Block 3508, lot 039
875 Stevenson St
- City’s use
- Commercial Office
- Built
- 1975
- Stories
- 10
- Units
- 1
- Rooms
- 20 bathrooms
- Building
- 355,120 sq ft
- Lot
- 39,650 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
176 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 16, 2024 | In progress issued Jul 2024 | 875 Stevenson St | Siemens Industry, Inc. | fire only work for the elevator modifications project on the basement & ground floor levels; additions are 3 smoke detectors, 1 heat detector and 4 modules. no ref pa (fire alarm system additions only)Details
fire only work for the elevator modifications project on the basement & ground floor levels; additions are 3 smoke detectors, 1 heat detector and 4 modules. no ref pa (fire alarm system additions only) | $5,240 |
| Mar 21, 2024 | Completed final sign-off Jun 2024 | 875 Stevenson St | R L H Fire Protection Inc | fire sprinkler to remove (1) sprinkler from the elevator pit and (1) from the top of the elevator shaft. fire sprinkler voluntary elevator modernization. remove sprinkler per sffd aproval letter dated 03-13-2024.Details
fire sprinkler to remove (1) sprinkler from the elevator pit and (1) from the top of the elevator shaft. fire sprinkler voluntary elevator modernization. remove sprinkler per sffd aproval letter dated 03-13-2024. | $1,000 |
| Dec 22, 2023 | Completed final sign-off May 2025 | 875 Stevenson St | Ca United Mechanical, Inc | replace (3) ahu with new on roof.Details
replace (3) ahu with new on roof. | $1,050,000 |
| Feb 24, 2023 | Completed final sign-off Apr 2023 | 875 Stevenson St | Siemens Industry, Inc. | 1/f: replace existing fire alarm dialer with cellular one, no ref permit # (fire alarm addition only)Details
1/f: replace existing fire alarm dialer with cellular one, no ref permit # (fire alarm addition only) | $7,318 |
| Nov 1, 2021 | Completed final sign-off Nov 2021 | 875 Stevenson St | Golden Gate Fire Protection Inc | 4/f: address correction for pa 202110281337. floor plan and design does not change. from 5th floor to "4th floor"Details
4/f: address correction for pa 202110281337. floor plan and design does not change. from 5th floor to "4th floor" | |
| Oct 28, 2021 | Never finaled issued Oct 2021, no final | 875 Stevenson St | Golden Gate Fire Protection Inc | 5/f: relocate 6 fire sprinkler pendeants. ref t.i. pa202108317503Details
5/f: relocate 6 fire sprinkler pendeants. ref t.i. pa202108317503 | $1,500 |
| Aug 31, 2021 | Completed final sign-off Jan 2022 | 875 Stevenson St | Novo Construction Inc | ti to (e) levels 4 & 5 to restore original ti mechanical and electrical work to consist of alterations of (e) lighting rework of low side duct distribution for occies & conference roomsDetails
ti to (e) levels 4 & 5 to restore original ti mechanical and electrical work to consist of alterations of (e) lighting rework of low side duct distribution for occies & conference rooms | $15,000 |
| Jun 24, 2021 | Never finaled issued Aug 2021, no final | 875 Stevenson St | Siemens Industry, Inc. | fire only work for the "freight elevator upgrade" project; additions are 12 smoke detectors, 4 heat detectors and 7 modules.Details
fire only work for the "freight elevator upgrade" project; additions are 12 smoke detectors, 4 heat detectors and 7 modules. | $13,660 |
| Mar 10, 2021 | Completed final sign-off May 2022 | 875 Stevenson St | Siemens Industry, Inc. | fire only work to add 2 modules for monitoring emergency generator status on the roof level; ref. permit app # 2021 0122 3132Details
fire only work to add 2 modules for monitoring emergency generator status on the roof level; ref. permit app # 2021 0122 3132 | $1,100 |
| Jan 22, 2021 | Completed final sign-off May 2022 | 875 Stevenson St | Richlen Construction | emergency generator set replacement.Details
emergency generator set replacement. | $800,000 |
| Nov 25, 2019 | Completed final sign-off Feb 2020 | 875 Stevenson St | Siemens Industry, Inc. | 1st fl - fire alarm work for the door holder installation - additions are 2 smoke detectorsDetails
1st fl - fire alarm work for the door holder installation - additions are 2 smoke detectors | $1,270 |
| Sep 9, 2019 | Completed final sign-off Feb 2021 | 875 Stevenson St | Whiteside Construction Corp. | replace existing sub basement waterproofing memebrane, asphalt pavement, artificial turf, topping slab, install new horizontal waterproofing, topping slab, artificial turf and asphalt pavement to match existingDetails
replace existing sub basement waterproofing memebrane, asphalt pavement, artificial turf, topping slab, install new horizontal waterproofing, topping slab, artificial turf and asphalt pavement to match existing | $128,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 875 Stevenson St | Acco Engineered Systems Inc. Dba Acco En | 1/f: demo (e) return grille/ductwork. install new exhaust fan and diffuser.Details
1/f: demo (e) return grille/ductwork. install new exhaust fan and diffuser. | $15,000 |
| Apr 10, 2019 | Expired or cancelled cancelled Nov 2024 | 875 Stevenson St | installation of 19" rack on 3rd floor of an existing building. installaiton of idas, unmanned telecom facility & all equipment.Details
installation of 19" rack on 3rd floor of an existing building. installaiton of idas, unmanned telecom facility & all equipment. | $5,000 | |
| Jun 22, 2017 | Never finaled issued Jul 2017, no final | 875 Stevenson St | Novo Construction Inc | 5th floor - minor ti including millwork upgrades for coffee bar service station. ref pa 2015-0414-3546 and 2017-0228-0225Details
5th floor - minor ti including millwork upgrades for coffee bar service station. ref pa 2015-0414-3546 and 2017-0228-0225 | $2,000 |
| Jun 16, 2017 | Never finaled issued Jun 2017, no final | 875 Stevenson St | Siemens Industry, Inc. | fire alarm work for the "nerdwallet" partial remodel on floor 4; additions are 2 duct detectors and 1 speaker/strobe. ref pa 2017-0228-0225Details
fire alarm work for the "nerdwallet" partial remodel on floor 4; additions are 2 duct detectors and 1 speaker/strobe. ref pa 2017-0228-0225 | $1,730 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 875 Stevenson St | Novo Construction Inc | mechanical & electrical work for ti on the 4th & 6th floor. ref pa 2017-0228-0225Details
mechanical & electrical work for ti on the 4th & 6th floor. ref pa 2017-0228-0225 | $20,000 |
| Apr 28, 2017 | Completed final sign-off Dec 2017 | 875 Stevenson St | Golden Gate Fire Protection Inc | 4th floor: fire sprinklers relocate 6 pendent sprinklers. add 3 pendent sprinklers. t.i. 201702280225.Details
4th floor: fire sprinklers relocate 6 pendent sprinklers. add 3 pendent sprinklers. t.i. 201702280225. | $4,725 |
| Feb 28, 2017 | Completed final sign-off Dec 2017 | 875 Stevenson St | Novo Construction Inc | 4/f: tenant improvement to include non-load bearing partitions & finish upgrades on the 4th floor. mep under separate permitDetails
4/f: tenant improvement to include non-load bearing partitions & finish upgrades on the 4th floor. mep under separate permit | $200,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2017 | 875 Stevenson St | Hathaway Dinwiddie Co. | 9/f- revision to 201507212018, minor structural revision to isolator details. no exterior workDetails
9/f- revision to 201507212018, minor structural revision to isolator details. no exterior work | |
| Feb 1, 2017 | Never finaled issued Feb 2017, no final | 875 Stevenson St | Siemens Industry, Inc. | skybridge: fire alarm add 1 vespa detector, 1 smoke detector, 3 modules, and 1 speaker/strobes ref 201507212018Details
skybridge: fire alarm add 1 vespa detector, 1 smoke detector, 3 modules, and 1 speaker/strobes ref 201507212018 | $4,700 |
| Dec 16, 2016 | Completed final sign-off Mar 2017 | 875 Stevenson St | Siemens Industry, Inc. | 1st flr: fire alarm add 1 speaker/strobes."mail screening" room used to be storage room.Details
1st flr: fire alarm add 1 speaker/strobes."mail screening" room used to be storage room. | $510 |
| Dec 7, 2016 | Never finaled issued Dec 2016, no final | 875 Stevenson St | Incom Mechanical Inc | basement- ref. 201608175226; added (2) sprinkler heads for the hvac units per request of inspector.Details
