Ashley Miller
- License
- C27258
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Aug 2024 to Nov 2026
3 permits since 2000 (architect on 3 permits): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Field Construction Inc.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2026 | In progress filed Nov 2026, not yet issued | 505 Sansome St | 5,9th fl: modification of (e) tenant improvements to include demo of (e) non-load bearing partitions, doors, frames & hardware, ceiling tile & grid systems, light fixtures & switching, power/data, finishes, & plumbing.Details
5,9th fl: modification of (e) tenant improvements to include demo of (e) non-load bearing partitions, doors, frames & hardware, ceiling tile & grid systems, light fixtures & switching, power/data, finishes, & plumbing. | $199,073 | |
| Nov 6, 2026 | In progress filed Nov 2026, not yet issued | 505 Sansome St | 10,11,12th fl: modification of (e) tenant improvements to include demo of (e) non-load bearing partitions, doors, frames & hardware, ceiling tile & grid systems, light fixtures & switching, power/data, finishes, & plumbing.Details
10,11,12th fl: modification of (e) tenant improvements to include demo of (e) non-load bearing partitions, doors, frames & hardware, ceiling tile & grid systems, light fixtures & switching, power/data, finishes, & plumbing. | $298,609 | |
| Aug 22, 2024 | Completed final sign-off Jan 2025 | 350 California St | Field Construction Inc. | modification of an (e) tenant suite to include selective demo and construction of non-load bearing partions, new light fixtures, ceiling, doors and frames and glazing systm and new finishes (mep deffered) suite 1920Details
modification of an (e) tenant suite to include selective demo and construction of non-load bearing partions, new light fixtures, ceiling, doors and frames and glazing systm and new finishes (mep deffered) suite 1920 | $185,000 |