Kirk Johnston
- Listed as
- architect, engineer
- Firm
- Degenkolb Engineers
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Apr 2026
20 permits since 2000 (engineer on 12 permits, architect on 8 permits): 12 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
6th floor. addition of phone booths and work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $215,720 |
| Apr 21, 2026 | In progress issued Jun 2026 | 400 Howard St | Novo Construction Inc | 4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall.Details
4th floor. addition of phone booths and work stations to (e) suite on the 4th floor, infill of 1 (e) doorway at demising wall. | $235,100 |
| Apr 21, 2026 | In progress issued May 2026 | 400 Howard St | Novo Construction Inc | 5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains.Details
5th floor. addition of 58 phone booths and other work stations to existing office suite. alteration of existing idf room. new drinking fountains. | $365,040 |
| Dec 12, 2025 | In progress issued Apr 2026 | 600 Battery St | Bcci Construction Company | interior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy.Details
interior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy. | $1,079,200 |
| Jun 18, 2024 | Completed final sign-off Aug 2024 | 360 Post St | Gci, Inc | revision to pa# 202103106256: for reduction in scope to remove unnecessary special inspections and attachment details not used.Details
revision to pa# 202103106256: for reduction in scope to remove unnecessary special inspections and attachment details not used. | |
| Aug 4, 2023 | Never finaled issued Aug 2023, no final | 1 Brady St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | revision to pa# 202211216930. mazzola garden's. landscape permit (courtyard)Details
revision to pa# 202211216930. mazzola garden's. landscape permit (courtyard) | |
| Nov 21, 2022 | Completed final sign-off Mar 2024 | 1 Brady St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | mayoral ed-17-02 for 'mazzola garden' portion of the 1629 market development. outdoor park, playground, landspace. on same ap# as one brady. reference pa# 2019.0103.9599.Details
mayoral ed-17-02 for 'mazzola garden' portion of the 1629 market development. outdoor park, playground, landspace. on same ap# as one brady. reference pa# 2019.0103.9599. | $400,000 |
| Nov 21, 2022 | Completed final sign-off Mar 2024 | 50 Colton St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | mayoral ed-17-02 for 'mazzola garden' public open space on bart parcel (3505/034) per the 1629 market dev. agreement. scope includes: 1) concrete masonry unit enclosure w/gate to surround (e) bart vent structure 2) tensile fabric canopy within enclosure 3) new paving 4) new planting areas 5) k4 rateDetails
mayoral ed-17-02 for 'mazzola garden' public open space on bart parcel (3505/034) per the 1629 market dev. agreement. scope includes: 1) concrete masonry unit enclosure w/gate to surround (e) bart vent structure 2) tensile fabric canopy within enclosure 3) new paving 4) new planting areas 5) k4 rate | $200,000 |
| Mar 10, 2021 | Completed final sign-off Aug 2024 | 360 Post St | Gci, Inc | replace current generator (90kw diesel) for emergency lights and one elevator with manufacturers recommended in-kind unit. will serve: 40hp fire pump, 1hp jockey pump, 40hp elevator (only 1 for emergency), 5hp sewage ejector pump 1 and 2.Details
replace current generator (90kw diesel) for emergency lights and one elevator with manufacturers recommended in-kind unit. will serve: 40hp fire pump, 1hp jockey pump, 40hp elevator (only 1 for emergency), 5hp sewage ejector pump 1 and 2. | $250,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2021 | 430 California St | Bana Construction Inc | scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher naDetails
scope of work includeds the partial rmeodel of e level 1, b1, & b3, including selective wall dmeo & installation of new doors & walls for fitness room, locker room & bike storage. fire sprinkler under separate permit. exterior scope reference permit #201805310546. maher na | $1,634,000 |
| May 2, 2018 | Completed final sign-off Jul 2019 | 430 California St | Rainbow Waterproofing & Restor | repair of (e) precast concrete fins on exterior facade. precast concrete panels. crack repair & space repair of (e) concrete facade panels maher naDetails
repair of (e) precast concrete fins on exterior facade. precast concrete panels. crack repair & space repair of (e) concrete facade panels maher na | $109,845 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 350 California St | Bcci Construction Company | 5th fl - structural for transformer anchorage & shelf unit. ref #201612054179. maher naDetails