basement- ref. 201608175226; added (2) sprinkler heads for the hvac units per request of inspector. | $1,000 |
| Sep 28, 2016 | Completed final sign-off Jun 2017 | 875 Stevenson St | Golden Gate Fire Protection Inc | fire sprinklers add 7 pendendt sprinklers on the 10th fl skybridge. hydralz calucations included. ti 201507212018Details
fire sprinklers add 7 pendendt sprinklers on the 10th fl skybridge. hydralz calucations included. ti 201507212018 | $1,785 |
| Aug 31, 2016 | Completed final sign-off Sep 2016 | 875 Stevenson St | Siemens Industry, Inc. | 1st flr: fire alarm fitness sf add 1 smoke det. 2 duct det and 3 speaker/strobesDetails
1st flr: fire alarm fitness sf add 1 smoke det. 2 duct det and 3 speaker/strobes | $3,360 |
| Aug 29, 2016 | Completed final sign-off Jun 2017 | 875 Stevenson St | Hathaway Dinwiddie Co. | 9th floor. an elevated walkway (skybridge) connecting 875 stevenson street and 1355 market street at the 9th floor of both bldg. submittal for glazing system for the walkwayDetails
9th floor. an elevated walkway (skybridge) connecting 875 stevenson street and 1355 market street at the 9th floor of both bldg. submittal for glazing system for the walkway | |
| Aug 17, 2016 | Completed final sign-off Dec 2016 | 875 Stevenson St | mechanical & electrical as part of expansion of fitness sf into adjacent space. ref pa 2015-1216-5280Details
mechanical & electrical as part of expansion of fitness sf into adjacent space. ref pa 2015-1216-5280 | ||
| Dec 16, 2015 | Completed final sign-off Jan 2017 | 875 Stevenson St | R.M.R. Construction Company | change of use of existing m- occupancy of 3610 sq fr space for fitness use for expansion of a3 occupancy (e) tenant fitness. construct (n) ada ramp stairs & handrail. add mech louver for future tenant mech. (n) door to (e) corridorDetails
change of use of existing m- occupancy of 3610 sq fr space for fitness use for expansion of a3 occupancy (e) tenant fitness. construct (n) ada ramp stairs & handrail. add mech louver for future tenant mech. (n) door to (e) corridor | $20,000 |
| Nov 23, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | Thomas Swan Sign Co Inc | 20 evacuation plans maps for floors 3, 4, 5, 6, 7Details
20 evacuation plans maps for floors 3, 4, 5, 6, 7 | $8,000 |
| Nov 19, 2015 | Completed final sign-off May 2017 | 875 Stevenson St | Hupp Signs & Lighting, Inc. | #100- to erect electrical sign double sided, flag mount sign.Details
#100- to erect electrical sign double sided, flag mount sign. | $2,500 |
| Oct 5, 2015 | Completed final sign-off Nov 2016 | 875 Stevenson St | Siemens Industry, Inc. | 2,3,9 & 10th floors: ti - addition 2 smoke detectors and 3 modules. ref permit 201504143546Details
2,3,9 & 10th floors: ti - addition 2 smoke detectors and 3 modules. ref permit 201504143546 | $2,700 |
| Aug 14, 2015 | Never finaled issued Aug 2015, no final | 875 Stevenson St | street spaceDetails
street space | ||
| Jul 24, 2015 | Completed final sign-off Nov 2016 | 875 Stevenson St | Siemens Industry, Inc. | 5th floor: fire alarm for "twitter" addition of 7 smoke detectors, 32 dect detectors, 10 modules, 2 strobe power supplies and 62 speaker/strobes. ref. appl. 2015.0414.3546.Details
5th floor: fire alarm for "twitter" addition of 7 smoke detectors, 32 dect detectors, 10 modules, 2 strobe power supplies and 62 speaker/strobes. ref. appl. 2015.0414.3546. | $62,500 |
| Jul 24, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Siemens Industry, Inc. | 6th floor: fire alarm t.i. for "twitter" additions of 4 smoke detectors, 27 duct detectors, 8 modules, 2 strobe power supplies and 65 speaker/strobes. ref. t.i. appl. 2015.0410.3243. maher n/a.Details
6th floor: fire alarm t.i. for "twitter" additions of 4 smoke detectors, 27 duct detectors, 8 modules, 2 strobe power supplies and 65 speaker/strobes. ref. t.i. appl. 2015.0410.3243. maher n/a. | $59,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | Siemens Industry, Inc. | 7th floor: fire alarm for "twitter" addition 4 smoke detectors, 27 duct detectors, 8 modules, 2 strobe power supplies and 63 speaker/strobes. ref. t.i. appl. 2015.0410.3304.Details
7th floor: fire alarm for "twitter" addition 4 smoke detectors, 27 duct detectors, 8 modules, 2 strobe power supplies and 63 speaker/strobes. ref. t.i. appl. 2015.0410.3304. | $58,000 |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 5th floor -revision to pa #2015.0414.3546: stair shown on original permit is not to be constructed at this time. this work is also associated with structural demo pa #201503160936.Details
5th floor -revision to pa #2015.0414.3546: stair shown on original permit is not to be constructed at this time. this work is also associated with structural demo pa #201503160936. | |
| Jul 22, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | revision to 201504093242. stair shown on original permit not to be constructed at this time. this work also associated with structural permit 201503160938Details
revision to 201504093242. stair shown on original permit not to be constructed at this time. this work also associated with structural permit 201503160938 | |
| Jul 22, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Siemens Industry, Inc. | fire alarm work floor 3 twitter ti remodel. additions are 4 smoke detectors, 26 duct detectors, 8 modules, 2 strobe power supplies, 60 speaker strobes. ref. pa#201504083072.Details
fire alarm work floor 3 twitter ti remodel. additions are 4 smoke detectors, 26 duct detectors, 8 modules, 2 strobe power supplies, 60 speaker strobes. ref. pa#201504083072. | $57,000 |
| Jul 22, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | revision to 201504083072. minor revision to partition layout new conf 333 and 334, storage 321, 348 conf rm 331 was removed and conf room 382 and 383 added. ddf rm 307 extended to include das cell room 384. stair shwn on orig.permit not constructed. also associated with structural plan 201503160938Details
revision to 201504083072. minor revision to partition layout new conf 333 and 334, storage 321, 348 conf rm 331 was removed and conf room 382 and 383 added. ddf rm 307 extended to include das cell room 384. stair shwn on orig.permit not constructed. also associated with structural plan 201503160938 | $1,000 |
| Jul 22, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Siemens Industry, Inc. | fire alarm work for the floor 4 twitter ti remodel. additions are 4 smoke detectors, 26 duct detectors, 8 modules, 2 storbe power supplies and 62 speaker strobes. ref pa#201504093242.Details
fire alarm work for the floor 4 twitter ti remodel. additions are 4 smoke detectors, 26 duct detectors, 8 modules, 2 storbe power supplies and 62 speaker strobes. ref pa#201504093242. | $58,000 |
| Jul 21, 2015 | Completed final sign-off Jun 2017 | 875 Stevenson St | Hathaway Dinwiddie Co. | an elevated walkway (skybridge) connecting 875 stevenson st to 1355 market street at the 9th fl of both building. (spans across 855 stevenson) see also pa #201603182439 and pa #201603182440 for easements to 1355 market st and 855 stevenson street. ** maher: n/a **Details
an elevated walkway (skybridge) connecting 875 stevenson st to 1355 market street at the 9th fl of both building. (spans across 855 stevenson) see also pa #201603182439 and pa #201603182440 for easements to 1355 market st and 855 stevenson street. ** maher: n/a ** | $2,600,000 |
| Jul 20, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 6th floor - revision to pa #201504093243 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160936.Details
6th floor - revision to pa #201504093243 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160936. | $5,000 |
| Jul 20, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 7th & 8th floor - revision to pa #201504103304 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160939.Details
7th & 8th floor - revision to pa #201504103304 - stair shown on original permit is not to be constructed at this time. this work was also associated with structural pa #201503160939. | |
| Jul 15, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | Golden Gate Fire Protection Inc | 7th floor: fire sprinklers, relocate 143 pendent sprinklers on the 7th floor. t.i. ref app#201504103304.Details
