Block 0239, lot 029
430 California St
- City’s use
- Commercial Office
- Built
- 1968
- Stories
- 21
- Building
- 295,783 sq ft
- Lot
- 13,020 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 4, 2025 | Completed final sign-off Jan 2026 | 430 California St | Sabah International Incorporated | addition to existing edwards fire emergency voice alarm communication system to accommodate t.i. on 11th floor. ref pa #202511048852Details
addition to existing edwards fire emergency voice alarm communication system to accommodate t.i. on 11th floor. ref pa #202511048852 | $17,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 430 California St | Architectural Design & Signs Inc | revision to pa# 202503172363: to change attachment method only. (details to supercede those approved under pa# 202509165337.)Details
revision to pa# 202503172363: to change attachment method only. (details to supercede those approved under pa# 202509165337.) | |
| Nov 6, 2025 | In progress issued Nov 2025 | 430 California St | Pioneer Fire Inc. | 11/fl- relocate (1) pendent, convert (3) pendents to uprights, ref 202511048852Details
11/fl- relocate (1) pendent, convert (3) pendents to uprights, ref 202511048852 | $1,000 |
| Nov 4, 2025 | Completed final sign-off Feb 2026 | 430 California St | Novo Construction Inc | 11/f: demolition of interior partitions to create open office. minor lighting and power. new finishes.Details
11/f: demolition of interior partitions to create open office. minor lighting and power. new finishes. | $193,000 |
| Sep 16, 2025 | Completed final sign-off Dec 2025 | 430 California St | Architectural Design & Signs Inc | rev to pa# 2025-0317-2363: to change attachment method only.Details
rev to pa# 2025-0317-2363: to change attachment method only. | |
| Mar 17, 2025 | In progress issued Jun 2025 | 430 California St | Architectural Design & Signs Inc | install 1) illuminated hanging sign "rippling" 2'4" x 16'7"Details
install 1) illuminated hanging sign "rippling" 2'4" x 16'7" | $8,000 |
| Feb 21, 2025 | In progress issued Feb 2025 | 430 California St | Innovative Mechanical Inc | 12th - 17th fl demo (12) existing cooling van boxes (2) boxes per floor. demo and installation of ductwork for new floor layout. furnish and install (12) new cooling only van boxesDetails
12th - 17th fl demo (12) existing cooling van boxes (2) boxes per floor. demo and installation of ductwork for new floor layout. furnish and install (12) new cooling only van boxes | $30,000 |
| May 16, 2024 | Completed final sign-off Jun 2024 | 430 California St | United Systems Fire And Security Llc | as-built fire alarm permit 202404190344.Details
as-built fire alarm permit 202404190344. | |
| Apr 19, 2024 | Completed final sign-off Jun 2024 | 430 California St | United Systems Fire And Security Llc | addition of 5 input modules for tamper monitoring of the new pressure reducing valves, addresses for new devices to be provoded w/as builts. ref to 202305198144Details
addition of 5 input modules for tamper monitoring of the new pressure reducing valves, addresses for new devices to be provoded w/as builts. ref to 202305198144 | $10,282 |
| Jul 20, 2023 | Completed final sign-off Dec 2023 | 430 California St | United Systems Fire And Security Llc | addotion of (e) single input module for fire pump phase reversal monitoring address for new device to be provided w/as-builtsDetails
addotion of (e) single input module for fire pump phase reversal monitoring address for new device to be provided w/as-builts | $8,720 |
| Jun 20, 2023 | Completed final sign-off Jun 2023 | 430 California St | United Systems Fire And Security Llc | unit 1bf: as-built fire alarm permr pa 202305198144 maher n/aDetails
unit 1bf: as-built fire alarm permr pa 202305198144 maher n/a | |
| May 19, 2023 | Completed final sign-off Jun 2023 | 430 California St | United Systems Fire And Security Llc | basement level t.i. adding 2 smoke detector & 5 speaker strobees to (e) fire alarm systemDetails
basement level t.i. adding 2 smoke detector & 5 speaker strobees to (e) fire alarm system | $14,461 |
| May 19, 2023 | Never finaled issued May 2023, no final | 430 California St | Pribuss Engineering Inc | fire sprinkler ti on b1 level l- relocate 5 heads. ref pa 2023-0124-0619Details
fire sprinkler ti on b1 level l- relocate 5 heads. ref pa 2023-0124-0619 | $2,500 |
| May 16, 2023 | Completed final sign-off Jul 2023 | 430 California St | Rylko Builders Inc. | alteration to mechanical and electrical for new office tenant improvement layout. ref ti permit 202301240619Details
alteration to mechanical and electrical for new office tenant improvement layout. ref ti permit 202301240619 | $90,000 |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 430 California St | Pribuss Engineering Inc | instll new prv's for floors b3,b2,b1 and l1 due to the (e) system pressure exceeding 175ps1Details
instll new prv's for floors b3,b2,b1 and l1 due to the (e) system pressure exceeding 175ps1 | $30,000 |
| Jan 24, 2023 | Completed final sign-off Jun 2023 | 430 California St | Rylko Builders Inc. | t.i. as a partial reconfiguration of an (e) tenant space, bif, at level b1 this includes selective demo and installation of walls, ceilings and doorsDetails
t.i. as a partial reconfiguration of an (e) tenant space, bif, at level b1 this includes selective demo and installation of walls, ceilings and doors | $85,000 |
| Nov 10, 2022 | Completed final sign-off Dec 2023 | 430 California St | Pribuss Engineering Inc | decommission and remove/replace (e) fire pump, jockey pump & controllers, to match (e) specsDetails
decommission and remove/replace (e) fire pump, jockey pump & controllers, to match (e) specs | $25,000 |
| Jan 5, 2021 | Never finaled issued Feb 2021, no final | 400 California St | Everon Llc | fire alarm as-built for pa #2020-1104-8184Details
fire alarm as-built for pa #2020-1104-8184 | |
| Nov 23, 2020 | Completed final sign-off Dec 2020 | 430 California St | Everon Llc | fire alarm as-built drawing for pa # 2020-0715-0253.Details
fire alarm as-built drawing for pa # 2020-0715-0253. | |
| Nov 4, 2020 | Completed final sign-off Dec 2020 | 400 California St | Everon Llc | fire alarm t.i. - level b1 - replace (8) smoke detector with new, add (1) smoke detector, (5) duct tetectors for fsd with control relays level 1 - replace (3) smoke detectors with new level 3 - add (1) smoke detector level 5 - add (3) smoke duct detectors for fsds w/ control relays ref#201804247160Details
fire alarm t.i. - level b1 - replace (8) smoke detector with new, add (1) smoke detector, (5) duct tetectors for fsd with control relays level 1 - replace (3) smoke detectors with new level 3 - add (1) smoke detector level 5 - add (3) smoke duct detectors for fsds w/ control relays ref#201804247160 | $8,000 |
| Aug 21, 2020 | Completed final sign-off Dec 2020 | 430 California St | Pribuss Engineering Inc | modify sprinkler head locations to accomadate new ceiling $ partition layout for new space on b3, b1, l1. total sprinklers this project = 100.Details
modify sprinkler head locations to accomadate new ceiling $ partition layout for new space on b3, b1, l1. total sprinklers this project = 100. | $51,400 |
| Jul 22, 2020 | Expired or cancelled cancelled Jan 2026 | 430 California St | 3/f. t.i includes building new non structural partitions and ceiling, new finishes, new mep, life safety & sprinklers. life safety and sprinkler under sep permit. bldg fully sprinklered.Details
3/f. t.i includes building new non structural partitions and ceiling, new finishes, new mep, life safety & sprinklers. life safety and sprinkler under sep permit. bldg fully sprinklered. | $2,000,000 | |
| Jul 22, 2020 | Expired or cancelled cancelled Jan 2026 | 430 California St | 2nd fl ti new non structural partitions, ceilings. new finishes, new or revised meps, ls and sprinklers under sep permit. fully sprinkleredDetails
2nd fl ti new non structural partitions, ceilings. new finishes, new or revised meps, ls and sprinklers under sep permit. fully sprinklered | $2,000,000 | |
| Jul 15, 2020 | Completed final sign-off Dec 2020 | 430 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti on level b3, b1 & 1st fl. b3 - add 3 smoke detectors, 2 duct detectors w/control relay & monitoring modules for fsd; b1 - add 2 speaker strobes. 1st fl - add 1 speaker strobes. ref pa 2019-1010-4117Details
