Thomas De Senna
- License
- M34908
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M34908 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Interface Engineering
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Sep 2023
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Achill Beg Construction Inc, Bana Construction Inc, Truebeck Construction
- Architects
- Michael Stanton, Russell Sherman, Toby Stella Levy
- Engineers
- Wesley S. Lau (2), David Coyle, Kirk Johnston
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 13, 2023 | Completed final sign-off Jun 2025 | 388 Beale St | Achill Beg Construction Inc | 4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tvDetails
4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tv | $325,000 |
| Oct 26, 2022 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo.Details
cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo. | $416,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2021 | 430 California St | Bana Construction Inc | scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher naDetails
scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na | $1,634,000 |