7th floor: fire sprinklers, relocate 143 pendent sprinklers on the 7th floor. t.i. ref app#201504103304. | $73,645 |
| Jul 15, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Golden Gate Fire Protection Inc | 3rd and 4th floors: fire sprinklers, relocate 126 pendent sprinklers on the 3rd floor and relocate 137 pendent sprinkler.t.i. ref 201504083072 and 201504093242 on 4th floor.Details
3rd and 4th floors: fire sprinklers, relocate 126 pendent sprinklers on the 3rd floor and relocate 137 pendent sprinkler.t.i. ref 201504083072 and 201504093242 on 4th floor. | $135,445 |
| Jun 2, 2015 | Never finaled issued Aug 2015, no final | 875 Stevenson St | Specialized Graphics Inc | 2 non electric signs double facedDetails
2 non electric signs double faced | $5,000 |
| May 18, 2015 | Expired or cancelled withdrawn Nov 2015 | 875 Stevenson St | interior construction of new steel chain link security gate located at the ground floor landing of stair #1. fire life/safety under seperate permit.Details
interior construction of new steel chain link security gate located at the ground floor landing of stair #1. fire life/safety under seperate permit. | $8,000 | |
| May 15, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Golden Gate Fire Protection Inc | 5th and 6th floor: fire sprinkler: relocate 111 pendent sprinklers on 5th floor. relocate 101 pendent sprinklers on the 6th floor. run new standpipes to hose cabinets. t.i. 201504143546 for the 5th floor. 201504093243 for the 6th floor.Details
5th and 6th floor: fire sprinkler: relocate 111 pendent sprinklers on 5th floor. relocate 101 pendent sprinklers on the 6th floor. run new standpipes to hose cabinets. t.i. 201504143546 for the 5th floor. 201504093243 for the 6th floor. | $109,180 |
| May 11, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Thomas Swan Sign Co Inc | 2nd, 8th,9th, & 10th floors: 16 evacution plan maps.Details
2nd, 8th,9th, & 10th floors: 16 evacution plan maps. | $4,800 |
| Apr 22, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 5th floor: mechanical, electrical & plumbing associated with app#201504143546. mech, elec, & plmg fitout connected to the extg bldg systems.Details
5th floor: mechanical, electrical & plumbing associated with app#201504143546. mech, elec, & plmg fitout connected to the extg bldg systems. | $1,240,000 |
| Apr 20, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 7th fl: work associated with 2015-0410-3304 - new mechanical & electrical fit out connected to existing base bldg systems. life safety deferred (fa to combine 7 & 8 fl). 5 new fsds.Details
7th fl: work associated with 2015-0410-3304 - new mechanical & electrical fit out connected to existing base bldg systems. life safety deferred (fa to combine 7 & 8 fl). 5 new fsds. | $1,240,000 |
| Apr 16, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 6th floor:mechanical and electrical associated with 2015-0409-3243. new mechanical and electrical t.i. fitout connected to extg base bldg systems. life safety deferred (& combined with 5th fl). 5 new fsds.Details
6th floor:mechanical and electrical associated with 2015-0409-3243. new mechanical and electrical t.i. fitout connected to extg base bldg systems. life safety deferred (& combined with 5th fl). 5 new fsds. | $1,240,000 |
| Apr 15, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | 3rd floor: mechanical, electrical, plumbing associated with approved permit # 201504083072. new mechanical, electrical system. t.i. fit out attached to extg base bldg system.Details
3rd floor: mechanical, electrical, plumbing associated with approved permit # 201504083072. new mechanical, electrical system. t.i. fit out attached to extg base bldg system. | $1,240,000 |
| Apr 15, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 4th floor: mechanical, electrical, plumbing associated with approved permit # 201504093242. new mechanical, electrical system. t.i. fit out attached to extg base bldg system. sprinklers and fire alarm separate permit. adding 4 fire smoke dampers-Details
4th floor: mechanical, electrical, plumbing associated with approved permit # 201504093242. new mechanical, electrical system. t.i. fit out attached to extg base bldg system. sprinklers and fire alarm separate permit. adding 4 fire smoke dampers- | $1,240,000 |
| Apr 14, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | interior tenant improvements on the 5th fl, including demo, new dry wall, horizontal exit, ceilings, doors, millwork, interior glazing and finishes, mechanical and electrical under sep permitDetails
interior tenant improvements on the 5th fl, including demo, new dry wall, horizontal exit, ceilings, doors, millwork, interior glazing and finishes, mechanical and electrical under sep permit | $2,267,030 |
| Apr 10, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | 7th & 8th flr:ti including demo, new dry wall, ceiling, doors, millwork, interior glazing and finishes, a new communicating stair between the 7th & 8th floor. m&e under seperate permitDetails
7th & 8th flr:ti including demo, new dry wall, ceiling, doors, millwork, interior glazing and finishes, a new communicating stair between the 7th & 8th floor. m&e under seperate permit | $2,480,030 |
| Apr 9, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | interior tenant improvement 4th flr include demo, drywall, ceilings, doors, interior glazing and finishes. mech. and elec. under seperate permit.Details
interior tenant improvement 4th flr include demo, drywall, ceilings, doors, interior glazing and finishes. mech. and elec. under seperate permit. | $2,293,016 |
| Apr 9, 2015 | Completed final sign-off Jan 2016 | 875 Stevenson St | Hathaway Dinwiddie Co. | interior tenant improvement on 6/f include demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. a new communicating stair between 5th and 6th floor. mech. and elec. under seperate permit.Details
interior tenant improvement on 6/f include demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. a new communicating stair between 5th and 6th floor. mech. and elec. under seperate permit. | $2,293,016 |
| Apr 8, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | 3rd flr: interior tenant improvements including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical and electrical under separate permit.Details
3rd flr: interior tenant improvements including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical and electrical under separate permit. | $2,267,030 |
| Mar 16, 2015 | Expired or cancelled cancelled Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy until the ti is complete.Details
demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy until the ti is complete. | $40,000 |
| Mar 16, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | demo portion of slab to accommodate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancyDetails
demo portion of slab to accommodate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy | $40,000 |
| Mar 16, 2015 | Expired or cancelled cancelled Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancyDetails
demo portiton of slab to accomodeate a stair for a soon to be permitted ti. floor is in shell condition and unoccupied. this work under ab-017. no occupancy | $40,000 |
| Mar 13, 2015 | Completed final sign-off May 2015 | 875 Stevenson St | Siemens Industry, Inc. | 10/f: fire alarm work for twitter ti remodel. additions are 10 strobe detectors, 30 duct detectors, 11 modules, 2 strobes power supplies, 60 speaker/stobes, 1 heat detectors. new matrix ref pa# 2014 0923 7058Details
10/f: fire alarm work for twitter ti remodel. additions are 10 strobe detectors, 30 duct detectors, 11 modules, 2 strobes power supplies, 60 speaker/stobes, 1 heat detectors. new matrix ref pa# 2014 0923 7058 | $57,000 |
| Mar 13, 2015 | Completed final sign-off May 2015 | 875 Stevenson St | Siemens Industry, Inc. | 9/f: fire alarm work for twitter ti remodel. additions are 13 strobe detectors, 30 duct detectors, 10 modules, 2 strobes power supplies, 70 speaker/stobes, 1 strobe and 1 heat detector. new matrix ref pa# 2014 0917 6534Details