fire alarm ti on level b3, b1 & 1st fl. b3 - add 3 smoke detectors, 2 duct detectors w/control relay & monitoring modules for fsd; b1 - add 2 speaker strobes. 1st fl - add 1 speaker strobes. ref pa 2019-1010-4117 | $12,000 |
| Jul 14, 2020 | Never finaled issued Jul 2020, no final | 430 California St | street spaceDetails
street space | ||
| Mar 11, 2020 | Never finaled issued Mar 2020, no final | 430 California St | street spaceDetails
street space | ||
| Nov 25, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 11th fl - revision to pa 2019-0820-9238 correcting fsd's, going from 11 fsd's to 8 fsd's etcDetails
11th fl - revision to pa 2019-0820-9238 correcting fsd's, going from 11 fsd's to 8 fsd's etc | |
| Nov 25, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 7th fl - revision to pa 2019-0830-9236. correction of fsd's going from 17 fsd's to 13 fsd's etsDetails
7th fl - revision to pa 2019-0830-9236. correction of fsd's going from 17 fsd's to 13 fsd's ets | |
| Nov 19, 2019 | Completed final sign-off Feb 2020 | 430 California St | Sc Builders, Inc | evacation signage for floor 7, 8, 9, 10, 11Details
evacation signage for floor 7, 8, 9, 10, 11 | |
| Nov 5, 2019 | Completed final sign-off Mar 2020 | 430 California St | Pioneer Fire Inc. | fire sprinklers on 7 & 11th fl: 96 relocated pendents, 59 relocated uprights, 15 relocated roosters, 23 added pendents, 10 added uprights, 3 added rooster. ref pa 201908209238Details
fire sprinklers on 7 & 11th fl: 96 relocated pendents, 59 relocated uprights, 15 relocated roosters, 23 added pendents, 10 added uprights, 3 added rooster. ref pa 201908209238 | $56,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2021 | 430 California St | Bana Construction Inc | scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher naDetails
scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na | $1,634,000 |
| Sep 24, 2019 | Completed final sign-off Nov 2019 | 430 California St | Ayoob & Peery Plumbing Co Inc | 8th fl - add 30, relocate 45 & plug 8 sprinkler per ti ref pa 2019-0731-7409; 9th fl - add 40, relocate 43 & plug 4 sprinklers per ti ref pa 2019-0701-4741; 10th fl - add 40, relocate 44 & plug 6 sprinklers per ti ref pa 2019-0731-7404Details
8th fl - add 30, relocate 45 & plug 8 sprinkler per ti ref pa 2019-0731-7409; 9th fl - add 40, relocate 43 & plug 4 sprinklers per ti ref pa 2019-0701-4741; 10th fl - add 40, relocate 44 & plug 6 sprinklers per ti ref pa 2019-0731-7404 | $87,450 |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 430 California St | street spaceDetails
street space | ||
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 430 California St | Sc Builders, Inc | 8th fl - revision to pa 2019-0731-7409 modification fsdsDetails
8th fl - revision to pa 2019-0731-7409 modification fsds | |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 430 California St | Sc Builders, Inc | 9th fl - revision to pa 2019-0701-4741 modification fsdsDetails
9th fl - revision to pa 2019-0701-4741 modification fsds | |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 430 California St | Sc Builders, Inc | 10th fl - revision to pa 2019-0731-7404 modification of fsds and ceilingDetails
10th fl - revision to pa 2019-0731-7404 modification of fsds and ceiling | |
| Aug 20, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 11th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinkleredDetails
11th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinklered | $2,000,000 |
| Aug 20, 2019 | Completed final sign-off May 2020 | 430 California St | Sc Builders, Inc | 7th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinkleredDetails
7th flr - new nion structural partitions and ceiling new finishes, new or revised mep (life safety & sprinklers under sep permit) bld is fully sprinklered | $2,000,000 |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | 12th & 13th fl - fire alarm as built for pa 2019-0418-8375Details
12th & 13th fl - fire alarm as built for pa 2019-0418-8375 | |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | 16th & 17th fl - fire alarm as built for pa 2019-0418-8379Details
16th & 17th fl - fire alarm as built for pa 2019-0418-8379 | |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | 14th & 15th fl - fire alarm as built for pa 2019-0418-8376Details
14th & 15th fl - fire alarm as built for pa 2019-0418-8376 | |
| Aug 9, 2019 | Completed final sign-off Oct 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | 18th & 19th fl - fire alarm as built for pa 2019-0418-8385Details
18th & 19th fl - fire alarm as built for pa 2019-0418-8385 | |
| Aug 1, 2019 | Never finaled issued Aug 2019, no final | 430 California St | street spaceDetails
street space | ||
| Jul 31, 2019 | Completed final sign-off Jan 2020 | 430 California St | Sc Builders, Inc | 10th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permitsDetails
10th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permits | $2,000,000 |
| Jul 31, 2019 | Completed final sign-off Jan 2020 | 430 California St | Sc Builders, Inc | 8th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permitsDetails
8th fl ti - building of (n) non-structural partitions, ceilings, finishes etc. meps; life safety and sprinklers under separate permits | $2,000,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 430 California St | street spaceDetails
street space | ||
| Jul 1, 2019 | Expired or cancelled withdrawn Jul 2019 | 430 California St | 10th fl. t.i. includes building of (n) non structural partitions and ceilings finishes etc; mep, (life safety & sprinklers under separate permit) building fully sprinklered n/a maherDetails
10th fl. t.i. includes building of (n) non structural partitions and ceilings finishes etc; mep, (life safety & sprinklers under separate permit) building fully sprinklered n/a maher | $2,000,000 | |
| Jul 1, 2019 | Completed final sign-off Jan 2020 | 430 California St | 9th fl. includes building of (n) non str. partitions and ceilings finishes etc; mep, (life safety & sprinklers under separate permit) building fully sprinklered n/a maher//vif fsds, elevator lobby card readers and claa a wood panel ceilingsDetails
9th fl. includes building of (n) non str. partitions and ceilings finishes etc; mep, (life safety & sprinklers under separate permit) building fully sprinklered n/a maher//vif fsds, elevator lobby card readers and claa a wood panel ceilings | $2,000,000 | |
| Jul 1, 2019 | Expired or cancelled withdrawn Jul 2019 | 430 California St | 10th fl. t.i. includes building of (n) non structural partitions and ceilings finishes etc; mep, (life safety & sprinklers under separate permit) building fully sprinklered n/a maherDetails
10th fl. t.i. includes building of (n) non structural partitions and ceilings finishes etc; mep, (life safety & sprinklers under separate permit) building fully sprinklered n/a maher | $2,000,000 | |
| Jun 13, 2019 | Never finaled issued Jun 2019, no final | 400 California St | street sapceDetails
street sapce | ||
| May 30, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | rev to pa# 201903084762; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maherDetails
rev to pa# 201903084762; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maher | |
| May 30, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | rev to pa# 201903084763; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maherDetails
rev to pa# 201903084763; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maher | |
| May 30, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | rev to pa# 201903084764; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maherDetails
rev to pa# 201903084764; changes to furniture layout, occupancy calcs, finishes, lighting, mechanical ducts, plumbing equipment n/a maher | |
| May 29, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | revision to app#201903074712. changes to furniture layout and occupancy calcs. finish changes. lighting change. mech ducts & plmg equipment.Details
revision to app#201903074712. changes to furniture layout and occupancy calcs. finish changes. lighting change. mech ducts & plmg equipment. | |
| May 13, 2019 | Completed final sign-off Nov 2019 | 430 California St | Pribuss Engineering Inc | fire sprinkler tenant improvements on 2nd, 3rd, 5th, 6th, 7th, 8th, 9th, 10th, 11th floors. relocate 554 sprinklers, add 82 sprinklers total 636 sprinklers. ref pa #201904188370.Details
