce suite 1450 that includes selective demo & const of non-load bearing partitions. maher naDetails
ti involves an expansion of (e) suite 1460. ti to include selective demo & construction of non-load bearing partitions, modifications to (e) ceiling grid, new door & frame & finishes. additional work to reduce suite 1450 that includes selective demo & const of non-load bearing partitions. maher na | $50,000 |
| Feb 23, 2018 | Never finaled issued Apr 2018, no final | 350 California St | Bcci Construction Company | 8/f: project involves selective demolition of non-load bearing walls, ceilings, light fixtures, millwork, plumbing and finishes. maher na. tenant improvement under separate permit per ab-017.Details
8/f: project involves selective demolition of non-load bearing walls, ceilings, light fixtures, millwork, plumbing and finishes. maher na. tenant improvement under separate permit per ab-017. | $85,000 |
| Jan 19, 2018 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | this tenant improvement project involves modifications of (e) tenant suite to include selective demolition and the modifcation of a non-load bearing partition. modification to celiing tiles & grid as needed in area of work, and new finishesDetails
this tenant improvement project involves modifications of (e) tenant suite to include selective demolition and the modifcation of a non-load bearing partition. modification to celiing tiles & grid as needed in area of work, and new finishes | $15,000 |
| Nov 17, 2017 | Never finaled issued Nov 2017, no final | 350 California St | Anderson, Rowe & Buckley, Inc. | replace extg 6" ddcva with new 6" ddcva matching extg one and add additional 6" ddcva. n/a for maherDetails
replace extg 6" ddcva with new 6" ddcva matching extg one and add additional 6" ddcva. n/a for maher | $8,000 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 350 California St | Bcci Construction Company | 5th fl - structural for transformer anchorage & shelf unit. ref #201612054179. maher naDetails
5th fl - structural for transformer anchorage & shelf unit. ref #201612054179. maher na | $5,000 |
| Sep 14, 2017 | Completed final sign-off Dec 2017 | 350 California St | Bcci Construction Company | 20/f: tenant improvement involves modification of e tenant suite to include selective demo and construction of non load bearing partitions, minor modifications to ceiling tiles and grid as neede in area of workDetails
20/f: tenant improvement involves modification of e tenant suite to include selective demo and construction of non load bearing partitions, minor modifications to ceiling tiles and grid as neede in area of work | $5,000 |
| Sep 12, 2017 | Completed final sign-off Nov 2017 | 350 California St | Tri-Signal Integration Inc. | 11/f: f/a t.i. include add 1 power supply, 25 photo smoke detectors, 1 control module, 2 relay modules, 1 multi voltage reley, 25 fire speaker/strobes, 1 strobe to (e) f/a system. ref t.i. 201706139227. maher n/a.Details
11/f: f/a t.i. include add 1 power supply, 25 photo smoke detectors, 1 control module, 2 relay modules, 1 multi voltage reley, 25 fire speaker/strobes, 1 strobe to (e) f/a system. ref t.i. 201706139227. maher n/a. | $35,000 |
| Sep 12, 2017 | Never finaled issued Sep 2017, no final | 350 California St | Tri-Signal Integration Inc. | 17/f: f/a t.i. include add 1 power supply, 25 photo smoke detectors, 1 relay modules, 1 multi voltage relay, 31 fire speaker/strobes, 1 strobe to (e) f/a system. ref t.i. 201706139223. maher n/a.Details
17/f: f/a t.i. include add 1 power supply, 25 photo smoke detectors, 1 relay modules, 1 multi voltage relay, 31 fire speaker/strobes, 1 strobe to (e) f/a system. ref t.i. 201706139223. maher n/a. | $40,000 |
| Aug 14, 2017 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 7th floor: t.i. project involves modifications of extg tenant suite to inlclude selective demolition and the construction of a non load bearing partition, modification to ceiling tiles and grid as needed in area of work and new finishes. n/a for maher.Details
7th floor: t.i. project involves modifications of extg tenant suite to inlclude selective demolition and the construction of a non load bearing partition, modification to ceiling tiles and grid as needed in area of work and new finishes. n/a for maher. | $15,000 |
| Aug 11, 2017 | Completed final sign-off Nov 2017 | 350 California St | Golden Gate Fire Protection Inc | relocate 90 pendents; add 10 and remove 8. 100 total pendents for union bank. ref pa 2017-0613-9227Details
relocate 90 pendents; add 10 and remove 8. 100 total pendents for union bank. ref pa 2017-0613-9227 | $24,750 |