9/f: fire alarm work for twitter ti remodel. additions are 13 strobe detectors, 30 duct detectors, 10 modules, 2 strobes power supplies, 70 speaker/stobes, 1 strobe and 1 heat detector. new matrix ref pa# 2014 0917 6534 | $63,500 |
| Mar 12, 2015 | Never finaled issued Mar 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | revision t0 201411030544. miscellanous changes to mechanical as requested by field inspector.Details
revision t0 201411030544. miscellanous changes to mechanical as requested by field inspector. | $1,000 |
| Mar 6, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Siemens Industry, Inc. | fire alarm work for the "twitter" ti remodel on flr 8; additions are 10 smoke detectors, 27 duct detectors, 9 modules, 2 strobe power supplies, and 65 speaker strobes. ref pa 201409116070Details
fire alarm work for the "twitter" ti remodel on flr 8; additions are 10 smoke detectors, 27 duct detectors, 9 modules, 2 strobe power supplies, and 65 speaker strobes. ref pa 201409116070 | $61,000 |
| Mar 6, 2015 | Never finaled issued Mar 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | mechanical revision to app#201410300363. revise in the 9th floor kitchen - fsd - 922 clambq size, uav & fpb update designation update vav airflow update mech 03 - e for vavDetails
mechanical revision to app#201410300363. revise in the 9th floor kitchen - fsd - 922 clambq size, uav & fpb update designation update vav airflow update mech 03 - e for vav | $1,000 |
| Mar 6, 2015 | Never finaled issued Mar 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | 9th floor:revision to app#201409176534. delete 6 offices. reconfigure 2 conference rooms. mech, elec, sprnklr, life safety or food service permit on seperate permit.Details
9th floor:revision to app#201409176534. delete 6 offices. reconfigure 2 conference rooms. mech, elec, sprnklr, life safety or food service permit on seperate permit. | $1,000 |
| Mar 6, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Siemens Industry, Inc. | fire alarm work for the "twitter" ti remodel on flr 2; additions are 8 smoke detectors, 28 duct detectors, 9 modules, 3 speakers, 5 strobes and 66 speaker strobes ref pa# 2014 0930 7645Details
fire alarm work for the "twitter" ti remodel on flr 2; additions are 8 smoke detectors, 28 duct detectors, 9 modules, 3 speakers, 5 strobes and 66 speaker strobes ref pa# 2014 0930 7645 | $66,000 |
| Feb 23, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | revision to 201410229602. additional information on duct smoke detectors on floor 8Details
revision to 201410229602. additional information on duct smoke detectors on floor 8 | $1,000 |
| Feb 23, 2015 | Completed final sign-off Nov 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | revision to 201410229608. additional information on duct smoke detectors on floor 10Details
revision to 201410229608. additional information on duct smoke detectors on floor 10 | $1,000 |
| Feb 20, 2015 | Never finaled issued Mar 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | revision to 201411060903 additonal information on smoke duct detectors on floor 9Details
revision to 201411060903 additonal information on smoke duct detectors on floor 9 | $1,000 |
| Feb 20, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | revision to 201412012702. additonal information on smoke duct detectors on floor 2Details
revision to 201412012702. additonal information on smoke duct detectors on floor 2 | $1,000 |
| Feb 2, 2015 | Completed final sign-off Sep 2015 | 875 Stevenson St | Thomas Swan Sign Co Inc | 7 fl exterior: 2 illuminated wall logo's - 2 elevation.Details
7 fl exterior: 2 illuminated wall logo's - 2 elevation. | $20,000 |
| Jan 26, 2015 | Completed final sign-off Dec 2015 | 875 Stevenson St | Golden Gate Fire Protection Inc | relocate 135 pendent sprinklers on the 9th floor. t.i. pa#201409176534Details
relocate 135 pendent sprinklers on the 9th floor. t.i. pa#201409176534 | $69,525 |
| Jan 26, 2015 | Completed final sign-off Nov 2015 | 875 Stevenson St | Golden Gate Fire Protection Inc | relocate 153 pendent sprinklers on the 10th floor. t.i. pa#201409237058Details
relocate 153 pendent sprinklers on the 10th floor. t.i. pa#201409237058 | $78,795 |
| Jan 16, 2015 | Completed final sign-off Feb 2016 | 875 Stevenson St | Tri-Signal Integration Inc. | furnish & install (1) pyro chem fire system in the main kitchen on the 9/f & (1) pyro chem fire system in the 10/f. t.i. pa#201410300363 (9/f), 201411030544 (10/f)Details
furnish & install (1) pyro chem fire system in the main kitchen on the 9/f & (1) pyro chem fire system in the 10/f. t.i. pa#201410300363 (9/f), 201411030544 (10/f) | $8,000 |
| Jan 8, 2015 | Completed final sign-off Nov 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | 2nd flr: structural work associated with approved permit 201409307645, support for won doors, roll up doors, naaa doors.Details
2nd flr: structural work associated with approved permit 201409307645, support for won doors, roll up doors, naaa doors. | $15,000 |
| Dec 23, 2014 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | addition of security turnstiles at ground floor elevator bank. maher ordinance 155-13 is not required.Details
addition of security turnstiles at ground floor elevator bank. maher ordinance 155-13 is not required. | $45,000 |
| Dec 1, 2014 | Completed final sign-off Nov 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | 2nd flr: mechanical and electrical & plumbing associated with 201409307645, work includes new ducts, 12 new smoke/fire dampers vav boxes, lighting, electrical, data, telephone & plumbing for hvacDetails
2nd flr: mechanical and electrical & plumbing associated with 201409307645, work includes new ducts, 12 new smoke/fire dampers vav boxes, lighting, electrical, data, telephone & plumbing for hvac | $820,000 |
| Nov 26, 2014 | Never finaled issued Dec 2014, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | 10th fl: mep associated with 2014.0923.7058. work includes ductwork, new fire dampers, vab boxes lighting power and data. mahn n/a. sprinkler, alarm & kitchen to be under separate permit.Details
10th fl: mep associated with 2014.0923.7058. work includes ductwork, new fire dampers, vab boxes lighting power and data. mahn n/a. sprinkler, alarm & kitchen to be under separate permit. | $1,300,000 |
| Nov 6, 2014 | Never finaled issued Dec 2014, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | 9th floor - mechanical, electrical & plumbing work associated with pa #2014.0917.6534, duct work, dampers, vav boxes & lighting.Details
9th floor - mechanical, electrical & plumbing work associated with pa #2014.0917.6534, duct work, dampers, vav boxes & lighting. | $560,000 |
| Nov 4, 2014 | Never finaled issued Nov 2014, no final | 875 Stevenson St | street space permitDetails
street space permit | ||
| Nov 3, 2014 | Never finaled issued Jan 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | 10th floor t.i. containing a new kitchen, the area of work includes new drywall, finishes, kitchen equipment & mechanical, electrical & plbg work. this work is associated with t.i. under separate permit #2014.0923.7058.Details
10th floor t.i. containing a new kitchen, the area of work includes new drywall, finishes, kitchen equipment & mechanical, electrical & plbg work. this work is associated with t.i. under separate permit #2014.0923.7058. | $297,570 |
| Nov 3, 2014 | Never finaled issued Jan 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | t.i. on 2nd floor containing a new catering kitchen. the area of work includes new drywall, finishes, kitchen equipment & mechanical, electrical & plumbing work. this is is associated with t.i. work under seperate pa# 2014/09/30/7645.Details
t.i. on 2nd floor containing a new catering kitchen. the area of work includes new drywall, finishes, kitchen equipment & mechanical, electrical & plumbing work. this is is associated with t.i. work under seperate pa# 2014/09/30/7645. | $196,200 |
| Oct 30, 2014 | Never finaled issued Jan 2015, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | 9th fl - tenant improvement on the 9th fl containing a new kitchen, area or work includes new drywal, finishes, kitchen equipment and mechanical, elec, plumbing work. associated with ti 201409176534Details