fire sprinkler tenant improvements on 2nd, 3rd, 5th, 6th, 7th, 8th, 9th, 10th, 11th floors. relocate 554 sprinklers, add 82 sprinklers total 636 sprinklers. ref pa #201904188370. | $326,390 |
| Apr 18, 2019 | Completed final sign-off Sep 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti 16th fl: add 35 speaker strobes, 6 strobes, 1 sync module, 5 smoke det, 7 duct detectors for fsds and 1 control relay for security interface. 17th fl add 35 speaker strobes, 6 strobes, 5 smoke detec, 7 duct detectors, 1 control relay for security interface ref 201810042317Details
fire alarm ti 16th fl: add 35 speaker strobes, 6 strobes, 1 sync module, 5 smoke det, 7 duct detectors for fsds and 1 control relay for security interface. 17th fl add 35 speaker strobes, 6 strobes, 5 smoke detec, 7 duct detectors, 1 control relay for security interface ref 201810042317 | $46,000 |
| Apr 18, 2019 | Completed final sign-off Jul 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alar ti 14th fl add 34 spekaer strobes, 6 strobes, 1 sync module, 8 smoke detectors, 7 duct detectors for fsd's & control relay for security interface, 15th fl: add 34 speaker strobes, 1 sync module, 3 smoke detectors, 8 deuct detectors for fsd's & 1 control relay for security interface. n/a maDetails
fire alar ti 14th fl add 34 spekaer strobes, 6 strobes, 1 sync module, 8 smoke detectors, 7 duct detectors for fsd's & control relay for security interface, 15th fl: add 34 speaker strobes, 1 sync module, 3 smoke detectors, 8 deuct detectors for fsd's & 1 control relay for security interface. n/a ma | $46,000 |
| Apr 18, 2019 | Completed final sign-off Dec 2019 | 430 California St | Sc Builders, Inc | removal of non-structural partitions, ceilings, architectural finishes. electrical & mechanical to prepare floors for future tenant improvements. demolition to occur on levels 2-3, 5-11. fire sprinkler & fire alarm under separate permit. n/a for maher.Details
removal of non-structural partitions, ceilings, architectural finishes. electrical & mechanical to prepare floors for future tenant improvements. demolition to occur on levels 2-3, 5-11. fire sprinkler & fire alarm under separate permit. n/a for maher. | $20,000 |
| Apr 16, 2019 | Completed final sign-off Apr 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alarm ti basement existing office suite. add 1 speaker strobe & 1 smoke detector. relocate 1 smoke & 1 notification appliances. ref pa #201901100033. n/a for maher.Details
fire alarm ti basement existing office suite. add 1 speaker strobe & 1 smoke detector. relocate 1 smoke & 1 notification appliances. ref pa #201901100033. n/a for maher. | $2,000 |
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 430 California St | streetspaceDetails
streetspace | ||
| Mar 15, 2019 | Never finaled issued Mar 2019, no final | 430 California St | streetspaceDetails
streetspace | ||
| Mar 8, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 16th & 17th flrs - revision to 201810042317 bathrooms it rooms finishes and mep upgrades to accomodate changes maher naDetails
16th & 17th flrs - revision to 201810042317 bathrooms it rooms finishes and mep upgrades to accomodate changes maher na | $150,000 |
| Mar 8, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 14th & 15th flrs - revision to 201810042316 bathrooms it rooms finishes and mep upgrades to accomodate changes maher naDetails
14th & 15th flrs - revision to 201810042316 bathrooms it rooms finishes and mep upgrades to accomodate changes maher na | $150,000 |
| Mar 8, 2019 | Expired or cancelled cancelled Dec 2019 | 430 California St | Sc Builders, Inc | 18th & 19th flrs - convert (e) outdoor terrace area to usable space, accessory to the office not open to the public; add aceesible ramp & install non-visible glass rail behind parapet max. 10" above (e)parapet.Details
18th & 19th flrs - convert (e) outdoor terrace area to usable space, accessory to the office not open to the public; add aceesible ramp & install non-visible glass rail behind parapet max. 10" above (e)parapet. | $20,000 |
| Mar 8, 2019 | Completed final sign-off Feb 2022 | 430 California St | Sc Builders, Inc | 18th & 19th flrs - revision to 201810042316 bathrooms it rooms finishes, add mezz wall & structural for wall. mep upgrades to accomodate changes maher naDetails
18th & 19th flrs - revision to 201810042316 bathrooms it rooms finishes, add mezz wall & structural for wall. mep upgrades to accomodate changes maher na | $150,000 |
| Mar 7, 2019 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 12th & 13th flr - removal of asbestos containng walls 300 sq ft (only in restroom) electrical modifications to idf rooms in 12 & 13 addition of wall at janitors closet on 14=3th flr, asbestom remediatioDetails
12th & 13th flr - removal of asbestos containng walls 300 sq ft (only in restroom) electrical modifications to idf rooms in 12 & 13 addition of wall at janitors closet on 14=3th flr, asbestom remediatio | $150,000 |
| Mar 4, 2019 | Completed final sign-off Feb 2022 | 430 California St | Sc Builders, Inc | 18th fl - structural opening to infill in (e) slab. ref pa 2018-1004-2318Details
18th fl - structural opening to infill in (e) slab. ref pa 2018-1004-2318 | $5,000 |
| Feb 25, 2019 | Never finaled issued Feb 2019, no final | 430 California St | Pj Murphy & Associates Inc Dba Gnu Group | install 24 evacuation mapsDetails
install 24 evacuation maps | $2,500 |
| Feb 14, 2019 | Completed final sign-off Mar 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | lobby - revision to pa 2018-1207-7762 update sheet fa 0.01 on scope of work. add sheet fa-0.04a. pre applicatoin minutes. update sheet fa-0.02 devices count. update sheet fa-1.03, 1.04 floor plan. all changes are cloudedDetails
lobby - revision to pa 2018-1207-7762 update sheet fa 0.01 on scope of work. add sheet fa-0.04a. pre applicatoin minutes. update sheet fa-0.02 devices count. update sheet fa-1.03, 1.04 floor plan. all changes are clouded | $2,000 |
| Feb 14, 2019 | Completed final sign-off May 2019 | 430 California St | Red Hawk Fire & Security Ca Llc | installing cameras for security on building. seven (7) cameras to be installed. no conduit showing. (3) cameras to be replaced. one (1) camera to be removed. paint camera to match ceiling cover.Details
installing cameras for security on building. seven (7) cameras to be installed. no conduit showing. (3) cameras to be replaced. one (1) camera to be removed. paint camera to match ceiling cover. | $20,000 |
| Jan 10, 2019 | Completed final sign-off Apr 2019 | 430 California St | remodel of an extg basement office and includes selective wall demolition and installation of new doors and walls. no exterior work or change of occupancy. fire life safety and mep under seperate permit.Details
remodel of an extg basement office and includes selective wall demolition and installation of new doors and walls. no exterior work or change of occupancy. fire life safety and mep under seperate permit. | $2,000 | |
| Jan 10, 2019 | Completed final sign-off Jul 2019 | 430 California St | Ayoob & Peery Plumbing Co Inc | 12th floor relocate 52.; 13th floor: add 1, relocate 53 and plug 4 sprinklers to conform with the new wall/ceiling layout of t.i. ref app#201810042315Details
12th floor relocate 52.; 13th floor: add 1, relocate 53 and plug 4 sprinklers to conform with the new wall/ceiling layout of t.i. ref app#201810042315 | $24,150 |
| Jan 10, 2019 | Completed final sign-off Jul 2019 | 430 California St | Ayoob & Peery Plumbing Co Inc | 18th floor add 2,relocate 39 change outs 2 and plug 4 sprinkler. 19th floor: add 2, relocate 44 change out 0. and plug 2 sprinklers to conform with the new wall/ceiling layout of t.i. ref app#201810042316Details
18th floor add 2,relocate 39 change outs 2 and plug 4 sprinkler. 19th floor: add 2, relocate 44 change out 0. and plug 2 sprinklers to conform with the new wall/ceiling layout of t.i. ref app#201810042316 | $21,225 |
| Jan 10, 2019 | Completed final sign-off Jul 2019 | 430 California St | Ayoob & Peery Plumbing Co Inc | 14th floor add 5, relocate 48, plug 4 sprinklers. 15th floor: add 3, relocate 62 and plug 3 sprinklers to conform with the new wall/ceiling layout of t.i. ref app#201810042316Details
14th floor add 5, relocate 48, plug 4 sprinklers. 15th floor: add 3, relocate 62 and plug 3 sprinklers to conform with the new wall/ceiling layout of t.i. ref app#201810042316 | $28,950 |