| Aug 11, 2017 | Completed final sign-off Nov 2017 | 350 California St | Golden Gate Fire Protection Inc | relocate 96 sprinkler pendents; add 9 pendents & remove 6 pendents for union bank (17th floor). ref pa 2017-0613-9227Details
relocate 96 sprinkler pendents; add 9 pendents & remove 6 pendents for union bank (17th floor). ref pa 2017-0613-9227 | $26,500 |
| Jun 23, 2017 | Completed final sign-off Aug 2017 | 350 California St | Tri-Signal Integration Inc. | 5th fl: add 1 power supply, 23 smoke det, 20 speaker/strobes, 5 strobes to e fa system. ref 2016-1205-4179. n/a for maher.Details
5th fl: add 1 power supply, 23 smoke det, 20 speaker/strobes, 5 strobes to e fa system. ref 2016-1205-4179. n/a for maher. | $31,000 |
| Jun 20, 2017 | Completed final sign-off Aug 2017 | 350 California St | Tri-Signal Integration Inc. | 4th fl: f/a t.i. includes: add (1) power supply; 26 (n) photo smoke detectors; 1 (n) relay module; 26 (n) speaker /strobes; 3 (n) strobes to existing fire alarm system. ref. #2016-1205-4179. maher naDetails
4th fl: f/a t.i. includes: add (1) power supply; 26 (n) photo smoke detectors; 1 (n) relay module; 26 (n) speaker /strobes; 3 (n) strobes to existing fire alarm system. ref. #2016-1205-4179. maher na | $36,000 |
| Jun 13, 2017 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinanceDetails
4th & 5th floor - revision to pa #201612054179 - revision to drawings ot incorporate new mechanical room on floor (5). n/a maher ordinance | |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
11th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 350 California St | Bcci Construction Company | 17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes.Details
17th floor t.i. involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling grid & tiles, new gyp board ceiling, lighitng fixtures, door & frames, millwork & new finishes. | $1,100,000 |
| May 5, 2017 | Completed final sign-off Jul 2017 | 350 California St | Ayoob & Peery Plumbing Co Inc | 4th floor full floor fire sprinkler - add 18, 82 relocate, 23 removed. ref pa 201612054179Details
4th floor full floor fire sprinkler - add 18, 82 relocate, 23 removed. ref pa 201612054179 | $52,500 |
| May 5, 2017 | Completed final sign-off Oct 2017 | 350 California St | Ayoob & Peery Plumbing Co Inc | 5th floor sprinkler ti: add relocate, remove fire sprinklers per tenant improvement (7 adds), 83 relocate, 24 removed. ref 201612054179Details
5th floor sprinkler ti: add relocate, remove fire sprinklers per tenant improvement (7 adds), 83 relocate, 24 removed. ref 201612054179 | $47,250 |
| Apr 27, 2017 | Never finaled issued Apr 2017, no final | 350 California St | Swinerton Builders | removal of the existing exterior tenant signage and the associated patch & repair work. n/a ordinance #155-13Details
removal of the existing exterior tenant signage and the associated patch & repair work. n/a ordinance #155-13 | $75,000 |
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 350 California St | Tri-Signal Integration Inc. | 4th & 5th flrs: demo of fa devices maher na ref 2016-1205-4179Details
4th & 5th flrs: demo of fa devices maher na ref 2016-1205-4179 | $2,500 |
| Dec 21, 2016 | Completed final sign-off Jan 2017 | 350 California St | Tri-Signal Integration Inc. | 20th fl: add 1 strobe and relocate 1 smoke detector. ref ti 2016-1122-3360.Details
20th fl: add 1 strobe and relocate 1 smoke detector. ref ti 2016-1122-3360. | $1,200 |
| Dec 8, 2016 | Completed final sign-off Dec 2016 | 350 California St | Anderson, Rowe & Buckley, Inc. | arch 201611223360, existing fire sprinkler system, tenant improvements, 4 relocated sprinklers & 1 removed sprinkler; maher n./aDetails
arch 201611223360, existing fire sprinkler system, tenant improvements, 4 relocated sprinklers & 1 removed sprinkler; maher n./a | $1,000 |
| Dec 5, 2016 | Completed final sign-off Sep 2017 | 350 California St | Bcci Construction Company | 4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain.Details
4th and 5th floor. this t.i. project involves modification of extg tenant suite to include selective demolition and construction of non-load bearing partitions, new ceiling tiles and grid, new gyp board ceiling , light fixtures, doors and frames, millwork and new finishes. extg stair to remain. | $2,500,000 |
| Nov 22, 2016 | Completed final sign-off May 2017 | 350 California St | Swinerton Builders | arche/mech/electrical - ti improvement modification of (e) tenant suite 200 to include selective demolition and construction of non-load bearing partitions, new ceiling tile & grid, light fixtures, door & frames and new finishes. combine two small conference rooms into 1 larger office. maher naDetails