9th fl - tenant improvement on the 9th fl containing a new kitchen, area or work includes new drywal, finishes, kitchen equipment and mechanical, elec, plumbing work. associated with ti 201409176534 | $461,070 |
| Oct 22, 2014 | Never finaled issued Dec 2014, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | mechanical,electrical, and plumbing work associated with 201409116070Details
mechanical,electrical, and plumbing work associated with 201409116070 | $798,250 |
| Oct 17, 2014 | Completed final sign-off Jan 2016 | 875 Stevenson St | Golden Gate Fire Protection Inc | 2nd floor: relocate 143 pendent sprinkler heads. ref. app. 2014.0930.7645. maher n/a.Details
2nd floor: relocate 143 pendent sprinkler heads. ref. app. 2014.0930.7645. maher n/a. | $73,645 |
| Oct 2, 2014 | Completed final sign-off May 2015 | 875 Stevenson St | Golden Gate Fire Protection Inc | 8th floor - relocate 109 pendent sprinkler heads. ref # 2014.0911.6070.Details
8th floor - relocate 109 pendent sprinkler heads. ref # 2014.0911.6070. | $56,135 |
| Sep 30, 2014 | Completed final sign-off Nov 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | 2nd flr: interior tenant improvements on the 2nd flr, including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical & food service under separate permit.Details
2nd flr: interior tenant improvements on the 2nd flr, including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical & food service under separate permit. | $2,335,875 |
| Sep 23, 2014 | Never finaled issued Nov 2014, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | 10th flr: interior tenant improvements on the 10th flr, including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical & food service under separate permit. final pending ab-056 approval.Details
10th flr: interior tenant improvements on the 10th flr, including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical & food service under separate permit. final pending ab-056 approval. | $2,394,750 |
| Sep 17, 2014 | Never finaled issued Oct 2014, no final | 875 Stevenson St | Hathaway Dinwiddie Co. | 9th floor. interior tenant improvements on 9/f including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical and food service under seperate permit.Details
9th floor. interior tenant improvements on 9/f including demo, new drywall, ceilings, doors, millwork, interior glazing and finishes. mechanical, electrical and food service under seperate permit. | $2,394,750 |
| Sep 11, 2014 | Completed final sign-off Dec 2015 | 875 Stevenson St | Hathaway Dinwiddie Co. | interior tenant improvements on the 8th floor. including demo, new drywall, ceilings doors, millwork, interior glazing and finishes. mech and elect. under seperate permit. note: final completion pending issuance of ab-056. letter for app#201406168521. see da check list. n/a for the maherDetails
interior tenant improvements on the 8th floor. including demo, new drywall, ceilings doors, millwork, interior glazing and finishes. mech and elect. under seperate permit. note: final completion pending issuance of ab-056. letter for app#201406168521. see da check list. n/a for the maher | $2,394,750 |
| Jul 29, 2014 | Completed final sign-off Sep 2014 | 875 Stevenson St | Hupp Signs & Lighting, Inc. | unit #100: erect a double faced illuminated sign by building entrance, 10 feet above gradeDetails
unit #100: erect a double faced illuminated sign by building entrance, 10 feet above grade | $1,000 |
| Jul 3, 2014 | Expired or cancelled cancelled Jan 2026 | 875 Stevenson St | request new street address "1-10th street" for this existing buildingDetails
request new street address "1-10th street" for this existing building | ||
| Jun 16, 2014 | Completed final sign-off Jan 2015 | 875 Stevenson St | Truebeck Construction | path of travel verification under ab-056 for ground floor & building core & shell. reference pa #201209058914 and pa #201306189795.Details
path of travel verification under ab-056 for ground floor & building core & shell. reference pa #201209058914 and pa #201306189795. | |
| Jun 6, 2014 | Completed final sign-off Jan 2016 | 875 Stevenson St | Incom Mechanical Inc | fire sprinkler additional 100 heads- 92 relocation & 8 new heads.Details
fire sprinkler additional 100 heads- 92 relocation & 8 new heads. | $24,000 |
| May 29, 2014 | Never finaled issued May 2014, no final | 875 Stevenson St | Siemens Industry, Inc. | fire alarm ti 1st floor: addition of 9 duct detectors, 2 modules, 1 strobe power supply, 4 speakers, 40 speaker/strobes and 3 strobes for the "fitness sf". all new devices connect onto the fire alarm system. ref app#201401297372Details
fire alarm ti 1st floor: addition of 9 duct detectors, 2 modules, 1 strobe power supply, 4 speakers, 40 speaker/strobes and 3 strobes for the "fitness sf". all new devices connect onto the fire alarm system. ref app#201401297372 | $24,300 |
| Apr 23, 2014 | Completed final sign-off May 2014 | 875 Stevenson St | Allied Fire Protection | basement level - remove (3) sprinkler heads & piping @ electric elevator shaft pits and remove 8" water flow switch @ discharge side of the backflow assembly.Details
basement level - remove (3) sprinkler heads & piping @ electric elevator shaft pits and remove 8" water flow switch @ discharge side of the backflow assembly. | $2,400 |
| Mar 17, 2014 | Never finaled issued Mar 2014, no final | 875 Stevenson St | street space permitDetails
street space permit | ||
| Mar 5, 2014 | Completed final sign-off May 2014 | 875 Stevenson St | Allied Fire Protection | t.i. #1 10th street: remove fire sprinkler piping and 4 heads at passenger elevators hoistway and 6 heads at machine room. ref app#201302079679. n/a for the control #428-13Details
t.i. #1 10th street: remove fire sprinkler piping and 4 heads at passenger elevators hoistway and 6 heads at machine room. ref app#201302079679. n/a for the control #428-13 | $2,400 |
| Feb 18, 2014 | Completed final sign-off Aug 2014 | 875 Stevenson St | Truebeck Construction | block 3508 lot 055. (n) entry gate to market square commons located directly off 10th st & accessibility deferred by ab-056.Details
block 3508 lot 055. (n) entry gate to market square commons located directly off 10th st & accessibility deferred by ab-056. | $200,000 |
| Feb 11, 2014 | Completed final sign-off Sep 2014 | 875 Stevenson St | Hupp Signs & Lighting, Inc. | to erect single face electric signDetails
to erect single face electric sign | $1,000 |
| Feb 11, 2014 | Completed final sign-off Sep 2014 | 875 Stevenson St | Hupp Signs & Lighting, Inc. | to erect electric double faced signDetails
to erect electric double faced sign | $1,000 |
| Feb 11, 2014 | Completed final sign-off Sep 2014 | 875 Stevenson St | Hupp Signs & Lighting, Inc. | to erect single face electric wall signDetails
to erect single face electric wall sign | $3,000 |
| Jan 29, 2014 | Completed final sign-off Oct 2014 | 875 Stevenson St | Yerba Buena Builders Inc | change of use. suite 100. (n)demishing wals for 3 studios,men's&womens locker rms,staffbreak&laundry rms.4personal traing/pt rms&offices.(n)acoustical ceilings&suspended ceilings. interim control area. sprinkler and fire alarm seperate permit.Details
change of use. suite 100. (n)demishing wals for 3 studios,men's&womens locker rms,staffbreak&laundry rms.4personal traing/pt rms&offices.(n)acoustical ceilings&suspended ceilings. interim control area. sprinkler and fire alarm seperate permit. | $800,000 |
| Jan 8, 2014 | Completed final sign-off Jul 2014 | 875 Stevenson St | Truebeck Construction | new demising partition at ground fl. new door & lighting . project filed under ab-017 for unoccupied space.Details
new demising partition at ground fl. new door & lighting . project filed under ab-017 for unoccupied space. | $20,000 |
| Nov 15, 2013 | Completed final sign-off Jul 2014 | 875 Stevenson St | Truebeck Construction | revision to permit #201209058914. (n) storefront window & door system replacement on the ground & 2nd fl exterior facade openings.Details