| Jan 10, 2019 | Completed final sign-off Jul 2019 | 430 California St | Ayoob & Peery Plumbing Co Inc | 16th floor: add 2, relocate 44 and plug 3 sprinkler. 17th floor: add 1, relocate 68 to conform with the new wall/ceiling layout of t.i. ref app#201810042317Details
16th floor: add 2, relocate 44 and plug 3 sprinkler. 17th floor: add 1, relocate 68 to conform with the new wall/ceiling layout of t.i. ref app#201810042317 | $26,775 |
| Dec 12, 2018 | Never finaled issued Dec 2018, no final | 400 California St | street spaceDetails
street space | ||
| Dec 7, 2018 | Completed final sign-off Mar 2019 | 400 California St | Red Hawk Fire & Security Ca Llc | fire alram ti on 1st fl - remove 2 existing door holders, 17 area smoke detectors, relocate 1 fireman's phone jack, 1 smoke detector & annunciator. add 7 wall mount spaker strobes, 2 ceiling mount speaker strobes. 2 new holders & 9 duct detectors for fsd; 2nd fl - remove 2 door holders, 2 smokeDetails
fire alram ti on 1st fl - remove 2 existing door holders, 17 area smoke detectors, relocate 1 fireman's phone jack, 1 smoke detector & annunciator. add 7 wall mount spaker strobes, 2 ceiling mount speaker strobes. 2 new holders & 9 duct detectors for fsd; 2nd fl - remove 2 door holders, 2 smoke | $20,000 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 400 California St | street spaceDetails
street space | ||
| Nov 14, 2018 | Completed final sign-off Mar 2019 | 430 California St | Red Hawk Fire & Security Ca Llc | f/s: add & relocate 9e) sprinklers for lobby renovation at 1st & 2nd fl.Details
f/s: add & relocate 9e) sprinklers for lobby renovation at 1st & 2nd fl. | $20,000 |
| Nov 7, 2018 | Expired or cancelled cancelled Feb 2019 | 430 California St | R L H Fire Protection Inc | t.i. upgrade of the (e) fire sprinkler system 74 relocated pendent sprinklers, 2 removal pendent sprinklers ref pa 201810021992Details
t.i. upgrade of the (e) fire sprinkler system 74 relocated pendent sprinklers, 2 removal pendent sprinklers ref pa 201810021992 | $15,600 |
| Oct 26, 2018 | Completed final sign-off May 2019 | 430 California St | Plant Construction Co, Lp | replacement glass & glazing; modifications of (e) storefrontDetails
replacement glass & glazing; modifications of (e) storefront | |
| Oct 16, 2018 | Completed final sign-off Aug 2019 | 430 California St | Western Allied Mechanical Inc. | mechanical and electrical for basement 3-replace hot water pump, add vfd and water softener- electrical work included to support mechanical workDetails
mechanical and electrical for basement 3-replace hot water pump, add vfd and water softener- electrical work included to support mechanical work | $45,000 |
| Oct 4, 2018 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 12-13th flrs. interior tenant improvement, office spaceDetails
12-13th flrs. interior tenant improvement, office space | $4,160,000 |
| Oct 4, 2018 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 14-15th flrs. interior tenant improvement, office spaceDetails
14-15th flrs. interior tenant improvement, office space | $3,500,000 |
| Oct 4, 2018 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 18-19th flrs. interior tenant improvement, office spaceDetails
18-19th flrs. interior tenant improvement, office space | $2,200,000 |
| Oct 4, 2018 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 16-17th flrs. interior tenant improvement, office spaceDetails
16-17th flrs. interior tenant improvement, office space | $3,500,000 |
| Oct 2, 2018 | Completed final sign-off Nov 2019 | 430 California St | Sc Builders, Inc | 12-19th floors.demolition work no mep, demo ceilings, mail room. sprinklers to remain. dmeo per ab-017.Details
12-19th floors.demolition work no mep, demo ceilings, mail room. sprinklers to remain. dmeo per ab-017. | $80,000 |
| Sep 20, 2018 | Expired or cancelled cancelled Jan 2026 | 430 California St | floor 12-19., total of 8 floors. interior demo - partition walls, floor finishes and fixtures per ab-017.Details
floor 12-19., total of 8 floors. interior demo - partition walls, floor finishes and fixtures per ab-017. | $50,000 | |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 430 California St | street spaceDetails
street space | ||
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 400 California St | Pribuss Engineering Inc | 19th fl. ref pa# 201703292736; fire sprinkler t.i, relocate/changeout to uright sprinklers (38), added upright spriklers (1), total (39).Details
19th fl. ref pa# 201703292736; fire sprinkler t.i, relocate/changeout to uright sprinklers (38), added upright spriklers (1), total (39). | $20,046 |
| Jun 14, 2018 | Completed final sign-off Sep 2018 | 400 California St | to obtain final inspection for work approved under pa# 201401136088, 201402269354. all work is complete.Details
to obtain final inspection for work approved under pa# 201401136088, 201402269354. all work is complete. | ||
| Jun 14, 2018 | Completed final sign-off Jun 2018 | 400 California St | to obtain final inspection for work approved under pa# 201410025446, 201312174344. all work is complete.Details
to obtain final inspection for work approved under pa# 201410025446, 201312174344. all work is complete. | ||
| Jun 14, 2018 | Never finaled issued Jun 2018, no final | 400 California St | to obtain final inspection for work approved under pa# 201409176505, 201406138340. all work is complete.Details
to obtain final inspection for work approved under pa# 201409176505, 201406138340. all work is complete. | ||
| Jun 14, 2018 | Completed final sign-off Jul 2018 | 400 California St | to obtain final inspection for work approved under pa# 201308204734, 200105172600. all work is completeDetails
to obtain final inspection for work approved under pa# 201308204734, 200105172600. all work is complete | ||
| Jun 14, 2018 | Completed final sign-off Sep 2018 | 400 California St | to obtain final inspection for work approved under pa# 201202093877. all work is completeDetails
to obtain final inspection for work approved under pa# 201202093877. all work is complete | ||
| May 31, 2018 | Completed final sign-off Jul 2019 | 430 California St | removal and replacement of entry glazing non structural partition walls and millwork - lobby - mechanical/lighting replacement - lobby structural work in lobby (minor), fcc room expanded (equipment, new turnstills that are never locked in ingress and egress side. fully sprinklered maher naDetails
removal and replacement of entry glazing non structural partition walls and millwork - lobby - mechanical/lighting replacement - lobby structural work in lobby (minor), fcc room expanded (equipment, new turnstills that are never locked in ingress and egress side. fully sprinklered maher na | $1,500,000 | |
| May 15, 2018 | Completed final sign-off Jul 2018 | 400 California St | to obtain final inspection for work under pa# 200808058439 & 200812188773 all work is completeDetails
to obtain final inspection for work under pa# 200808058439 & 200812188773 all work is complete | ||
| May 15, 2018 | Completed final sign-off Jul 2018 | 400 California St | to obtain final inspection for work under pa# 201312184444. all work is completeDetails
to obtain final inspection for work under pa# 201312184444. all work is complete | ||
| May 15, 2018 | Completed final sign-off Jul 2018 | 400 California St | to obtain final inspection for work under pa# 200512200716, 200603217134, 200806235043 all work is completeDetails
to obtain final inspection for work under pa# 200512200716, 200603217134, 200806235043 all work is complete | ||
| May 15, 2018 | Completed final sign-off Jul 2018 | 400 California St | to obtain final inspection for work under pa# 200401234739 all work is completeDetails
to obtain final inspection for work under pa# 200401234739 all work is complete | ||
| May 15, 2018 | Expired or cancelled cancelled Oct 2018 | 400 California St | to obtain final inspection for work under pa# 201208016264 all work is completeDetails
to obtain final inspection for work under pa# 201208016264 all work is complete | ||
| May 15, 2018 | Completed final sign-off Sep 2018 | 400 California St | to obtain final inspection for work under pa# 201309166860. all work is completeDetails
to obtain final inspection for work under pa# 201309166860. all work is complete | ||
| May 15, 2018 | Completed final sign-off Jul 2018 | 400 California St | to obtain final inspection for work under pa# 201304174757 all work is completeDetails
to obtain final inspection for work under pa# 201304174757 all work is complete | ||