5th fl - structural for transformer anchorage & shelf unit. ref #201612054179. maher na | $5,000 |
| Jul 7, 2016 | Never finaled issued Dec 2016, no final | 490 Jamestown Av | De Silva Gates Construction | grading. ** maher: disturbance of at least 50 cu.yd of soil, route to dph **Details
grading. ** maher: disturbance of at least 50 cu.yd of soil, route to dph ** | $450,000 |
| Aug 19, 2015 | Expired or cancelled cancelled Jan 2026 | 451 Galvez Av | grading of landscaped area, irrigation system installation. wood deck installation, less than 30" tall. planting materials gravel.Details
grading of landscaped area, irrigation system installation. wood deck installation, less than 30" tall. planting materials gravel. | $149,300 | |
| May 11, 2015 | Completed final sign-off Jan 2016 | 150 Chestnut St | Rudolph And Sletten Inc | partial interior renovation, demo non-load bearing partitions, ceiling & lighting elements & associated finishes. new construction consists of new non load bearing partitions, wheelchair lift, guardrails, bike racks, pantry, ceiling and lighting element and associated finishes. n/a ordinance #155-13Details
partial interior renovation, demo non-load bearing partitions, ceiling & lighting elements & associated finishes. new construction consists of new non load bearing partitions, wheelchair lift, guardrails, bike racks, pantry, ceiling and lighting element and associated finishes. n/a ordinance #155-13 | $75,000 |
| Aug 6, 2013 | Completed final sign-off Jul 2014 | 875 Stevenson St | Truebeck Construction | site/landscape improve@stevenson alley,betw 10th&9th,market&jessie.proj incl passive recre areas,stormwtr treatment areas&planting.a service corridor& pg&e access to valults&pedes circulation.ab-056 for access will be deferred in a future submital. mep sep.permit.aka 855 stevenson st.Details
site/landscape improve@stevenson alley,betw 10th&9th,market&jessie.proj incl passive recre areas,stormwtr treatment areas&planting.a service corridor& pg&e access to valults&pedes circulation.ab-056 for access will be deferred in a future submital. mep sep.permit.aka 855 stevenson st. | $900,000 |
| Jul 12, 2013 | Completed final sign-off Jul 2014 | 875 Stevenson St | Truebeck Construction | site&landscape improv at stevenson alley, betw 10th &9th street,market st&jessie st. proj incl passive recreation areas,stormwtr treatment areas&planting. a service corridor & pg&e access to valults & pedestrian circulation.ab-056 for accessibility will be deferred in a future submital. mep underDetails
site&landscape improv at stevenson alley, betw 10th &9th street,market st&jessie st. proj incl passive recreation areas,stormwtr treatment areas&planting. a service corridor & pg&e access to valults & pedestrian circulation.ab-056 for accessibility will be deferred in a future submital. mep under | $100,000 |
| Jul 12, 2013 | Completed final sign-off Nov 2013 | 1355 Market St | Truebeck Construction | site&landscape improv at stevenson alley, betw 10th &9th street,market st&jessie st. proj incl passive recreation areas,stormwtr treatment areas&planting. a service corridor & pg&e access to valults&pedestrian circulation.ab-056 for accessibility will be deferred in a future submital.mep underDetails
site&landscape improv at stevenson alley, betw 10th &9th street,market st&jessie st. proj incl passive recreation areas,stormwtr treatment areas&planting. a service corridor & pg&e access to valults&pedestrian circulation.ab-056 for accessibility will be deferred in a future submital.mep under | $400,000 |
| Jul 9, 2008 | Completed final sign-off Apr 2009 | 2130 Fulton St | new stand alone canopy. including colums & beams supporting a translucent glazing system.Details
new stand alone canopy. including colums & beams supporting a translucent glazing system. | $100,000 | |
| Aug 2, 2007 | Completed final sign-off Oct 2008 | 2130 Fulton St | install 12th. century stone portal in an exterior courtyard between kalmanovitrz hall & cowell hall on usf campus. will not affect any buildings on the private campus. the portal is to be supported by a new steel and concrete structure cautilevered from a new concrete foundation.Details
install 12th. century stone portal in an exterior courtyard between kalmanovitrz hall & cowell hall on usf campus. will not affect any buildings on the private campus. the portal is to be supported by a new steel and concrete structure cautilevered from a new concrete foundation. | $10,000 |