revision to permit #201209058914. (n) storefront window & door system replacement on the ground & 2nd fl exterior facade openings. | $800,000 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 875 Stevenson St | street spaceDetails
street space | ||
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 875 Stevenson St | street spaceDetails
street space | ||
| Aug 6, 2013 | Completed final sign-off Jul 2014 | 875 Stevenson St | Truebeck Construction | site/landscape improve@stevenson alley,betw 10th&9th,market&jessie.proj incl passive recre areas,stormwtr treatment areas&planting.a service corridor& pg&e access to valults&pedes circulation.ab-056 for access will be deferred in a future submital. mep sep.permit.aka 855 stevenson st.Details
site/landscape improve@stevenson alley,betw 10th&9th,market&jessie.proj incl passive recre areas,stormwtr treatment areas&planting.a service corridor& pg&e access to valults&pedes circulation.ab-056 for access will be deferred in a future submital. mep sep.permit.aka 855 stevenson st. | $900,000 |
| Jul 12, 2013 | Completed final sign-off Jul 2014 | 875 Stevenson St | Truebeck Construction | site&landscape improv at stevenson alley, betw 10th &9th street,market st&jessie st. proj incl passive recreation areas,stormwtr treatment areas&planting. a service corridor & pg&e access to valults & pedestrian circulation.ab-056 for accessibility will be deferred in a future submital. mep underDetails
site&landscape improv at stevenson alley, betw 10th &9th street,market st&jessie st. proj incl passive recreation areas,stormwtr treatment areas&planting. a service corridor & pg&e access to valults & pedestrian circulation.ab-056 for accessibility will be deferred in a future submital. mep under | $100,000 |
| Jun 18, 2013 | Completed final sign-off Mar 2014 | 875 Stevenson St | Truebeck Construction | basemt & 1/f select area as indicated in loc. zone 1. new const, new vehicle ramp,new mail rm & new basemt storage rm. mep & life safety will be designed/build under separate permit. ada accessibility will be deferred under ab-056Details
basemt & 1/f select area as indicated in loc. zone 1. new const, new vehicle ramp,new mail rm & new basemt storage rm. mep & life safety will be designed/build under separate permit. ada accessibility will be deferred under ab-056 | $250,000 |
| Jun 14, 2013 | Completed final sign-off Jul 2014 | 875 Stevenson St | Truebeck Construction | replace a diesel fuel system for a back up generator. 450 gallon day tank.Details
replace a diesel fuel system for a back up generator. 450 gallon day tank. | $70,000 |
| Jun 6, 2013 | Completed final sign-off Apr 2014 | 875 Stevenson St | Siemens Industry, Inc. | addition of a fire alarm system for the entire building (fire alarm system) + new smoke control panelDetails
addition of a fire alarm system for the entire building (fire alarm system) + new smoke control panel | $250,000 |
| May 16, 2013 | Completed final sign-off Mar 2014 | 875 Stevenson St | Truebeck Construction | work in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal ofDetails
work in basement & 1st flr-includes exterior & interior demolition work, structural work in the indicated locations, zone 1 & 2. select areas of demolition including hole in 1st flr slab for new vehicle ramp, removal of (e) trash chute at basement & 1st flrs. (e) future trash enclosure & removal of | $50,000 |
| May 8, 2013 | Never finaled issued May 2013, no final | 875 Stevenson St | street space for b201209058914 for "one tenth street"Details
street space for b201209058914 for "one tenth street" | ||
| Mar 20, 2013 | Completed final sign-off Jun 2014 | 875 Stevenson St | Truebeck Construction | unitized curtain wall system structural features drawing set & structural calculations. reference the architectural permit #201209058914Details
unitized curtain wall system structural features drawing set & structural calculations. reference the architectural permit #201209058914 | |
| Mar 19, 2013 | Completed final sign-off Sep 2013 | 875 Stevenson St | Truebeck Construction | 1st thru 10th floors-interior demolition scope includes removal of all unoccupied tenant build-outs, mechanical, electrical, plumbing & other interior finishes throughout. no structural demolition is part of this scope of work. building to remain unoccupied per ab-017Details
1st thru 10th floors-interior demolition scope includes removal of all unoccupied tenant build-outs, mechanical, electrical, plumbing & other interior finishes throughout. no structural demolition is part of this scope of work. building to remain unoccupied per ab-017 | $75,000 |
| Mar 14, 2013 | Never finaled issued Mar 2013, no final | 875 Stevenson St | street spaceDetails
street space | ||
| Feb 15, 2013 | Completed final sign-off Apr 2014 | 875 Stevenson St | Truebeck Construction | new basement level bike parking secure storage locker. work includes bike storage racks, security chain link fencing, security gates & doors with card reader access, security cameras, bicycle path striping & new /reconfigured lighting for secure passage.Details
new basement level bike parking secure storage locker. work includes bike storage racks, security chain link fencing, security gates & doors with card reader access, security cameras, bicycle path striping & new /reconfigured lighting for secure passage. | $80,000 |
| Feb 7, 2013 | Completed final sign-off May 2014 | 875 Stevenson St | modification to existing auto sprinkler system: install (n) backflow preventer (basement); upgrade earthquake bracing (basement); relocate (e) sprinklers bsmt. thru 10th floors, per scope of work on plans.Details
modification to existing auto sprinkler system: install (n) backflow preventer (basement); upgrade earthquake bracing (basement); relocate (e) sprinklers bsmt. thru 10th floors, per scope of work on plans. | $118,000 | |
| Dec 7, 2012 | Completed final sign-off Jun 2014 | 875 Stevenson St | Truebeck Construction | mechanical, electrical, and plumbing for core and shell. improvements to coincide with architectural/structural improvement submitted under 2012-0905-8914Details
mechanical, electrical, and plumbing for core and shell. improvements to coincide with architectural/structural improvement submitted under 2012-0905-8914 | $7,000,000 |
| Sep 5, 2012 | Completed final sign-off May 2014 | 875 Stevenson St | Truebeck Construction | interior demo (e) tenant build outs, base building core-shell upgrades & new finishes. exterior envelope renovation of floors 3-10 including. removal of (e) precast concrete panels and replaced with a new glass curtain wall skin.Details
interior demo (e) tenant build outs, base building core-shell upgrades & new finishes. exterior envelope renovation of floors 3-10 including. removal of (e) precast concrete panels and replaced with a new glass curtain wall skin. | $17,000,000 |
| Dec 1, 2011 | Expired or cancelled cancelled Jan 2026 | 875 Stevenson St | ground floor-revision to pa# 2011-0908-4173-reduced scope of work for demolition of interior tenant improvements in un-occupied suite per ab-017Details
ground floor-revision to pa# 2011-0908-4173-reduced scope of work for demolition of interior tenant improvements in un-occupied suite per ab-017 | ||
| Nov 23, 2011 | Expired or cancelled cancelled Jan 2026 | 875 Stevenson St | 2nd floor-demolition of interior tenant improvements in an unoccpied suite, per ab-017Details
2nd floor-demolition of interior tenant improvements in an unoccpied suite, per ab-017 | $95,000 | |
| Sep 29, 2011 | Never finaled issued Sep 2011, no final | 875 Stevenson St | street spaceDetails
street space | ||
| Sep 8, 2011 | Completed final sign-off Dec 2013 | 875 Stevenson St | Truebeck Construction | demolition of interior tenant improvements un-unoccupied suite per ab-017Details
demolition of interior tenant improvements un-unoccupied suite per ab-017 | $70,000 |
| Jun 30, 2010 | Completed final sign-off Oct 2010 | 875 Stevenson St | Sabaria Inc. Dba Usa Glass & Aluminum | to comply with nov 200910021 to change the door closer and the pair of doors to the same kind at main entranceDetails
to comply with nov 200910021 to change the door closer and the pair of doors to the same kind at main entrance | $8,400 |