| May 15, 2018 | Expired or cancelled cancelled Oct 2019 | 400 California St | to obtain final inspection for work under pa# 201307182182. all work is completeDetails
to obtain final inspection for work under pa# 201307182182. all work is complete | ||
| May 2, 2018 | Completed final sign-off Jul 2019 | 430 California St | Rainbow Waterproofing & Restor | repair of (e) precast concrete fins on exterior facade. precast concrete panels. crack repair & space repair of (e) concrete facade panels maher naDetails
repair of (e) precast concrete fins on exterior facade. precast concrete panels. crack repair & space repair of (e) concrete facade panels maher na | $109,845 |
| Mar 12, 2018 | Completed final sign-off Mar 2018 | 400 California St | Deb Construction Llc | to obtain final inspection for work approved under pa#201312184444. all work is complete.Details
to obtain final inspection for work approved under pa#201312184444. all work is complete. | |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 430 California St | Pribuss Engineering Inc | 16th and 17th floors: fire sprinkler t.i. : 161 relocated sprinklers and 22 add sprinklers. total 183 (x $514.62) ref app#201802221910Details
16th and 17th floors: fire sprinkler t.i. : 161 relocated sprinklers and 22 add sprinklers. total 183 (x $514.62) ref app#201802221910 | $94,175 |
| Mar 8, 2018 | Expired or cancelled cancelled Nov 2018 | 400 California St | Anderson, Rowe & Buckley, Inc. | to obtain final inspection for work approved under bpa#201312305265. all work is complete.Details
to obtain final inspection for work approved under bpa#201312305265. all work is complete. | |
| Mar 1, 2018 | Completed final sign-off Apr 2018 | 430 California St | Pribuss Engineering Inc | 14th & 15th floors: fire sprinkler demo work for future t.i. (ref app#201802221909): relocated sprinklers= 153 heads. added sprinklers=20 heads. total=173 heads(x 514.62) n/a for maherDetails
14th & 15th floors: fire sprinkler demo work for future t.i. (ref app#201802221909): relocated sprinklers= 153 heads. added sprinklers=20 heads. total=173 heads(x 514.62) n/a for maher | $89,030 |
| Feb 22, 2018 | Completed final sign-off May 2018 | 430 California St | Plant Construction Co, Lp | 14th & 15th floors interior demo non bearing paritions, arch finishes and mep deferred; space to remain vacant per ab017. fire sprinkler under separate permit maher not reqDetails
14th & 15th floors interior demo non bearing paritions, arch finishes and mep deferred; space to remain vacant per ab017. fire sprinkler under separate permit maher not req | $45,000 |
| Feb 22, 2018 | Completed final sign-off May 2018 | 430 California St | Plant Construction Co, Lp | 16th & 17th floors interior demo non bearing paritions, ceiling, arch finishes and mep deferred; space to remain vacant per ab017. fire sprinkler under separate permit maher not reqDetails
16th & 17th floors interior demo non bearing paritions, ceiling, arch finishes and mep deferred; space to remain vacant per ab017. fire sprinkler under separate permit maher not req | $45,000 |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 430 California St | Pribuss Engineering Inc | 12 & 13th flr: fires sprinkler- relocate 162 heads, add 16 heads for demo ref pa 201711103696. maher naDetails
12 & 13th flr: fires sprinkler- relocate 162 heads, add 16 heads for demo ref pa 201711103696. maher na | $91,492 |
| Jan 25, 2018 | Completed final sign-off Feb 2018 | 400 California St | Dome Construction Corp | to obtain finalf inspection for work approved under pa # 200304162414. all work is complete. n/a maherDetails
to obtain finalf inspection for work approved under pa # 200304162414. all work is complete. n/a maher | $23,000 |
| Nov 10, 2017 | Completed final sign-off May 2018 | 430 California St | Plant Construction Co, Lp | 12 and 13 flr demo - interior demolition of non-bearing partitions, arch finishes and mep distribution. space to remain vacant per ab-017. no ceiling demo. arch ti, fire under separate permits. n/a maherDetails
12 and 13 flr demo - interior demolition of non-bearing partitions, arch finishes and mep distribution. space to remain vacant per ab-017. no ceiling demo. arch ti, fire under separate permits. n/a maher | $45,000 |
| Sep 27, 2017 | Completed final sign-off Nov 2017 | 430 California St | Capitol Electric Const | 18/f- install new dimmable led light fixture. t.i. pa#201706270419. n/a ordinance #155-13Details
18/f- install new dimmable led light fixture. t.i. pa#201706270419. n/a ordinance #155-13 | $9,548 |
| Aug 16, 2017 | Completed final sign-off Nov 2017 | 430 California St | Plant Construction Co, Lp | 18th floor - revision to pa #201706270419: consisting of a new smoke barrier partition & doors to create elevator lobby. n/a maher ordinanceDetails
18th floor - revision to pa #201706270419: consisting of a new smoke barrier partition & doors to create elevator lobby. n/a maher ordinance | $300 |
| Jul 25, 2017 | Completed final sign-off Sep 2017 | 400 California St | Anderson, Rowe & Buckley, Inc. | 18/f: existing fire sprinkler system ti 27 added sprinklers, 91 relocated sprinklers. ref pa 2017-0627-3700. maher naDetails
18/f: existing fire sprinkler system ti 27 added sprinklers, 91 relocated sprinklers. ref pa 2017-0627-3700. maher na | $59,000 |
| Jun 27, 2017 | Completed final sign-off Dec 2017 | 430 California St | Plant Construction Co, Lp | 18th floor - interior tenant improvement consisting of demolition, new non bearing partitions and finishes. elec, plumbing work under sep permits. (no mechanical or life safety work, existing to remain). maher not reqDetails
18th floor - interior tenant improvement consisting of demolition, new non bearing partitions and finishes. elec, plumbing work under sep permits. (no mechanical or life safety work, existing to remain). maher not req | $300,000 |
| Apr 27, 2017 | Completed final sign-off Jun 2017 | 400 California St | Arrow Sign Company | remove & discard 1 led illuminated sign "union bank" from the 18th floor exterior. cap electrical & seal holes in wallDetails
remove & discard 1 led illuminated sign "union bank" from the 18th floor exterior. cap electrical & seal holes in wall | $8,000 |
| Mar 29, 2017 | Completed final sign-off Nov 2017 | 400 California St | Bluewater Environmentl Svc Inc | demolition of existing tenant office space. non-bearing partitions, electrical, plumbing, lighting and finishes. demolition only ab-017 applies to this project. fire life safety permit deferred submittalDetails
demolition of existing tenant office space. non-bearing partitions, electrical, plumbing, lighting and finishes. demolition only ab-017 applies to this project. fire life safety permit deferred submittal | $135,276 |
| Jan 12, 2015 | Completed final sign-off Jan 2015 | 400 California St | Pribuss Engineering Inc | sprinkler t.i. under permit# 2014-0613-8340. relocate or change 1 head.Details
sprinkler t.i. under permit# 2014-0613-8340. relocate or change 1 head. | $515 |
| Jun 13, 2014 | Completed final sign-off Jun 2015 | 400 California St | Swinerton Builders | installation of new 20th flr mechanical platform and screen and 1st flr fluid oil pump room in preparation for installation of new emergency standy generator under separate permit; install new transformer on 8th flr.ups room; compliance with ord 155-13 not requiredDetails
installation of new 20th flr mechanical platform and screen and 1st flr fluid oil pump room in preparation for installation of new emergency standy generator under separate permit; install new transformer on 8th flr.ups room; compliance with ord 155-13 not required | $1,800,000 |
| May 27, 2014 | Completed final sign-off May 2014 | 400 California St | Field Construction Inc. | revision to 201307182182: restroom renovation on the 8th fl only. eliminate floors 9 and 10 from project scope per inspector request. n/a for the maher ordinance no. 155-13.Details
revision to 201307182182: restroom renovation on the 8th fl only. eliminate floors 9 and 10 from project scope per inspector request. n/a for the maher ordinance no. 155-13. | |
| Feb 14, 2014 | Completed final sign-off Mar 2014 | 400 California St | R L H Fire Protection Inc | fire sprinkler. relocate 6 pendents on the 8th only ti 201307182182Details
fire sprinkler. relocate 6 pendents on the 8th only ti 201307182182 | $6,168 |
