Jun Young Yang
- License
- M31962
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M31962 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Oct 2018 to Aug 2023
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Swinerton Builders (2), Plant Construction Co, Lp, Western Allied Mechanical Inc.
- Architects
- Cyrus Cowasjee (2)
- Engineers
- Mark Batten (2), Rene Canedo (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2023 | Completed final sign-off Oct 2024 | 350 California St | Swinerton Builders | 20/f suite 2018 and 2020: revision to permit 202212289249. partial acoustical tile suspended ceiling and new lighting throughout the suites.Details
20/f suite 2018 and 2020: revision to permit 202212289249. partial acoustical tile suspended ceiling and new lighting throughout the suites. | |
| Dec 28, 2022 | Completed final sign-off Oct 2024 | 350 California St | Swinerton Builders, Plant Construction Co, Lp | 20/f: tenant improvement to renovate 2 (e) mufg bank, ltd office suites (2018 and 2020). to create 3 independent suites. ti to include partial demo of (e) walls, acoustical tile suspended ceiling and lighting, new offices, conference/huddle rooms, lockers, mother's room, work/print/copy and...Details
20/f: tenant improvement to renovate 2 (e) mufg bank, ltd office suites (2018 and 2020). to create 3 independent suites. ti to include partial demo of (e) walls, acoustical tile suspended ceiling and lighting, new offices, conference/huddle rooms, lockers, mother's room, work/print/copy and... | $2,000,000 |
| Oct 16, 2018 | Completed final sign-off Aug 2019 | 430 California St | Western Allied Mechanical Inc. | mechanical and electrical for basement 3-replace hot water pump, add vfd and water softener- electrical work included to support mechanical workDetails
mechanical and electrical for basement 3-replace hot water pump, add vfd and water softener- electrical work included to support mechanical work | $45,000 |