| Jun 11, 2010 | Completed final sign-off Jul 2010 | 875 Stevenson St | Simplex Grinnell | 4th floor-fire alarm tenant improvement that includes relocation of of 2 (e) speakers/strobes. devices to remain on (e) circuitsDetails
4th floor-fire alarm tenant improvement that includes relocation of of 2 (e) speakers/strobes. devices to remain on (e) circuits | $2,000 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 875 Stevenson St | Plant Construction Company Lp | tenant improvement floor 4. minor demolition. new modular partitioin and finishes for portion of 4th fl. elec outlets rearrangement. deferredd submittals: elec, fire protection, life safetyDetails
tenant improvement floor 4. minor demolition. new modular partitioin and finishes for portion of 4th fl. elec outlets rearrangement. deferredd submittals: elec, fire protection, life safety | $111,688 |
| May 28, 2009 | Completed final sign-off Oct 2009 | 875 Stevenson St | Simplex Grinnell | install 7 new ceiling mounted speaker/strobes on the 6th flDetails
install 7 new ceiling mounted speaker/strobes on the 6th fl | $5,000 |
| May 13, 2009 | Completed final sign-off Jun 2009 | 875 Stevenson St | Ayoob & Peery Plumbing Co Inc | 16th floor relocate 9 fire sprinkler heads per tenant improvement.Details
16th floor relocate 9 fire sprinkler heads per tenant improvement. | $1,350 |
| Apr 9, 2009 | Completed final sign-off Oct 2009 | 875 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 6th/fl. t.i. remodel extg file room for conference rooms. install new doors at conference rooms. build new wall to convert extg conference to resource library.construct new walls at extg shaft walls. sprkr, life safety under seperate permit.Details
6th/fl. t.i. remodel extg file room for conference rooms. install new doors at conference rooms. build new wall to convert extg conference to resource library.construct new walls at extg shaft walls. sprkr, life safety under seperate permit. | $67,000 |
| Apr 7, 2009 | Completed final sign-off Aug 2009 | 875 Stevenson St | Allied Fire Protection | at basement: to replace broken fire pump. 1000 gpm @ 125 psi, diesel pump.Details
at basement: to replace broken fire pump. 1000 gpm @ 125 psi, diesel pump. | $45,300 |
| Mar 16, 2009 | Never finaled issued Mar 2009, no final | 875 Stevenson St | Simplex Grinnell | to obtain final inspeciton for work approved under pa#200611107417. all work complete.Details
to obtain final inspeciton for work approved under pa#200611107417. all work complete. | |
| Feb 25, 2009 | Completed final sign-off Mar 2009 | 875 Stevenson St | Allied Fire Protection | relocate 14 sprinkler heads and add 12 on the 3rd floorDetails
relocate 14 sprinkler heads and add 12 on the 3rd floor | $7,310 |
| Feb 20, 2009 | Completed final sign-off Mar 2009 | 875 Stevenson St | Acco Engineered Systems Inc. Dba Acco En | install 2 heat pump on 3rd floor and vav boxes alsoDetails
install 2 heat pump on 3rd floor and vav boxes also | $70,000 |
| Feb 10, 2009 | Completed final sign-off Mar 2009 | 875 Stevenson St | Simplex Grinnell | 3rd floor install (1) nac extender card (1) smoke detector, (37) speaker - strobes & (4) speakers.Details
3rd floor install (1) nac extender card (1) smoke detector, (37) speaker - strobes & (4) speakers. | $7,000 |
| Feb 3, 2009 | Completed final sign-off Mar 2009 | 875 Stevenson St | Plant Construction Company Lp | 3rd floor revision to appl #200901230739 change in wall type at ncr, server room to be full height. change to opex room wall & ceiling to be hard up w/surface mounted fixtures. chang in the height of the mail room.Details
3rd floor revision to appl #200901230739 change in wall type at ncr, server room to be full height. change to opex room wall & ceiling to be hard up w/surface mounted fixtures. chang in the height of the mail room. | $15,000 |
| Jan 23, 2009 | Completed final sign-off Mar 2009 | 875 Stevenson St | Plant Construction Company Lp | ti floor 3: minor demolition, new partitions and finishes for portion of 3rd fl. elec outlets and lighting rearrangement, relocate door frames and install security locks at existing doors. mep, fire protection/life safety separate permitDetails
ti floor 3: minor demolition, new partitions and finishes for portion of 3rd fl. elec outlets and lighting rearrangement, relocate door frames and install security locks at existing doors. mep, fire protection/life safety separate permit | $500,000 |
| Jan 12, 2009 | Completed final sign-off Mar 2009 | 875 Stevenson St | Simplex Grinnell | 3rd floor-install (1) nac panel, (1) signal zam, (2) smoke detectors, (9) speaker/strobes & (5) strobesDetails
3rd floor-install (1) nac panel, (1) signal zam, (2) smoke detectors, (9) speaker/strobes & (5) strobes | $10,000 |
| Dec 22, 2008 | Completed final sign-off Feb 2009 | 875 Stevenson St | Plant Construction Company Lp | at 3rd fl: t.i. build two walls to create storage/copier rm in breakfast rm area, electrical outlets & lighting rearrangement, install security locks @ exit, doors deferred, mep, firesprinkler, under separate permit. including lightingDetails
at 3rd fl: t.i. build two walls to create storage/copier rm in breakfast rm area, electrical outlets & lighting rearrangement, install security locks @ exit, doors deferred, mep, firesprinkler, under separate permit. including lighting | $60,000 |
| Dec 12, 2008 | Never finaled issued Dec 2008, no final | 875 Stevenson St | street space permit only.Details
street space permit only. | ||
| Nov 18, 2008 | Never finaled issued Nov 2008, no final | 875 Stevenson St | street space permit.Details
street space permit. | ||
| Nov 12, 2008 | Never finaled issued Nov 2008, no final | 875 Stevenson St | street space permit.Details
street space permit. | ||
| Sep 19, 2008 | Never finaled issued Sep 2008, no final | 875 Stevenson St | street space permit only.Details
street space permit only. | ||
| Aug 21, 2008 | Never finaled issued Aug 2008, no final | 875 Stevenson St | street space permit only.Details
street space permit only. | ||
| Feb 8, 2008 | Never finaled issued Feb 2008, no final | 875 Stevenson St | street space for scaffoldDetails
street space for scaffold | ||
| Jan 10, 2008 | Completed final sign-off Jan 2008 | 875 Stevenson St | Richlen Construction | renew pa# 200610033968, 200611218210, 200612280656 for final inspection only.Details
renew pa# 200610033968, 200611218210, 200612280656 for final inspection only. | |
| Apr 23, 2007 | Never finaled issued Apr 2007, no final | 875 Stevenson St | installation of card readers & emergendy pull staition ot elevation lobby doors on 6th floor no other workDetails
installation of card readers & emergendy pull staition ot elevation lobby doors on 6th floor no other work | $10,000 | |
| Feb 22, 2007 | Expired or cancelled expired May 2009 | 875 Stevenson St | Ayoob & Peery Plumbing Co Inc | 6th fl, western mart:relocate fire sprinklers for tenant improvement (278 relocate, 8 new)Details
6th fl, western mart:relocate fire sprinklers for tenant improvement (278 relocate, 8 new) | $92,900 |
| Jan 29, 2007 | Never finaled issued Feb 2007, no final | 875 Stevenson St | Rudolph Commercial Interiors Inc, Rci | oti-2, golden gate regional center, 6/fl, el, me.Details
oti-2, golden gate regional center, 6/fl, el, me. | $475,000 |
| Jan 22, 2007 | Never finaled issued Jan 2007, no final | 875 Stevenson St | Rudolph Commercial Interiors Inc, Rci | 6th floor-demolition-remove (e) soffit at building perimeter and abandoned duct work.Details
6th floor-demolition-remove (e) soffit at building perimeter and abandoned duct work. | $5,600 |
| Jan 18, 2007 | Expired or cancelled expired Feb 2008 | 875 Stevenson St | Simplex Grinnell | 6th floor tenant imporvement, add new fire alarm devices tie into existing facp. slmoke detectora 6, door holders 2, strobes 34, a/vDetails
6th floor tenant imporvement, add new fire alarm devices tie into existing facp. slmoke detectora 6, door holders 2, strobes 34, a/v | $24,575 |
| Dec 28, 2006 | Never finaled issued Dec 2006, no final | 875 Stevenson St | Ayoob & Peery Plumbing Co Inc | alternate spnklr heads in approved locations per app#200611218210 for 6th floor restroom as builtsDetails