| Jan 2, 2014 | Expired or cancelled cancelled Nov 2018 | 400 California St | Allied Fire Protection | fire sprinkler t.i. pa#2013-12-17-4344 (2) added heads. apn: 201312174344Details
fire sprinkler t.i. pa#2013-12-17-4344 (2) added heads. apn: 201312174344 | $3,500 |
| Dec 30, 2013 | Completed final sign-off Mar 2018 | 400 California St | Anderson, Rowe & Buckley, Inc. | 3rd floor: fire sprinkler system t.i. extg. relocated 4 sprinklers, removed one sprinkler and added one sprinkler.Details
3rd floor: fire sprinkler system t.i. extg. relocated 4 sprinklers, removed one sprinkler and added one sprinkler. | $3,000 |
| Dec 18, 2013 | Expired or cancelled expired Jul 2018 | 400 California St | Deb Construction Llc | demo existing single floor tenant improvement, work limited to selective demolition of partitions, ceiling and finishes. no new construction, per ab-017Details
demo existing single floor tenant improvement, work limited to selective demolition of partitions, ceiling and finishes. no new construction, per ab-017 | $10,000 |
| Nov 27, 2013 | Completed final sign-off Jan 2014 | 400 California St | Deb Construction Llc | 3/f: partial remodel of single tenant floor, upgrade to (e) finishes, flooring, paint & furniture, new millwork, demolition limited to finishes, select partitions and ceilings. separate sprinkler permit & life and fire safety.Details
3/f: partial remodel of single tenant floor, upgrade to (e) finishes, flooring, paint & furniture, new millwork, demolition limited to finishes, select partitions and ceilings. separate sprinkler permit & life and fire safety. | $100,000 |
| Nov 1, 2013 | Completed final sign-off Nov 2013 | 400 California St | R L H Fire Protection Inc | b-1 level:fire sprinklers. relocate 21, add 6 pendents and relocate 1 upgright. reference ti 2013.0916.6860Details
b-1 level:fire sprinklers. relocate 21, add 6 pendents and relocate 1 upgright. reference ti 2013.0916.6860 | $14,392 |
| Sep 16, 2013 | Expired or cancelled expired Jul 2018 | 400 California St | Deb Construction Llc | b1 level:construction of new bicycle storage,men and women's locker and shower rooms, and associated fitness room in extg empty shell space. includes plmg, mech, and electrical necessary to finish the space. f/a and sprinklers under separate permit. all work is on level b-1Details
b1 level:construction of new bicycle storage,men and women's locker and shower rooms, and associated fitness room in extg empty shell space. includes plmg, mech, and electrical necessary to finish the space. f/a and sprinklers under separate permit. all work is on level b-1 | $324,166 |
| Jul 18, 2013 | Expired or cancelled expired Jul 2018 | 400 California St | Field Construction Inc. | floors 8,9,10 renovation of existing restrooms - new plumbing fixtures, new mechnaical & electrical serving area of work. barrier removal in adjacent accessible restrooms to provide fully compliant equivalant facilitation. compliance with ordinance #155-13 not required.Details
floors 8,9,10 renovation of existing restrooms - new plumbing fixtures, new mechnaical & electrical serving area of work. barrier removal in adjacent accessible restrooms to provide fully compliant equivalant facilitation. compliance with ordinance #155-13 not required. | $221,829 |
| Jun 5, 2013 | Completed final sign-off Jul 2013 | 400 California St | Swinerton Builders | 16th fl. construction of (n) non load bearing partitions, floor, ceiling, lighting and furnishing, modifications to mech & electricalDetails
16th fl. construction of (n) non load bearing partitions, floor, ceiling, lighting and furnishing, modifications to mech & electrical | $10,000 |
| May 14, 2013 | Completed final sign-off Dec 2013 | 400 California St | Swinerton Builders | replacement of extg ups with new ups. installation of fire dampers in extg ductwork. remove exsting halon system, sprinklers to remain. new distribution panels for new ups.Details
replacement of extg ups with new ups. installation of fire dampers in extg ductwork. remove exsting halon system, sprinklers to remain. new distribution panels for new ups. | $120,000 |
| Apr 17, 2013 | Expired or cancelled expired Jul 2018 | 400 California St | 15th floor-create & produce 4 evac signs.Details
15th floor-create & produce 4 evac signs. | $1,425 | |
| Feb 20, 2013 | Completed final sign-off May 2013 | 400 California St | Turner Construction Co | office t.i. of empty shell space on b.1 level. minor electrical for new furniture and lighting. minor hvac connecting to extg system inside space.Details
office t.i. of empty shell space on b.1 level. minor electrical for new furniture and lighting. minor hvac connecting to extg system inside space. | $363,500 |
| Feb 19, 2013 | Completed final sign-off Jun 2013 | 400 California St | R L H Fire Protection Inc | 15th floor:fire sprinkler permit: relocate 6 and delete 1 pendent sprinkler. ref app#201301288865Details
15th floor:fire sprinkler permit: relocate 6 and delete 1 pendent sprinkler. ref app#201301288865 | $3,000 |
| Jan 28, 2013 | Completed final sign-off May 2013 | 400 California St | Turner Construction Co | 15th floor:renovation of extg restrooms to meet the requirements for accessibility on the 15th floor. demolition of extg non structural walls, plmg fixtures, ceiling and construct new.Details
15th floor:renovation of extg restrooms to meet the requirements for accessibility on the 15th floor. demolition of extg non structural walls, plmg fixtures, ceiling and construct new. | $300,000 |
| Nov 14, 2012 | Completed final sign-off Jan 2013 | 400 California St | R L H Fire Protection Inc | 15th floor fire sprinkler only - upgrade for union bank, total 96 heads - 84 relcoates, 12 adds & 9 deletes. ref pa #2012.09.24.0508Details
15th floor fire sprinkler only - upgrade for union bank, total 96 heads - 84 relcoates, 12 adds & 9 deletes. ref pa #2012.09.24.0508 | $48,000 |
| Aug 7, 2012 | Completed final sign-off Aug 2013 | 400 California St | Swinerton Builders | 20th & 21st fl-demolition of(e)cooling towers&concrete supports. demo concrete roof.relocate exhaust fans.install new cooling towers&piping.electrical wk associated w/ c.t &fan installation. new bldg maintenance unit.install new steel equip platform.no ada wk.alarm&sprinkler defered permit.Details
20th & 21st fl-demolition of(e)cooling towers&concrete supports. demo concrete roof.relocate exhaust fans.install new cooling towers&piping.electrical wk associated w/ c.t &fan installation. new bldg maintenance unit.install new steel equip platform.no ada wk.alarm&sprinkler defered permit. | $4,000,000 |
| Aug 1, 2012 | Expired or cancelled expired Jul 2018 | 400 California St | Turner Construction Co | 9th & 10th flrs-renovation of restrms to meet ada requirements for accessibility, demo (e) non structural rated partitions, (e) plumbing fixtures, finishes throughout & ceiling assembly. construct new non structural rated partitions, new plumbing fixtures, new finishes throughout & new ceiling assemDetails
9th & 10th flrs-renovation of restrms to meet ada requirements for accessibility, demo (e) non structural rated partitions, (e) plumbing fixtures, finishes throughout & ceiling assembly. construct new non structural rated partitions, new plumbing fixtures, new finishes throughout & new ceiling assem | $300,000 |
| Feb 9, 2012 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler head sf per tenant improvement. 7 relocate. 5 sprinklers and 14th floor and 2 sprinklers on 16th floor.Details
relocate fire sprinkler head sf per tenant improvement. 7 relocate. 5 sprinklers and 14th floor and 2 sprinklers on 16th floor. | $3,598 |
| Nov 10, 2011 | Completed final sign-off Mar 2012 | 400 California St | Swinerton Builders | tenant improvement to existing office space. remodel existing restrooms to accomodate disabled access in the 14th and 16th floors. alteration to existing elevator lobby on the 14th floor to accomodate disabled access.Details
tenant improvement to existing office space. remodel existing restrooms to accomodate disabled access in the 14th and 16th floors. alteration to existing elevator lobby on the 14th floor to accomodate disabled access. | $400,000 |
| Aug 12, 2011 | Completed final sign-off Sep 2011 | 400 California St | Anderson, Rowe & Buckley, Inc. | 11th.: t.i. (e) fire sprinkler system; one added sprinkler, one relocated sprinkler.Details
11th.: t.i. (e) fire sprinkler system; one added sprinkler, one relocated sprinkler. | $1,000 |