arche/mech/electrical - ti improvement modification of (e) tenant suite 200 to include selective demolition and construction of non-load bearing partitions, new ceiling tile & grid, light fixtures, door & frames and new finishes. combine two small conference rooms into 1 larger office. maher na | $50,000 |
| Oct 27, 2016 | Completed final sign-off Nov 2016 | 350 California St | Tri-Signal Integration Inc. | 6th floor - as build fire alarm drawings for pa 2016-1008-1843. maher naDetails
6th floor - as build fire alarm drawings for pa 2016-1008-1843. maher na | |
| Jul 8, 2016 | Completed final sign-off Nov 2016 | 350 California St | Tri-Signal Integration Inc. | on the 6th floor - fire alarm ti add 1 smoke detector, 5 speakers and 8 strobes. replace 25 e ion smoke detectors with 25 n photo smoke detectors. replace 12 speakers and 19 strobes. remove 4 e oin smoke detectors. ref 201503293334; maher n/aDetails
on the 6th floor - fire alarm ti add 1 smoke detector, 5 speakers and 8 strobes. replace 25 e ion smoke detectors with 25 n photo smoke detectors. replace 12 speakers and 19 strobes. remove 4 e oin smoke detectors. ref 201503293334; maher n/a | $39,932 |
| Jul 8, 2016 | Completed final sign-off Jul 2018 | 350 California St | Tri-Signal Integration Inc. | replace 29 e ion smoke det with 29 n photo smoke det. replace 16 speakers and 23 strobes. remove 2 e ion smoke det ref 201603293335; maher n/aDetails
replace 29 e ion smoke det with 29 n photo smoke det. replace 16 speakers and 23 strobes. remove 2 e ion smoke det ref 201603293335; maher n/a | $39,120 |
| Jun 17, 2016 | Completed final sign-off Aug 2016 | 350 California St | Tri-Signal Integration Inc. | 1st flr: add two relay modules to existing fa system for pressurized stairways, ref. 201411101129; maher n/a older "building management system" hybrid smoke protectionDetails
1st flr: add two relay modules to existing fa system for pressurized stairways, ref. 201411101129; maher n/a older "building management system" hybrid smoke protection | $1,016 |
| Jun 3, 2016 | Completed final sign-off Nov 2016 | 350 California St | Golden Gate Fire Protection Inc | 6th & 16th floors: fire sprinkler: relocate 117 pendent sprinklers on the 6th. relocate 103 on 16th. ref. 2016-03-29-3334, 6th flr; #2016-03-29-3335, 16th flr. maher naDetails
6th & 16th floors: fire sprinkler: relocate 117 pendent sprinklers on the 6th. relocate 103 on 16th. ref. 2016-03-29-3334, 6th flr; #2016-03-29-3335, 16th flr. maher na | $115,500 |
| Apr 26, 2016 | Completed final sign-off Apr 2016 | 350 California St | Tri-Signal Integration Inc. | added 3 monitoring points to existing fire alarm system (fuel system monitoring) show added devices on as built. ref pa 2016-0217-9782. maher naDetails
added 3 monitoring points to existing fire alarm system (fuel system monitoring) show added devices on as built. ref pa 2016-0217-9782. maher na | |
| Mar 29, 2016 | Completed final sign-off Nov 2016 | 350 California St | Deb Construction Llc | 16th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp board, light fixtures, door frames, millwork & new finishes.Details
16th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp board, light fixtures, door frames, millwork & new finishes. | $1,800,000 |
| Mar 29, 2016 | Completed final sign-off Nov 2016 | 350 California St | Deb Construction Llc | 6th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp bd. ceiling, light fixtures, door frames, millwork & new finishes.Details
6th floor - project involves modifications of existing tenant suite to include selective demolitoin & construction of non-load bearing partitions, new ceiling tile & grid, new gyp bd. ceiling, light fixtures, door frames, millwork & new finishes. | $1,700,000 |
| Mar 9, 2016 | Completed final sign-off Apr 2016 | 350 California St | Pribuss Engineering Inc | basement fire sprinkler - relocate 2. add 1 total 3. ref t.i. 201508144341 (23rd flr). n/a maher ordinanceDetails
basement fire sprinkler - relocate 2. add 1 total 3. ref t.i. 201508144341 (23rd flr). n/a maher ordinance | $1,552 |
| Feb 17, 2016 | Completed final sign-off Apr 2016 | 350 California St | Tri-Signal Integration Inc. | add 2 duct detectors and 1 relay to an (e) fire alarm system. maher naDetails
add 2 duct detectors and 1 relay to an (e) fire alarm system. maher na | $3,000 |