alternate spnklr heads in approved locations per app#200611218210 for 6th floor restroom as builts | |
| Dec 15, 2006 | Expired or cancelled expired Sep 2009 | 875 Stevenson St | Rudolph Commercial Interiors Inc, Rci | t.i. remodel vacant office space build new dry wall offices , install all new ceiling and lights, carpet /paint.Details
t.i. remodel vacant office space build new dry wall offices , install all new ceiling and lights, carpet /paint. | $675,000 |
| Nov 21, 2006 | Expired or cancelled expired Apr 2009 | 875 Stevenson St | Ayoob & Peery Plumbing Co Inc | 6th floor-relocate sprinkler heads per tenant improvements-5 relocates.Details
6th floor-relocate sprinkler heads per tenant improvements-5 relocates. | $750 |
| Nov 10, 2006 | Expired or cancelled expired Apr 2009 | 875 Stevenson St | Simplex Grinnell | modify (e) 6 fire alarm system. relocate and demo (e) devices as shown on the drawings. floors:-basement, ground, 6th,7th,8th, 9th,10th & penthouse (2) facp (1) annunciator, (11) pull stations, (15) smoke detectors, (22) heat sensor, (10) duct detector, (26) iam and (12) speaker/strobes, (6) module.Details
modify (e) 6 fire alarm system. relocate and demo (e) devices as shown on the drawings. floors:-basement, ground, 6th,7th,8th, 9th,10th & penthouse (2) facp (1) annunciator, (11) pull stations, (15) smoke detectors, (22) heat sensor, (10) duct detector, (26) iam and (12) speaker/strobes, (6) module. | $170,000 |
| Oct 3, 2006 | Expired or cancelled expired Feb 2008 | 875 Stevenson St | oti-1, 6th floor, el, ls, sp.Details
oti-1, 6th floor, el, ls, sp. | $98,000 | |
| Aug 9, 2006 | Never finaled issued Aug 2006, no final | 875 Stevenson St | demolition of the entire 7th floor, demolition only. accessibility work not required at this time per ab-017Details
demolition of the entire 7th floor, demolition only. accessibility work not required at this time per ab-017 | $25,000 | |
| May 8, 2006 | Expired or cancelled cancelled Dec 2007 | 875 Stevenson St | general notes & key plan listed on drawing #t2.0 which includes all work to be done in entrance lobby. demo constructuion, plans, interior elevations, sections & details. lobby storefront part plans & elevations. entry canopy details, elevation plan sections & detail. structural, mechanical,Details
general notes & key plan listed on drawing #t2.0 which includes all work to be done in entrance lobby. demo constructuion, plans, interior elevations, sections & details. lobby storefront part plans & elevations. entry canopy details, elevation plan sections & detail. structural, mechanical, | $300,000 | |
| Apr 24, 2006 | Expired or cancelled expired Mar 2009 | 875 Stevenson St | demo all interior walls, doors, and glass walls throughout. remove all light track fixtures, sofits and exit signs throughout. remove raised floors. remove all 1x1 grid ceiling lights, down light fixtures , exit signs, sprinkler heads throughout corridor. rmove all carpet on entire floor. removeDetails
demo all interior walls, doors, and glass walls throughout. remove all light track fixtures, sofits and exit signs throughout. remove raised floors. remove all 1x1 grid ceiling lights, down light fixtures , exit signs, sprinkler heads throughout corridor. rmove all carpet on entire floor. remove | $55,000 | |
| Mar 9, 2005 | Expired or cancelled expired Feb 2006 | 875 Stevenson St | demo (e) non load bearing walls, doors, partitions, caseworks, shalving, etc. as shown. (10th floor)Details
demo (e) non load bearing walls, doors, partitions, caseworks, shalving, etc. as shown. (10th floor) | $6,000 | |
| Jun 30, 2004 | Expired or cancelled expired Apr 2005 | 875 Stevenson St | Peninsula Air Condition | install (1) 2 ton server room a/c unit as per plan. mechanical hvac work onlyDetails
install (1) 2 ton server room a/c unit as per plan. mechanical hvac work only | $4,000 |
| Jan 23, 2004 | Completed final sign-off Apr 2004 | 875 Stevenson St | Peninsula Air Condition | mechanical hvac work only-2nd flr add secondary drain pan. apply sound absorbing lagging to exhaustDetails
mechanical hvac work only-2nd flr add secondary drain pan. apply sound absorbing lagging to exhaust | $6,000 |
| May 7, 2003 | Completed final sign-off Aug 2003 | 875 Stevenson St | partitions, carpeting, painting for new tenant move-in idept. of adult & aging services)Details
partitions, carpeting, painting for new tenant move-in idept. of adult & aging services) | $70,000 | |
| Jul 8, 2002 | Completed final sign-off Jul 2002 | 875 Stevenson St | Northern Sun Associates | 9/fl- provide new high opening bwtn #914 & 918 patch & repair at demo location, re-hang (e) doorsDetails
9/fl- provide new high opening bwtn #914 & 918 patch & repair at demo location, re-hang (e) doors | $3,000 |
| Jul 8, 2002 | Completed final sign-off Jul 2002 | 875 Stevenson St | Northern Sun Associates | demo (e)wall @8th flr(#812);provde accssble hardware on entry door,patch & repair at demo locationsDetails
demo (e)wall @8th flr(#812);provde accssble hardware on entry door,patch & repair at demo locations | $5,000 |
| Dec 14, 2001 | Completed final sign-off Jan 2002 | 875 Stevenson St | demolish 40lin.ft. of decorative, non bearing drywall partition/construct 36 lin. ft of partial heigDetails
demolish 40lin.ft. of decorative, non bearing drywall partition/construct 36 lin. ft of partial heig | $2,100 | |
| Jun 28, 2001 | Expired or cancelled expired Dec 2001 | 875 Stevenson St | Mcentee Construction | create opening between spaces 612/614-opening between the walls-cutDetails
create opening between spaces 612/614-opening between the walls-cut | $8,900 |
| May 1, 2001 | Expired or cancelled expired May 2002 | 875 Stevenson St | construction of new counter & demo of one (e)wall (2nd flr)Details
construction of new counter & demo of one (e)wall (2nd flr) | $30,000 | |
| Apr 23, 2001 | Expired or cancelled expired Aug 2001 | 875 Stevenson St | relocate one fire extinguisher w/in (e)tenant spaceDetails
relocate one fire extinguisher w/in (e)tenant space | $815 | |
| Apr 20, 2001 | Expired or cancelled expired Oct 2001 | 875 Stevenson St | const new wall, door and min elect workDetails
const new wall, door and min elect work | $15,500 | |
| Mar 16, 2001 | Expired or cancelled expired Jul 2001 | 875 Stevenson St | cut 4'10' x 4'6" opening in non rated partition wallDetails
cut 4'10' x 4'6" opening in non rated partition wall | $2,112 | |
| Feb 4, 2000 | Expired or cancelled expired Jun 2000 | 875 Stevenson St | Rosendin Electric, Inc. | show sequence of operations on appl.#9920265, 9921958 and 9921959Details
show sequence of operations on appl.#9920265, 9921958 and 9921959 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (41), Siemens Industry, Inc. (21), Truebeck Construction (15), Golden Gate Fire Protection Inc (11), Simplex Grinnell (7), Hupp Signs & Lighting, Inc. (5), Allied Fire Protection (4), Ayoob & Peery Plumbing Co Inc (4), Novo Construction Inc (4), Plant Construction Company Lp (4), Rudolph Commercial Interiors Inc, Rci (4), Thomas Swan Sign Co Inc (3), Acco Engineered Systems Inc. Dba Acco En (2), Incom Mechanical Inc (2), Northern Sun Associates (2), Peninsula Air Condition (2), Richlen Construction (2), Ca United Mechanical, Inc, Mcentee Construction, R L H Fire Protection Inc, R.M.R. Construction Company, Rosendin Electric, Inc., Sabaria Inc. Dba Usa Glass & Aluminum, Specialized Graphics Inc, Tri-Signal Integration Inc., Whiteside Construction Corp., Yerba Buena Builders Inc
- Architects
- James Kirkpatrick (14), Stanley Lew (5), Robbin Mcdonald (4), James Cottrail (2), Willett Moss (2), Darshan Amrit, Hans Rainer Baldauf, Joe Pirrone, Joseph Mendoza Szto Associates, Pak Hui, Rmw Architect, Stanley H. Lew, Steven Curry, Thomas J. Toweg, Yi-Tso Jeff Chen
- Engineers
- Pak Hui (4), Alan C. Burr (3), Justin Schultz (2), Kerry Ettinger (2), Pak Hui (2), Alexander Pacheco, Craig Ristow, Jillian P. Moritz, Kuppe Sprinivas, Lars P. Mortensen, Levi Abarte, Mike Narouzi, Pak Hui, Rachel Schulz, Ray Juachon, Saied Nazeri, Stephen Shafeer, Steven Curry, William Hadinger, Xuong Quach
- Authorized agent-otherss
- Joe Pirrone