| Jun 21, 2011 | Completed final sign-off May 2012 | 400 California St | Bcci Construction Company | 11th floor-partial t.i. space including minor demolition, new partitions, ceiling & finshes. m.e.p, life safety & sprinklers under seperate permitDetails
11th floor-partial t.i. space including minor demolition, new partitions, ceiling & finshes. m.e.p, life safety & sprinklers under seperate permit | $30,000 |
| Apr 18, 2011 | Completed final sign-off Jul 2012 | 400 California St | Swinerton Builders | basement 1 & ground level - leed ci tenant improvement. demolish all non-structural partitions, suspended ceiling, finishes, electrical, mech, & plbg, replace w/ (n) on b1 level. install (n) mech sys on ground fl lobby.Details
basement 1 & ground level - leed ci tenant improvement. demolish all non-structural partitions, suspended ceiling, finishes, electrical, mech, & plbg, replace w/ (n) on b1 level. install (n) mech sys on ground fl lobby. | $610,875 |
| Jul 15, 2010 | Completed final sign-off Aug 2010 | 400 California St | Anderson, Rowe & Buckley, Inc. | 14th. flr.: t.i. to the (e) fire sprinkler system. 9-relocated sprinklers, 5-added sprinklers.Details
14th. flr.: t.i. to the (e) fire sprinkler system. 9-relocated sprinklers, 5-added sprinklers. | $2,800 |
| Jun 14, 2010 | Completed final sign-off Aug 2010 | 400 California St | Swinerton Builders | 14th floor-partial t.i. for video conference room, copy & pantry area. scope includes selective demo, partitions, elecitrcal, cceiling, finishes. life safety under seperate permit. installation of tactile exit signage to be provided per cbc 1011Details
14th floor-partial t.i. for video conference room, copy & pantry area. scope includes selective demo, partitions, elecitrcal, cceiling, finishes. life safety under seperate permit. installation of tactile exit signage to be provided per cbc 1011 | $100,000 |
| Apr 26, 2010 | Completed final sign-off Oct 2010 | 400 California St | Swinerton Builders | replace existing curb cut with new. barrier removal, california & sansome street. demolish existing corner sidewalk, reconstruct new.Details
replace existing curb cut with new. barrier removal, california & sansome street. demolish existing corner sidewalk, reconstruct new. | $100,000 |
| Jul 22, 2009 | Completed final sign-off Sep 2010 | 400 California St | Skyline Construction | remodel existing restrooms at 11th & 17th floors including selective demo of existing partiitons & ceiling. construction of new partitions & ceiling for new restrooms. installation of lighting, plumbing fixtures and finishes. life safety under separate permit.Details
remodel existing restrooms at 11th & 17th floors including selective demo of existing partiitons & ceiling. construction of new partitions & ceiling for new restrooms. installation of lighting, plumbing fixtures and finishes. life safety under separate permit. | $150,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 430 California St | Arrow Sign Company | to erect non electric wall signDetails
to erect non electric wall sign | $1,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 430 California St | Arrow Sign Company | to erect non electric wall signDetails
to erect non electric wall sign | $1,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 430 California St | Arrow Sign Company | to erect non electric wall signDetails
to erect non electric wall sign | $1,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2009 | 430 California St | Arrow Sign Company | to erect non electric wall sign single faced.Details
to erect non electric wall sign single faced. | $1,000 |
| May 4, 2009 | Expired or cancelled revoked Aug 2009 | 430 California St | Arrow Sign Company | to erect electric wall signDetails
to erect electric wall sign | $11,000 |
| Jan 9, 2009 | Completed final sign-off Feb 2009 | 400 California St | Swinerton Builders | single floor tenant improvement including selective demolition, partition, electrical, finishes.Details
single floor tenant improvement including selective demolition, partition, electrical, finishes. | $35,000 |
| Dec 18, 2008 | Expired or cancelled expired Jul 2018 | 400 California St | Anderson, Rowe & Buckley, Inc. | tenant improvement to the (e) fire sprinkler system. relocate 10, removed 3Details
tenant improvement to the (e) fire sprinkler system. relocate 10, removed 3 | $2,000 |
| Nov 25, 2008 | Completed final sign-off Oct 2009 | 400 California St | Siemens Industry, Inc. | 2nd basement-addition of 4 duct detectors (at fsd's) & 1 smoke detector (at door holders) in the 2nd basement chiller room. all (e) speakers & strobes in the 2nd basement remain as installedDetails
2nd basement-addition of 4 duct detectors (at fsd's) & 1 smoke detector (at door holders) in the 2nd basement chiller room. all (e) speakers & strobes in the 2nd basement remain as installed | $2,900 |
| Aug 18, 2008 | Completed final sign-off Oct 2009 | 400 California St | Swinerton Builders | replacement of existing chiller and associate mechanical and electrical equipment.Details
replacement of existing chiller and associate mechanical and electrical equipment. | $2,750,000 |
| Aug 5, 2008 | Expired or cancelled expired Jul 2018 | 400 California St | Swinerton Builders | interior demolition of partitions, flooring and ceiling on b3, demo of exposed studs on b2, & demo of loading dock on floor 1. replacement of chiller unit under seperate permit.Details
interior demolition of partitions, flooring and ceiling on b3, demo of exposed studs on b2, & demo of loading dock on floor 1. replacement of chiller unit under seperate permit. | $40,000 |
| Jul 28, 2008 | Completed final sign-off Mar 2009 | 400 California St | Swinerton Builders | 10th fl ti: selective ceiling demolition, new partitions and doors for private open offices, new ceiling, electrical, lighting, and finishes of single tenant floor. mep scope of work to be performed and modified per new layout. life safety to be design build under seperate permit.Details
10th fl ti: selective ceiling demolition, new partitions and doors for private open offices, new ceiling, electrical, lighting, and finishes of single tenant floor. mep scope of work to be performed and modified per new layout. life safety to be design build under seperate permit. | $200,000 |
| Jul 10, 2008 | Never finaled issued Jul 2008, no final | 400 California St | street spaceDetails
street space | ||
| Jun 26, 2008 | Completed final sign-off Oct 2008 | 400 California St | Dynalectric Company | 1st floor-all new notification devices tied into (e) visual circuit, two new door holders tied into (e) floor slc circuit. add 5 speaker strobes, 2 door holders & 1 relay module.Details
1st floor-all new notification devices tied into (e) visual circuit, two new door holders tied into (e) floor slc circuit. add 5 speaker strobes, 2 door holders & 1 relay module. | $5,622 |
| Jun 23, 2008 | Expired or cancelled expired Jul 2018 | 400 California St | W. Bradley Electric | install 8 smoke dectector and 4 door mags to fire rated corridorDetails
install 8 smoke dectector and 4 door mags to fire rated corridor | $6,000 |
| Jun 23, 2008 | Completed final sign-off Oct 2008 | 400 California St | W. Bradley Electric | add life safety interface with new card reader on the 7th floor freight elevator lobbyDetails
add life safety interface with new card reader on the 7th floor freight elevator lobby | $2,000 |
| Dec 17, 2007 | Expired or cancelled cancelled Jan 2026 | 400 California St | erect non-electric single faced (banner) signDetails
erect non-electric single faced (banner) sign | $10,000 | |
| Dec 17, 2007 | Completed final sign-off Mar 2008 | 400 California St | Ayoob & Peery Plumbing Co Inc | basement level-install fire sprinkler heads at switch gear room and (e) closets, total 14 heads.Details
basement level-install fire sprinkler heads at switch gear room and (e) closets, total 14 heads. | $3,800 |
| Sep 18, 2007 | Completed final sign-off Apr 2008 | 400 California St | W. Bradley Electric | 6th floor - provide equipment and devices for fire alarm system. install and wire fire alarm equipmentand devices. inspect and test fire alarm system. quantity of new devices =67.Details
6th floor - provide equipment and devices for fire alarm system. install and wire fire alarm equipmentand devices. inspect and test fire alarm system. quantity of new devices =67. | $32,500 |