| Jan 21, 2016 | Expired or cancelled cancelled Jan 2026 | 350 California St | Swinerton Builders | 4th floor: scope limited to new access door to 4th floor roof as a service access point to roof. work includes new access, pre cast reinforcing fame and finishes. roof for maintenance only. maher naDetails
4th floor: scope limited to new access door to 4th floor roof as a service access point to roof. work includes new access, pre cast reinforcing fame and finishes. roof for maintenance only. maher na | $10,000 |
| Aug 14, 2015 | Completed final sign-off Jun 2016 | 350 California St | Swinerton Builders | installation of fuel oil system to serve (e) emergency generator on 23rd floor. includes new exterior fuel oil port, interior fuel oil pump, fuel oil service tank and associated piping and construction. maher naDetails
installation of fuel oil system to serve (e) emergency generator on 23rd floor. includes new exterior fuel oil port, interior fuel oil pump, fuel oil service tank and associated piping and construction. maher na | $1,000,000 |
| Aug 14, 2015 | Never finaled issued Aug 2015, no final | 350 California St | Arrow Sign Company | change face on 4 existing signs. compliance with maher ordinance no 155-13 not required.Details
change face on 4 existing signs. compliance with maher ordinance no 155-13 not required. | $1,500 |
| Jul 15, 2015 | Never finaled issued Jul 2015, no final | 350 California St | True North Signs & Graphic Services | erect a non-electric single faced sign (#1); maher n/aDetails
erect a non-electric single faced sign (#1); maher n/a | $4,275 |
| Jul 15, 2015 | Never finaled issued Jul 2015, no final | 350 California St | True North Signs & Graphic Services | erect a non-electric single faced sign (#2); maher n/aDetails
erect a non-electric single faced sign (#2); maher n/a | $2,385 |
| Jul 15, 2015 | Never finaled issued Jul 2015, no final | 350 California St | True North Signs & Graphic Services | erect a non-electric wall single faced sign (#3); maher n/aDetails
erect a non-electric wall single faced sign (#3); maher n/a | $1,500 |
| Jun 30, 2015 | Completed final sign-off Jan 2016 | 350 California St | Northern Sun Associates | no change to extg bldg foot print, square footage, or light. t.i. from an extg food services retail tenant to new food service retail tenant. new food prep area, partition walls, casework, interior lighting, plmg and electrical work. n/a for maher. no exterior work no change of use proposed.Details
no change to extg bldg foot print, square footage, or light. t.i. from an extg food services retail tenant to new food service retail tenant. new food prep area, partition walls, casework, interior lighting, plmg and electrical work. n/a for maher. no exterior work no change of use proposed. | $74,700 |
| Nov 24, 2014 | Completed final sign-off Dec 2014 | 350 California St | Potter Fire Protection | install (1) fire sprinkler per inspector request. ref. permit # 2014-1120-2075; maher n/aDetails
install (1) fire sprinkler per inspector request. ref. permit # 2014-1120-2075; maher n/a | $700 |
| Nov 20, 2014 | Completed final sign-off Dec 2014 | 350 California St | San Francisco Commercial Builders Inc | project is limited to the basement level fountain pump/storage room ceiling. repair and relace damaged concealed spine ceiling grid and tile with new to match existing or existing building stock. accessibility upgrade exempted per section 11b-203.5-machinery space. n/a for maher.Details
project is limited to the basement level fountain pump/storage room ceiling. repair and relace damaged concealed spine ceiling grid and tile with new to match existing or existing building stock. accessibility upgrade exempted per section 11b-203.5-machinery space. n/a for maher. | $5,000 |
| Nov 18, 2014 | Completed final sign-off Jan 2015 | 350 California St | Skyline Construction | 7th & 15th floor - restoration of water closet removed under previous t.i. permit.- barrier removal.Details
7th & 15th floor - restoration of water closet removed under previous t.i. permit.- barrier removal. | $5,000 |
| Nov 10, 2014 | Never finaled issued Dec 2014, no final | 350 California St | Swinerton Builders | 1st and 24th floor mechanical work only. replacement of fan and ventilation equipment in kind and electrical connections as it relates to the equipment replacement. maher n/a.Details
1st and 24th floor mechanical work only. replacement of fan and ventilation equipment in kind and electrical connections as it relates to the equipment replacement. maher n/a. | $210,000 |
| Jul 22, 2014 | Completed final sign-off Sep 2014 | 350 California St | 15th floor:create and produce 3 evacuation signs.Details
15th floor:create and produce 3 evacuation signs. | $1,100 |