| Jul 18, 2007 | Completed final sign-off Apr 2008 | 400 California St | Anderson, Rowe & Buckley, Inc. | 6th floor-tenant improvements (e) fire sprinkler system-96 relocates, 21 newDetails
6th floor-tenant improvements (e) fire sprinkler system-96 relocates, 21 new | $18,000 |
| Feb 26, 2007 | Never finaled issued Feb 2007, no final | 400 California St | street spaceDetails
street space | ||
| Feb 15, 2007 | Expired or cancelled expired Apr 2009 | 400 California St | Pribuss Engineering Inc | 2nd fl-uboc:install fire sprinkler work for tenant improvement 2nd floor, 87 sprinklers, calculated on existing system 400 calif jc2469Details
2nd fl-uboc:install fire sprinkler work for tenant improvement 2nd floor, 87 sprinklers, calculated on existing system 400 calif jc2469 | $11,600 |
| Sep 15, 2006 | Expired or cancelled expired Jun 2011 | 400 California St | Swinerton Builders | oti-1 2nd floor el me ls sp.Details
oti-1 2nd floor el me ls sp. | $800,000 |
| Jun 27, 2006 | Expired or cancelled expired Jun 2011 | 400 California St | Swinerton Builders | selected demolition, non-partitions and new wall finishes . new wall above ceiling grid with sound insulationDetails
selected demolition, non-partitions and new wall finishes . new wall above ceiling grid with sound insulation | $44,500 |
| Jun 7, 2006 | Expired or cancelled expired Aug 2011 | 400 California St | Kent M Lim & Company Inc | oti-2 1st floor meDetails
oti-2 1st floor me | $185,000 |
| Mar 28, 2006 | Completed final sign-off Feb 2007 | 400 California St | Swinerton Builders | oti-1 included selected demo, new paritions, ceiling & non interior finishes.Details
oti-1 included selected demo, new paritions, ceiling & non interior finishes. | $350,000 |
| Mar 23, 2006 | Expired or cancelled expired Oct 2006 | 400 California St | erect:non elecvtic, single faced, non illuinated new sign. the fabarication and installation of qty 2, 8x33 single sided vinyl banners to be installed using 1/4 cuble in plastic tubes wrapped around the 5 diamater columns of the california st side. the banner are to hung vertically and will hungDetails
erect:non elecvtic, single faced, non illuinated new sign. the fabarication and installation of qty 2, 8x33 single sided vinyl banners to be installed using 1/4 cuble in plastic tubes wrapped around the 5 diamater columns of the california st side. the banner are to hung vertically and will hung | ||
| Mar 21, 2006 | Expired or cancelled expired Jul 2018 | 400 California St | Intelligent Technologies & Services Inc | install pre-action detection system in 20/f, 21/f elevator machiune rooms.Details
install pre-action detection system in 20/f, 21/f elevator machiune rooms. | $7,000 |
| Feb 23, 2006 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | install preaction system and connect to existing riser. install fire sprinklers system for t.i. connect to existing riser.Details
install preaction system and connect to existing riser. install fire sprinklers system for t.i. connect to existing riser. | $35,000 |
| Feb 23, 2006 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | install preaction system and connect to existing riser.install fire sprinklers system for. t.i. connect to existing riser.Details
install preaction system and connect to existing riser.install fire sprinklers system for. t.i. connect to existing riser. | $30,000 |
| Dec 20, 2005 | Expired or cancelled expired May 2011 | 400 California St | Swinerton Builders | oti-1= el, me, ls, spDetails
oti-1= el, me, ls, sp | $65,000 |
| Dec 20, 2005 | Expired or cancelled expired Jul 2018 | 400 California St | Swinerton Builders | oti-1= el, me, ls, spDetails
oti-1= el, me, ls, sp | $32,000 |
| Sep 20, 2005 | Completed final sign-off Dec 2005 | 400 California St | Young Electric Co | fire alarm tenant improvement.add speaker and strobes iwth remote power on 7th fl.Details
fire alarm tenant improvement.add speaker and strobes iwth remote power on 7th fl. | $7,000 |
| Sep 16, 2005 | Completed final sign-off Dec 2005 | 400 California St | oti-2 7th/fl-el.Details
oti-2 7th/fl-el. | $130,000 | |
| Apr 21, 2005 | Expired or cancelled expired Oct 2006 | 400 California St | Swinerton Builders | addition of door in corridor revision to #200412080939. sheet sa-1.0Details
addition of door in corridor revision to #200412080939. sheet sa-1.0 | $2,500 |
| Mar 15, 2005 | Expired or cancelled expired Oct 2006 | 400 California St | Swinerton Builders | delete wall & door and add mail chute door for access. revision to 200412080939Details
delete wall & door and add mail chute door for access. revision to 200412080939 | |
| Dec 22, 2004 | Completed final sign-off May 2005 | 400 California St | oti-2, 5th floor, el, me, spDetails
oti-2, 5th floor, el, me, sp | $350,000 | |
| Dec 20, 2004 | Expired or cancelled expired Oct 2006 | 400 California St | interior non-structural demolition in advance of tenant improvement under seprate app #200412080939Details
interior non-structural demolition in advance of tenant improvement under seprate app #200412080939 | $4,500 | |
| Dec 8, 2004 | Completed final sign-off May 2005 | 400 California St | Swinerton Builders | oti-1, 5th floor, el, me, ls, sp.Details
oti-1, 5th floor, el, me, ls, sp. | $287,325 |
| Sep 17, 2004 | Completed final sign-off Dec 2004 | 400 California St | Capitol Electric Const | t/i to small section of 9/f this appln is for life safety modificationsDetails
t/i to small section of 9/f this appln is for life safety modifications | $2,000 |
| Mar 26, 2004 | Completed final sign-off Feb 2005 | 400 California St | Ayoob & Peery Plumbing Co Inc | install 5th floor base bldg fire sprinkler system connect to existing riserDetails
install 5th floor base bldg fire sprinkler system connect to existing riser | $15,850 |
| Mar 26, 2004 | Expired or cancelled cancelled Mar 2018 | 400 California St | Ayoob & Peery Plumbing Co Inc | 7/f install base bldg fire sprinkler system connect to existing riserDetails
7/f install base bldg fire sprinkler system connect to existing riser | $15,850 |
| Jan 23, 2004 | Expired or cancelled expired Jul 2018 | 400 California St | demolition of office tenant improvements-demo only, future construction w/in 3 mons of filing of demDetails
demolition of office tenant improvements-demo only, future construction w/in 3 mons of filing of dem | $20,000 | |
| Sep 9, 2003 | Completed final sign-off Oct 2003 | 400 California St | oti-2 mech elec. 3rd floorDetails
oti-2 mech elec. 3rd floor | $60,000 | |
| Jul 22, 2003 | Completed final sign-off Oct 2003 | 400 California St | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work 3rd floor, 7 heads only to be relocated under this permit, no inDetails
provide tenant fire protection work 3rd floor, 7 heads only to be relocated under this permit, no in | $2,500 |
| Jun 25, 2003 | Completed final sign-off Oct 2003 | 400 California St | Capitol Electric Const | update f.a aud/vis coverage in t.i spaceDetails
update f.a aud/vis coverage in t.i space | $5,000 |
| Jun 10, 2003 | Expired or cancelled cancelled Aug 2004 | 400 California St | addition of the food prep area with new ceiling light fixtures and wall floor finish new millworkDetails
addition of the food prep area with new ceiling light fixtures and wall floor finish new millwork | $45,000 | |
| May 20, 2003 | Completed final sign-off Oct 2003 | 400 California St | Richlen Construction | (n) interior shell space @9th fl. partition, ceiling, ele, mech.plum,(n)compliant restrms/finishesDetails
(n) interior shell space @9th fl. partition, ceiling, ele, mech.plum,(n)compliant restrms/finishes | $500,000 |
| Apr 16, 2003 | Completed final sign-off Oct 2003 | 400 California St | oti-1 - 3rd fl. el, me, ls, spDetails
oti-1 - 3rd fl. el, me, ls, sp | $75,000 | |
| Apr 16, 2003 | Expired or cancelled expired Dec 2004 | 400 California St | oti-2 (3rd fl.) el/ meDetails
oti-2 (3rd fl.) el/ me | $23,000 | |
| Jan 30, 2003 | Completed final sign-off Oct 2003 | 400 California St | sprinklers: 2 new heads & 10 relocated in office space 3rd flrDetails
sprinklers: 2 new heads & 10 relocated in office space 3rd flr | $2,300 | |
| Jan 22, 2003 | Expired or cancelled withdrawn Feb 2003 | 400 California St | Richlen Construction | commercial, offices w/ employee dining (arch, mech, ele, structural, plumbing, fire sprinkler)Details
commercial, offices w/ employee dining (arch, mech, ele, structural, plumbing, fire sprinkler) | $333,100 |